STAMP

ISSUES:
BMZ - ISSUING REFERENCE LIST OF STRUCTURAL DRAWINGS NO. DATE DESCRIPTION
A 2020-04-23 ISSUED AS 100% SD
CURRENT CURRENT B 2020-06-16 50% DD PROGRESS
DWG. NO. SHEET TITLE CURRENT ISSUING DESCRIPTION
ISSUED NO. ISSUING DATE SET
C 2020-08-03 100% DD PROGRESS
S0.01 COVER SHEET C 100% DD PROGRESS SET 2020-08-03 SET

S0.02 PERSPECTIVE VIEW - NORTH / WEST C 100% DD PROGRESS SET 2020-08-03

S0.03 3D VIEW - LOWER LEVELS C 100% DD PROGRESS SET 2020-08-03

S0.04 3D VIEW - LOWER LEVELS A 100% DD PROGRESS SET 2020-08-03

S0.05 3D VIEW - ROOF C 100% DD PROGRESS SET 2020-08-03

S0.06 3D VIEW - ROOF A 100% DD PROGRESS SET 2020-08-03

S1.01 GENERAL NOTES C 100% DD PROGRESS SET 2020-08-03

S1.02 GENERAL NOTES C 100% DD PROGRESS SET 2020-08-03

S1.03 GENERAL NOTES C 100% DD PROGRESS SET 2020-08-03

S1.04 TYPICAL DETAILS C 100% DD PROGRESS SET 2020-08-03

S1.05 TYPICAL DETAILS C 100% DD PROGRESS SET 2020-08-03

S1.06 TYPICAL DETAILS C 100% DD PROGRESS SET 2020-08-03

S1.07 TYPICAL DETAILS C 100% DD PROGRESS SET 2020-08-03

S1.08 TYPICAL DETAILS C 100% DD PROGRESS SET 2020-08-03

S2.01.1 LEVEL P2 - FOUNDATION PLAN AND REINFORCING PLAN C 100% DD PROGRESS SET 2020-08-03

S2.01.2 LEVEL P2 - STIRRUP REINFORCING PLAN A 100% DD PROGRESS SET 2020-08-03

S2.02.1 LEVEL P1 PLAN - CONCRETE OUTLINE LEVEL P1 PLAN - REINFORCING C 100% DD PROGRESS SET 2020-08-03

S2.02.2 LEVEL P1 - DIAPHRAGM REINFORCING PLAN A 100% DD PROGRESS SET 2020-08-03

S2.03.1 LEVEL 01 PLAN - CONCRETE OUTLINE LEVEL 01 PLAN - REINFORCING C 100% DD PROGRESS SET 2020-08-03

S2.03.2 LEVEL 01 PLAN - DIAPHRAGM REINFORCING A 100% DD PROGRESS SET 2020-08-03

THESE DRAWINGS ARE NOT TO BE USED FOR


TENDER, CONTRACT, OR CONSTRUCTION
S2.04.1 LEVEL 1.5 PLAN - CONCRETE OUTLINE LEVEL 1.5 PLAN - REINFORCING A 100% DD PROGRESS SET 2020-08-03

S2.05.1 LEVEL 02 PLAN - CONCRETE OUTLINE LEVEL 02 PLAN - REINFORCING C 100% DD PROGRESS SET 2020-08-03

S2.05.2 LEVEL 02 - DIAPHRAGM REINFORCING PLAN A 100% DD PROGRESS SET 2020-08-03

2020-08-26 4:45:06 PM
PROGRESS
S2.06.1 LEVEL 03 PLAN - CONCRETE OUTLINE LEVEL 03 PLAN - REINFORCING C 100% DD PROGRESS SET 2020-08-03

S2.06.2 LEVEL 03 - DIAPHRAGM REINFORCING PLAN A 100% DD PROGRESS SET 2020-08-03

S2.07.1 LEVEL 04 PLAN - CONCRETE OUTLINE LEVEL 04 PLAN - REINFORCING C 100% DD PROGRESS SET 2020-08-03

S2.07.2 LEVEL 04 PLAN - DIAPHRAGM REINFORCING A 100% DD PROGRESS SET 2020-08-03

S2.08.1 LEVEL 05 PLAN - CONCRETE OUTLINE LEVEL 05 PLAN - REINFORCING C 100% DD PROGRESS SET 2020-08-03

S2.08.2 LEVEL 05 - DIAPHRAGM REINFORCING PLAN A 100% DD PROGRESS SET 2020-08-03

S2.09.1 LEVEL 06 PLAN - CONCRETE OUTLINE LEVEL 06 PLAN - REINFORCING C 100% DD PROGRESS SET 2020-08-03

S2.09.2 LEVEL 06 - DIAPHRAGM REINFORCING PLAN A 100% DD PROGRESS SET 2020-08-03

S2.10.1 LEVEL 07 PLAN - CONCRETE OUTLINE LEVEL 07 PLAN - REINFORCING C 100% DD PROGRESS SET 2020-08-03

S2.10.2 LEVEL 07 - DIAPHRAGM REINFORCING PLAN A 100% DD PROGRESS SET 2020-08-03

S2.11.1 LEVEL 08 PLAN - CONCRETE OUTLINE LEVEL 08 PLAN - REINFORCING C 100% DD PROGRESS SET 2020-08-03

S2.11.2 LEVEL 08 PLAN - DIAPHRAGM REINFORCING PLAN A 100% DD PROGRESS SET 2020-08-03

S2.12.1 LEVEL 09-19 TYP. PLAN - CONCRETE OUTLINE AND REINFORCING C 100% DD PROGRESS SET 2020-08-03

S2.12.2 LEVEL 09-19 PLAN - DIAPHRAGM REINFORCING A 100% DD PROGRESS SET 2020-08-03
LEVEL 20-PH PLAN - CONCRETE OUTLINE LEVEL 20-PH PLAN -
S2.13.1 C 100% DD PROGRESS SET 2020-08-03
REINFORCING
S2.13.2 LEVEL 20 - DIAPHRAGM REINFORCING PLAN A 100% DD PROGRESS SET 2020-08-03

S2.14.1 LEVEL 21-ROOF PLAN - CONCRETE OUTLINE AND REINFORCING PLAN C 100% DD PROGRESS SET 2020-08-03

S2.14.2 LEVEL 21-ROOF - DIAPHRAGM REINFORCING PLAN A 100% DD PROGRESS SET 2020-08-03

S2.15.1 LEVEL HIGH ROOF PLAN - CONCRETE OUTLINE AND REINFORCING PLAN C 100% DD PROGRESS SET 2020-08-03

S2.15.2 LEVEL HIGH ROOF - DIAPHRAGM REINFORCING PLAN A 100% DD PROGRESS SET 2020-08-03

S2.16.1 T.O. UPPER ROOF CONCRETE OUTLINE AND REINFORCING PLAN C 100% DD PROGRESS SET 2020-08-03

S3.01 SHEAR WALL SCHEDULE B 100% DD PROGRESS SET 2020-08-03

S3.02 SHEAR WALL SCHEDULE

30925-01
Date APRIL 10TH, 2020

SA
JD
S3.03 SHEARWALL DETAILS B 100% DD PROGRESS SET 2020-08-03

S3.11 SHEAR WALL ELEVATIONS B 100% DD PROGRESS SET 2020-08-03

S3.12 SHEAR WALL ELEVATIONS A 100% DD PROGRESS SET 2020-08-03

S4.01 COLUMN KEY PLAN, NOTES, SCHEDULE, AND TYPICAL COLUMN DETAILS B 100% DD PROGRESS SET 2020-08-03

Project Number
S5.01 WALL ELEVATIONS B 100% DD PROGRESS SET 2020-08-03

Checked By
S5.02 WALL DETAILS B 100% DD PROGRESS SET 2020-08-03

Drawn By
S6.01 SECTIONS AND DETAILS A 100% DD PROGRESS SET 2020-08-03

1233 South Grand

ADDRESS, AVE, SUITE


CITY, STATE, ZIP
PROJECT NAME

THE LIMITED PURPOSE OF EVALUATION, BIDDING OR REVIEW. THIS DOCUMENT OR ITS CONTENTS MAY NOT BE USED FOR ANY
THIS DOCUMENT CONTAINS INFORMATION PROPRIETARY TO MVE + PARTNERS, INC. AND IS FURNISHED IN CONFIDENCE FOR

OTHER PURPOSE AND MAY NOT BE REPRODUCED OR DISCLOSED TO OTHERS WITHOUT THE PRIOR WRITTEN CONSENT OF
MVE + PARTNERS, INC. ALL RIGHTS RESERVED, © COPYRIGHT 2018.
COVER SHEET

08/03/2020 - ISSUED FOR 100% DD PROGRESS SET


SHEET TITLE

Scale
SHEET NUMBER

S0.01
PROJECT NUMBER
30925-01

BRYSON MARKULIN ZICKMANTEL


STRUCTURAL ENGINEERS

#501 - 510 BURRARD STREET, VANCOUVER, B.C. V6C 3A8


(604) 685-9533 WWW.BMZSE.COM CONTACT@BMZSE.COM
(604) 685-9533

SHEET TITLE PROJECT NAME STAMP


B
A

Project Number
NO.

30925-01
PERSPECTIVE VIEW - NORTH / WEST
ISSUES:

Date APRIL 10TH, 2020


DATE

1233 South Grand PROGRESS


30925-01

Drawn By
WWW.BMZSE.COM

SA
S0.02

THESE DRAWINGS ARE NOT TO BE USED FOR


SET
SET

Checked By TENDER, CONTRACT, OR CONSTRUCTION


JD
SHEET NUMBER

Scale 2020-08-26 4:45:18 PM


PROJECT NUMBER

STRUCTURAL ENGINEERS

THIS DOCUMENT CONTAINS INFORMATION PROPRIETARY TO MVE + PARTNERS, INC. AND IS FURNISHED IN CONFIDENCE FOR
#501 - 510 BURRARD STREET, VANCOUVER, B.C. V6C 3A8

THE LIMITED PURPOSE OF EVALUATION, BIDDING OR REVIEW. THIS DOCUMENT OR ITS CONTENTS MAY NOT BE USED FOR ANY
OTHER PURPOSE AND MAY NOT BE REPRODUCED OR DISCLOSED TO OTHERS WITHOUT THE PRIOR WRITTEN CONSENT OF
ADDRESS, AVE, SUITE
DESCRIPTION

MVE + PARTNERS, INC. ALL RIGHTS RESERVED, © COPYRIGHT 2018. CITY, STATE, ZIP
2020-06-16 50% DD PROGRESS
2020-04-23 ISSUED AS 100% SD

BRYSON MARKULIN ZICKMANTEL


2020-08-03 100% DD PROGRESS

CONTACT@BMZSE.COM

08/03/2020 - ISSUED FOR 100% DD PROGRESS SET


(604) 685-9533

SHEET TITLE PROJECT NAME STAMP


B
A

Project Number
NO.

30925-01
3D VIEW - LOWER LEVELS
ISSUES:

Date APRIL 10TH, 2020


DATE

1233 South Grand PROGRESS


30925-01

Drawn By
WWW.BMZSE.COM

SA
S0.03

THESE DRAWINGS ARE NOT TO BE USED FOR


SET
SET

Checked By TENDER, CONTRACT, OR CONSTRUCTION


JD
SHEET NUMBER

Scale 2020-08-26 4:45:25 PM


PROJECT NUMBER

STRUCTURAL ENGINEERS

THIS DOCUMENT CONTAINS INFORMATION PROPRIETARY TO MVE + PARTNERS, INC. AND IS FURNISHED IN CONFIDENCE FOR
#501 - 510 BURRARD STREET, VANCOUVER, B.C. V6C 3A8

THE LIMITED PURPOSE OF EVALUATION, BIDDING OR REVIEW. THIS DOCUMENT OR ITS CONTENTS MAY NOT BE USED FOR ANY
OTHER PURPOSE AND MAY NOT BE REPRODUCED OR DISCLOSED TO OTHERS WITHOUT THE PRIOR WRITTEN CONSENT OF
ADDRESS, AVE, SUITE
DESCRIPTION

MVE + PARTNERS, INC. ALL RIGHTS RESERVED, © COPYRIGHT 2018. CITY, STATE, ZIP
2020-06-16 50% DD PROGRESS
2020-04-23 ISSUED AS 100% SD

BRYSON MARKULIN ZICKMANTEL


2020-08-03 100% DD PROGRESS

CONTACT@BMZSE.COM

08/03/2020 - ISSUED FOR 100% DD PROGRESS SET


(604) 685-9533

SHEET TITLE PROJECT NAME STAMP


A

Project Number
NO.

30925-01
3D VIEW - LOWER LEVELS
ISSUES:

Date APRIL 10TH, 2020


DATE

1233 South Grand PROGRESS


30925-01

Drawn By
WWW.BMZSE.COM

ML
S0.04

THESE DRAWINGS ARE NOT TO BE USED FOR


SET

Checked By TENDER, CONTRACT, OR CONSTRUCTION


JD
SHEET NUMBER

Scale 2020-08-26 4:45:30 PM


PROJECT NUMBER

STRUCTURAL ENGINEERS

THIS DOCUMENT CONTAINS INFORMATION PROPRIETARY TO MVE + PARTNERS, INC. AND IS FURNISHED IN CONFIDENCE FOR
#501 - 510 BURRARD STREET, VANCOUVER, B.C. V6C 3A8

THE LIMITED PURPOSE OF EVALUATION, BIDDING OR REVIEW. THIS DOCUMENT OR ITS CONTENTS MAY NOT BE USED FOR ANY
OTHER PURPOSE AND MAY NOT BE REPRODUCED OR DISCLOSED TO OTHERS WITHOUT THE PRIOR WRITTEN CONSENT OF
ADDRESS, AVE, SUITE
DESCRIPTION

MVE + PARTNERS, INC. ALL RIGHTS RESERVED, © COPYRIGHT 2018. CITY, STATE, ZIP
BRYSON MARKULIN ZICKMANTEL
2020-08-03 100% DD PROGRESS

CONTACT@BMZSE.COM

08/03/2020 - ISSUED FOR 100% DD PROGRESS SET


(604) 685-9533

SHEET TITLE PROJECT NAME STAMP


B
A

Project Number
NO.

30925-01
3D VIEW - ROOF
ISSUES:

Date APRIL 10TH, 2020


DATE

1233 South Grand PROGRESS


30925-01

Drawn By
WWW.BMZSE.COM

SA
S0.05

THESE DRAWINGS ARE NOT TO BE USED FOR


SET
SET

Checked By TENDER, CONTRACT, OR CONSTRUCTION


JD
SHEET NUMBER

Scale 2020-08-26 4:45:39 PM


PROJECT NUMBER

STRUCTURAL ENGINEERS

THIS DOCUMENT CONTAINS INFORMATION PROPRIETARY TO MVE + PARTNERS, INC. AND IS FURNISHED IN CONFIDENCE FOR
#501 - 510 BURRARD STREET, VANCOUVER, B.C. V6C 3A8

THE LIMITED PURPOSE OF EVALUATION, BIDDING OR REVIEW. THIS DOCUMENT OR ITS CONTENTS MAY NOT BE USED FOR ANY
OTHER PURPOSE AND MAY NOT BE REPRODUCED OR DISCLOSED TO OTHERS WITHOUT THE PRIOR WRITTEN CONSENT OF
ADDRESS, AVE, SUITE
DESCRIPTION

MVE + PARTNERS, INC. ALL RIGHTS RESERVED, © COPYRIGHT 2018. CITY, STATE, ZIP
2020-06-16 50% DD PROGRESS
2020-04-23 ISSUED AS 100% SD

BRYSON MARKULIN ZICKMANTEL


2020-08-03 100% DD PROGRESS

CONTACT@BMZSE.COM

08/03/2020 - ISSUED FOR 100% DD PROGRESS SET


(604) 685-9533

SHEET TITLE PROJECT NAME STAMP


A

Project Number
NO.

