1)Contractor to make sure all fittings and pipes to be painted according

to approved painting procedure before installation.


2)sleeves need to be replaced by ERW galvanized pipe as per project
specifications & approved method statement.
3)for groove connection bolt nuts shall be head down to allow Abanob Saad
tightening and torque inspection.
4)Contractor to provide calibrated torque wrench for inspection.
5)Missing spools shall be added at first fix inspection to minimize
second fix installation as possible.
6)final approval subject to pressure test inspection.

Khaled Shehata 08/08/2023


KEY PLAN:
12
L 120 50 12 SCHEDULE
ITEM DESCRIPTION QUANTITY

12
2050 8300 9600
No:
D01 D01 D01 65mm LANDING VALVE RESTRICTION 1 NORTH

r
───── ───── ───── 1. /REDUCING TYPE FIRE WHERE REQ.

50
PIPE DIAMETER SCHEDULE

220
T11 T12 T13
2. CABINET-(BACK BOX) 1

12
FIRE RISER 3. 40mm/65mmx30mtr. FIRE HOSE 1 PIPE DIAMETER SPRINKLER NUMBER D01M D01
0.5% 0.5%
4. Ø65mm ADJUSTABLE NOZZLE 1
1 in. (25 mm) 2 sprinklers D02M D02
5. HOSE VALVE 1

to
STRUCTURE SLAB EXPANSION BOLT

W
6. 25mmx30mtr. HOSE REEL ASSY. 1 1 1 ⁄ 4 in. (32 mm) 3 sprinklers
7. MULTIPURPOSE ABC EXTINGUISHER 1 1 1 ⁄ 2 in. (40 mm) 5 sprinklers

150

VARIES
500

500
D01 D01

510
───── ───── 8. Ø65mm FIRE STANDPIPE CONNECTION 1 2 in. (50 mm) 10 sprinklers

941

936
T01
1520 1580 1580 1520
T01
Ø65mm FIRE STANDPIPE 1
Typical details
9. HANGER ROD

2110
1 should be 2 1 ⁄ 2 in. (65 mm) 30 sprinklers
10. FIRE HOSE STATION CABINET

1600
599
DN25,BOP+2920
581 4520
submitted 3 in. (80 mm) 60 sprinklers
separately for

2405

2400
01
CONC.LINTEL 4 in. (100 mm) -
DN25,BOP+3180
20 150 approval Ø25MM ELBOW
DN25,BOP+2920 DN25,BOP+3180
01

SECTIONAL PLAN-TOP VIEW MS 'Z' ANGLE PLATE


DN25,BOP+3080 1520 1580 DN25,BOP+3080 NOTE: PIPE DIAMETER SCHEDULE ACCORDING TO
DN25,BOP+3080
DN40,BOP+3080
DN25,BOP+3080 MS BOX VARIES
NFPA 13 - CHAPTER 27.5

VARIES
425

425
3160 DN25,BOP+3080

3160
1580 1520
SECTION FRAME IN
7000

7000
BRANCH LINE

di
0.5%

470

470
ANTIRUST PRIME FINISH Ø25MM DROPPED

970
DN40,BOP+3080

0.5%
D-2-E-1 DN50,BOP+3070 D-2-E-2
L

4016
560 542 1250 648 545 562
DN25,BOP+3080 T01
DN25,BOP+3080
DN50,BOP+3070
Ø25MM X Ø15MM NIPPLE
DN25,BOP+3080

100
1470

1470
Fixation details REDUCER SPRINKLER SCHEDULE OF L04-ZVA-01

970
DN25,BOP+3080 DN50,BOP+3070
DN25,BOP+2920 DN50,BOP+3070 DN25,BOP+2830 DN25,BOP+2920
DN25,COP+3100 mm FIRE PIPE should be
FALSE CEILING

219
DN50,BOP+3070
SPRINKLER TYPE SPRINKLER QUANTITY
1790

1790
310 4770 580 600
DN50,BOP+3070 submitted to Arch
DN25,BOP+3080 620 578
CONCEALED TYPE COVER PLATE TOWER KEY PLAN

830
DN25,BOP+2730
DN50,BOP+2830
255 852
DN25,COP+2760 mm team for approval PENDENT SPRINKLER 164
D01 Drain Valve D01 SPRINKLER HEAD
───── DN50,BOP+2580
DN25,BOP+2590
───── UPRIGHT SPRINKLER 5
T02 T02
DN50,BOP+2830 SIDEWALL SPRINKLER 38

