1. CONTRACTOR SHALL ENSURE THE NEW ELECTRICAL INSTALLATION COMPLY WITH THE LATEST
CODE OF PRACTICE SS638 AND SS551.
LEGENDS:
2. CONTRACTOR TO PROVIDE VOLT DROP CALCULATION TO ENSURE COMPLIANCE WITH SS638:
2018. ATS AUTOMATIC TRANSFER SWITCH
3. ALL QUANTITIES & RATING SHOWN IN THE SINGLE LINE DIAGRAM IS INDICATIVE AS DESIGN INTENT
ONLY. CONTRACTOR SHALL SUBMIT DETAILED CALCULATION AND PLANT SIZING TO VERIFY THE
SELECTION FOR REVIEW. AIR CIRCUIT BREAKER
TO L4 & L5 OFFICE +
BASE BUILDING SERVICES 4. CONTRACTOR TO SUBMIT BREAKERS & PROTECTIVE RELAY COORDINATION STUDY BASED ON
THE EQUIPMENT OFFERED FOR REVIEW PRIOR TO CONSTRUCTION. THE STUDY SHALL ENSURE
TOTAL DISCRIMINATION IS ACHIEVABLE, ANY RECOMMENDATION IN THE REPORT SUCH AS
RF-EMSB BB BATTERIES
GS-D AT ROOF
NOTES:
GREEN COLOUR SERVICES ARE
PROPOSED CHANGES OF THE CIRCUIT BREAKER FRAME SIZE, ELECTRONIC TRIPPING UNIT, ETC.
SHALL BE INCLUDED IN THE TENDER COST.
3MVA PROVIDED BY BASE BUILT 5. ALL PROTECTIVE RELAY AND BREAKER SETTINGS SHALL BE SUBJECTED TO BUILDING LEW'S
415V, 0.8PF APPROVAL. TRANSFORMER
6. FINISHES OF SWITCH BOARDS, TRANSFORMERS, UPS, PDUS, DISTRIBUTION BOARDS AND CABLE
GD CONTAINMENT. ETC. SHALL SUBJECT TO COLOUR CODING COMPLY WITH CLENT"S STANDARD
E COLOUR CODE REQUIREMENTS TO BE CONFIRMED LATER. MOLDED CASE CIRCUIT BREAKER
BASE BUILDING BASE BUILDING 7. CONTRACTOR SHALL ENGAGE THE BUILDING LEW FOR POWER TURN ON/SHUTDOWN THE POWER
G SUPPLY TO THE INSTALLATION, ENDORSE & SUBMISSION NECESSARY DOCUMENTS TO THE
TRANSFORMER GENERATOR
ROOF L1-BB-TX
(AT ROOF TOP)
GS-BB
(AT ROOF TOP)
RELEVANT AUTHORITIES & LANDLORD.