30925-01
3D VIEW - ROOF
ISSUES:

Date APRIL 10TH, 2020


DATE

1233 South Grand PROGRESS


30925-01

Drawn By
WWW.BMZSE.COM

ML
S0.06

THESE DRAWINGS ARE NOT TO BE USED FOR


SET

Checked By TENDER, CONTRACT, OR CONSTRUCTION


JD
SHEET NUMBER

Scale 2020-08-26 4:45:47 PM


PROJECT NUMBER

STRUCTURAL ENGINEERS

THIS DOCUMENT CONTAINS INFORMATION PROPRIETARY TO MVE + PARTNERS, INC. AND IS FURNISHED IN CONFIDENCE FOR
#501 - 510 BURRARD STREET, VANCOUVER, B.C. V6C 3A8

THE LIMITED PURPOSE OF EVALUATION, BIDDING OR REVIEW. THIS DOCUMENT OR ITS CONTENTS MAY NOT BE USED FOR ANY
OTHER PURPOSE AND MAY NOT BE REPRODUCED OR DISCLOSED TO OTHERS WITHOUT THE PRIOR WRITTEN CONSENT OF
ADDRESS, AVE, SUITE
DESCRIPTION

MVE + PARTNERS, INC. ALL RIGHTS RESERVED, © COPYRIGHT 2018. CITY, STATE, ZIP
BRYSON MARKULIN ZICKMANTEL
2020-08-03 100% DD PROGRESS

CONTACT@BMZSE.COM

08/03/2020 - ISSUED FOR 100% DD PROGRESS SET


STAMP
ISSUES:
NO. DATE DESCRIPTION
A 2020-04-23 ISSUED AS 100% SD
TABLE 1704.3
REQUIRED VERIFICATION AND INSPECTION OF STEEL CONSTRUCTION
B 2020-06-16 50% DD PROGRESS
SET
VERIFICATION AND INSPECTION CONTINUOUS PERIODIC REFERENCED STANDARD IBC REFERENCE 12.0 SPECIAL INSPECTION PROGRAM (CONT.) 9.0 CONTRACTOR 5.0 GENERAL 1.0 GENERAL NOTES C 2020-08-03 100% DD PROGRESS
SET

1. MATERIAL VERIFICATION OF HIGH STRENGTH BOLTS, NUTS AND WASHERS: 24. PERIODIC INSPECTION SHALL OCCUR DAILY.
CONSTRUCTION QUALITY CONTROL 1. STRUCTURAL DRAWINGS ARE TO BE READ IN CONJUNCTION WITH ARCHITECTURAL, MECHANICAL,
PLUMBING, ELECTRICAL, SURVEY AND OTHER DRAWINGS AND SPECIFICATIONS. SPECIFICATIONS SHALL THIS SET OF DRAWINGS SHOWS THE COMPLETED PROJECT, THEY DO NOT INCLUDE COMPONENTS THAT MAY BE
25. PERIODIC INSPECTION SHALL BE PERFORMED ON THE INSTALLATION OF HIGH−STRENGTH BOLTS. THE GENERAL CONTRACTOR PROVIDES AND IS RESPONSIBLE FOR THE LABOUR, MATERIALS AND EQUIPMENT CONTROL OVER THESE DRAWINGS AND GENERAL NOTES ONLY WHERE THE SPECIFICATION PROVIDES NECESSARY FOR CONSTRUCTION SAFETY. THE CONTRACTOR IS RESPONSIBLE FOR SAFETY IN AND ABOUT
a. IDENTIFICATION MARKINGS TO AISC 360, INSPECTION SHALL INCLUDE OBSERVATION OF THE CALIBRATION PROCEEDINGS AND MONITORING THE FOR THE EXECUTION AND QUALITY CONTROL OF THE WORK AS SHOWN IN THE CONTRACT DOCUMENTS. FOR MORE STRINGENT REQUIREMENTS. OF THE DESIGN. THE JOB SITE DURING CONSTRUCTION, AND THE DESIGN AND ERECTION OF ALL TEMPORARY STRUCTURES,
CONFORM TO ASTM STANDARDS SECTION A3.3 AND INSTALLATION OF BOLTS TO DETERMINE THAT ALL PLIES OF CONNECTED MATERIALS HAVE BEEN
SPECIFIED IN THE APPROVED − X APPLICABLE ASTM DRAWN TOGETHER AND THAT THE SELECTED PROCEDURE IS PROPERLY USED TO TIGHTEN ALL BOLTS
FURTHER, THE GENERAL CONTRACTOR IS RESPONSIBLE FOR THE CONSTRUCTION MEANS, METHODS, 2. USE THESE DRAWINGS ONLY FOR THE PURPOSES SPECIFICALLY NOTED IN THE REVISION COLUMN. DO FORMWORK, FALSEWORK, SHORING, ETC, REQUIRED TO COMPLETE THE WORK
TECHNIQUES, SEQUENCES, PROCEDURES, SAFETY PRECAUTION AND PROGRAMS ASSOCIATED WITH THE NOT CONSTRUCT BY THESE DRAWINGS UNLESS INDICATED: "FOR CONSTRUCTION". THE TERM ISSUED
CONSTRUCTION DOCUMENTS. MATERIAL STANDARDS 26. PERIODIC SPECIAL INSPECTION IS REQUIRED FOR ERECTION AND FASTENING OF EXTERIOR CLADDING, CONSTRUCTION WORK. FOR BUILDING PERMIT INDICATES THAT THE DRAWINGS ARE COMPLETE FOR DESIGN OF ALL KEY NOTES, PLANS, DETAILS AND SPECIFICATIONS SHALL BE READ AS ONE DOCUMENT.
b. MANUFACTURER’S CERTIFICATE EXTERIOR AND INTERIOR NON−BEARING WALLS, INTERIOR AND EXTERIOR VENEER IN ACCORDANCE WITH STRUCTURAL DESIGN ELEMENTS HOWEVER FINAL COORDINATION AND INSTRUCTIONS FOR
OF COMPLIANCE REQUIRED. − X − − CBC SECTION 1705.11.5. REFER TO ARCHITECTURAL SPECIFICATIONS FOR REQUIREMENTS. THE CONTRACTOR IS RESPONSIBLE TO CONSTRUCT THE BUILDING STRUCTURE IN ACCORDANCE WITH THE CONSTRUCTION MAY NOT BE FULLY COMPLETE. THESE DRAWINGS TO BE READ IN CONJUNCTION WITH OTHER CONSULTANT DRAWINGS INCLUDING
2. INSPECTION OF HIGH−STRENGTH BOLTING: INTENT OF THE CONTRACT DOCUMENTS, TO CHECK AND CONFIRM THAT CONSTRUCTION CONFORMS TO THESE 3. THESE DRAWINGS ARE PREPARED IN CONJUNCTION WITH ARCHITECTURAL DRAWINGS BY JWDA ARCHITECTURAL, MECHANICAL, ELECTRICAL, GEOTECHNICAL, LANDSCAPE, ETC.
OFF−SITE FABRICATION DOCUMENTS AND TO RECORD AND REPORT ERRORS AND OMISSIONS IN CONSTRUCTION TO THE ENGINEER ARCHITECTS .
a. SNUG−TIGHT JOINTS. − X 27. SPECIAL INSPECTION IS REQUIRED FOR FABRICATION OF OF MEMBERS AND ASSEMBLIES DONE IN A SHOP
FOR HIS REVIEW. 4. THE ARCHITECT IS THE PRIME CONSULTANT AND IS RESPONSIBLE FOR GENERAL COORDINATION OF THE PROJECT CODES AND STANDARDS:
OF A FABRICATOR WHICH IS NOT APPROVED BY INSPECTION SERVICES. AN APPLICATION TO PERFORM
DRAWINGS. DISCREPANCIES AND INCOMPATIBILITIES IN THE DRAWINGS SHALL BE REPORTED TO THE
OFF−SITE FABRICATION MUST BE SUBMITTED TO AND APPROVED BY INSPECTION SERVICES.
b. PRETENSIONED AND SLIP−CRITICAL EACH CONTRACTOR SHALL BE RESPONSIBLE FOR QUALITY CONTROL OF ITS OWN AND ITS SUB−CONTRACTOR’S ARCHITECT . ALL CORRESPONDENCE SHOULD BE SUBMITTED OR DUPLICATED TO THE ARCHITECT THIS SECTION INDICATES CODES APPLICABLE TO THE DESIGN OF THIS BUILDING AS PRESENTED IN THE
JOINTS USING TURN−OF−NUT WITH 28. FABRICATOR MUST SUBMIT AN "APPLICATION TO PERFORM OFF−SITE FABRICATION" TO THE INSPECTION
WORK AND THE GENERAL CONTRACTOR SHALL MAINTAIN OVERALL RESPONSIBILITY FOR CONFORMANCE OF WITHOUT DELAY. DRAWINGS. THIS SECTION ALSO APPLIES TO THE DESIGN OF STRUCTURAL ELEMENTS WHICH ARE THE
MATCHMARKING, TWIST−OFF BOLT − X SERVICES DIVISION FOR APPROVAL PRIOR TO COMMENCEMENT OF FABRICATION.
THE WORK TO THE DESIGN DRAWINGS WITHOUT SUBROGATING THIS RESPONSIBILITY TO OTHERS. 5. REFER TO ARCHITECTURAL, MECHANICAL AND ELECTRICAL DRAWINGS AND SPECIFICATIONS FOR RESPONSIBILITY OF OTHERS TO BE DESIGNED BY SPECIALTY STRUCTURAL ENGINEERS.
OR DIRECT TENSION INDICATOR 29. FABRICATOR SHALL SUBMIT A "CERTIFICATE OF COMPLIANCE FOR OFF−SITE FABRICATION" TO THE
GRADES, FLOOR AND ROOF ELEVATIONS AND SLOPES, AND FOR DIMENSIONS AND LOCATIONS OF DOORS, LOS ANGELES 2017
METHODS OF INSTALLATION AISC 360, INSPECTION SERVICES DIVISION PRIOR TO ERECTION OF PREFABRICATED COMPONENTS.
1704.3.3 WINDOWS, RECESSES, SLEEVES, WINDOW WASHING ANCHORAGE AND SYSTEMS, EQUIPMENT, SHAFTS, THE GOVERNING BUILDING CODE: CALIFORNIA BUILDING CODE 2016
SECTION M2.5 30. FABRICATION OF MEMBERS AND ASSEMBLIES DONE IN A FABRICATORS SHOP APPROVED BY INSPECTION
INSERTS, NAILERS, CHAMFERS, AND SIMILAR ITEMS. GRADES, ELEVATIONS AND SLOPES SHOWN ON
SERVICES NEED NOT HAVE CONTINUOUS OR PERIODIC SPECIAL INSPECTION. AT COMPLETION OF
c. PRETENSIONED AND SLIP−CRITICAL STRUCTURAL DRAWINGS ARE FOR REFERENCE ONLY AND MUST BE CONFIRMED.
FABRICATION, THE APPROVED FABRICATOR SHALL SUBMIT THE "CERTIFICATE OF COMPLIANCE" FORM TO
JOINTS USING TURN−OF−NUT
WITHOUT MATCHMARKING OR X − INSPECTION SERVICES. 10.0 FIELD REVIEW BY BMZ STRUCTURAL 6.
7.
SLOPES FOR DRAINAGE REQUIREMENTS MUST BE OBTAINED FROM THE ARCHITECT.
SEE ARCHITECTURAL DRAWINGS AND SPECIFICATIONS FOR LOCATIONS AND REQUIREMENTS RELATING STANDARDS:
31. SPECIAL INSPECTOR SHALL VERIFY THAT FABRICATOR MAINTAINS DETAILED FABRICATION AND QUALITY
CALIBRATED WRENCH METHODS OF
INSTALLATION. CONTROL PROCEDURES THAT PROVIDE A BASIS FOR INSPECTION CONTROL OF THE WORKMANSHIP AND
FABRICATOR’S ABILITY TO CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND REFERENCED
ENGINEERS 8.
TO FIRE RATINGS, FIRE STOPPING, SMOKE SEALING REQUIREMENTS, ETC..
SEE ARCHITECTURAL DRAWINGS AND SPECIFICATIONS FOR ALL ASPECTS OF WATERPROOFING, SEALING, ASCE 7−10 MINIMUM DESIGN LOADS FOR BUILDINGS AND OTHER STRUCTURES
STANDARDS. THE SPECIAL INSPECTOR SHALL REVIEW THE PROCEDURES FOR COMPLETENESS AND JOINTING, TAPING, AIR BARRIER, FLASHING, VENTING, AND SIMILAR REQUIREMENTS FOR BUILDING ACI 318−14 BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETE
3. MATERIAL VERIFICATION OF STRUCTURAL STEEL AND COLD−FORMED STEEL DECK: THE CONTRACTOR(S) SHALL GIVE NOTICE THAT APPROPRIATE PORTIONS OF THE WORK ARE COMPLETE AND
ADEQUACY RELATIVE TO THE CODE REQUIREMENTS FOR FABRICATOR’S SCOPE OF WORK. CONSTRUCTION. ACI 117−10 SPECIFICATIONS FOR TOLERANCES FOR CONCRETE CONSTRUCTION AND
AVAILABLE FOR FIELD REVIEW. IT IS THE CONTRACTORS RESPONSIBILITY TO COORDINATE FIELD REVIEWS IN A
9. SEE ARCHITECTURAL DRAWINGS AND SPECIFICATIONS FOR NON−STRUCTURAL CONCRETE INCLUDING MATERIALS
a. FOR STRUCTURAL STEEL, TIMELY MANNER SUITABLE TO THE METHODS AND SCHEDULE OF CONSTRUCTION. WORK COVERED BY
AISC 360,
IDENTIFICATION MARKINGS TO − X SECTION M5.5
STRUCTURAL OBSERVATIONS FINISHES PRIOR TO FIELD REVIEW BY THE CONSULTANT OR BY SPECIALTY ENGINEERS INCLUDING CONCRETE
ELEMENTS NOT FORMING PART OF THE PRIMARY STRUCTURE, FLOOR TOPPINGS NOT FORMING PART OF AISC 2005 STEEL CONSTRUCTION MANUAL
CONFORM TO AISC 360 32. STRUCTURAL OBSERVATIONS PER CHAPTER 17 OF THE 2016 CALIFORNIA BUILDING CODE ARE REQUIRED. THE STRUCTURAL FLOOR, EXTERIOR FINISH MATERIALS INCLUDING LANDSCAPING MATERIALS AND ACI 530−13 BUILDING CODE REQUIREMENTS AND SPECIFICATION FOR MASONRY
CAST AROUND REBAR MAY REQUIRE REMOVAL IN ORDER TO REVIEW THE WORK. THE COST OF REMOVAL FOR
33. THE OWNER SHALL EMPLOY THE ENGINEER OR ARCHITECT RESPONSIBLE FOR THE STRUCTURAL DESIGN SIDEWALKS, ETC. SOME NON−STRUCTURAL CONCRETE MAY BE SHOWN FOR CONVENIENCE ONLY AND STRUCTURES
INSPECTION PURPOSES SHALL BE BOURN BY THE CONTRACTOR. INSTRUCTIONS FOR REMOVAL OF FINISHES
b. FOR OTHER STEEL, IDENTIFICATION TO PERFORM VISUAL OBSERVATION OF THE STRUCTURAL SYSTEM FOR GENERAL CONFORMANCE TO THE MUST BE CONFIRMED WITH ARCHITECTURAL DRAWINGS. ATC−72−1 MODELING AND ACCEPTANCE CRITERIA FOR ANALYSIS AND DESIGN OF TALL
OR CONCRETE ARE AT THE SOLE DISCRETION OF THE STRUCTURAL ENGINEER OF RECORD.
MARKINGS TO CONFORM TO ASTM APPROVED PLANS AND SPECIFICATIONS, AT SIGNIFICANT CONSTRUCTION STAGES AND AT COMPLETION 10. THE CONTRACTOR SHALL CHECK AND VERIFY ALL DIMENSIONS AND OUTLINES WITH THE ARCHITECTURAL BUILDINGS
APPLICABLE ASTM
STANDARDS SPECIFIED IN THE − X MATERIALS STANDARD OF THE STRUCTURAL SYSTEM. FIELD REVIEW IS AT THE PROFESSIONAL DISCRETION OF BMZ STRUCTURAL ENGINEERS AND IS TO ASCERTAIN
DRAWINGS AND NOTIFY ANY ERRORS OR OMISSIONS PRIOR TO COMMENCING WITH WORK.
APPROVED CONSTRUCTION
34. THE CONTRACTOR SHALL NOTIFY THE STRUCTURAL OBSERVER AT SIGNIFICANT CONSTRUCTION STAGES DISCREPANCIES NOT REPORTED ARE THE RESPONSIBILITY OF THE CONTRACTOR(S).
DOCUMENTS GENERAL COMPLIANCE WITH THE STRUCTURAL PLANS AND SUPPORTING DOCUMENTS FOR THE PRIMARY AND ALL REFERENCE CODES AND STANDARDS LISTED WITHIN THESE APPLICABLE STANDARDS.
AND AT COMPLETION OF THE STRUCTURAL SYSTEM. 11. SHOULD THE BIDDERS OF THIS PROJECT FIND DISCREPANCIES IN, OR OMISSIONS FROM THE DRAWINGS,
STRUCTURAL COMPONENTS OF THE BUILDING ONLY. FIELD REVIEW DOES NOT MAKE BMZ STRUCTURAL
c. MANUFACTURER’S CERTIFIED TEST 35. STRUCTURAL OBSERVATION DOES NOT INCLUDE OR WAIVE THE RESPONSIBILITY FOR SPECIAL SPECIFICATIONS OR DOCUMENTS, OR SHOULD HE BE IN DOUBT AS TO THEIR MEANING, THEY MUST
REPORTS. − X INSPECTION
ENGINEERS GUARANTORS OF THE CONTRACTORS WORK. FIELD REVIEW IS NOT FOR THE BENEFIT OF THE
NOTIFY THE ENGINEER WHO MAY SEND A WRITTEN INSTRUCTION TO BIDDERS.
CONTRACTOR AND MAY NOT FORM PART OF THE CONTRACTORS CONSTRUCTION QUALITY CONTROL .
36. OBSERVED DEFICIENCIES SHALL BE REPORTED IN WRITING TO THE OWNERS REPRESENTATIVE , SPECIAL 12. THE CONTRACTOR(S) SHALL REVIEW ALL AVAILABLE INFORMATION FOR BIDDING AND, WHERE CONFLICT
4. MATERIAL VERIFICATIONS OF WELD FILLER MATERIALS:
INSPECTOR, CONTRACTOR AND INSPECTION SERVICES. OCCURS BETWEEN ITEMS, INCLUDE THE MORE ONEROUS IN THE BID, UNLESS OTHERWISE INDICATED BY
THE CONTRACTOR SHALL PROVIDE AT LEAST 72 HR. ADVANCE NOTICE ON A BUSINESS DAY TO INSPECT THE
a. IDENTIFICATION MARKINGS TO ASIC 360, 37. AT THE CONCLUSION OF THE WORK THE STRUCTURAL OBSERVER SHALL SUBMIT A WRITTEN STATEMENT THE CONSULTANT PRIOR TO BID CLOSING.
PLACEMENT OF REINFORCEMENT IN ALL CONCRETE POURS ON A BUSINESS DAY. INSPECTIONS SHALL BE
CONFORM TO AWS SPECIFICATION SECTION A3.5 AND TO INSPECTION SERVICES INDICATING THAT SITE VISITS HAVE BEEN MADE AND IDENTIFY ANY REPORTED