3205
1800

1800
EXTENDED COVERAGE

1880
DN25,BOP+2920 DN65,BOP+2570
840 210 3600 310
SELF TAPPING 17

E
DN25,BOP+2920 SIDE WALL SPRINKLER DN25 COP+2800mm
310 3600 260 790 SCREW
1740 1060
NOTE: FINAL SPRINKLER TYPE SHALL BASED ON APPROVED MATERIAL SUBMITTAL.
690

DN25,BOP+2730 DN25,BOP+2590 DN50,BOP+3070 DN25,BOP+2730


1060 1740
DN50,BOP+2790 NOTE: 1.THE SPRINKLER FINAL LOCATION WILL FOLLOW ELEVATION
missing sprinkler DN25,BOP+3080
FALSE CEILING REFLECTION DRAWING. CENTER OF PIPE

1750
1800

DN32,BOP+3080
DN50,BOP+2790
DN50,BOP+2580 DN32,BOP+3080 STAINLESS TYPICAL DETAIL OF 2.FINAL SPRINKLER COVERAGE SHALL REFER TO PIPE SIZE
STEEL COVER
2010

2010
CONCEALED PENDENT SPRINKLER HEAD CONNECTION APPROVED MATERIAL SUBMITTAL.
7800

7800
0.5%

DN32,BOP+3080

0.5%
4000

DN25,BOP+3080 DN32,BOP+3080 SCALE: 1:10


1240 1145
01

1540
1515

DN25,BOP+3080

576
575

1140 1245
DN25,BOP+3080
DN25,BOP+2920
1051 1051
1070

1075
DN25,BOP+2920
935 1450 1445 940

2110

H
2085

DN25,BOP+2830 3450 310


DN25,BOP+2760 DN25,BOP+2770
310 3450
DOOR LOCK
1179

1174

F
D01 D01
───── ─────
T03 T03
4000

12MM THICK CEMENT BOARD

220

220
Ø65 STAND PIPE
790

1230

23 3630 310
FIRE CONNECTION WITH PAINT FINISH
1700

1702

2025
DN25,BOP+2760 DN25,BOP+2740
DN25,BOP+2920
905 895
(1 HR FIRE RATED THIS CEMENT BOARD
310 3630 1209 1886 875
WALL DESIGNED AND INSTALLED BY LEGEND
1669

1000

DN25,BOP+2920
D-1-A-1 DN25,BOP+2810 OTHER TEAM AS PER 25mm. MIN.
DN25,BOP+3080
DWG-CSCEC-D00-FD-AR-AR-09-GL-00-0003-00) EXPANSION BOLT EXPANSION BOLT STRUCTURE SLAB
1268

DN25,BOP+2820 DN32,BOP+3080
295

STRUCTURE SLAB 300mm. MAX.


560
1700

DN50,BOP+2810 DOOR LOCK SYMBOLS DESCRIPTIONS


1475

1627 1100
511

01
635 213
HANGER ROD

VARIES

D
900

DN32,BOP+3080
510

01

150mm. MIN.

VARIES
DN32,BOP+3080 DN25,BOP+3080
DN50,BOP+2850 DN50,BOP+3070 SP-1 PENDENT RECESSED SPRINKLER
0.5%

0.5%
7800

7800
215

DN25,BOP+3080
DN50,BOP+3070 450mm. MAX. CONCEALED TYPE SP-2 UPRIGHT SPRINKLER
4000

HANGER ROD
855

should be as per SPRINKLER HEAD

VARIES
1585

1700

DN80,BOP+2570
1850

220 820

DN25,BOP+3080 SP-3 SIDE WALL SPRINKLER


200 805
the sprinkler

680
DN25,BOP+3080
BRANCH LINE Ø25MM X Ø15MM
270

manufacturer's SIDE WALL REDUCER SP-4 EXTENDED COVERAGE SIDE WALL SPRINKLER
310 2195
DN25,BOP+2920
VARIES
DN25,BOP+2830 DN25,BOP+2920
1210 1320 5020 D-1-B-1 310
instruction SPRINKLER
Ø25MM DROPPED NOTES
N0
1900

