You are on page 1of 1

A B B.

2 C D E F
PROJECT
NORTH

TRUE NORTH

STAMP
A B C D E F A B C D E F
ISSUES:
NO. DATE DESCRIPTION
A 2020-04-23 ISSUED AS 100% SD
B 2020-06-16 50% DD PROGRESS
21'-10" 30'-6" 21'-4" 29'-11" 19'-11" 21'-10" 30'-6" 21'-4" 29'-11" 19'-11" SET

1 WALL 1
S5.01 ELEVATION S5.01
4' - 0" 5' - 6"
WALL

12"

12"
ELEVATION
1 11 1

P01SC33
P01SC32
2 2

P01SC30 P01SC31
S5.01 S5.01

ER "

ER "
ER "

ER "
ST 48

ST 48
16 ILA

16 ILA
ST 48

ST 48
P01SC14

P
" x ST

" x ST
PI " x

PI " x
PI " x

PI " x
12' - 2"
16

16
48 ER

48 ER
LA

LA
16

16
LA

LA
"

"
P01SC35
(9) (11) FIRE PUMP
P1-03
28'-6"

28'-6"
16" 16" 299 SF
(2)

P01SC36
P01SC13
(10) 8.9 6 kips/ft

P01SC34
kips/ft 14.7

"

"

"

"
72

72

72

72
6 kips/ft

x
"

"
UP

42

42
"

"

"

"
UP UP

16

16

16

16
x

x
kips/ft

"

"
11' - 4"
30

30
2 P01SC15 22 2

3' - 0"
P01SC38
DN. DN.
DN

P01SC17
DN. DN.

THESE DRAWINGS ARE NOT TO BE USED FOR


TENDER, CONTRACT, OR CONSTRUCTION
P01SC37
25'-6"

25'-6"
(3)

P01SC07

P01SC09
(6)
P01SC40

P01SC16
P01SC39

2020-06-17 12:03:59 PM
PROGRESS
10" SLAB 10" SLAB

7' - 6"
14.7 kips/ft

24"

24"
3 33 3
P01SC18 P01SC01 P01SC02
P01SC11 11.8 kips/ft

22"

22"
"

"
30

30

8"
x

x
3.3 3.3
"

"
24

24
P01SC44
TO LEVEL P2

TO LEVEL P2
UP UP
P01SC19 (4)
RAMP DN.

RAMP DN.
P01SC43
P01SC20 24"

DN.
24"
24"

DN.
DN
24"

P01SC21
28'-0"

28'-0"
14"

HSS 6x4x.375
14"
14.7 kips/ft HSS 6x4x.375

(5)
14" 14"
ALL HEADER BEAMS TO BE 30" DP. ALL HEADER BEAMS TO BE 30" DP.
INCLUDING SLAB DEPTH ON ALL INCLUDING SLAB DEPTH ON ALL
(12)
20"

20"
P01SC03 P01SC04
P01SC41

P01SC42

VARIES

VARIES
LEVELS LEVELS
STEP

STEP
(14)

"

"
14" 14"

48

48
24"

24"
x

x
24" 24"

"

"
24

24
4 44 4
14" 24" 14" 24"

11.8 6 kips/ft
"

"
P01SC24 6 kips/ft
30

30
x

x
"

"
24

24
P01SC25 4.5 kips/ft 4.5

P01SC45
P01SC22
RAMP UP TO LEVEL 1

RAMP UP TO LEVEL 1
P01SC23
28'-0"

28'-0"
"

"
30

30
24" 24"
24" 24"

30925-01
Date APRIL 10TH, 2020

JD
ML
x

x
"

"
24

24
P01SC05 P01SC06 4.7
26"

26"
P01SC08

P01SC10

P01SC26 P01SC12

24"

24"
8.9 kips/ft
P01SC50

5 55 (8)

Project Number

Checked By
Drawn By
P01SC51

14" 14" (13)


10" SLAB 14" (7) 10" SLAB 6 14"
25'-6"

25'-6"
kips/ft
4"

4"
P01SC29 8.9
11

11
"

"

"

"
"

"
72

72

72

72
96

96
"x

"x
x

x
24

24
x

x
"

"

"

"
"