THESE DRAWINGS ARE NOT TO BE USED FOR


13. INFORMATION TRANSMITTED TO CONTRACTORS THROUGH TELEPHONE CONVERSATION MUST BE
IN THE APPROVED CONSTRUCTION − X APPLICABLE AWS DEFICIENCIES THAT, TO THE BEST OF THE STRUCTURAL OBSERVER’S KNOWLEDGE, HAVE NOT BEEN
DURING NORMAL WORKING HOURS ONLY. INSPECTIONS REQUIRING SUBSTANTIAL TRAVEL TIME MUST BE GIVEN

TENDER, CONTRACT, OR CONSTRUCTION


CONFIRMED IN WRITING TO BE BINDING.
DOCUMENTS. A5 DOCUMENTS ADEQUATE NOTICE.
RESOLVED. 14. THE CONTRACTOR IS RESPONSIBLE FOR DIMENSIONS IN THE FIELD TO SUIT EXISTING CONDITIONS. HE
b. MANUFACTURER’S CERTIFICATE OF 38. THE FOLLOWING STRUCTURAL OBSERVATIONS ARE REQUIRED: SHALL SITE MEASURE AND CONTROL THE PRODUCTION OF WORK ON SITE AND ELSEWHERE TO FULFILL
COMPLIANCE REQUIRED − X − − − PLACEMENT OF REINFORCING STEEL IN WALLS, SLABS AND FOUNDATIONS.
INSTRUCTIONS GIVEN AS A RESULT OF FIELD REVIEW SHALL NOT BE CAUSE FOR EXTRA CHARGE TO THE
THE INTENT OF THE DRAWINGS. NOTIFY THE ENGINEER OF ANY DIMENSIONAL VARIATION FROM THE
− PLACEMENT OF IN−SLAB DUCTS CONTRACT.
5. INSPECTION OF WELDING: PLANS.
− PLACEMENT OF ELECTRICAL CONDUIT
a. STRUCTURAL STEEL AND COLD−FORMED STEEL DECK: − PLACEMENT OF POST−TENSIONED TENDONS FIELD REVIEW BY BMZ STRUCTURAL ENGINEERS DOES NOT REPLACE FIELD REVIEW REQUIRED BY SPECIALTY
15. CONTRACTOR(S) SHALL RECORD AND REPORT ANY SITE CONDITIONS WHICH MAY EFFECT THE
2.0 BASIS OF DESIGN

2020-08-26 4:45:51 PM
STRUCTURE (BUILDINGS, BUILDING COMPONENTS, PROPERTY LINES, SOIL CONDITIONS, ETC.).

PROGRESS
− INSTALLATION OF EXTERIOR WALL ASSEMBLIES AND CLADDING SYSTEMS STRUCTURAL ENGINEERS OR SPECIAL INSPECTION .
16. CONFIRM HEADROOM CLEARANCES, OPENING WIDTH AND HEIGHT, FLOOR−TO−FLOOR, AND OTHER
1) COMPLETE AND PARTIAL JOINT
X − − PLACEMENT OF SHOTCRETE CONCRETE WALLS
DIMENSIONS WITH DRAWINGS PROVIDED BY OTHER CONSULTANTS AND REPORT ANY DISCREPANCIES
DESIGN SUPERIMPOSED LOADS
PENETRATION GROOVE WELDS. WORK MUST BE COMPLETE AT THE TIME OF INSPECTION. WHERE WORK IS INCOMPLETE AT THE TIME OF THE
− ERECTION OF STRUCTURAL STEEL PRIOR TO PROCEEDING WITH CONSTRUCTION OF THE BUILDING ELEMENT.
INSPECTION FURTHER INSPECTION MAY BE REQUIRED. COPIES OF ALL REPORTS SHALL BE FORWARDED TO
2) MULTIPASS FILLET WELDS. X − 17. MAKE AVAILABLE TO THE ENGINEER, AFTER CONTRACT AWARD, A COMPLETE BREAKDOWN OF COSTS
SPECIFIED LIVE LOADS (PSF):
THE ENGINEER AND THE OWNER.
FOR THE STRUCTURAL PORTIONS OF THE WORK AS PREPARED FOR THE BID.
3) SINGLE−PASS FILLET WELDS > 5/16" X − AWS D1.1 1704.3.1
18. CHARGES FOR EXTRAS TO THE CONTRACT MUST BE BROUGHT TO THE ENGINEERS ATTENTION BEFORE
40 RESIDENTIAL BASIC FLOOR AREAS
SPECIAL NOTICES THE WORK PROCEEDS. ADEQUATE TIME MUST BE ALLOWED FOR REVIEW AND APPROVAL OF EXTRAS BY
60 RESIDENTIAL EXTERIOR BALCONIES
4) PLUG AND SLOT WELDS X − 39. THE SPECIAL INSPECTOR MUST, INSPECT THE MATERIALS, VERIFY THE QUALIFICATIONS OF WELDING
THE ARCHITECT AND/OR OWNER . WORK WHICH PROCEEDS PRIOR TO APPROVAL BY THE CONSULTANT
VARIES BALCONIES (1.5 TIMES AREA SERVED)
5) SINGLE−PASS FILLET WELDS PROCEDURES AND WELDERS PRIOR TO THE START OF WORK; INSPECT WORK IN PROGRESS DURING 100 BALCONIES (NEED NOT EXCEED)
− X MAY NOT BE GRANTED EXTRA PAYMENT.
NOT > 5/16" PERIODS STATED AND VISUALLY INSPECTS ALL WELDS PRIOR TO COMPLETION OF PRIOR TO SHIPMENT
OF SHOP WELDED ITEMS. 11.0 QUALITY CONTROL AND INSPECTIONS 19. DO NOT CUT OR DRILL INTO STRUCTURAL MEMBERS, OR CUT REBAR PROJECTIONS WITHOUT FIRST
100
100
GROUND FLOOR (EXCEPT LIVING AREA)
ASSEMBLY AREAS, WALKWAYS, CORRIDORS, LOBBIES, EXITS, STAIRS, ETC.
6) FLOOR AND ROOF DECK WELDS. − X AWS D1.3 40. CONTINUOUS INSPECTION IS ALWAYS REQUIRED DURING THE PERFORMANCE OF THE WORK UNLESS CONTACTING AND OBTAINING THE PERMISSION OF THE ENGINEER OF RECORD.
100 YARDS AND TERRACES − PEDESTRIAN
OTHERWISE SPECIFIED. WHEN WORK IN MORE THAN ONE CATEGORY OF WORK REQUIRING SPECIAL 1. ALL QUALITY CONTROL AND INSPECTION PROCEDURES TO BE AS PER THE CALIFORNIA BUILDING CODE . 20. WHERE WORK PROCEEDS CONTRARY TO THE INSTRUCTIONS OF THESE GENERAL NOTES, THE
b. REINFORCING STEEL: 100 DINING ROOMS AND RESTAURANTS
INSPECTION IS TO BE PERFORMED SIMULTANEOUSLY, OR THE GEOGRAPHIC LOCATION OF WORK IS SUCH 2. THIS PROJECT REQUIRES A SPECIAL INSPECTOR AS PER THE CALIFORNIA BUILDING CODE . CONTRACTOR SHALL BRING THIS MATTER TO THE ATTENTION OF THE ENGINEER FOR HIS CONSIDERATION
40 PARKING AREAS − PASSENGER VEHICLES ONLY (NON−REDUCIBLE)
THAT IT CANNOT BE CONTINUOUSLY OBSERVED IN ACCORDANCE WITH THE PROVISIONS OF CBC 3. THE SPECIAL INSPECTOR SHALL OBSERVE THE WORK FOR CONFORMANCE TO THE APPROVED DESIGN PRIOR TO PROCEEDING WITH THE WORK. IN ANY EVENT, THE ENGINEER SHALL BE MADE FULLY AWARE
1) VERIFICATION OF WELDABILITY OF 250 PARKING AREAS − TRUCKS AND BUSES
DOCUMENTS. THE SPECIAL INSPECTOR SHALL FURNISH INSPECTION REPORTS TO THE BUILDING OFFICIAL, OF ALL MODIFICATIONS TO THE DESIGN OR PROCEDURES HEREIN.
REINFORCING STEEL OTHER − X CHAPTER 17, IT IS THE AGENT’S RESPONSIBILITY TO EMPLOY A SUFFICIENT NUMBER OF INSPECTORS TO 125 STORAGE − LIGHT STORAGE AREAS (AT PARKING LEVELS)
THAN ASTM A 706. ASSURE THAT ALL WORK IS INSPECTED IN ACCORDANCE WITH THOSE PROVISIONS. THE STRUCTURAL ENGINEER OF RECORD, THE ARCHITECT AND THE CONTRACTOR. THE SPECIAL 21. THE CONTRACTOR SHALL REVIEW THE DRAWINGS AND CONSTRUCTION AS IT PROCEEDS TO ENSURE
250 STORAGE − HEAVY STORAGE AREAS
41. THE SPECIAL INSPECTORS MUST BE CERTIFIED BY THE BUILDING OFFICIAL TO PERFORM THE TYPES OF INSPECTOR WILL BRING ALL DISCREPANCIES TO THE IMMEDIATE ATTENTION OF THE CONTRACTOR FOR THAT THE ASSUMPTIONS MADE IN THE DRAWINGS REFLECT THE REQUIREMENTS OF THE BUILDING
100 ELECTRICAL ROOMS (EXCEPT TRANSFORMER LOADS SHOWN)
2) REINFORCING STEEL RESISTING INSPECTIONS SPECIFIED. CORRECTION, THEN, IF UNCORRECTED, TO THE STRUCTURAL ENGINEER OF RECORD AND THE BUILDING CONSTRUCTION AND FIELD CONDITIONS ENCOUNTERED. WHERE DISCREPANCIES ARISE, REPORT
250 LOADING BAY AND DESIGNATED TRUCK ROUTES
FLEXURAL AND AXIAL FORCES IN 42. EXCEPTIONS: OFFICIAL. IMMEDIATELY TO THE ENGINEER.
INTERMEDIATE AND SPECIAL 250 SIDEWALKS AND DRIVEWAYS
AWS D1.4 ACI 318: A. SOILS INSPECTIONS BY THE SOILS ENGINEER OF RECORD 4. THE SPECIAL INSPECTOR SHALL SUBMIT A FINAL REPORT STATING WHETHER THE WORK REQUIRING 22. RFI REQUESTS FOR INFORMATION WHETHER FORMAL OR INFORMAL MUST BE SUBMITTED WITH
MOMENT FRAMES, AND BOUNDARY X − SECTION 26.5.4 − B. SMOKE CONTROL SYSTEM, BY THE MECHANICAL ENGINEER OF RECORD. SPECIAL INSPECTION WAS, TO THE BEST OF THE INSPECTOR’S KNOWLEDGE, IN CONFORMANCE WITH THE ADEQUATE TIME FOR REVIEW AND RESPONSE INCLUDING CONSIDERATION OF THE COMPLEXITY OF THE
20 ROOFS − ORDINARY FLAT, PITCHED, AND CURVED ROOFS
ELEMENTS OF SPECIAL STRUCTURAL 100 ROOFS − USED FOR ROOF GARDENS
C. WHEN WAIVED BY THE BUILDING OFFICIAL APPROVED DESIGN DOCUMENTS AND THE APPLICABLE WORKMANSHIP PROVISIONS OF THE CODE. QUESTION. EACH SUBMISSION OF EACH RFI MUST BE ALLOWED AT LEAST ONE CALENDAR WEEK
WALLS OF CONCRETE AND SHEAR VARIES ROOFS − SAME AS OCCUPANCY SERVED
44. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO NOTIFY THE SPECIAL INSPECTOR OR INSPECTION 5. DEFICIENCIES MUST BE CORRECTED BEFORE WORK PROGRESSES BEYOND THE STATE AT WHICH RESPONSE TIME BY BMZ STRUCTURAL ENGINEERS.
REINFORCEMENT. 100 RETAIL − GROUND FLOOR
AGENCY AT LEAST THREE WORKING DAYS PRIOR TO PERFORMING ANY WORK THAT REQUIRES SPECIAL CORRECTIONS CAN BE EASILY MADE. CONCRETE SHALL NOT BE CAST UNTIL CORRECTIONS ARE MADE TO 23. SITE PRACTICES BY CONTRACTORS OR SUBCONTRACTORS THAT PURPOSELY AVOID PROPER
100 OFFICE − SECOND FLOOR
INSPECTION. ANY DEFICIENCIES FOUND BY EITHER THE SPECIAL INSPECTOR, CONTRACTOR, OR ENGINEER OF RECORD. PERFORMANCE OF THE WORK AS DEEMED BY THE STRUCTURAL ENGINEER SHALL BE GROUNDS FOR
3) SHEAR REINFORCEMENT X − 45. WORK REQUIRING SPECIAL INSPECTION THAT IS INSTALLED OR COVERED WITHOUT THE APPROVAL OF REQUIRING FULL TIME INSPECTION AND/OR SUPERVISION OF THE PROJECT BY THE ENGINEER OR OTHER
100 MECHANICAL ROOMS (EXCEPT UNIT WEIGHTS NOTED)
6. STRUCTURAL OBSERVATION:
5 AWNING AND CANOPIES (200 LB POINT LOAD)
4) OTHER REINFORCING STEEL − X THE CITY INSPECTOR IS SUBJECT TO REMOVAL OR EXPOSURE AT NO COST TO THIS JURISDICTION. THE STRUCTURAL ENGINEER OF RECORD, OR HIS DESIGNATE WHO IS DIRECTLY RESPONSIBLE TO THE INDEPENDENT INSPECTION AGENCY. ALL COSTS FOR ADDITIONAL CONTROL, INSPECTION, TESTING,
VARIES BACKFILL PRESSURE ON WALLS (SEE LOADING DIAGRAM)
STRUCTURAL ENGINEER OF RECORD, WILL MAKE STRUCTURAL OBSERVATIONS AS DEFINED IN SECTION SUPERVISION OR OTHER ACTIONS NECESSARY FOR QUALITY CONTROL OF THE PROJECT AS DEEMED
6. INSPECTION OF STEEL FRAME JOINT DETAILS FOR COMPLIANCE: 220 OF THE CALIFORNIA BUILDING CODE . OBSERVED DEFICIENCIES SHALL BE REPORTED IN WRITING TO APPROPRIATE BY THE STRUCTURAL ENGINEER IN HIS SOLE DISCRETION SHALL BE TO THE ACCOUNT OF
SOILS THE OWNER, SPECIAL INSPECTOR, CONTRACTOR AND BUILDING OFFICIAL. THE STRUCTURAL OBSERVER THE CONTRACTOR REQUIRING THE ADDED WORK.
a. DETAILS SUCH AS BRACING AND 46. PROVIDE SOILS EXPANSION TEST, EXPANSION INDEX, RECOMMENDATIONS FOR SITE SPECIFIED DEAD LOADS (PSF):
SHALL SUBMIT TO THE BUILDING OFFICIAL A WRITTEN STATEMENT ABOUT THE SITE VISITS HAVE BEEN 24. WORK FOUND DEFECTIVE AFTER COMPLETION OF THE WORK OR COMPLETION OF THE PROJECT SHALL
STIFFENING. − X PREPARATIONS AND FOR FOUNDATIONS / ON−GRADE SLAB DESIGN FOR EACH BUILDING SITE. MADE AND IDENTIFYING ANY REPORTED DEFICIENCIES THAT, TO THE BEST OF THE STRUCTURAL REMAIN THE RESPONSIBILITY OF THE CONTRACTOR TO MAKE GOOD. THIS OBLIGATION REMAINS ALIVE
47. SOILS SPECIAL INSPECTIONS SHALL BE PERFORMED BY THE REGISTERED DESIGN PROFESSIONAL IN 20 PARTITIONS
b. MEMBER LOCATIONS. − X − 1704.3.2
RESPONSIBLE CHARGE (SOILS ENGINEER OR GEOTECHNICAL ENGINEER OF RECORD), WHO HAS
OBSERVER’S KNOWLEDGE, HAVE NOT BEEN RESOLVED. BEYOND SUBSTANTIAL COMPLETION OF THE PROJECT OR ANY PORTION THEREOF, REGARDLESS OF
15 ROOFING MATERIALS
PRIOR ACCEPTANCE OR APPROVAL.
c. APPLICATION OF JOINT DETAILS PREPARED THE APPROVED GEOTECHNICAL INVESTIGATION REPORT. 50 MECHANICAL ROOMS (TOTAL LOADS NOT EXCEEDING 400 LBS )
AT EACH CONNECTION. − X 48. A SOILS INSPECTION REPORT (SIGNED, STAMPED AND DATED BY THE SOILS ENGINEER OR
25. BUILDING ENVELOPE: BMZ STRUCTURAL ENGINEERS DO NOT DESIGN, REVIEW, INSPECT OR VERIFY ANY
NOTED ON PLAN MECHANICAL UNITS (TOTAL LOADS EXCEEDING 400 LBS )
MATTERS RELATED TO BUILDING ENVELOPE, WATERPROOFING, VAPOUR BARRIER, TANKING, FINISHES OR
GEOTECHNICAL ENGINEER OF RECORD) SHALL BE SUBMITTED TO, AND APPROVED BY THE CITY’S VARIES SOIL IN EXTERIOR LANDSCAPING (SEE LANDSCAPE LOADING PLAN)
FOR SI: 1 INCH = 25.4 mm OTHER APPLIED MATERIALS. REFER TO THE ARCHITECT OR OTHER SPECIALTY CONSULTANTS.
BUILDING INSPECTOR PRIOR TO FOUNDATION CONCRETE PLACEMENT.
26. FIRE AND HAZARD PREVENTION COMPLIANCE IS PROVIDED BY THE ARCHITECT. SEE ARCHITECTURAL
SEISMIC:
DRAWINGS FOR NOTES REGARDING FIRE RESISTANCE RATING REQUIREMENTS AND MATERIALS, AND FIRE
HAZARD PREVENTION.
SOIL SITE CLASS: C
TABLE 1705.2.2 SEISMIC CATEGORY: D
REQUIRED VERIFICATION & INSPECTION OF STEEL CONSTRUCTION OTHER THAN STRUCTURAL STEEL RISK CATEGORY: II
TABLE 1705.3
SHORT PERIOD SPECTRAL RESPONSE ACCELERATION, Ss: 1.203 g 1.936g
REQUIRED VERIFICATION AND INSPECTION OF CONCRETE CONSTRUCTION
VERIFICATION AND INSPECTION CONTINUOUS PERIODIC REFERENCED STANDARD IBC REFERENCE 1−SECOND PERIOD SPECTRAL RESPONSE ACCELERATION, s1: 0.463 g 0.688g
SHORT PERIOD SPECTRAL RESPONSE ACCELERATION PARAMETER: Sds: 0.802 g 1.548g
VERIFICATION AND INSPECTION CONTINUOUS PERIODIC REFERENCED STANDARD IBC REFERENCE
1. MATERIAL VERIFICATION OF HIGH STRENGTH BOLTS, NUTS AND WASHERS: 6.0 TEMPORARY CONSTRUCTION AND SITE 1−SECOND SPECTRAL RESPONSE ACCELERATION PARAMETER: Sd1: 0.413 g 0.642g
12.0 SPECIAL INSPECTION PROGRAM SEISMIC COEFFICIENT, Fa: 1.0
1. INSPECTION OF REINFORCING
SAFETY