1850
1845

N0

Ø25MM X Ø15MM NIPPLE VARIES


REDUCER

100
SECTION 1- ALL PIPE LEVELS ARE MEASURED FROM FINISHED FLOOR LEVEL,
DN80,BOP+2570 Ø25MM ELBOW BRANCH LINE
DN40,BOP+1720 AND ALL PIPE LEVELS ARE IN METER.
1350

rP
D01 D01
───── DN65,BOP+850 ─────
CEILING BOARD
FALSE CEILING

300
T04 ∅ 150mm INTERMEDIATE ZONE FIRE T04
4000

STANDPIPE FROM 4TH FLOOR TO


2- ALL EQUIPMENT ,PIPES AND FITTINGS ARE AS PER SPECIFICATIONS
275

1029

12TH FLOOR
MS 'Z' ANGLE
∅ 150mm HIGH ZONE FIRE
180 720 1505 825
AND APPROVED MATERIAL SUBMITTAL.
1970
2000

STANDPIPE FROM 13TH FLOOR TO DN25,BOP+2750


PLATE
550

F.F.L.
1856

26TH FLOOR FHC CLASS 3 30 3095 310 F.F.L. 3- TOWER AREA (4F-54F) TO BE LIGHT HAZARD CLASSIFICATION.
L04-FHC-03
215 535

300 900
01

NOTE: FINAL SIZE OF FIRE HOSE CABINET SHALL BE BASED ON APPROVED MATERIAL SUBMITTAL.
DN25,BOP+2920 DN25,BOP+2920
4- PENDENT SPRINKLERS TO BE ADDED WHEN TOILET AREA EXCEED 5.1㎡.
DN25,BOP+3080
DN25,BOP+2800 TYPICAL DETAIL OF NOTE: FINAL SPRINKLER TYPE SHALL BASED ON APPROVED MATERIAL SUBMITTAL.
1629
515

NOTE: DISTANCE BETWEEN BOTTOM OF CONCRETE SLAB AND SPRINKLER


730
2000

425 775 FIRE HOSE CABINET-CLASS 3 PROJECT NAME:


310 2545 335 1920 1150 HEAD DEFLECTOR SHALL BE 150mm MINIMUM TO 450mm MAXIMUM.
DN25,BOP+3080 DN25,BOP+3080 SCALE: 1:10
7800

7800
0.5%

0.5%

01

DN40,BOP+3080

Alamein Downtown Towers


1882

DN50,BOP+3070
1580

DN50,BOP+2820 305 320


4000

DN32,BOP+3080
TYPICAL DETAIL OF
1800

DN80,BOP+2570
1920 1275 DN32,BOP+3080
DN25,BOP+2920
TYPICAL DETAIL OF UPRIGHT SPRINKLER HEAD CONNECTION
563

DN25,BOP+3080
DN25,BOP+2750 5.51m2 SIDEWALL SPRINKLER HEAD CONNECTION SCALE: 1:10
1170

253

575 575 3515 310


DN25,BOP+2920 DN40,BOP+3080

220
310 3720 430 450
SCALE: 1:10
2228

DN25,BOP+2800 DN25,BOP+2820
DN50,BOP+2810
640

1547

DN25,BOP+3080 820 775


CLIENT:
3641

te
D01 D01
───── DN25,BOP+2780 ─────
T05 T05 STRUCTURE SLAB EXPANSION BOLT
295

POST TENSION
2215

PIPE SLEEVE
Ministry of Housing, Utilities
4000

220 805
SEALANT STRUCTURE SLAB
906

DN25,BOP+3080
STEEL BAR
1885

VARIES
DN25,BOP+3080
RCC SLAB PACKING MATERIAL
2190 1555 4755 310

& Urban Communities


0.5%

1320

0.5%

1000 570 DUCT HANGER ROD


DN25,BOP+3080 DN25,BOP+2920 FFL
FOR DUCT
315

DN32,BOP+2850 DN25,BOP+3080 SEALANT

220
220
DN25,BOP+2920 DN25,BOP+2850 D-2-A-5 FIBERGLASS 200 200
2280

INSULATION
1590

1590

DN32,BOP+3080 DN25,BOP+2730

PIPE SLEEVE
2730

1452 1765 ANGLE FOR DUCT


7800

7800

PACKING MATERIAL
DN25,BOP+3080 DN50,BOP+2780 HANGER ROD WALL MARK New Urban Communities
750

DN40,BOP+3080 EXPANSION BOLT


DN25,BOP+2920 FOR FIRE PIPE EXPANSION BOLT
Authority

VARIES
1690
4000

VARIES
1905

as
DN50,BOP+3070 2190 1555 4755 310
DN25,BOP+3080
HANGER ROD ANGLE FOR FIRE PIPE
D-2-B-1
DN25,BOP+2790
310 4380 DN100,BOP+2540 CLAMP
0.5%