ISOLATION TRANSFORMER
GS-B
3MVA GB
415V, 0.8PF
LEVEL 5
GS-E
3MVA
415V, 0.8PF
GE
LEVEL 4
GC GS-C
3MVA
415V, 0.8PF
(LEVEL 3 - DATA HALL) (LEVEL 3 - DATA HALL) (LEVEL 3 - DATA HALL) (LEVEL 3 - DATA HALL) (LEVEL 3 - DATA HALL)
PDU-3-E1
PDU-3-E2
PDU-3-E3
PDU-3-E4
PDU-3-C1
PDU-3-C2
PDU-3-A1
PDU-3-A2
PDU-3-C3
PDU-3-B1
PDU-3-B2
PDU-3-B3
PDU-3-D1
PDU-3-D2
PDU-3-D3
PDU-3-D4
PDU-3-A3
PDU-3-A4
UDB-CRAH-2C
UDB-CRAH-3C
UDB-CRAH-2D
UDB-CRAH-3D
TO PDUs AT TO PDUs AT
SPARE
SPARE
TO LB
TO LB
UDB-CRAH-2B
UDB-CRAH-3B
UDB-CRAH-2A
UDB-CRAH-3A
PDU-2-A1
PDU-2-A2
PDU-2-A3
PDU-2-A4
PDU-2-B1
PDU-2-B2
PDU-2-B3
PDU-2-B4
SB-LP-3D
SB-LP-3C
SB-M-3D
SB-M-3C
MCC-02
MCC-03
CUSTOMER:
SPARE
SPARE
SPARE
SPARE
UPS-3-C1 UPS-3-C2 UPS-3-D1 UPS-3-D2
SPARE
SPARE
TO LB
TO LB
ATS ATS
EMSB 3-C EMSB 3-D
AT LEVEL 3 AT LEVEL 3
DEVELOPER / LANDOWNER:
4000A 2000A 2000A 4000A 2000A 2000A
UMSB 2-A UMSB 2-B
E E
AT LEVEL 2 AT LEVEL 2
(LEVEL 2 - DATA HALL) (LEVEL 2 - DATA HALL) (LEVEL 2 - DATA HALL)
SB-LP-2B
SB-LP-2A
SB-M-2B
SB-M-2A
MCC-05
MCC-04
UPS-2-A1 UPS-2-A2 UPS-2-B1 UPS-2-B2
SPARE
SPARE
SPARE
SPARE
PDU-2-C1
PDU-2-C2
PDU-2-C3
PDU-2-C4
PDU-2-D1
PDU-2-D2
PDU-2-D3
PDU-2-D4
PDU-2-E1
PDU-2-E2
PDU-2-E3
PDU-2-E4
DATA CENTRE CONSULTANT :
ATS ATS
EMSB 2-A FROM UMSB 3-C FROM UMSB 1-E EMSB 2-B FROM UMSB 3-D
(AT LEVEL 3) (AT LEVEL 1) (AT LEVEL 3)
LEVEL 2 AT LEVEL 2 AT LEVEL 2
9 BURN ROAD
#08-02 TRIVEX, SINGAPORE 369977
ARCHITECT:
UDB-CRAH-2E
UDB-CRAH-3E
TO LB
LEVEL 2 - DATA HALL LEVEL 3 - DATA HALL CIVIL & STRUCTURAL ENGINEER:
TX-1-Aa BATTERY ROOM A TX-1-Ac BATTERY ROOM C TX-1-Bb BATTERY ROOM B TX-1-Bd BATTERY ROOM D
3MVA AT LEVEL 1 3MVA AT LEVEL 1 3MVA AT LEVEL 1 3MVA AT LEVEL 1
22KV/LV 22KV/LV 22KV/LV 22KV/LV
AT LEVEL 1 AT LEVEL 1 AT LEVEL 1 AT LEVEL 1
SPARE
SPARE
SPARE
SPARE
MECHANICAL & ELECTRICAL ENGINEER:
4000A 2000A 2000A
UMSB 1-E
E
AT LEVEL 1
SB-LP-1E
SB-M-1E
MCC-01
SPARE
SPARE 630A 630A 630A 630A 630A 1250A 1250A 630A 630A 630A 630A 630A
UPS-1-E1 UPS-1-E2 PROJECT TITLE
1250A 1250A
VCB VCB
L1-HTSB-A E L1-HTSB-B E
AT LEVEL 1 AT LEVEL 1
ATS
EMSB 1-E
E
SPPG SPPG
AT LEVEL 1
INCOMING 1 INCOMING 2
5min
LITHIUM
TX-1-Ae ION
BATTERY
3MVA
22KV/LV DRAWING TITLE
LEVEL 1 AT LEVEL 1 BATTERY ROOM E
AT LEVEL 1
PROPOSED ELECTRICAL SCHEMATIC LOW VOLTAGE MAIN
SINGLE LINE DIAGRAM
SCALE DATE DESIGNED DRAWN
NTS 11/11/2022 TJC CCW
819-TW-E-102
DRAWING NO.