30925-01
Date APRIL 10TH, 2020

SA
JD
ACI 318: Ch. 20, 25.2, a. IDENTIFICATION MARKINGS TO SEISMIC COEFFICIENT, FV: 1.34
STEEL, INCLUDING PRESTRESSING − X 1908.4 CONFORM TO ASTM STANDARDS APPLICABLE ASTM
TENDONS, AND PLACEMENT.
25.3, 26.5.1 − 26.5.3
SPECIFIED IN THE APPROVED
− X
MATERIAL STANDARDS GENERAL Cs=0.043, Ct= 0.02 , Cu= 1.40 , I= 1.0
1. NOTICE TO THE APPLICANT/OWNER/OWNER’S AGENT/ARCHITECT OR ENGINEER OF RECORD: BY USING THESE ENGINEERING DRAWINGS SHOW THE REQUIREMENTS FOR PERMANENT COMPLETED STRUCTURE ONLY. T= FROM DYNAMIC ANALYSIS
CONSTRUCTION DOCUMENTS.
THIS PERMITTED CONSTRUCTION DRAWINGS FOR CONSTRUCTION/INSTALLATION OF THE WORK TEMPORARY WORKS REQUIRED TO COMPLETE THE CONSTRUCTION SHALL BE THE RESPONSIBILITY OF THE
2. IN ACCORDANCE WITH TABLE 1705.2.2, AWS D1.4 HIGH RISE TOWER STRUCTURE:
ITEM 2b. − − ACI 318: 26.5.4
− b. MANUFACTURER’S CERTIFIED TEST −
REPORTS.
X − − SPECIFIED HEREIN, YOU AGREE TO COMPLY WITH THE REQUIREMENTS OF CITY OF SAN DIEGO FOR CONTRACTORS. BMZ STRUCTURAL ENGINEERS ARE NOT RESPONSIBLE FOR DESIGN OR FIELD REVIEW OF
SPECIAL INSPECTIONS, STRUCTURAL OBSERVATIONS, CONSTRUCTION MATERIAL TESTING, AND OFF−SITE TEMPORARY AND ANCILLARY WORK.
2. INSPECTION OF WELDING: FABRICATION OF BUILDING COMPONENTS, CONTAINED IN THE STATEMENT OF SPECIAL INSPECTIONS AND, R = 6.0 "BUILDING FRAME SYSTEM" − SPECIAL REINFORCED CONCRETE SHEARWALLS
AS REQUIRED BY THE CALIFORNIA CONSTRUCTION CODES. THE CONTRACTOR ALONE IS RESPONSIBLE FOR SAFETY IN AND AROUND THE JOBSITE. PROPER AND SAFE
a. COLD−FORMED STEEL DECK: 2. NOTICE TO THE CONTRACTOR/BUILDER/INSTALLER/SUB−CONTRACTOR/OWNER−BUILDER: BY USING MODAL RESPONSE SPECTRUM ANALYSIS PERFORMED USING A SITE SPECIFIC SPECTRUM PROVIDED BY
METHODS OF CONSTRUCTION SHALL BE USED AT ALL TIMES INCLUDING GUYING AND BRACING OF INCOMPLETE
3. INSPECTION OF ANCHORS TO BE − THESE PERMITTED CONSTRUCTION DRAWINGS FOR CONSTRUCTION/INSTALLATION OF THE WORK STRUCTURES, FORMWORK, SHORING, RESHORING, FALSEWORK, PLATFORMS, SCAFFOLDING, BARRIERS, LEIGHTON AND ASSOCIATES, INC. GEOPENTECH
− X ACI 318: 17.8.2 1) FLOOR & ROOF DECK WELDS − X

Project Number
INSTALLED IN CONCRETE SPECIFIED HEREIN, YOU ACKNOWLEDGE AND ARE AWARE OF, THE REQUIREMENTS CONTAINED IN THE WALKWAYS, ETC. PROJECT NO. 11403.001 DATED: AUGUST 15, 2016
b. REINFORCING STEEL: STATEMENT OF SPECIAL INSPECTIONS. YOU AGREE TO COMPLY WITH THE REQUIREMENTS OF CITY OF 15031A MAY 27,2020

Checked By
SAN DIEGO FOR SPECIAL INSPECTIONS, STRUCTURAL OBSERVATIONS, CONSTRUCTION MATERIAL THE CONTRACTOR IS RESPONSIBLE TO CONTROL THE INTENSITY, DURATION AND LOCATION OF CONSTRUCTION

Drawn By
1) VERIFICATION OF WELDABILITY WIND:
AWS D1.4 ACI 318, TESTING, AND OFF−SITE FABRICATION OF BUILDING COMPONENTS, CONTAINED IN THE STATEMENT OF
OF REINFORCING STEEL OTHER − LOADS UPON THE STRUCTURE.
− X SPECIAL INSPECTIONS AND, AS REQUIRED BY THE CALIFORNIA CONSTRUCTION CODES
4. INSPECTION OF ANCHORS Section 26.5.4
ASTM A 706. BASIC WIND SPEED = 110 mph
POST INSTALLED IN HARDENED X − ACI 318: 17.8.2 − 3. SPECIAL INSPECTION IS REQUIRED PER CBC CHAPTER 17.
WHERE SAFETY IS CONCERNED DURING THE COURSE OF CONSTRUCTION, A SPECIALTY ENGINEER SHALL BE EXPOSURE C
CONCRETE. 4. THE SPECIAL INSPECTOR OR MUST BE CERTIFIED BY THE CITY OF SAN DIEGO, DEVELOPMENT SERVICES,
ENGAGED TO ASSURE THE SAFETY AND STABILITY OF THE STRUCTURE UNDER TEMPORARY CONDITIONS AND
2) REINFORCING STEEL RESISTING IN THE CATEGORY OF WORK REQUIRED TO HAVE SPECIAL INSPECTION.
5. VERIFYING USE OF REQUIRED ACI 318: Ch. 19, 1904.2, 1904.1, CONSTRUCTION LOADS UNTIL THE STRUCTURE OF THE BUILDING IS COMPLETE. WATER TABLE ELEVATION: N/A
DESIGN MIX. − X 26.4.3, 26.4.4 1908.8, 1908.3
FLEXURAL AND AXIAL FORCES IN 5. THE CONSTRUCTION MATERIALS TESTING LABORATORY MUST BE APPROVED BY THE C ITY OF SAN DIEGO,
INTERMEDIATE AND SPECIAL DEVELOPMENT SERVICES, FOR TESTING MATERIALS, SYSTEMS, COMPONENTS AND EQUIPMENTS.
MOMENT FRAMES, AND BOUNDARY X −
6. ALL OBSERVED DEFICIENCIES SHALL BE REPORTED IN WRITING TO THE OWNER’S REPRESENTATIVE,
FORMWORK
6. PRIOR TO CONCRETE PLACEMENT, ELEMENTS OF SPECIAL STRUCTRAL THE PRIMARY STRUCTURE OF THIS BUILDING HAS BEEN DESIGNED FOR SEISMIC AND WIND LOADS IN
WALLS OF CONCRETE AND SHEAR SPECIAL INSPECTOR, CONTRACTOR, & FIELD INSPECTION SERVICES.
FABRICATE SPECIMENS FOR ASTM C 172 FORMWORK SHALL BE DESIGNED BY THE CONTRACTOR IN ACCORDANCE WITH THE CODE, THE FOLLOWING ACCORDANCE WITH APPLICABLE PROJECT CODES AND STANDARDS.
REINFORCING. 7. FABRICATOR MUST BE REGISTERED AND APPROVED BY THE CITY OF SAN DIEGO, DEVELOPMENT
STRENGTH TESTS, PERFORM SLUMP
AND AIR CONTENT TESTS, AND
X − ASTM C 31 1908.10 SERVICES FOR THE FABRICATION OF MEMBERS AND ASSEMBLIES ON THE PREMISES OF THE
REQUIREMENTS AND ACI 347 "GUIDE TO FORMWORK FOR CONCRETE" WHEREVER THE ACI REQUIREMENTS DO
ACI 318: 26.4.5, 26.12 NOT DIMINISH THE INTENT OR REQUIREMENTS OTHERWISE STATED HEREIN. FORMWORK SHALL BE DESIGNED CONTRACTORS SHALL REPORT TO THE STRUCTURAL ENGINEER ANY LOADS TO THE BUILDING EXCEEDING THE
DETERMINE THE TEMPERATURE 3) SHEAR REINFORCING. X − FABRICATOR’S SHOP.
OF THE CONCRETE. TO SAFELY SUPPORT THE PRESSURES AND LOAD FROM CONCRETE AND MEN AND EQUIPMENT. FORMWORK LOADS INDICATED ON THE PLANS, OR ANY LOADS EXCEEDING 500 POUNDS NOT SHOWN ON THE PLANS.
4) OTHER STEEL REINFORCING. − X REQUIRED INSPECTIONS SHALL BE DESIGNED TO AVOID ANY OVERLOAD TO THE STRUCTURE OF THE BUILDING. FORMWORK INCLUDING
8. THE SPECIAL INSPECTIONS IDENTIFIED ON PLANS ARE, IN ADDITION TO, AND NOT A SUBSTITUTE FOR, BRACING, RESHORING, FALSEWORK, ETC. SHALL BE DESIGNED AND INSPECTED BY A SPECIALTY ENGINEER CONSTRUCTION LOADS SHALL NOT EXCEED THE SPECIFIED DESIGN LIVE LOAD FOR THE STRUCTURAL
7. INSPECTION OF CONCRETE AND
SHOTCRETE PLACEMENT FOR THOSE INSPECTIONS REQUIRED TO BE PERFORMED BY A CITY BUILDING INSPECTOR. WHO IS A REGISTERED PROFESSIONAL ENGINEER WITH EXPERIENCE IN THE PROPOSED METHODS OF ELEMENTS. CONTRACTORS MUST CONFIRM ANY QUESTIONABLE LOADING AS REQUIRED FOR TEMPORARY
X − ACI 318: 26.4.5
1908.6, 1908.7,