DN25,BOP+2790

VARIES
VARIES
0.5%

THE ENGINEER:
2150

DN25,BOP+2920 SPRINKLER PIPE


D-2-A-4 TYPICAL DETAIL OF U BAR HANGER ROD
1985

PIPE SLEEVES THROUGH FLOOR / WALL


1770

Coverage area should be verified to meet NFPA 13 HANGER ROD


SCALE : NTS
Submit composite shaft layouts and elevations details
D01 D01
Fixed (rigid) Supports to be provided at the end of each branch line NOTE: PIPE SLEEVE TO BE RESERVED WHEN PIPE GO THROUGH CONCRETE SLAB OR
───── ─────
CONCRETE WALL, OPENNING TO BE RESERVED WHEN PIPE GO THROUGH BRICK WALL. CLAMP CLAMP
T06 T06
Sprinkler locations to be as per the final RCP drawings TYPICAL DETAIL OF
Shair & Partners
320

PIPE HANGER UNDER DUCT


Test and drain connection and to be connected to nearest drain SPRINKLER PIPE SPRINKLER PIPE
1301

820 775
4000

1370

NTS
310 3720 277 1550
640 3515 310
please follow the IFC typical details CONTRACTOR:
1431

1945

7800 7800 7800 7800 9100 650

H
H
DN25,BOP+2920
305

DN25,BOP+2760

D
D
700

DN25,BOP+2800 D01 D01 D01 D01 D01 D01


DN25,BOP+2630 DN32,BOP+3080 ───── ───── ───── ───── ───── ─────
1925 1270
T14 T15 T16 T17 T18 T19
DN25,BOP+2920 DN25,BOP+3080 DN32,BOP+3080
1675
834
1420

222 780 DN50,BOP+2810 DN50,BOP+3070 345 280


DN25,BOP+3080
0.5%
1816
240

1375 1911

DN25,BOP+3080
FE2 should be provided
M
0.5%
7750

DN40,BOP+3080
DN25,BOP+3080 DN50,BOP+3070 DN25,BOP+3080 outside electrical and telecom rooms
425 775
PIPE HANGER SCHEDULE
DN50,BOP+2780 01

Provide FE 3 in the corridor in case the FE in 0.5%


0.5%
REFERENCE TABLE:
1565

0.5
1755

DN40,BOP+3080
520

%
1765

DN40,BOP+3080 0.5%
DN25,BOP+3080 OUTER Max. HANGER HANGER
4000

the FHC 3 not sufficient to cover the whole


220

DN25,BOP+2920
DN25,BOP+2740 DN25,BOP+3080
300 900
21 3105 310
0.5%
0.5%
PIPE SIZE DIAMETER(D) SPACING [m] Rod Size H HANGER TYPE Type No. Ref. No. Date
floor
580

310 4380 2180 1940 DN25,BOP+3080 DN25,BOP+2920 1 SHD-CSCEC-D01-AR-AR-01-04-00-0001-0000-01 10-10-2022


DN25,BOP+3080 1 inch 33.4 3.7 M10 60 SWIVEL HANGER
470

DN25,BOP+2780 2 SHD-CSCEC-D01-ST-SC-04-04-01-0001-0000-01 01-08-2022


1860

1 1 ⁄ 4 inch 42.2 3.7 M10 70 SWIVEL HANGER


1760

2120

D-1-C-1
310

310

310

310

310

310

310

310

310

310
1505 825
3 DWG-CSCEC-D00-FD-AR-ID-13-ML-00-0001-00 SEP. 2022
1254

1 1 ⁄ 2 inch 48.3 4.6 M10 79 SWIVEL HANGER 4 DWG-CSCEC-D01-FD-ME-FF-01-ML-00-0001-00 AUG. 2022

1195
DN25,BOP+2810
D01 DN25,BOP+2730 DN25,BOP+2920 D01 2 inch 60.3 4.6 M10 96 SWIVEL HANGER 5 DWG-CSCEC-D00-FD-ME-FF-04-00-00-0000-00 AUG. 2022
───── 600 580 ─────
T07

