Professional Documents
Culture Documents
A B C D E A B C D E
4" THK CHB
13.80
3.10
ON - FILL ON - FILL
3.31
B1 (REFER TO SLAB DETAIL) B1 (REFER TO SLAB DETAIL) B1 (REFER TO SLAB DETAIL) B1 (REFER TO SLAB DETAIL) B1
ELEV. @ 0.30m ELEV. @ 0.30m
10mm TEMP BARS 10mm TEMP BARS
SPACED @ 0.60 O.C. SPACED @ 0.60 O.C.
WF WF
5.94
B1 B1 B1 B1
WF WF
0.10m POURED 0.10m POURED 100 MM THK SLAB 100 MM THK SLAB SECOND FLOOR
CONCRETE CONCRETE B1 B1 B1 B1 B1
2.63
(REFER TO SLAB DETAIL) STAIR STAIR (REFER TO SLAB DETAIL)
ELEV. @ 0.30m ELEV. @ 0.30m
9.84
9.84
6.40
CIF1 CIF1 CIF1 CIF1 CIF1 WALL - JOINT DETAIL
2 WF WF
2 2 B1 B1 B1 B1 2 SCALE: 1:20 MTS
0.10m POURED 0.10m POURED 100 MM THK SLAB 100 MM THK SLAB 4" THK HOLLOW
3.90
3.95
WF CONCRETE WF WF CONCRETE WF B2 (REFER TO SLAB DETAIL) B2 B2 (REFER TO SLAB DETAIL) B2 BLOCKS
ELEV. @ 0.30m ELEV. @ 0.30m
3.30
1 1 1 B2 B2 1 10MM DIAM. 10MM VERTICAL
WF WF
TRANSVERSE BAR SPCD AT 0.80M O.C.
SPCD AT 0.30M O.C.
2-10MM DIAM.
LONGITUDINAL BAR
10MM DIAM. HOOPS
SPCD. @ 4 - 0.05M.,4-0.10
THE REST AT 0.15 O.C.
A B C D E A B C D E
0.25
FOUNDATION PLAN BEAM PLAN
0.40
0.90
SCALE: 1:100 MTS SCALE: 1:100 MTS
1.20
0.15
2"x3"xL'C-PURLINS SPACED @ 0.60M O.C. 2"x3"xL'C-PURLINS SPACED @ 0.60M O.C.
0.30
A B C D E
0.30
16.10
WALL - FOOTING DETAIL
2.00 2.09 2.50 1.47 1.47 2.50 4.09 1.20
SCALE: 1:10 MTS
HT-2
SPCD. @ 4 - 0.05M.,4-0.10
10MM DIAM. HOOPS THE REST AT 0.15 O.C.
F-T
F-T
F-T
F-T
HT
-1
4.04
RB RB
0.35
0.35
0.25 0.25
B1 DETAIL
0.75
AT SUPPORT AT MIDSPAN
0.90
HT-2 HT-2
1.00
F-T
F-T
F-T
F-T
HT
-1
1.20
HT
-1
2 2
2.00
0.25
RB RB RB RB
HT-2
HT-2
1.00
0.35
0.35
1.20
0.20 0.20
0.38
BARS EQUALLY SPCD BARS EQUALLY SPCD
0.45
1.00
0.25
4 -16mm DIAM. BARS
1.20
0.30
0.38
0.45
0.35
0.35
0.38 0.25 0.38
1.00
0.45 0.30 0.45 0.20 0.20
A B C D E 1.20
RB DETAIL AT SUPPORT AT MIDSPAN