1233 South Grand


PROPER APPLICATION AND 1908.8 9. WELDS IDENTIFIED AS REQUIRING CONTINUOUS OR PERIODIC SPECIAL INSPECTION NEED NOT HAVE FORMWORK CONSTRUCTION. CONDITIONS OF CONSTRUCTION, UNDER THE SUPERVISION OF A PROFESSIONAL ENGINEER.
TECHNIQUES. SPECIAL INSPECTION WHEN THE WELDING IS DONE IN A FABRICATOR’S SHOP APPROVED AND
REGISTERED BY THE CITY OF SAN DIEGO . HOWEVER, THE APPROVED FABRICATOR MUST SUBMIT A WORKERS SAFETY AUTHORITY
8. INSPECTION FOR MAINTENANCE CERTIFICATE OF COMPLIANCE IN ACCORDANCE WITH IBC CHAPTER 17. WHEN WELDING IS DONE IN A
OF SPECIFIED CURING − X ACI 318: 26.4.7 − 26.4.9 −
SHOP WHICH IS NOT AN APPROVED FABRICATOR, SPECIAL INSPECTION IS REQUIRED AND AN THE GENERAL CONTRACTOR AND SUBCONTRACTORS ARE RESPONSIBLE TO ADMINISTER AND PROVIDE FOR
TEMPERATURE AND TECHNIQUES.
APPLICATION TO PERFORM OFF−SITE FABRICATION MUST BE SUBMITTED TO AND APPROVED BY THE ALL MATTERS RELATED TO THE WORKERS SAFETY INCLUDING AUTHORITIES ADMINISTERING GOVERNMENTAL
INSPECTION SERVICES DIVISION. LAWS AND BYLAWS PERTAINING TO WORKER SAFETY INCLUDING BUT NOT LIMITED TO SITE SAFETY,
9. INSPECTION OF PRESTRESSED 10. THE SPECIAL INSPECTOR MUST, INSPECT THE MATERIALS, VERIFY THE QUALIFICATIONS OF WELDING TEMPORARY AND ANCILLARY WORKS, TRAINING, AND CONTROL OF THE WORK AND WORK PROCESSES. THE
CONCRETE: PROCEDURES AND WELDERS PRIOR TO THE START OF WORK; INSPECT WORK IN PROGRESS DURING CONTRACTORS SHALL ENSURE COMPLIANCE WITH WORKERS HEALTH AND SAFETY REGULATIONS AND GOOD
X
a. APPLICATION OF PRESTRESSING
FORCES.
X

ACI 318: 26.9.2.1
ACI 318: 26.9.2.3 −
PERIODS STATED AND VISUALLY INSPECT ALL WELDS PRIOR TO COMPLETION OF PRIOR TO SHIPMENT OF
SHOP WELDED ITEMS.
WORK PRACTICES AND WHERE NECESSARY OR PRUDENT SHALL PROVIDE ENGINEERING EXPERTISE TO
CONFIRM SUCH COMPLIANCE.
3.0 DEFERRED APPROVALS
b. GROUTING OF BONDED
11. SPECIAL INSPECTOR SHALL PERFORM AN INSPECTION OF THE STEEL FRAME TO VERIFY COMPLIANCE
PRESTRESSING TENDON DEFERRED SUBMITTAL(S) SHALL BE PROVIDED FOR THE FOLLOWING BUILDING COMPONENTS / ELEMENTS:
WITH THE DETAILS SHOWN ON THE APPROVED PLANS, SUCH AS BRACING, STIFFENING, MEMBER
(REFER TO ARCHITECTURAL DRAWINGS FOR A COMPLETE LIST OF REMAINING DEFERRED SUBMITTAL ITEMS)
LOCATIONS AND PROPER APPLICATION OF JOINT DETAILS AT EACH CONNECTION.
10. ERECTION OF PRECAST CONCRETE
MEMBERS − X ACI 318: Ch. 26.8 − 12. NON DESTRUCTIVE TESTING OF WELDS AS REQUIRED PER SECTION 1705.2 MUST BE PERFORMED BY A
− GLAZING WALLS AND WINDOW SYSTEMS
CONSTRUCTION MATERIALS TESTING LABORATORY CERTIFIED BY THE CITY OF SAN DIEGO . NON

11. VERIFICATION OF IN−SITU CONCRETE


DESTRUCTIVE TESTING TO BE ULTRASONIC OR MAGNETIC PARTICLE TESTING OR PRE−APPROVED
EQUIVALENT. 7.0 SUBMITTALS 1. IT IS UNDERSTOOD THAT PLANS FOR THE PROJECT HAVE , AT THIS TIME, BEEN REVIEWED FOR
STRENGTH, PRIOR TO STRESSING OF 13. NON DESTRUCTIVE TESTING IS REQUIRED FOR CONNECTIONS OF ALL SEISMIC ELEMENTS, BRACING,
− COMPLIANCE WITH THE APPLICABLE STATE AND CITY REGULATIONS, AND THAT THE PROJECT AS A
TENDONS IN POST−TENSIONED FRAMES, AND BUTT−JOINTED CONNECTIONS.
CONCRETE AND PRIOR TO REMOVAL − X ACI 318: 26.10.2
14. SPECIAL INSPECTION IS REQUIRED FOR BOLTED CONNECTIONS UTILIZING HIGH−STRENGTH A325 AND SHOP DRAWINGS SHALL BE SUBMITTED VIA THE ARCHITECT WITH A MINIMUM OF 3 WEEKS FOR REVIEW. WHOLE HAS BEEN APPROVED BY THE CITY, WITH THE EXCEPTION OF THE DEFERRED SUBMITTAL ITEMS
OF SHORES AND FORMS FROM A490 BOLTS. SUCH INSPECTIONS SHALL BE IN ACCORDANCE WITH APPROVED NATIONALLY RECOGNIZED DOCUMENTS REQUIRING THE SEAL OF A SPECIALTY STRUCTURAL ENGINEER SHOULD BE SEALED WHEN LISTED.
BEAMS AND STRUCTURAL SLABS. STANDARDS AND THE REQUIREMENTS OF CBC CHAPTER 17 AND AISC 360. WHILE THE WORK IS IN SUBMITTED FOR REVIEW. DOCUMENTS RECEIVED WITHOUT APPROPRIATE USE OF THE SEAL MAY BE 2. I/WE UNDERSTAND THAT I/WE WILL NOT BE AUTHORIZED ANY INSPECTION OF THE DEFERRED ITEMS
PROGRESS, THE SPECIAL INSPECTOR SHALL DETERMINE THAT THE REQUIREMENTS FOR BOLTS, NUTS , RETURNED AND ALL INCOMPLETE SUBMISSIONS MAY REQUIRE A FURTHER COMPLETE SUBMISSION. PROPOSED PRIOR TO THE SUBMITTAL AND APPROVAL OF PLANS AND/OR CALCULATIONS FOR THOSE
WASHERS AND PAINT; BOLTED PARTS; AND INSTALLATION AND TIGHTENING IN SUCH STANDARDS ARE DEFERRED ITEMS.
12. INSPECT FORMWORK FOR MET. SUCH INSPECTIONS MAY BE PERFORMED ON A PERIODIC BASIS IN ACCORDANCE WITH THE REVIEW OF SHOP DRAWINGS IS ONLY FOR GENERAL COMPATIBILITY WITH THE DESIGN CONCEPT. THE 3. SUBMITTAL DOCUMENTS FOR DEFERRED SUBMITTAL ITEMS SHALL BE SUBMITTED TO THE BUILDING
SHAPE, LOCATIONS AND REQUIREMENTS OF CBC CHAPTER 17 AND AISC 360 CONSULTANT DOES NOT WARRANT OR REPRESENT THAT THE INFORMATION CONTAINED ON THE SHOP OFFICIAL FOR REVIEW AND APPROVAL BY THE PROJECT ARCHITECT, AND NOT BY THE INDIVIDUAL
DIMENSIONS OF CONCRETE − X ACI 318: 26.10.1 (B) −
CONTRACTOR / CONSULTANT.
15. THE SPECIAL INSPECTOR FOR HIGH STRENGTH BOLTED CONNECTIONS SHALL OBSERVE THE DRAWINGS IS EITHER ACCURATE OR COMPLETE. SOLE RESPONSIBILITY FOR CORRECT DESIGN, DETAILS AND
MEMBER BEING FORMED 4. DEFERRED SUBMITTAL DOCUMENTS IN ADDITION TO THE SEAL OF THE RESPONSIBLE ENGINEER SHALL
CALIBRATION PROCEDURES WHEN SUCH PROCEDURES ARE REQUIRED BY THE PLANS OR DIMENSIONS SHALL REMAIN WITH THE PARTIES SUBMITTING THE DRAWING. REVIEW IS NOT APPROVAL OF

ADDRESS, AVE, SUITE


SPECIFICATIONS AND SHALL MONITOR THE INSTALLATION OF BOLTS TO DETERMINE THAT ALL PLIES OF DESIGN AND SHALL NOT RELIEVE THE CONTRACTOR OF RESPONSIBILITY TO SATISFY REQUIREMENTS OF THE BEAR THE SHOP DRAWING APPROVAL STAMPS OF THE ARCHITECT, ENGINEER OF RECORD, AND THE
CONNECTED MATERIALS HAVE BEEN DRAWN TOGETHER AND THAT THE SELECTED PROCEDURE IS CONTRACT DOCUMENTS. GENERAL CONTRACTOR ON ALL SHEETS OF PLANS AND COVER OF THE CALCULATIONS.
PROPERLY USED TO TIGHTEN ALL BOLTS. 5. SUBMITTAL DOCUMENTS FOR DEFERRED SUBMITTAL ITEMS LISTED ABOVE SHALL BE SUBMITTED IN A

CITY, STATE, ZIP


PROJECT NAME
16. SPECIAL INSPECTION MUST BE PROVIDED FOR THE APPLICATION OF SPRAY APPLIED FIRE RESISTIVE TIMELY MANNER THAT ALLOWS A MINIMUM OF 30 WORKING DAYS FOR INITIAL PLAN REVIEW. ALL
MATERIAL SUCH AS FIBROUS AND CEMENTITIOUS FIRE−RESISTIVE MATERIALS, INTUMESCENT PAINTS AS COMMENTS RELATED TO THE DEFERRED SUBMITTAL MUST BE ADDRESSED TO THE SATISFACTION OF THE
WELL AS OTHER SIMILAR MATERIALS. PER CBC CHAPTER 17 AND AISC 360. THE SPECIAL INSPECTOR BUILDING OFFICIAL PRIOR TO APPROVAL OF THE SUBMITTAL ITEMS. INSPECTIONS OF DEFERRED
MUST VERIFY THE CONDITION OF THE SUBSTRATE OF THE STRUCTURAL ELEMENT TO BE PROTECTED, SUBMITTAL ITEMS WILL NOT BE PERFORMED UNTIL THE ITEM IS APPROVED.
THE THICKNESS OF THE SPRAY APPLIED MATERIAL AND THE DENSITY OF THE SPRAY APPLIED MATERIAL. 8.0 DESIGN BY CONTRACTORS 6. DEFERRED SUBMITTAL ITEMS SHALL NOT BE FABRICATED / INSTALLED UNTIL THEIR DESIGN AND
A COHESION/ADHESION TEST MUST BE PERFORMED IN ACCORDANCE WITH THE REQUIREMENTS OF CBC SUBMITTAL DOCUMENTS HAVE BEEN APPROVED BY THE BUILDING OFFICIAL.
CHAPTER 17 AND AISC 360. STRUCTURAL ELEMENTS REQUIRED BUT NOT INDICATED IN THE DRAWINGS SHALL BE DESIGNED BY A 7. DOCUMENTS FOR THE DEFERRED SUBMITTAL ITEMS LISTED SHALL BE SUBMITTED IN A TIMELY MANNER
17. SEE SUMMARY OF SPECIAL INSPECTION IN FOLLOWING TABLES FOR A LIST OF REQUIRED INSPECTIONS. SPECIALTY STRUCTURAL ENGINEER. CONNECTIONS BETWEEN STRUCTURAL ELEMENTS REQUIRED BUT NOT TO THE BUILDING OFFICIAL THAT ALLOWS A MINIMUM OF 30 WORKING DAYS FOR INITIAL REVIEW.
18. HIGH−STRENGTH BOLTS, NUTS, AND WASHERS MAY BE REQUIRED TO BE SAMPLED, TESTED AND SHOWN SHALL BE DESIGNED BY A SPECIALTY STRUCTURAL ENGINEER. SEMI−STRUCTURAL ELEMENTS 8. PROVIDE TWO COPIES OF DEFERRED SUBMITTAL DOCUMENTS FOR FINAL APPROVAL.
INSPECTED BY THE BUILDING OFFICIAL, INSPECTOR SERVICES DIVISION PRIOR TO INSTALLATION INDICATED ON ARCHITECTURAL, MECHANICAL, ELECTRICAL AND OTHER DRAWINGS, OR REQUIRED TO FULFILL

THE LIMITED PURPOSE OF EVALUATION, BIDDING OR REVIEW. THIS DOCUMENT OR ITS CONTENTS MAY NOT BE USED FOR ANY
19. SPECIAL INSPECTION IS REQUIRED PRIOR TO AND DURING THE PLACEMENT OF CONCRETE AROUND