160
T07 Drawings
2 1 ⁄ 2 inch 73 4.6 M10 118 SWIVEL HANGER 6 DWG-CSCEC-D00-FD-ME-FF-05-00-00-0000-00 AUG. 2022

3300

3300
3305
1266

AUG. 2022
3690

3690
3695

3 inch 88.9 4.6 M10 138 SWIVEL HANGER 7 DWG-CSCEC-D01-FD-ME-FF-02-ML-00-0001-00


1055

1100

DN25,BOP+2740 DN100,BOP+2540
4000

4568

4568

4570
1160 1170
725 1650 1470 1480 8 DWG-CSCEC-D01-FD-ME-FF-02-ML-00-0002-00 AUG. 2022
D-2-A-1 D-2-A-1 D-2-A-2 D-3-C-1
4 inch 114.3 4.6 M12 192 CLEVIS HANGER

2680
DN25,BOP+3090
820

2130 1620 1975 1975 3370 660


9 DWG-CSCEC-D01-FD-ME-FF-02-ML-00-0003-00 AUG. 2022
1975 1975
310 3570 DN25,BOP+2930
1660 1665 1660 1665
9 DWG-CSCEC-D01-FD-ME-FF-02-ML-00-0004-00 AUG. 2022
DN25,BOP+2920 1560 1 1564
DN25,BOP+2920 NOTE: PIPE DIAMETER AND HANGER SPACING ARE ACCORDING TO NFPA13
in
DN25,BOP+2920
685

1
336 935 600 580 10 DWG-CSCEC-D01-FD-ME-FF-02-ML-00-0005-00 AUG. 2022

323 323
305 340

DN25,BOP+2920 DN25,BOP+2920 DN25,BOP+2920


965

970

970
DN25,BOP+2920 DN25,BOP+3080
AND APPROVED MATERIAL SUBMITTAL.
215

660
655

01
1825 1825
DN25,BOP+2730 01
1788 1787 1788 1787 DN25,BOP+2740 DN25,BOP+2750

320
01
01 DN25,BOP+2730 11 DWG-CSCEC-D01-FD-ME-FF-02-ML-00-0006-00 AUG. 2022
320

635 635 DN32,BOP+3090 01

0.5%
3995

01

EXPANSION BOLT SHALL AVOID DAMAGING POST TENSION STEEL BAR.


4005

DN25,BOP+2920
1078 580 DN25,BOP+2920 DN25,BOP+2920 DN25,BOP+3090 535 1105
1123 485
DN32,BOP+3090 DN50,BOP+3080 DN25,BOP+2920 12 DWG-CSCEC-D01-FD-ME-FF-02-ML-00-0007-00 AUG. 2022
581

DN25,BOP+2810
600

580
DN32,BOP+3090 DN32,BOP+3090
901

1346
890
DN25,BOP+3090
900

DN25,BOP+3090
1000

1000
1344
1365

620 3221 3013 1787 DN25,BOP+3090 1359


01
DN40,BOP+3090 DETAIL OF SWIVEL HANGER 13 DWG-CSCEC-D01-FD-ME-FF-02-ML-00-0008-00 AUG. 2022
8600

8600
535 215 DN25,BOP+3090 DN25,BOP+3090 535 200 610 3292 700
DN25,BOP+3080
620

590
600
2024

SCALE: 1:10

310
300

300

DN25,BOP+3090 AUG. 2022


2232

2230
2237

14

3310
DN50,BOP+3080 DN25,BOP+2780 725 3275 785 215 535 DN40,BOP+3090 DWG-CSCEC-D01-FD-ME-FF-02-ML-00-0009-00
DN25,BOP+2930
DN25,BOP+2930 DN40,BOP+3090 DN25,BOP+2760 DN40,BOP+3090 DN40,BOP+3090 15
4000