"
16

16

16

16
16

16

1233 South Grand


kips/ft
14.7 kips/ft
P01SC46

6 66
P01SC27
10"

10"
OPEN OPEN

(1)
13'-0"

13'-0"
12" 12"

4 4
16"

16"
12"

12"
S5.01 S5.01
7 77 WALL
12"

12"
PROPERTY ELEVATION PROPERTY
LINE LINE
SLAB NOTES:
3 1. 3
SEE PLAN FOR SLAB THICKNESS WALL
S5.01 S5.01 ELEVATION
CLEAR COVER TO REINFORCING:
1” CLEAR COVER TOP – TO UPPER MOST TOP REINF.
1” CLEAR COVER BOTTOM – TO LOWERMOST BOTTOM REINF.

ADDRESS, AVE, SUITE


ALL INTERIOR SPANS TO BE CONSIDERED "RESTRAINED" ALL END SPANS
PERPENDICULAR TO BASEMENT WALLS TO BE CONSIDERED
"UNRESTRAINED" (INCREASE BOTTOM COVER TO 1 1/4").

CITY, STATE, ZIP


PROJECT NAME
2. DROP BARS FOR CHAIRING PURPOSES ARE TO BE CONSIDERED
ACCESSORIES SUPPLIED BY THE CONTRACTOR. REFER TO BAR PLACING
ORDER FOR FURTHER REQUIREMENTS.
LEVEL P1 PLAN - REINFORCING LEVEL P1 3. PROVIDE TEMPERATURE REBAR EACH DIRECTION BOTTOM MINIMUM IN ALL
SLABS UNLESS NOTED OTHERWISE ON PLAN OR IN DETAILS. REFER TO
REINFORCING STEEL SECTION OF THE GENERAL NOTES. PROVIDE
STAGGERED SPLICES AS REQUIRED.

4. PROVIDE CAMBER TO SLABS AS SHOWN ON PLAN AND AS NOTED IN THE

THE LIMITED PURPOSE OF EVALUATION, BIDDING OR REVIEW. THIS DOCUMENT OR ITS CONTENTS MAY NOT BE USED FOR ANY
THIS DOCUMENT CONTAINS INFORMATION PROPRIETARY TO MVE + PARTNERS, INC. AND IS FURNISHED IN CONFIDENCE FOR
CONCRETE SLAB SECTION OF THE GENERAL NOTES.

OTHER PURPOSE AND MAY NOT BE REPRODUCED OR DISCLOSED TO OTHERS WITHOUT THE PRIOR WRITTEN CONSENT OF
5. ALL SLABS TO BE MONITORED DURING CONSTRUCTION FOR FLATNESS AND

LEVEL P1 PLAN - CONCRETE OUTLINE


LEVELNESS AS NOTE IN THE SLAB SURVEY CONTROL SECTION OF THE
GENERAL NOTES. SUBMIT SURVEY DATA TO BMZ STRUCTURAL ENGINEERS
FOR REVIEW.

6. ALL MAT REINFORCING INDICATED ON PLANS ARE TOP REINF. REFER TO


DETAIL 11/S1.04 FOR FURTHER DETAILS.

LEVEL P1 PLAN - REINFORCING


7. FOR STUDRAIL REINFORCING REFER TO STUD RAIL SCHEDULE ON PLAN.

8. CONFIRM ALL SLAB ELEVATIONS, STEPS, SLOPES, AND OPENINGS WITH


ARCHITECTURAL DRAWINGS.

9. FOR BUILTUP STRUCTURES SHOWN ON PLAN REFER TO DETAILS 2/S1.06


& 3/S1.06

10. FOR ALL DRAINAGE AND WATER PROOFING REQUIREMENTS REFER TO THE
ARCHITECT.

MVE + PARTNERS, INC. ALL RIGHTS RESERVED, © COPYRIGHT 2018.


11. SEE ARCHITECTURAL DRAWINGS FOR SIZE AND LOCATION OF ALL
ARCHITECTURAL CURBS, UPSTANDS AND ARCHITECTURAL FEATURES.

12. REFER TO ARCHITECTURAL DRAWINGS FOR EXACT LOCATION OF MASONRY

1/8" = 1'-0"
WALLS. ALL MASONRY WALLS TO BE 8” MINIMUM THICKNESS. REFER TO
CONCRETE MASONRY BLOCK GENERAL NOTES FOR REINFORCING. REFER
TO DETAIL 8/S1.06 FOR FURTHER REQUIREMENTS.