THIS DOCUMENT CONTAINS INFORMATION PROPRIETARY TO MVE + PARTNERS, INC. AND IS FURNISHED IN CONFIDENCE FOR
THE INTENT OF THE WORK SHALL BE DESIGNED BY A SPECIALTY STRUCT8RAL ENGINEER FOR GRAVITY AND

OTHER PURPOSE AND MAY NOT BE REPRODUCED OR DISCLOSED TO OTHERS WITHOUT THE PRIOR WRITTEN CONSENT OF
BOLTS. SEISMIC INTEGRITY AND CONNECTION TO PRIMARY STRUCTURE.
20. SPECIAL INSPECTION IS REQUIRED DURING TAKING TEST SPECIMENS AND PLACING CONCRETE.
21. SPECIAL INSPECTION IS REQUIRED DURING STRESSING AND GROUTING OF PRESTRESSED CONCRETE.
22. THE SPECIAL INSPECTOR SHALL VERIFY THE REINFORCING PRIOR TO CLOSING THE FORMS OR DELIVERY DESIGN OF COMPONENTS WHICH RELY ON THE PRIMARY STRUCTURE FOR SUPPORT SHALL BE SUBMITTED TO
OF CONCRETE TO THE JOBSITE. THE STRUCTURAL ENGINEER FOR REVIEW. INDICATE CLEARLY THE METHOD AND MEANS OF ATTACHMENT AND
THE MAGNITUDE OF FORCES THAT THE STRUCTURE MUST WITHSTAND. REVIEW BY THE ENGINEER OF RECORD
PERIODIC INSPECTIONS MAY RESULT IN THE NEED TO MODIFY THIS MEANS OF CONNECTION WHICH MUST THEN BE REDESIGNED BY THE
23. THE SPECIAL INSPECTOR NEED NOT BE CONTINUOUSLY PRESENT DURING WELDING OF THE FOLLOWING
ITEMS PROVIDED THE MATERIALS, QUALIFICATIONS OR WELDING PROCEDURES, AND WELDERS ARE
SPECIALTY STRUCTURAL ENGINEER.
4.0 SEPARATE PERMIT
VERIFIED PRIOR TO THE START OF WORK; PERIODIC INSPECTIONS ARE MADE OF WORK IN PROGRESS;
ALL CONSTRUCTION, DESIGN, MATERIALS AND PRACTICES SHALL COMPLY WITH THE CURRENT EDITIONS OF
AND A VISUAL INSPECTION OF ALL WELDS IS MADE PRIOR TO COMPLETION OR PRIOR TO SHIPMENT OF THE FOLLOWING ITEMS ARE NOT DEFERRED SUBMITTAL ITEMS FOR THIS PERMIT APPLICATION, BUT ARE ITEMS
APPLICABLE CODES.
SHOP WELDING: THAT SHALL BE SUBMITTED UNDER A SEPARATE PERMIT. PLANS AND CALCULATIONS FOR THESE ITEMS ARE TO
− SINGLE−PASS FILLET WELDS NOT EXCEEDING 5/16 INCH IN SIZE BE SUBMITTED TO THE CITY FOR REVIEW AND APPROVAL:
A SPECIALTY STRUCTURAL ENGINEER IS AN ENGINEER REGISTERED IN CALIFORNIA , EMPLOYED BY A
− WELDED STUDS ON FLOOR BEAMS
CONTRACTOR(S), THE OWNER, OR OTHERS, WHO POSSESSES SPECIALTY KNOWLEDGE OR EXPERIENCE AND IS
− EXCAVATION SHORING
RESPONSIBLE FOR DESIGN AND FIELD REVIEW OF SPECIFIC COMPONENTS OF THE PRIMARY STRUCTURE
AND/OR OTHER SEMI−STRUCTURAL BUILDING COMPONENTS WHETHER FORMING PART OF THE STRUCTURE OR
AS PART OF THE WORK SPECIFIED BY OTHER CONSULTANTS ON THE PROJECT. WORK BY A SPECIALTY
STRUCTURAL ENGINEER IS INDEPENDENT OF THE STRUCTURAL ENGINEER OF RECORD.

MVE + PARTNERS, INC. ALL RIGHTS RESERVED, © COPYRIGHT 2018.


ALL ENGINEERS PROVIDING SERVICES AFFECTING THE PERMANENT BUILDING STRUCTURE SHALL PROVIDE
LETTERS OF CERTIFICATION, FIELD REVIEW, SEALED CALCULATIONS (WHEN REQUESTED) AND SEALED
DRAWINGS SUBMITTED TO THE CONSULTANT FOR REVIEW PRIOR TO COMMENCING WITH THE WORK.

GENERAL NOTES

1/8" = 1'-0"

08/03/2020 - ISSUED FOR 100% DD PROGRESS SET


SHEET TITLE

Scale
SHEET NUMBER

S1.01
PROJECT NUMBER
30925-01

BRYSON MARKULIN ZICKMANTEL


STRUCTURAL ENGINEERS

#501 - 510 BURRARD STREET, VANCOUVER, B.C. V6C 3A8


(604) 685-9533 WWW.BMZSE.COM CONTACT@BMZSE.COM
STAMP
TABLE 1704.5.1
LEVEL 1 REQUIRED VERIFICATION AND INSPECTION OF MASONRY CONSTRUCTION

23.0 TOLERANCES 20.0 CONCRETE CONSTRUCTION 16.0 GEOTECHNICAL CONSULTANT 13.0 SECONDARY BUILDING COMPONENTS FREQUENCY OF INSPECTION REFERENCE FOR CRITERIA ISSUES:
1. TOLERANCES SHALL BE IN ACCORDANCE WITH PROJECT CODES AND STANDARDS EXCEPT AS NOTED HERE. 1. CONCRETE WORK SHALL CONFORM TO THE LATEST EDITIONS OF PROJECT CODES AND STANDARDS THE GEOTECHNICAL CONSULTANT IS AN INDEPENDENT REGISTERED PROFESSIONAL WHO SHALL PROVIDE AND NO. DATE DESCRIPTION
2. THICKNESS OF SLABS, BEAMS, WALLS, AND OTHER FORMED CONCRETE MEMBERS: 2. THE GENERAL CONTRACTOR SHALL SUPERVISE AND BE RESPONSIBLE FOR THE METHODS AND BE RESPONSIBLE FOR CONSULTING AND FIELD REVIEW OF GEOTECHNICAL ASPECTS OF THE PROJECT. TMS 402/ACI TMS 602/ACI
VERIFICATION AND INSPECTION CONTINUOUS PERIODIC IBC SECTION
DESIGN TOLERANCE −0 TO +1/2 INCH IN NARROW DIMENSION OF MEMBER PROCEDURES OF CONCRETE PLACEMENT. ENSURE THAT CONCRETE PLACEMENT DOES NOT DISPLACE 530/ASCE 5 ª 530.1/ASCE 6 ª A 2020-04-23 ISSUED AS 100% SD
THIS SECTION INDICATES LOADS AND REQUIREMENTS FOR CONSTRUCTION ITEMS NOT PART OF THE PRIMARY
DESIGN TOLERANCE −0 TO +3/4 INCH IN OTHER DIMENSIONS INCLUDING LENGTH OF MEMBERS OVER 3 FT REINFORCING MATERIALS FROM THEIR INTENDED LINE AND POSITION. THE GEOTECHNICAL CONSULTANT FOR THIS PROJECT IS: STRUCTURE OF THE BUILDING. IT IS PROVIDED FOR THE CONVENIENCE OF THE ARCHITECT AND B 2020-06-16 50% DD PROGRESS
1. COMPLIANCE WITH REQUIRED SET
LONG EXCEPT FOR LEVEL AND SIZE AS IT WOULD AFFECT OTHER TRADES 3. ENSURE THAT CONCRETE IS PROPERLY CONSOLIDATED IN ALL AREAS. ENSURE THAT CONCRETE LEIGHTON AND ASSOCIATES, INC. GEOPENTECH CONTRACTORS BUT DOES NOT FORM PART OF THE REQUIREMENTS FOR THE PRIMARY STRUCTURE FOR WHICH INSPECTION PROVISIONS OF THE
3. COLUMN OFFSET BETWEEN FLOOR LEVELS: PLACING METHODS DO NOT OVERLOAD FORMWORK. C 2020-08-03 100% DD PROGRESS
DESIGN TOLERANCE +/− 3/8 INCHES FROM INTENDED ALIGNMENT
ROBERT C. STROH, CEG 2099 STEVEN K. DUKE, CEG 2269 THESE DRAWINGS APPLY. WHERE OTHER MORE ONEROUS REQUIREMENTS ARE INDICATED ELSEWHERE, AND CONSTRUCTION DOCUMENTS AND − X − − ART 1.5
SET
PROJECT NO. 11403.001 DATED: AUGUST 15, 2016 BY OTHERS OR IN APPLICABLE CODES, THEY SHALL APPLY. THE APPROVED SUBMITTALS SHALL
4. COLUMN HEIGHT TO UNDERSIDE OF SLAB OR BEAM: WEATHER CONDITIONS: 15031A MAY 27,2020 BE VERIFIED.
+0 TO −4 INCHES. NOTE: COLUMN SHOULD NOT EXTEND UP INTO SLAB. 1. SECONDARY ELEMENTS AND BUILDING COMPONENTS INCLUDING ARCHITECTURAL, MECHANICAL AND
5. PLUMBNESS, SLOPE AND ALIGNMENT OF SURFACES: VERTICAL OR SLOPED MEMBERS 4. SPECIAL CONSTRUCTION PROCEDURES FOR CONCRETE WORK IN ADVERSE WEATHER CONDITIONS 2. VERIFICATION OF ’m OF ’AAC
THE GEOTECHNICAL CONSULTANT SHALL BE RESPONSIBLE FOR CONFIRMING THAT THE WORK PRACTICES OF SEMI−STRUCTURAL MEMBERS AND THEIR CONNECTIONS TO THE PRIMARY STRUCTURE SHALL BE
DESIGN TOLERANCE LESSER OF 1:400 OR 3/4 INCH MAX OVER ANY ELEMENT EXCEPT FOR FULL HEIGHT PRIOR TO CONSTRUCTION EXCEPT
SHALL BE IN ACCORDANCE WITH THE CALIFORNIA BUILDING CODE AND SHALL BE REVIEWED BY THE THE CONTRACTOR(S) PERTAINING TO SOILS RELATED WORK CONFORMS TO REQUIREMENTS OF THIS DESIGNED AND INSPECTED IN THE FIELD BY A SPECIALTY STRUCTURAL ENGINEER REGISTERED TO WHERE SPECIFICALLY EXEMPTED BY − X − − ART 1.4B
TOLERANCE AS REQUIRED FOR OTHER TRADES SUCH AS ELEVATORS, WALL SYSTEMS, FINISHES AND SPECIAL INSPECTOR. THIS INCLUDES CONCRETE CAST DURING COLD OR HOT WEATHER, AND ANY OTHER SPECIFICATION, THE GEOTECHNICAL REPORT AND GOOD WORK PRACTICE. PRACTICE IN THE STATE OF CALIFORNIA FOR THE SUPPLIER. THIS CODE.
SIMILAR AS SPECIFIED BY OTHERS. CONDITIONS SUCH AS HEAVY RAIN WHERE THE QUALITY OF THE WORK MAY BE JEOPARDIZED. 2. SUBMIT TO THE ARCHITECT SHOP DRAWINGS TOGETHER WITH CALCULATIONS SEALED BY THE
6. ALIGNMENT OF FORMING MATERIALS ALONG A FACE OF CONCRETE 1/8 INCH MAXIMUM TOLERANCE 5. MEASURES TO BE TAKEN BY CONTRACTOR FOR MASS CONCRETE POURS TO ENSURE HEAT OF GEOTECHNICAL REPORTS FOR THE PROJECT MAY GIVE ALTERNATE FOUNDATION SYSTEMS AND OTHER SPECIALTY STRUCTURAL ENGINEER INDICATING DETAILS OF CONNECTIONS MADE TO THE BUILDING 3. VERIFICATION OF SLUMP FLOW AND
EXCEPT FOR ARCHITECTURAL EXPOSED CONCRETE AS SPECIFIED BY THE ARCHITECT. HYDRATION IS CONTROLLED WITHIN ACCEPTABLE TOLERANCES PER ACI 207 MANUAL OF CONCRETE
7. SITE REFERENCE SYSTEMS SHALL BE ACCURATELY LOCATED WITHIN 1/8 INCH MAX TOLERANCE. PRACTICE. CONTRACTOR TO MONITOR CONCRETE TEMPERATURES AND REPORT RESULTS TO BMZ
GENERAL DESIGN INFORMATION. FOR CONSTRUCTION, THE GEOTECHNICAL CONSULTANT SHALL REVIEW THE PRIMARY STRUCTURE. SHOW ALL DESIGN LOADS APPLIED TO THE BUILDING STRUCTURE. THE DESIGN VSI AS DELIVERED TO THE SITE FOR X − − − ART 1.5B.1.b.3
STRUCTURAL DRAWINGS AND PROVIDE ANY NECESSARY REQUIREMENTS FOR PREPARATION OF THE BEARING AND INSPECTION OF CONNECTIONS SHALL BE THE RESPONSIBILITY OF THE SUPPLIER. SELF CONSOLIDATING GROUT.
8. EMBEDDED ITEMS RECEIVING STRUCTURAL STEEL MEMBERS SHALL BE LOCATED TO WITHIN +/− 3/8 INCH STRUCTURAL ENGINEERS. SURFACES, BACKFILL, DEEP STRATA OR OTHER SOILS WHICH MAY BE NECESSARY FOR THE SAFE, 3. SECONDARY AND SEMI−STRUCTURAL BUILDING COMPONENTS SHALL NOT BE BUILT RIGIDLY AGAINST
OF INTENDED POSITION OR WITH GREATER ACCURACY AS REQUIRED BY THE STEEL ELEMENT DESIGN 6. ALL CONSTRUCTION JOINTS IN STRUCTURAL MEMBERS TO BE REVIEWED BY BMZ STRUCTURAL SERVICEABLE PERFORMANCE OF THE STRUCTURE AS DESIGNED. STRUCTURE IN A MANNER WHICH WOULD FORCE REDISTRIBUTION OF LATERAL LOADS IN THE 4. AS MASONRY CONSTRUCTION BEGINS, THE FOLLOWING SHALL BE VERIFIED TO ENSURE COMPLIANCE:
(EXAMPLE: STEEL BOLT ACCURACY). PROVIDE ANCHOR SYSTEMS WITH TOLERANCE IN THE CONNECTION ENGINEERS FOR LOCATION AND DETAIL PRIOR TO CONSTRUCTION. REINFORCEMENT TO CONTINUE
STRUCTURE. PROVIDE EXPANSION AND MOVEMENT JOINTS AT SIDES AND TOP OF RIGID COMPONENTS
TO MAKE UP FOR PLACEMENT TOLERANCES. UNINTERRUPTED THROUGH ALL CONSTRUCTION JOINTS. KEYWAYS TO BE PROVIDED PERPENDICULAR
SUCH AS MASONRY. SUBMIT DETAILS FOR REVIEW BY THE ENGINEER. a. PORTIONS OF SITE−PREPARED
9. ANCHOR BOLT TOLERANCE +/− 1/8 INCH FROM INTENDED ALIGNMENT AND 1/400 PLUMB. COORDINATE TO THE DIRECTION OF LOAD IN ALL JOINTS. SEE TYPICAL DETAILS.
4. SECONDARY ELEMENTS SHALL BE CONNECTED TO PRIMARY STRUCTURE IN SUCH LOCATIONS AND WITH MORTAR. − X − − ART 2.6A
WITH ANCHOR BOLT HOLE SIZES IN STEEL PLATES.
METHODS WHEREBY THE PRIMARY STRUCTURE IS CAPABLE OF RESISTING IMPOSED FORCES FROM
10. SPECIAL PROVISIONS FOR SLABS AND FINISHED HORIZONTAL SURFACES:
• MEASURE TOLERANCES WITHIN 18 HOURS OF FINISHING AND BEFORE FORM REMOVAL.
TOLERANCES:
17.0 FOUNDATION AND SOILS WORK SECONDARY ELEMENTS. PROVIDE ELEMENTS AS NECESSARY TO MAKE CONNECTION TO THE PRIMARY
b. CONSTRUCTION OF MORTAR JOINTS − X − − ART 3.3B