1215 1635 DN50,BOP+3080 DN25,BOP+3090


1470 1480 DN25,BOP+3090 DN25,BOP+2730 DN40,BOP+3080
1950

1950

1655
16
1800

DN50,BOP+3080 725 1650 DN25,BOP+3080


DN50,BOP+3080 DN50,BOP+2790 DN25,BOP+2780
800

DN25,BOP+2920 1825 1825


795

1760 1815 1135 1790


DN25,BOP+2480
DN25,BOP+2550 DN25,BOP+3080
595 605
DN25,BOP+2780 17
DN25,BOP+3080 DN25,BOP+3120
2015

1600

1600
1595

18
0.5%

310 3895

1205
1050 1502
01
DN32,BOP+3090 1

1646
620 580
DN50,BOP+3070 DN25,BOP+3080
1800

INDICATING TYPE FLOW CONTROL VALVE Documents 2


DN100,BOP+2540 DN50,BOP+2840 DN50,BOP+3080
DN25,BOP+2740 DN50,BOP+2790 WITH SUPERVISORY SWITCH

836
DN25,BOP+2520 DN65,BOP+2560 3

1050
1053

1053

1053
2738 4000 4000 4000 4000 4000 4000 4000 4000 4000 4000 4000 3600 997
1280

DN25,BOP+2810 DN25,BOP+2810 DN25,BOP+2800 DN25,BOP+2960 DN25,BOP+2800


D01 DN25,BOP+2780 DN25,BOP+2830 DN25,BOP+2780 DN25,BOP+2860 D01
DN25,BOP+2830 DN25,BOP+2860 DN100,BOP+2540
───── DN25,BOP+2800 DN25,BOP+2780 DN100,BOP+2540
DN65,BOP+3060
1785 2400
─────
CHECK VALVE COORDINATION TABLE:

820
T08 DN25,BOP+2790 DN100,BOP+2540 DN100,BOP+2540 DN100,BOP+2540 T08
ed

DN100,BOP+2540 DN25,BOP+2910
1047

1047

1047
DN100,BOP+2540
PRESSURE GAUGE
4000

1956
DN32,BOP+2780
DN25,BOP+2800 DN25,BOP+2800 DN50,BOP+2790 DN25,BOP+2820 Discipline Signature Date
DN25,BOP+2790 DN25,BOP+3080

440
DN32,BOP+2780
2210 BALL VALVE
1815

740 305 2405 360 A.R.-A.R. Magdy Allam

1356
310 4770 2050 1680 DN25,BOP+2560 ∅ 150mm HIGH ZONE (1) FIRE RISER DN50,BOP+2790 710 200

Magdy Allam

50
FHC CLASS 3
865

A.R.-A.I.

1040
975

FEEDING FROM 13RD FLOOR TO


DN25,BOP+2920 DN25,BOP+2730 L04-FHC-02 553 600
26TH FLOOR FEEDING ODD
1564

DN25,BOP+2920
1570

1570
1996

DN25,BOP+3080 DN25,BOP+3080
DN25,BOP+2810 WATER FLOW
1795

DN65,BOP+850 NUMBER OF FLOORS DN50,BOP+2370 S.C.


140
2305

455

DN25,BOP+1720 ∅ 150mm INTERMEDIATE ZONE FIRE RISER DN25,BOP+3080 1810 1765 DN25,BOP+3080

1915
140

390 1110

Ø150MM MAIN WET RISER


1764 1810
1245 205
SWITCH S.S.

888
FEEDING FROM 4TH FLOOR TO 12TH FLOOR

1644

Ø80MM DRAIN DRY RISER


645 655 425 1025
DN25,BOP+2830 DN65,BOP+2560 DN25,BOP+3080
405 300 260

DN25,BOP+3080 DN25,BOP+2680
1810

1810

D-2-A-3 DN65,BOP+2760 FEEDING ODD NUMBER OF FLOORS 1390 777


1950

1950

DN50,BOP+3070
DN25,BOP+3080 E.L. Li YONG
∅ 80mm DRAIN FIRE STANDPIPE DN25,BOP+3080
1250

1120 2830 1200


P.L. Jie YuanQing

887
DN25,BOP+2750 FHC CLASS 3

0.5%
∅ 150mm INTERMEDIATE ZONE FIRE RISER
Ø100MM Ø100MM
2265

2265
N0

N0

L04-FHC-01
300

300

305 970 DN40,BOP+3080 DN25,BOP+2740 FEEDING FROM 4TH FLOOR TO 12TH FLOOR Li Yang
3000

2080

HVAC
2105

215 535
DN50,BOP+3070
600
620

1230
8600

8600
FEEDING EVEN NUMBER OF FLOORS
1620
585

DN25,BOP+2920 535 215 DN25,BOP+3080


DN50,BOP+3070 DN40,BOP+3080 DN100,BOP+2540
1360

1360

DN25,BOP+3080 Mo Yan
1000

1000

FAC
1140

DN25,BOP+3080
1070

900

900

920
DN25,BOP+3080 DN25,BOP+3080 L04-ZVA-01
600
580

DN32,BOP+3080 715 3217 680 DN25,BOP+2920 ∅ 150mm HIGH ZONE (1) FIRE RISER DN25,BOP+3080
325 3613 20
1043 1160 DN25,BOP+2780 1058 555
DN25,BOP+2920 730 3385 670 DN25,BOP+2730
DN25,BOP+2780 FEEDING FROM 13RD FLOOR TO 26TH FLOOR OTHER
N0

