CONSTRUCTION DRAWING
CWP COLD WATER PIPE 1. THE DESIGN AND INSTALLATION OF WATER RETICULATION SYSTEM SHALL
NEW COLD WATER PIPE (CWP) COMPLY WITH THE CODE OF PRACTICE FOR WATER SERVICES -SINGAPORE
STANDARD 636 : 2018 AND PUBLIC UTILITIES (WATER SUPPLY) REGULATIONS.
WC WATER CLOSET 2. ALL WATER PIPES ARE LAID AT HIGH LEVEL AND NOT IN FLOOR SLAB.
EXISTING COLD WATER PIPE 3. WHERE THERE ARE CROSSING OF WATER & SOIL/WASTE PIPES, WATER
PIPES SHALL BE INSTALLED ABOVE THE SOIL/WASTE PIPES.
SH SHOWER
4. PIPES AND FITTINGS SHALL COMPLY TO STANDARD STIPULATED BY PUB.
HOT WATER PIPE ( INSULATION ) 5. PIPES THROUGH WATER-TIGHT STRUCTURES & RETAINING WALLS SHALL BE
SK SINK MADE WATER-TIGHT WITH PUDDLE FLANGE AT THE POINT OF PENETRATION.
6. ALL BRASS WATER FITTINGS, EXCEPT EXPOSED TERMINAL DRAW-OFF
WB WASH BASIN FITTING MUST BE OF DEZINCIFICATION-RESISTANT TYPES.
HOT WATER RETURN PIPE ( INSULATION )
7. PIPE SIZES SHOWN ARE NOMINAL IN MILLIMETRES. COPPER AND STAINLESS STEEL
PIPE SIZES SHALL BE EITHER EQUAL OR LARGER THAN SPECIFIED SIZES.
NC NORMALLY CLOSED
WATER FITTINGS WITH MINIMUM 2 TICKS.
GATE VALVE
F/A FROM ABOVE
8. PIPE SIZES TO INDIVIDUAL FITTINGS ARE AS FOLLOWS :
CHECK VALVE
FITTINGS COLD WATER
F/B FROM BELOW
AUTO SENSOR CUM MANUAL WC Ø28
OPERATE FLUSH VALVE WB Ø22
T/A TO ABOVE
SK Ø22
VACUUM BREAKER
TAP Ø15
T/B TO BELOW
BIB TAP
9. MATERIAL OF WATER PIPES SHALL BE AS FOLLOWS :
H/L HIGH LEVEL a. ABOVEGROUND PIPES :
i) Ø67mm & BELOW : COPPER PIPE TO BS EN 1057:1996 TABLE Y WITH BRAZING JOINT
L/L LOW LEVEL ii) ABOVE Ø67 : DUCTILE IRON CEMENT LINED PIPE TO BS EN 545 WITH FLANGED CONNECTION
b. UNDERGROUND PIPES :
i) Ø67mm & BELOW : COPPER PIPE TO BS EN 1057, HEAVY GAUGE WITH BRAZING JOINT
ii) ABOVE Ø67 : DUCTILE IRON CEMENT LINED PIPE TO BS EN 545 WITH FLANGE CONNECTION
10. PIPES SHALL BE CONCEALED IN WALLS UNLESS OTHERWISE STATED. EXPOSED PIPES SHALL BE CHROME-PLATED.
11. PIPES SHALL RUN PARALLEL TO WALLS OR BEAMS, AND SHALL BE NEATLY GROUPED ON COMMON PIPE SUPPORTS.
12. SHOP DRAWINGS SHOWING LOCATIONS OF PIPE SLEEVES SHALL BE SUBMITTED BEFORE CONSTRUCTION.
4 5 6 7 8 9 10 11 12 13 14 15 16
/ / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / /
/ / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / /
/ / / / / / / / / / / / / / /
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
K
/
/
/
L
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
ELEC
/
/
/
/
AC
/
/
/
/
/
/
/
/
/
M
/
/
/
/
/
VP
/
/
/
/
/
/
/
/
J
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
NARROW
/
/
I
PS
/
/
/
SITE PLAN
/
SCALE : 1:150
/
/
/
/
N
/
/
H
/
/
/
/
ACRYLIC PANEL
/
0 CONSTRUCTION DRAWING JUNE'22
/
/
/
/
DB
/
/
/
/
REV DESCRIPTION DATE
/
/
/
/
/
DB
AC
/
/
/
DB
Owner
/
/
MOUNT ROSIE ROAD
/
/
/
/
/
/
/
G
/
/
/
/
/
/
/
O
/
/
/
/
/
/
ACRYLIC PANEL
/
/
/
/
/
/
/
/
/
F
/
/
ARCHITECT:
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
RT+Q
ARCHITECTS PTE LTD
/
/
/
/
/
/
/
20
Singapore 059510
/
/
/
/
/
/
/
/
/
/
/
/
M&E CONSULTANT :
/
/
/
/
/
/
18
/
/
/
/
/
/
/
/
/
/
/
/
/ 17
/
/
/
/
/
/
/
/
D
/
/
/
/
1 Pemimpin Drive,
/
/
/
/
/
/
/
/
/
/
/
VP
/
/
/
/
/
/
/
Singapore 576151
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
Email: info@kunda.com.sg
/
C
/
/
/
/
/
Project Title :
/
AREA), SINGAPORE
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
Drawing Title :
/
/
/
/
/
/
/
/
/
/
/
/
PLUMBING SERVICES
/
/
/
/
/
/
/
/
/
/
/
/
/
/
758
/
/
/
/
/
/
/
/
/
SITE PLAN
/
/
/
/
/
N S 15
/
N
9
T
TBM L...10.
Designed : Checked :
AY MK
O
Scale:
AS SHOWN
Drawing No. : Rev.
P2037-PS-100 0
THE OWNERSHIP OF THE COPYRIGHT IN THIS DRAWING IS RETAINED BY KUNDA CONSULTING
ENGINEERS WHOSE CONSENT MUST BE SOUGHT BEFORE ANY USE OR REPRODUCTION OF
THE DRAWING OR ANY PART THEREOF CAN BE MADE