• MEASURE TO ACCURACY OF 1/16 INCH. 7. TOLERANCES SPECIFIED HEREIN SHALL NOT RELIEVE THE CONTRACTOR OF THE RESPONSIBILITY
STRUCTURE AS PERMITTED BY BMZ STRUCTURAL ENGINEERS.
c. LOCATIONS OF REINFORCEMENT
• 1 IN 10 MEASUREMENTS MAY EXCEED TOLERANCE IF MEASUREMENTS ARE UNIFORMLY SPACED 1. MINIMUM REQUIRED FOUNDATION DESIGN BEARING CAPACITY: 5. STORE FRONT GLAZING, WINDOWS AND WINDOW MULLIONS, GLAZED PARTITIONS, CURTAIN WALLS, ART 3.4,
TO PROVIDE CLOSER TOLERANCES REQUIRED BY OTHER BUILDING COMPONENTS.
GLASS BLOCK WALLS, STEEL STUD OR FRAME WALLS, EXTERIOR CLADDING, HANDRAILS, GUARDRAILS,
CONNECTORS, PRESTRESSING − X − − 36.A
THROUGHOUT THE WORK AREA. 8. CONFIRM HEADROOM CLEARANCES, OPENING WIDTH AND HEIGHT, FLOOR−TO−FLOOR, AND OTHER TENDONS AND ANCHORAGES.
• MEASURE TOLERANCE AT ALL SUPPORT LOCATIONS, MID−SPAN BETWEEN SUPPORTS, SLAB EDGES DIMENSIONS WITH DRAWINGS PROVIDED BY OTHER CONSULTANTS AND REPORT ANY DISCREPANCIES
10,000 PSF SPREAD FOOTINGS UPSTANDS, AND CONNECTIONS FOR BRICK, ETC. SHALL BE DESIGNED FOR LOADS IN ACCORDANCE WITH
AND CORNERS AND AT ANY APPARENT HIGH OR LOW SPOTS IN THE SURFACE. PRIOR TO PROCEEDING WITH CONSTRUCTION. 6,000 PSF 12,000 PSF MAT FOUNDATION APPLICABLE PROJECT CODES AND STANDARDS INCLUDING SEISMIC PROVISIONS. PROVIDE ALL d. PRESTRESSING TECHNIQUE. − X − − ART 3.6B
• MAXIMUM TOLERANCE FROM INTENDED LINE INCLUDING CAMBER AND SLOPE: 9. PROVIDE SUITABLE CURING FOR ALL CONCRETE IN ACCORDANCE WITH GOOD WORK PRACTICE AND 8,000 PSF 16,000 PSF SEISMIC PRESSURE AT ULTIMATE NECESSARY CONNECTION AND SUPPORT MATERIALS TO CARRY LOADS OF THE SECONDARY ELEMENTS
−0 TO +5/8 INCH BETWEEN SUPPORTS >20 FT APART 8,800 PSF STRIP FOOTINGS TO THE PRIMARY STRUCTURE. e. GRADE AND SIZE OF
APPLICABLE CODES.
−0 TO +1/2 INCH BETWEEN SUPPORTS <20 FT APART 10. NON−STRUCTURAL CONCRETE FLOOR TOPPING SHALL BE SPECIFIED BY THE ARCHITECT AND REVIEWED
6. GLAZED WALLS SHALL BE DESIGNED FOR THE LATERAL FORCES OF HANDRAILS AND GUARDS . PRESTRESSING TENDONS AND − X − − ART 2.6A
• 2. ALL FOUNDATION GROUND PREPARATION WORK IS OUTSIDE THE SCOPE OF WORK FOR BMZ STRUCTURAL 7. MAKE PROVISION IN ALL FINISH MATERIALS TO PERMIT THE FREE MOVEMENT OF THE STRUCTURE FOR ANCHORAGES.
FOR AREAS WITH HARD FINISHES WITH HIGH QUALITY REQUIREMENTS: FOR SUITABILITY BY THE CONTRACTOR. SPECIFICATION OF NON−STRUCTURAL CONCRETE IS NOT
−0 TO +1/2 INCH BETWEEN SUPPORTS >20 FT APART ENGINEERS AND MUST BE PROVIDED BY OTHERS UNDER PROFESSIONAL RESPONSIBILITY OF A DEFLECTIONS. SEE NOTES REGARDING DEFLECTIONS, TOLERANCES AND REPAIR OF SLABS OUT OF
PROVIDED BY BMZ STRUCTURAL ENGINEERS. 5. DURING CONSTRUCTION THE INSPECTION PROGRAM SHALL VERIFY:
−0 TO +5/16 INCH BETWEEN SUPPORTS <20 FT APART GEOTECHNICAL CONSULTANT. TOLERANCE.
11. SPECIAL REQUIREMENTS FOR CONTROL OF SHRINKAGE IN WALLS CAST MONOLITHIC OVER 25 FEET
11. ALLOW FOR LIGHTWEIGHT TOPPING ON ALL SLAB SURFACES TO MAKE UP TOLERANCES AS REQUIRED 3. PREPARE ALL FOUNDATION BEARING STRATA, BACKFILL, DRAINAGE MATERIAL, STRUCTURAL FILL, SLAB a. SIZE AND LOCATION OF
BY THE ARCHITECT AT HIS SOLE DISCRETION.
IN LENGTH ARE SHOWN IN TYPICAL DETAILS FOR REBAR, KEYS, ETC. SUBMIT DETAILS OF VARIATIONS
WIND PRESSURE: STRUCTURAL ELEMENTS. − X − − ART 3.3F
PROPOSED AND LOCATIONS OF CONSTRUCTION AND CONTROL JOINTS. AVOID VERTICAL CONTROL OR ASPHALT SUB−BASE AND OTHER GEOTECHNICAL ASPECTS IN ACCORDANCE WITH THE REPORT AND
JOINTS IN WALLS AT BEAM INTERSECTIONS. RECOMMENDATIONS OF THE GEOTECHNICAL CONSULTANT. b. TYPE, SIZE AND LOCATION OF
12. SEE NOTES FOR FORMWORK AND RESHORING . 4. BEARING CAPACITY OF ALL BEARING SOIL AND SLAB/ASPHALT SUBGRADE TO BE INSPECTED AND STORE FRONT GLAZING, WINDOWS AND WINDOW MULLIONS, GLAZED PARTITIONS, CURTAIN WALLS, GLASS ANCHORS, INCLUDING OTHER
CONFIRMED ON SITE IMMEDIATELY PRIOR TO CASTING CONCRETE BY THE GEOTECHNICAL CONSULTANT. BLOCK WALLS, STEEL STUD OR FRAME WALLS, AND EXTERIOR CLADDING SYSTEMS SHALL BE DESIGNED BY THE DETAILS IF ANCHORAGE OF SEC. 1.2.2(E),
MASONRY TO STRUCTURAL − X − 1.16.1 −
5. PROVIDE DRAINAGE FROM BEHIND ALL STRUCTURAL WALLS WITH A DRAINAGE SYSTEM TIED INTO THE SPECIALTY STRUCTURAL ENGINEER IN ACCORDANCE WITH APPLICALBLE CODES AND CONSIDERING THE
MEMBERS, FRAMES OR OTHER
24.0 SLAB SURVEY CONTROL MECHANICAL DRAINAGE SYSTEM OF THE BUILDING. SEE MECHANICAL DRAWINGS FOR DRAINAGE
SYSTEM, SEE GEOTECHNICAL CONSULTANT FOR DETERMINATION OF GROUND WATER FLOWS AND
REQUIREMENTS NOTED IN THE WIND STUDY CONDUCTED BY ???? CONSULTING ENGINEERS DATED: ????????.
CONSTRUCTION.

SUITABLE FREE DRAINING FILLS. DRAINAGE EFFICIENCY, DESIGN AND FIELD REVIEW IS OUTSIDE THE c. SPECIFIED SIZE, GRADE AND TYPE
HANDRAIL AND GUARDRAIL LOADS:
1. PROVIDE SLAB SURVEY CONTROL AND MEASUREMENT IN ACCORDANCE WITH THESE NOTES TO CONFIRM
THAT CONSTRUCTION MEETS TOLERANCE REQUIREMENTS OF NOTED HEREIN, APPLICABLE CODES, AND
21.0 CONCRETE SLABS 6.
SCOPE OF WORK OF BMZ STRUCTURAL ENGINEERS.
THE GEOTECHNICAL CONSULTANT SHALL VERIFY THAT THE DRAINAGE SYSTEM SUPPLIED BY THE
OF REINFORCEMENT, ANCHOR
BOLTS, PRESTRESSING TENDONS − X − SEC. 1.15 ART. 2.4, 3.4
TOLERANCES NOTED BY OTHERS INCLUDING THE ARCHITECT AND OWNER. SEE "TOLERANCES". GUARDRAILS 50 PLF IN ANY DIRECTION AND ANCHORAGES.
1. FOR SHRINKAGE AND TEMPERATURE REINFORCING SEE REINFORCING NOTES. UNLESS NOTED CONTRACTOR PROVIDES SUITABLE DRAINAGE FOR THE SOIL PRESSURE LOADS PROVIDED BY HIM FOR
2. PROVIDE BASE POINT FOR SURVEY AT OUTSIDE CORNER OF STAIR OR ELEVATOR SHAFT AND MEASURE 25 PSF HORIZONTAL LOAD ACTING ON TOTAL
OTHERWISE ALL SLABS TO BE REINFORCED WITH MINIMUM TEMPERATURE REINFORCING IN EACH DESIGN. THE GEOTECHNICAL CONSULTANT SHALL CONFIRM THE BACKFILL LOAD PRESSURES USED FOR d. WELDING REINFORCING BARS SEC. 2.1.9.7.2
ALL SLAB SURVEY FROM SINGLE LOCATION ON EACH FLOOR LEVEL BEING SURVEYED. VERTICAL PLANE OF THE GUARDRAIL X − − −

THESE DRAWINGS ARE NOT TO BE USED FOR


ORTHOGONAL DIRECTION. DESIGN PRIOR TO PROCEEDING WITH CONSTRUCTION OF BACKFILLED WALLS. GEOTECHNICAL ENGINEER 3.3.3.4(b)
3. SLAB SURVEY CONTROL TO BE PROVIDED AND THE FOLLOWING STAGES OF CONSTRUCTION:

TENDER, CONTRACT, OR CONSTRUCTION


2. PROVIDE STAGGERED TENSION LAPS FOR CONTINUOUS REBAR IN SLABS. TO PROVIDE SUPERVISION OF EXCAVATION AND BACKFILL.
4. SURVEY THE FIRST SUSPENDED SLAB ABOVE GRADE AND THE FIRST ’TYPICAL’ TOWER FLOOR AS SUITE GUARDRAILS 20 PLF IN ANY DIRECTION e. PREPARATION, CONSTRUCTION AND
3. PROVIDE MINIMUM REINFORCING IN SLABS AND SLAB BANDS AS NOTED IN REINFORCING STEEL NOTES. 7. WALLS SHALL NOT BE BACKFILLED UNTIL THE FLOORS RESTRAINING THE WALLS ARE CONSTRUCTED. PROTECTION OF MASONRY DURING
FOLLOWS: 25 PSF HORIZONTAL LOAD ACTING ON TOTAL VERTICAL
4. CONSTRUCTION JOINTS IN SLABS PROVIDE CONTINUOUS BOTTOM MAT AND ADD AS REQUIRED TO 8. ALL BACKFILL SHALL BE CLEAN FREE DRAINING GRANULAR MATERIAL AND SHALL BE PLACED AND COLD WEATHER (TEMPERATURE SEC. 2104.3,
A) SURFACE OF THE FORMWORK BEFORE SLAB IS CAST
MAINTAIN MINIMUM #4 REBAR AT 12 INCH CENTERS TOP AND BOTTOM WITH A CONTINUOUS KEY OF COMPACTED IN THIN LAYERS AS INDICATED BY THE GEOTECHNICAL ENGINEER. SOIL COMPACTION
PLANE OF THE GUARDRAIL
BELOW 40°F) OR − X 2104.4 − ART. 1.8C,1.8D
B) SLAB SURFACE WITHIN 18 HOURS OF FINISHING AND BEFORE FORMWORK REMOVAL
1/3 SLAB THICKNESS BY 3/4 INCH DEPTH. WITHIN 1200mm OF THE WALL TO BE ACHIEVED USING LIGHT HAND COMPACTING EQUIPMENT SUCH AS A HOT WEATHER (TEMPERATURE
C) IMMEDIATELY AFTER RESHORE REMOVAL (NOTE THAT IMPROPER RESHORE TECHNIQUES CAN HANDRAILS & GUARDRAILS 200 LB IN ANY DIRECTION AT ANY POINT
6. FOR CONSTRUCTION JOINTS IN WIDE SLAB BEAMS PROVIDE CONTINUOUS BOTTOM REINFORCING WITH 12" TO 18" PLATE TAMPER. AREAS ON CITY PROPERTY TO BE COMPACTED WITH FILL MEETING CITY SPECS ABOVE 90°F).
IMPOSE SLAB DEFLECTIONS) 50 PLF IN ANY DIRECTION