N0

1200 1210
DN25,BOP+2730 1785 1790 FEEDING EVEN NUMBER OF FLOORS TO SPRINKLER SYSTEM

1149
312 323

312 323

540

1230 1260
600

DN25,BOP+2750 485 471

1004
DN25,BOP+3090 MECHANICAL TEE REVISION TABLE:
1100
920

923

1050 1050 DN25,BOP+2920 DN25,BOP+2920 ∅ 80mm DRAINE STANDPIPE DN25,BOP+3080


550
1020

DN25,BOP+3080 DN25,BOP+2920 01
1640
01
1635 DN25,BOP+2920
635

1635 1690
900 300
UNION
3535

1720 2280

745
2130 1620 01 DN25,BOP+3080
215

1675

DN25,BOP+2780
Ø25MM Ø25MM

1751
DN40,BOP+3090

275
DN65,BOP+3070 DN25,BOP+2920
at

DN25,BOP+3090 DN25,BOP+2780
4565

4565

805 1092
1215

1740 1738
01
DN25,BOP+2920
1135

3700

DN50,BOP+3080
3800

DN25,BOP+3090
3350

3345

3610 1040 415 1363


3731 565 475
TEST & DRAIN VALVE 02

2481
1315

600 600
430

D01 DN25,BOP+2920 DN25,BOP+3090 D-2-A-1 D-2-A-1


D01
1875

─────
1750
───── WITH SIGHT GLASS & STOP VALVE 01 01 FOR APPROVAL 01-03-2023 CaoQing
1115

T09 825 825 T09


DN65,BOP+3070 DN25,BOP+3090
DN40,BOP+3090 DN50,BOP+3080 00 FOR APPROVAL 11-26-2022 CaoQing
2540

DN25,BOP+3090 DN50,BOP+3080 DN40,BOP+3090


DN25,BOP+3090
0.5%

DN25,BOP+3090
1115

1115

No. Description Date App.


605

445

445

455

310

310

310

310

310

310

310
210

DN25,BOP+2760 DN25,BOP+3090 DN25,BOP+2760 DN25,BOP+3090 DN25,BOP+3090 DN32,BOP+3090


1480 4230 3107 3130
DN25,BOP+3090
1288 1565 TYPICAL DETAIL OF
583

583

570
595

DRAWING TITLE:
500

500

DN25,BOP+3090 DN25,BOP+2920 DN25,BOP+2920


DN25,BOP+2920
DN25,BOP+2920
DN25,BOP+2920 make it right hand 0.5%
0.5% ZONE VALVE ASSEMBLY(ZVA)
349 370

800 4200 4200 798


310 390 3895 868
01

DN25,BOP+2920
side open and 0.5%
NTS
%
5850

5850
0.5
coordinate with the
5239

2110 2089

shaft access door


0.5%

Restudy the FHC


3400
re 3260

D01 - RESIDENTIAL TOWER


3697

location with your


2560

D-3-J-1

designer M/S 4th FLOOR PLAN FIRE


shaker
D01 D01
FIGHTING SYSTEM LAYOUT
610

610

310

310

───── ─────
450

450
T10 T10

Designed Checked Approved


18/1/2023
0.5%
0.5% Z.H.L C.Q BEN

D01 D01 D01 D01 D01 D01 D01 D01 D01


───── ───── ───── ───── ───── ───── ───── ───── ───── Drawn Date Scale
T11 T12 T13 T14 T15 T16 T17 T18 T19

2050 8300 9600 8550 7800 7800 7800 7800 9100 650
L.Y 11-26-2022 1:100

SHD-CSCEC-D01-ME-FF-01-04-00-0001-0000-01
Document Part Sheet Sequence
Contractor Building Trade Discipline Elements Floor Level No. Rev.
Type No. No.
r
i to
Date: 12 Feb,2023
Request no: MST-CSCEC-ALA-ME-FF-0008-02

Ed
Contractor:
,\rJ:J Re�ubl,c of E,tvpt
Mi., �lry �f Ho•.;�rn&, Ut,l,fil"s Jncl Urban C.Jrr'1'un ti,�5
.,....._..,l'·r. New Urban Communities Authority
,--:

F
1. Document type

0 Material samples D Catalogues D Tests 0 Technical sheets

PD
0 Manufacturer certificates 0 Schedules D Other
2. Submittal details
Contract doc. Ref. &
Item no. ! Description of items submitted/ quantity Ref.
compliances
i Method of Statement for ERW piping Installation of
firefighting system
te r
as

These are transmitted for:


D D Approval D
□/7
Your information Review & comment

i� -�
_/
Submitted by: Salim Basbous / Eslam Abdelfattah Signature: I . \ ...... '
nM

3. Engineeer's Representative comments:

D Approved Subject to verification of the implementation of the control measure mentioned in the
risk assessment at the site
D Approved as noted KHALED AWAD
ME: Calibrated torque wrench should be used to tighten the
21/2/2023
D Revise & resubmit bolts of the grooved coupling. Follow the NFPA, project specification,
di

and Egyptian code requirements.


D Rejected
D Others
Signature: Date: 22/2/2023
a te

Approval shall not relieve Contractor of his liabilities under the Contract or constitute authorization of any change to Contract Documents.

dar
re

S-PRC-SS-02 (F43) Rev 2


r
Transmittal Of Documents

i to
Date: 22/Feb/2023
Request no: MST-CSCEC-ALA-ME-FF-0010-00

Ed
Project No. & Title: E21110-0100S - Alamein Downtown Towers

Employer: Engineer: Contractor:

DF
1. Document type

Material samples Catalogues Tests Technical sheets


Manufacturer certificates Schedules Other

2. Submittal details

rP
Contract doc. Ref. &
Item no. Description of items submitted/ quantity Ref.
compliances
1 Method statement for Sandblasting and Painting of
FF&HVAC pipes
te
as

These are transmitted for:


Your information Approval Review & comment Other
M

Submitted by: David Ebrahim Signature: David Ibrahim

3. Engineeer's Representative comments:


Subject to verification of the implementation of the control measure mentioned in
in

Approved
the risk assessment at the site
Approved as noted
khaled awad
22/2/2023
Revise & resubmit
ed

Rejected

Others

Signature: Date :
at

Approval shall not relieve Contractor of his liabilities under the Contract or constitute authorization of any change to Contract Documents.
re

S-PRC-SS-02 (F43) Rev 2


r
i to
Inspection of materials delivered to site
Date: 12 Jun .2023
Request no.: MIR-CSCEC-ALA-ME-FF-0069-00

Ed
Project no. & title: E21110-0100S - Alamein Downtown Towers

Employer: Engineer: Contractor

DF
1. Material / equipment
Description : ERW Pipes
Materials submittal ref. no. : MAT-CSCEC-ALA-ME-FF-0003-03 Date : 18 May 2022
Bill of quantities ref. no. :
Quantity : As Per Attached Sheets

rP
2. Manufacturer's details
Manufacturer : Al-JAZEERA STEEL/Egy Tropic
Model no.: Serial no. :
Country of origin: Oman
Date of ARRIVAL on Site : 05-Jun-23
te
STORAGE Location : ALA store
Submitted by : Li dongsheng/Ali Elkahlawy Signature :

3. Inspection report
as
Yes/No Initials
Physical damage ? Yes No
Details given above correct ? Yes No
Conform with approved submission ? Yes No
Accessories/ spare parts included ? Yes No
M

Details :

Remarks:
in

4.Engineer's Representative comments


The above material has been inspected on site and found at time of inspection to be :

Satisfactory Unsatisfactory
ed

for incorporation in the permanent works.


at

Signature Date :

Above inspection shall not relieve Contractor of his responsibilities to incorporate in the Works only such materials that are in conformity with the
Contract.
re

IMD-1

S-PRC-SS-02(F36) Rev 1
r
i to
Ed
F
PD
te r
as
nM
di

Mill test certificate and country of origin certificate shall be provided


along with the material delivery.
Test report for random pipe of the material delivery to be provided.
Manufacturer's guarantee shall be provided along with the material
a te

delivery.

Amr Abdelsalam 18-5-2022


re
re
at
ed
in
M
as
te
rP
D
F
E
di
to
r
re
at
ed
in
M
as
te
rP
D
F
E
di
to
r
re
a te
di
nM
as
te r
PD
F
Ed
i to
r

You might also like