13. CONFIRM ALL MECHANICAL AND ELECTRICAL OPENINGS AND SLEEVES WITH
CONSULTANTS DRAWINGS. CONFIRM ALL OPENINGS AND ELEMENTS NOT
SHOWN ON THE STRUCTURAL DRAWINGS WITH BMZ STRUCTURAL
ENGINEERS PRIOR TO CONSTRUCTION.

14. REFER TO MECHANICAL DRAWINGS FOR LOCATIONS OF IN-SLAB DUCTS.


REFER TO DETAIL 5/S1.04 FOR CLEARANCE REQUIREMENTS TO DUCTS AND
EXTRA REINFORCING REQUIRED AT IN-SLAB DUCTS.

SHEET TITLE
15. FOR SHEARWALL REINFORCING DETAILS AND ELEVATIONS SEE DRAWING
SERIES S3.00 UNLESS NOTED OTHERWISE ON PLAN.

Scale
CONCRETE COLUMN REFERENCE NOTE:

06/16/2020 - 50% DD PROGRESS SET


16. FOR COLUMN REINFORCING AND DETAILS SEE DRAWING SERIES S4.00
UNLESS NOTED OTHERWISE ON PLAN.
1. COLUMN WITH SYMBOL PC9 DENOTES PARKADE
CONCRETE COLUMN. 17. FOR BASEMENT WALL ELEVATIONS AND OTHER WALLS SEE DRAWING SHEET NUMBER
TYPE VARIES SERIES S5.00 UNLESS NOTED OTHERWISE ON PLAN.
SEE PLAN. INSIDE CIRCLE

2. COLUMN WITH SYMBOL 50 DENOTES TOWER


18. PROVIDE SHORING AND RESHORING PROCEDURES TO ENSURE
CONSTRUCTION LOADS DO NOT EXCEED THE SPECIFIED DESIGN LIVE LOAD.
S2.02.1
CONCRETE COLUMN. TYPE VARIES
REFER TO THE FORMWORK AND RESHORING SECTION OF THE GENERAL
NOTES FOR FURTHER REQUIREMENTS.
INSIDE CIRCLE
3. SEE DRAWINGS S4.01, S4.02 AND S4.03 FOR ALL THE 19. MINIMUM UNOBSTRUCTED HEADROOM CLEARANCE OF 7’-0” IS REQUIRED IN PROJECT NUMBER
TOWER CONCRETE COLUMNS, U.N.O. ALL FLOOR AREAS ACCESSIBLE TO VEHICLE TRAFFIC (8’-2” WHEN ACCESS
FOR DISABLED IS REQUIRED). CLEARANCE IS TO BE PROVIDED ABOVE THE
30925-01
FINISHED FLOOR TO ANY STRUCTURAL ELEMENTS, CEILINGS, PIPES, OR
SIMILAR OBSTRUCTIONS. REFER TO THE ARCHITECT AND OTHER
CONSULTANTS DRAWINGS FOR COMPONENTS NOT PART OF THE BASE
BUILDING STRUCTURE.

20. REFER TO GENERAL NOTES FOR FURTHER REQUIREMENTS.

21. THE TWO-WAY FLAT SLAB SHOWN ON THIS PLAN IS CONSIDERED PART OF
THE PRIMARY STRUCTURAL FRAME AND HAS BEEN REINFORCED FOR 3hr BRYSON MARKULIN ZICKMANTEL
FIRE RESISTANCE RATING IN ACCORDANCE WITH CBC 2016 CHAPTER 721. STRUCTURAL ENGINEERS

22. FOR EMBED PLATES, SEE DET. 5 / S1.11 #501 - 510 BURRARD STREET, VANCOUVER, B.C. V6C 3A8
(604) 685-9533 WWW.BMZSE.COM CONTACT@BMZSE.COM

23. FOR SLAB BAND REINF. SCHEDULE INCLUDING STIRRUPS, SEE DET. 7 / S1.11