PGCA-HT-2050A
NAME CONDENSATE SUB-COOLER (A)
QUANTITY 2x50%
DESIGN PRESSURE (BARG) HOT SIDE: 140 / FV
COLD SIDE: 16
DESIGN TEMP. MAX/MIN (°C) HOT SIDE: 65 / -29
COLD SIDE: 65 / 0 FIRE
OPERATING PRESSURE MAX/MIN (BARG) HOT SIDE: 100.8 / 23.5 1-1/2D2
PSV SET @ 140 barg
+
30
0#
15
C01B
00
COLD SIDE: 30 (IN) / 35 (OUT) 3"-VB-1-152-FB TO HP FLARE HEADER
#
3"x2" 3"-VH-43026-C01B
DUTY/DESIGN CAPACITY 315 kW (TOTAL) 1500# PR-PID-1-107
3/4"-VB-1-151
FALL 1:200
IG LO
SIZE (mm) -
2"x1-1/2"
P09N
NC
MATERIAL TUBE SIDE: ALLOY C276 (NACE) TO HP FLARE HEADER
2"-VH-43062-C01B
SHELL SIDE: CS + ALLOY C276 CLADDING PR-PID-1-107
MOTOR RATING (kW) - LO
2"-VD-9-069-FB
SP
2"-VL-9-048
TDIA P09N TUBE RUPTURE
2"-PL-20031-P09N
NC
2051 SET @ PSE ZIO
NO POCKET
L SET @ 16 barg 2057B 2057B
FALL
NOTE 8 8C
2"-PG-20027-P09N 6"-VB-1-153-FB 6"-VB-1-155-FB
TDZA
2057
1.5"-VB-1-911
LL SET @ 3/4"-VB-9-065
ILC ILC
6C
6"-WS-50603-Y03N
NC
Y03N C01B
NOTE 3
NC PI TUBE RUPTURE
2"-VB-9-064
TI TZI PI TI 2056 SET @ PSE ZIO
NC
2051 2057 2052 2053 16 barg 2057A 2057A
4"-VD-9-022 6"-VB-1-154-FB 6"-VB-1-156-FB
FROM HP SEPARATOR 6"x4" TO HP FLARE HEADER
6"-PL-20012-P09N NOTE 14 4"-PL-20027-P09N 6"-WS-50604-Y03N 6"-VH-43055-C01B
PR-PID-1-019 PR-PID-1-107
FALL 1:200
1.5"-VB-1-912
ILO ILO
SP
NC
NC
MIN.
Y03N C01B
6"x4"
860
NOTE 1, 12
6"-WS-50636-Y03N
2"-VB-1-157
TO CONDENSATE
SUB-COOLER HT-2050 (B)
INTERLOCK SYSTEM Rupture Disk
RS
TUBE RUPTURE
NC
4"-PL-20026-P09N NOTE 14
PR-PID-1-021 SET @ PSE ZIO Tag No:
16 barg
N1 N4 N9 N8
2057C 2057C PSE-2057A
6"-WS-50637-Y03N 6"-VB-1-XXX-FB PSE-2057B TO HP FLARE HEADER
6"-VH-43057-C01B
PR-PID-1-107
SIS PGCA-HT-2050A ILO ILO
FALL 1:200
1.5"-VB
NOTE 13 6"-VB-1-XXX-FB
NC
15.6 mm
RO N2 N3 N6 Y03N C01B
+ TUBE RUPTURE PSE ZIO
2"-VB-1-158
2051 BDV SET @
NOTE 1, 12
+
2057D 2057D
2051 16 barg
NC
TO HP FLARE HEADER 6"-VB-9-067-FB
RS
6"-VH-43029-C01B 6"x3" 6"-VB-1-XXX-FB 6"-VB-1-XXX-FB
PR-PID-1-107
3/4"-VB-9-068
FALL 1:200 IG
LO FB
ILC ILC
1.5"VB
NC
FO SP
C01B P09N NC
3"-PL-20032-P09N
2"-PL-20035-P09N 3"-DC-57064-A01D
NOTE 11
TI PR-PID-1-118
CORIOLIS NC
METER 2054 2"-VB-9-066 P09N A01D
TZI TI FIA PG
SET @ PI
2058 2052 2051 2054
L 10 m^3/hr 2053 PI
TO CONDENSATE EXPORT
6"-VD-9-025 NOTE 15 6"-VD-9-024 4"-VD-9-023 2055
BOOSTER PUMP 6"x4" NOTE 14
6"-PL-20029-P09N 4"-PL-20028-P09N
PR-PID-1-025
6"x3" 6"x3" 4"-VC-9-007
NOTE 4
TI
NC
NC
NC
6"x4"
NOTES:
2055
6"-VB-9-069 1. DROPOUT SPOOL TO FACILITATE REMOVAL OF TUBE BUNDLE.
