You are on page 1of 1

TOB

A B C D E A B C D E
4" THK CHB
13.80

3.75 3.15 3.15 3.75 13.80 1-12MM DIAM. VERT. BAR

3.68 3.23 3.23 3.68


CIF1 CIF1 CIF1 CIF1 CIF1 CONC. FILL
WF WF WF WF 8 -16MM DIAM.
COLUMN MAIN BAR
3 3 3 B1 B1 B1 B1 3

3.10
ON - FILL ON - FILL

0.10m POURED 0.10m POURED


WF WF WF WF 100 MM THK SLAB 100 MM THK SLAB 100 MM THK SLAB 100 MM THK SLAB 10MM DIAM. HORIZONTAL BAR
CONCRETE CONCRETE

3.31
B1 (REFER TO SLAB DETAIL) B1 (REFER TO SLAB DETAIL) B1 (REFER TO SLAB DETAIL) B1 (REFER TO SLAB DETAIL) B1
ELEV. @ 0.30m ELEV. @ 0.30m
10mm TEMP BARS 10mm TEMP BARS
SPACED @ 0.60 O.C. SPACED @ 0.60 O.C.
WF WF
5.94

B1 B1 B1 B1
WF WF
0.10m POURED 0.10m POURED 100 MM THK SLAB 100 MM THK SLAB SECOND FLOOR
CONCRETE CONCRETE B1 B1 B1 B1 B1

2.63
(REFER TO SLAB DETAIL) STAIR STAIR (REFER TO SLAB DETAIL)
ELEV. @ 0.30m ELEV. @ 0.30m
9.84

9.84

6.40
CIF1 CIF1 CIF1 CIF1 CIF1 WALL - JOINT DETAIL
2 WF WF
2 2 B1 B1 B1 B1 2 SCALE: 1:20 MTS

0.10m POURED 0.10m POURED 100 MM THK SLAB 100 MM THK SLAB 4" THK HOLLOW
3.90

3.95
WF CONCRETE WF WF CONCRETE WF B2 (REFER TO SLAB DETAIL) B2 B2 (REFER TO SLAB DETAIL) B2 BLOCKS
ELEV. @ 0.30m ELEV. @ 0.30m

C2F2 C2F2 C2F2 C2F2 C2F2 10MM HORIZONTAL


BAR EVERY 3 LAYER

3.30
1 1 1 B2 B2 1 10MM DIAM. 10MM VERTICAL
WF WF
TRANSVERSE BAR SPCD AT 0.80M O.C.
SPCD AT 0.30M O.C.

2-10MM DIAM.
LONGITUDINAL BAR
10MM DIAM. HOOPS
SPCD. @ 4 - 0.05M.,4-0.10
THE REST AT 0.15 O.C.

A B C D E A B C D E

0.25
FOUNDATION PLAN BEAM PLAN

0.40
0.90
SCALE: 1:100 MTS SCALE: 1:100 MTS

1.20

0.15
2"x3"xL'C-PURLINS SPACED @ 0.60M O.C. 2"x3"xL'C-PURLINS SPACED @ 0.60M O.C.

0.30
A B C D E
0.30
16.10
WALL - FOOTING DETAIL
2.00 2.09 2.50 1.47 1.47 2.50 4.09 1.20
SCALE: 1:10 MTS

4 -16MM DIAM. FLOOR TO BEAM CONNECTION DETAIL


HT-2

HT-2

COLUMN MAIN BAR


RB RB RB RB
8 -16MM DIAM.
2.00

3 3 COLUMN MAIN BAR 10MM DIAM. HOOPS


SCALE: 1:35 MTS

SPCD. @ 4 - 0.05M.,4-0.10
10MM DIAM. HOOPS THE REST AT 0.15 O.C.
F-T

F-T

F-T

F-T
HT

-1

HT-2 HT-2 SPCD. @ 4 - 0.05M.,4-0.10 6 -16mm DIAM. BARS


HT
-1

THE REST AT 0.15 O.C.


10mm HOOPS SPCD 5-@0.05m REST AT 0.10m O.C.
8.04

4.04

RB RB

0.35

0.35
0.25 0.25

B1 DETAIL

0.75
AT SUPPORT AT MIDSPAN
0.90

HT-2 HT-2

1.00
F-T

F-T

F-T

F-T

HT
-1

1.20
HT

-1

2 2
2.00

5 -16mm DIAM. BARS

0.25
RB RB RB RB
HT-2

HT-2

10mm HOOPS SPCD 5-@0.05m REST AT 0.10m O.C.


0.30

1.00

0.35

0.35
1.20

0.20 0.20

14 -16MM MATTING 12 -16MM MATTING B2 DETAIL AT SUPPORT AT MIDSPAN

0.38
BARS EQUALLY SPCD BARS EQUALLY SPCD
0.45

BOTH WAYS BOTH WAYS


1 1

1.00

0.25
4 -16mm DIAM. BARS
1.20

0.30

10mm HOOPS SPCD 5-@0.05m REST AT 0.10m O.C.

0.38
0.45

0.35

0.35
0.38 0.25 0.38

1.00
0.45 0.30 0.45 0.20 0.20

A B C D E 1.20
RB DETAIL AT SUPPORT AT MIDSPAN

ROOF FRAMING PLAN COLUMN - FOOTING DETAIL BEAM DETAIL


SCALE: 1:100 MTS SCALE: 1:30 MTS SCALE: 1:25 MTS

PRC NO. 0086605 S E A L APPROVED AS TO PLANS: SHEET CONTENT SHEET NO.


CIVIL ENGINEER
PTR NO.: 2019671

DATE: JAN. 03, 2019


PROJECT TITLE PROPOSED TWO STOREY RESIDENTIAL 4
BUILDING
PLACE: DGTE. CITY ROY C. ANG GOBONSENG S-1
ROY C. ANG GOBONSENG TIN: 921-252-859 LOCATION DUMAGUETE CITY, NEGROS ORIENTAL, PHILIPPINES OWNER