2. MINIMUM UPSTREAM/DOWNSTREAM STRAIGHT LENGTH OF 5D/2D SHALL BE PROVIDED.
3. TI TO BE LOCATED CLOSE TO SUBCOOLER.
FROM CONDENSATE NC
SUB-COOLER HT-2050 (B)
4"-PL-20030-P09N NOTE 14 see Master RLMU 4. METER RANGE REQUIRED: 0-12000 BARRELS/DAY.
5. SDV TO BE SLOW CLOSING TO PREVENT SURGE.
PR-PID-1-021
comment. check if 6. 4 VALVE INTERLOCK SYSTEM FOR UPSTREAM AND DOWNSTREAM VALVES OF PSE-2057A/B/C/D.
7. SDV-2052/2053 WILL BE CLOSED IN THE EVENT OF CONDENSATE SUB-COOLER TUBE RUPTURE TO MINIMIZE
2052 12. PROVIDE ADEQUATE SPACE AT INLET/OUTLET TO ALLOW REMOVAL OF TUBE BUNDLE.
FILTRATION PACKAGE 4"x1-1/2" 4"x1-1/2"
4"-WS-50601-Y01N 4"-WS-50634-Y03N 13. ENSURE THAT GAS DETECTORS PROVIDED TO DETECT CONDENSATE LEAKS ARE CORRECTLY SPECIFIED
PR-PID-1-090 M
AND CALIBRATED ACCORDING TO THE CONDENSATE COMPOSITION.
FC 4"-VC-1-011
NOTE 5, 7 NOTE 2, 9 14. SYMMETRICAL PIPE ROUTING.
15. LOW FLOW SHALL STOP THE CONDENSATE EXPORT BOOSTER PUMP. AUTOMATICALLY VIA SIS.
16. THE ROUTING OF THE VENT LINES ON THE OVERBOARD DUMP HEADER AND CAISSON SHALL TAKE INTO ACCOUNT
THE TUBE RUPTURE FLOW FROM PGCA-HT-2050A IN THE EVENT THAT SDV-2053 FAILS TO CLOSE AS INTENDED.
CONTRACTOR CONSULTANT DRAWN BY DATE COMPANY DRAWING TITLE COMPANY PROJECT NO.
Z1 19.06.2021 AS-BUILT LIN ZHA/ISW MRY AJT
LIN 08.05.2018
PEGAGA INTEGRATED CENTRAL PROCESSING PLATFORM (ICPP)
C3 18.10.2019 APPROVED FOR CONSTRUCTION (AFC) LIN JGS/KMT RJ AJT
PIPING & INSTRUMENTATION DIAGRAM
C2 15.04.2019 APPROVED FOR CONSTRUCTION (AFC) LIN JGS/KMT RJ AJT CHECKED BY DATE CONDENSATE SUB COOLER (A)
F7001
C1 28.11.2018 APPROVED FOR CONSTRUCTION (AFC) LIN JGS/KMT RJ AJT JGS/KMT 08.05.2018 PROJECT TITLE
PROVISION OF ENGINEERING , PROCUREMENT , CONSTRUCTION ,
COPYRIGHT C 2.4 30.08.2018 ISSUED FOR APPROVAL (IFA) LIN JGS/KMT RJ AJT INSTALLATION AND COMMISSIONING ( EPCIC )
THIS DRAWING REMAINS THE PROPERTY OF MDC OIL & APP BY DATE
GAS (SK 320) LTD AND MAY NOT BE COPIED IN ANY WAY MDC OIL & GAS (SK 320) LTD SCALE SIZE DRAWING NO. SHEET REV
SFSB MDC
EXCEPT FOR FULLFILING THE SPECIFIC PURPOSE FOR RJ 08.05.2018
WHICH IT IS ISSUED
REFERENCE DRAWING NUMBER REFERENCE DRAWING TITLE N0. DATE REVISION DESCRIPTION PREPARED REVIEWED APPROVED ENDORSED (A MUBADALA PETROLEUM AFFILIATE) N.T.S A1 PGCA-PR-PID-1-020 01 OF 01 Z1
BY BY BY BY