2020-08-26 4:45:55 PM
STAGGERED TENSION LAPS PROJECTING FROM THE FIRST POUR. PROVIDE TOP BARS EQUAL TO MINIMUM

PROGRESS
D) 3 MONTHS AFTER RESHORE REMOVAL (PRIOR TO INSTALLATION OF FINISHES INCLUDING EXTERIOR AS INSTRUCTED BY THE GEOTECHNICAL CONSULTANT. f. APPLICATION AND MEASUREMENT OF
WALL SYSTEMS AND WINDOWS)
TEMPERATURE REINFORCEMENT. PROVIDE AT LEAST TWO HORIZONTAL KEYS OF 1/5 THE DEPTH OF THE 9. PROVIDE A TWO INCH THICK SKIM COAT OF CONCRETE OVER THE BASE OF ALL FOOTING EXCAVATIONS PRESTRESSING FORCE. X − − − ART. 3.6B
SLAB BAND EQUAL SPACED. VEHICLE BARRIER SYSTEMS 6000 LB APPLIED 1’−6" ABOVE THE FLOOR
SURVEY SLABS AT THE FOLLOWING LOCATIONS: TO HELP PROTECT AGAINST DEGRADATION OF THE BEARING STRATA. THIS THICKNESS NOT TO BE
7. PROVIDE 1−#5 TOP AND BOTTOM PARALLEL TO ALL SLAB EDGES, INCLUDING AROUND OPENINGS. 6. PRIOR TO GROUTING, THE FOLLOWING SHALL BE VERIFIED TO ENSURE COMPLIANCE:
A) AT COLUMNS, ENDS OF WALLS AND OTHER SUPPORTS (WITHIN 12 INCHES) INCLUDED IN THE FOOTING DEPTH SHOWN ON THE DRAWINGS. SKIM COAT MAY BE DELETED ONLY WITH
PROJECT 24" PAST EDGE OF OPENINGS AND #5 04.O DIAGONAL ON ALL INSIDE CORNERS AND CORNER CONTRACTORS SHALL OBTAIN DESIGN BY A SPECIALTY STRUCTURAL ENGINEER FOR THE HANDRAIL AND
THE WRITTEN ACCEPTANCE OF THE GEOTECHNICAL CONSULTANT.
B) AT SLAB EDGES, CORNERS AND TIPS OF CANTILEVERS
BARS ON OUTSIDE CORNERS. EMBEDS BEFORE COMPLETING THE STRUCTURAL PORTIONS OF THE BUILDING WHICH WILL RECEIVE THE a. GROUT SPACE IS CLEAN. − X − − ART 3.2D
C) MID−SPAN BETWEEN SUPPORTS 10. FOOTINGS TO BE CENTERED UNDER COLUMNS AND WALLS UNLESS SPECIFICALLY NOTED OR SHOWN
8. PROVIDE #5 SUPPORT BARS AS REQUIRED TO SUPPORT CORNERS OF TIES IN BEAMS AND SLAB BANDS. HANDRAIL COMPONENTS. b. PLACEMENT OF REINFORCEMENT
D) AT LOCATIONS WHERE CAMBER IS SPECIFIED OTHERWISE.
9. PROVIDE SUFFICIENT CHAIRING TO ENSURE THAT REINFORCEMENT IS NOT DISPLACED WHEN PLACING AND CONNECTORS, AND
E) AT ANY OTHER LOCATIONS OF INTEREST
CONCRETE.
11. COLUMN DOWELS TO BE TIED INTO POSITION. DOWELS FOR SHEARWALLS TO BE TIED INTO POSITION.
PRESTRESSING TENDONS AND − X − SEC. 1.13 ART. 3.4
EACH SURVEY SHOULD RECORD SLAB ELEVATIONS AT THE SAME LOCATION FOR LATER REFERENCE AND 12. FOOTINGS MAY NEED TO BE LOWERED TO ACCOMMODATE MECHANICAL OR ELECTRICAL SERVICES. SEE
ANALYSIS PURPOSES.
10. PROVIDE CORRECT CHAIR HEIGHTS OR SMALLER CHAIRS WITH ADDITIONAL SUPPORT BARS TO SUPPORT
MECHANICAL, ELECTRICAL AND ARCHITECTURAL DRAWINGS.
DIFFERENTIAL MOVEMENTS FOR CLADDING DESIGN: ANCHORAGES.
PRIMARY STRUCTURAL REINFORCING IN SLABS. PROVIDE SUPPORT BARS AS REQUIRED.
5. WHENEVER SLAB IS OUTSIDE TOLERANCE, SURVEY SLAB THICKNESS AT THE FOLLOWING LOCATIONS: 13. FOOTING ELEVATIONS, IF SHOWN ARE FOR REFERENCE ONLY AND MAY NEED TO BE MODIFIED TO SUIT THE FOLLOWING DEFLECTION GAPS ARE BASED ON THE ASSUMPTION THAT CLADDING AND GLAZING c. PROPORTIONS OF
11. WHERE SUPPORT REBAR IS WITHIN THE REQUIRED CONCRETE COVER THICKNESS IT SHALL NOT BE
A) AT COLUMNS, ENDS OF WALLS AND OTHER SUPPORTS.
INCLUDED IN THE STRUCTURAL REBAR.
SITE CONDITIONS, BEARING LEVEL, FLOOR SLOPES AND ELEVATIONS, DRAINS, SERVICES, ETC. INSTALLATION OCCURS NO SOONER THAN 2 MONTHS AFTER SHORING IS REMOVED FROM SLABS AND BEAMS SITE−PREPARED GROUT FOR − X − − ART 2.6B
B) AT SLAB EDGES, CORNERS AND TIPS OF CANTILEVERS 14. CONCRETE CAST IN FOOTINGS WITH STANDING WATER SHALL CONFORM TO ACI 318 AND BE PLACED AND THEY ARE FREE TO DEFLECT. IF INSTALLATION OCCURS AT AN EARLIER TIME, ADDITIONAL VERTICAL BONDED TENDONS.
12. WHERE SLAB OPENINGS OCCUR AND ARE NOT OTHERWISE DETAILED ON THE STRUCTURAL DRAWINGS,
C) MID−SPAN BETWEEN SUPPORTS UNDER THE FULL TIME SUPERVISION OF THE SPECIAL INSPECTOR. MOVEMENT CAN BE ANTICIPATED.
SPREAD REINFORCEMENT EACH SIDE OF THE OPENING WITH THE SAME TOTAL NUMBER OF REBAR
D) AT ANY NOTICEABLE HIGH POINTS OR LOW POINTS
PASSING THE OPENING, PLUS ONE. PROVIDE ADDITIONAL TOP AND BOTTOM EDGE BARS AROUND THE
15. MAINTAIN MAXIMUM SLOPE OF 1.5 HORIZ. TO 1.0 VERT. BETWEEN UNDERSIDE OF ADJACENT FOOTINGS OR d. CONSTRUCTION OF MORTAR JOINTS − X − − ART. 3.3B
REPORT SURVEY RESULTS IN +/− DIMENSION FROM DESIGN THICKNESS. AS OTHERWISE INDICATED BY THE GEOTECHNICAL CONSULTANT. FOR DEEPER EXCAVATIONS BESIDE VERTICAL MOVEMENT BETWEEN ANY 2 FLOORS: REFER TO STRUCTURAL DEFLECTIONS FOR REQUIREMENTS.
OPENING AS NOTED. CONFIRM WITH THE ENGINEER ANY OPENING IN EXCESS OF 18 INCHES IN
6. REVIEW THE LAYOUT OF SURVEY POINTS WITH THE ENGINEER OF RECORD AND CONTRACTOR PRIOR TO EXISTING FOOTINGS, SEE SOILS CONSULTANT FOR PROCEDURES − CONFIRM SELECTED APROACH WITH
DIMENSION. DO NOT PERMIT OPENINGS OF ANY SIZE WITHIN 4 FEET FROM A COLUMN OR WALL SUPPORT. HORIZONTAL DISPLACEMENT BETWEEN FLOORS: SERVICEABILITY CONDITION (WINDOW AND WALL 7. GROUT PLACEMENT SHALL BE
CONDUCTING THE SURVEY. REVIEW WITH THE ENGINEER OR RECORD FOR FOLLOW UP SURVEY OF
13. CONDUITS AND SLEEVES WITHIN SLABS AND WALLS MUST BE PLACED WITHIN THE MIDDLE THIRD OF THE BMZ STRUCTURAL ENGINEERS BEFORE PROCEEDING. SERVICEABILITY MAINTAINED): ALLOW FOR HORIZONTAL VERIFIED TO ENSURE COMPLIANCE: X − − − ART 3.5
ADDITIONAL SLABS BASED UPON RESULTS OF THE FIRST SLAB SURVEY. 16. SLAB ON GRADE TO BE SUPPORTED BY STRUCTURAL FILL DESIGNED BY THE GEOTECHNICAL
THICKNESS OF THE WALL OR SLAB. MAXIMUM SIZE OF CONDUIT IS 1/4 THE SLAB THICKNESS. SPACE DISPLACEMENT OF 0.002 x INTERSTORY HEIGHT WITH A MINIMUM
7. MAKE ALLOWANCES TO REPAIR STRUCTURE TO MEET TOLERANCES. ALLOW FOR GRINDING OF HIGH CONSULTANT SUFFICIENT TO SUPPORT THE SLAB ON GRADE FOR THE SERVICE LOADING OF THE SLAB. SEISMIC INTERSTORY DRIFT
CONDUITS OR SLEEVES AT LEAST 3 TIMES THEIR DIAMETER. MAINTAIN WELL CLEAR OF ALL (INELASTIC) OF 3/4 INCH UNLESS NOTED OTHERWISE ON THE DRAWINGS. 8. PREPARATION OF ANY REQUIRED
POINTS EXCEEDING MAXIMUM TOLERANCE AT TIME OF SURVEY BEFORE FORMS ARE REMOVED.
POST−TENSIONING ANCHORAGE, AND 4 FT CLEAR OF GROUPS OF POST−TENSIONING ANCHORAGE. GROUT SPECIMENS, MORTAR SEC. 2105.2.2,
ALLOW FOR SELF LEVELING TOPPING IN LOW POINTS EXCEEDING MINIMUM TOLERANCE. PROVIDE
ADDITIONAL REINFORCING OR RELOCATION OF THE MATERIALS MAY BE NECESSARY AS DIRECTED SPECIAL INSPECTION IS REQUIRED FOR SUBGRADE BEARING MATERIALS , SEE SPECIAL INSPECTION
% FLOOR DRIFT ULTIMATE CONDITION (WINDOW AND WALL COLLAPSE AND/OR PRISMS SHALL BE − X 2105.3 − ART. 1.4
PROPOSED TOPPING MATERIAL AND PROCEDURE FOR REVIEW BY ENGINEER OF RECORD BEFORE PROGRAM. LEVEL
BY BMZ STRUCTURAL ENGINEERS. HEIGHT (INCHES) PREVENTED): ALLOW FOR HORIZONTAL DISPLACEMENT OF 0.02 x OBSERVED.
PERFORMING THE WORK.
14. PROVIDE ADDITIONAL REBAR MATS OVER AREAS OF CONGESTED CONDUIT AS INDICATED IN THE INTERSTOREY HEIGHT WITH A MINIMUM OF 1.5 INCHES UNLESS
8. REPAIR COLUMNS CAST OVER HEIGHT BY CHIPPING DOWN TO LEVEL WITH THE UNDERSIDE OF SLAB. FOR SI: °C=[(°F) − 32] / 1.8.
STANDARD DETAILS AND AS FURTHER INSTRUCTED IN THE FIELD. 19 − ROOF 1.60 2.83 NOTED OTHERWISE ON DRAWINGS (REFER TO TABLE FOR
THE CENTRAL PORTION OF THE COLUMN INSIDE THE REBAR CAGE MAY BE SLOPED UPWARD AT 45 a. THE SPECIFIC STANDARDS REFERENCED ARE THOSE LISTED IN CHAPTER 35.
15. DUCTS WITHIN SLABS MUST BE PLACED WITHIN THE MIDDLE THIRD OF THE THICKNESS OF THE SLAB. 10 − 18 1.62 2.03 MAXIMUM INELASTIC INTERSTORY DEFLECTION).
DEGREES MAXIMUM BUT NO PART OF THE COLUMN SHALL BE HIGHER THAN 2 INCHES ABOVE THE
SPACE DUCTS 2 TIMES THE MAXIMUM DUCT DIMENSION CLEAR BETWEEN, AND 36 INCHES MINIMUM FROM 6−9 1.47 1.75 TABLE 1705.6
BOTTOM OF THE SLAB.
COLUMN OR WALLS. DUCTS TO HAVE ADDITIONAL REINFORCING OVER AND UNDER THE DUCT AS SHOWN 3−5 1.25 1.77 REQUIRED VERIFICATION AND INSPECTION OF SOILS
IN STANDARD DETAILS. CONTRACTORS TO REVIEW AND CONFIRM THAT DUCT LAYOUTS ARE NOT IN
CONFLICT WITH POST TENSION STRANDS AS SHOWN ON THESE PLANS. REVIEW WITH BMZ STRUCTURAL 18.0 UNDERPINNING, SOIL STABILIZATION, 1−2 0.85 1.55
VERIFICATION AND INSPECTION TASK CONTINUOUS DURING TASK LISTED PERIODICALLY DURING TASK LISTED
ENGINEERS PRIOR TO PLACEMENT OF CONCRETE..
16. WHERE COLUMN CONCRETE STRENGTH EXCEEDS THAT OF THE SLAB BY MORE THAN 40%, CONCRETE OF SLOPE STABILITY VOIDING AND VOID MATERIALS:
1. VERIFY MATERIALS BELOW SHALLOW
FOUNDATIONS ARE ADEQUATE TO
SAME STRENGTH AS COLUMNS MUST BE PLACED IN THE SLAB IN THE REGION OF THE COLUMN,
PROJECTING 2 FEET MINIMUM EACH SIDE OF THE COLUMN. ENSURE THAT THE SLAB CONCRETE IS PLACED 1. PROVIDE TEMPORARY OR PERMANENT UNDERPINNING AS REQUIRED TO TRANSFER LOADS FROM ACHIEVE THE DESIGN BEARING − X
WHILE THE HIGHER STRENGTH MIX IS STILL PLASTIC AND THAT VIBRATION INTEGRATES THE TWO MIXES. WHERE REQUIRED AND AS SHOWN ON THE STRUCTURAL OR ARCHITECTURAL DRAWINGS OR AS NEEDED TO CAPACITY.
ADJACENT BUILDING FOUNDATIONS DOWN TO BEARING STRATA AT OR BELOW THE LEVEL OF
OPTION, CAST THE ENTIRE SLAB OF THE HIGHER STRENGTH MIX, WITH SUITABLE DURABILITY FOR THE MAINTAIN ALLOWABLE THICKNESS OF BUILT−UP CONCRETE OR OTHER MATERIALS UPON THE STRUCTURE,
FOUNDATIONS FOR THIS BUILDING. PROVIDE DESIGN, FIELD REVIEW AND LETTERS OF ASSURANCE 2. VERIFY EXCAVATIONS ARE EXTENDED
PROVIDE VOIDING AS REQUIRED. VOIDING SHALL BE:
SLAB. BY A REGISTERED PROFESSIONAL ENGINEER FOR THE DESIGN OF THESE ELEMENTS.
− FOR INTERIOR SPACES WITHOUT WHEEL LOADS, PROVIDE TYPE 2 CLOSED CELL STYROFOAM UNDER
TO PROPER DEPTH AND HAVE REACHED − X
17. SLABS ON GRADE TO HAVE 1/8 INCH SAWCUTS BY 1/4 SLAB THICKNESS, OR CONSTRUCTION JOINTS, AT 2. PROVIDE LATERAL LOAD UPON COMPLETED STRUCTURE FOR LONG TERM − RELY ONLY UPON PROPER MATERIAL.
ALL COLUMN LOCATIONS AND TO MATCH REENTRANT CORNERS, AND AT 24 INCH CENTERS MAXIMUM CONCRETE SLAB POURS WITH 30 PSI COMPRESSIVE CAPACITY MINIMUM.
CONTIGUOUS FLOOR LEVELS FOR RESTRAINT OF LATERAL LOADS (SPAN BETWEEN FLOOR LEVELS).
UNLESS NOTED ON PLAN. UNREINFORCED SLABS ON GRADE TO HAVE SAWCUTS AT 6 FT CENTERS − FOR EXTERIOR SPACES, PROVIDE TYPE 2 CLOSED CELL STYROFOAM WITH HIGH COMPRESSIVE 3. PERFORM CLASSIFICATION AND
3. EXCAVATION SHORING UNDERPINNING SOIL STABILIZATION SLOPE STABILITY AND OTHER SOILS RELATED
MAXIMUM UNLESS NOTED. SAWCUTS SHALL BE MADE WITHIN 24 HOURS OF CASTING THE SLAB. PANELS STRENGTH, 100 PSI OR GREATER. TESTING OF COMPACTED FILL − X
WORK IS NOT A PART OF THE PRIMARY STRUCTURE OF THE BUILDING AND IS THEREFORE NOT DESIGNED MATERIALS.
OF SLAB ON GRADE TO BE APPROXIMATELY SQUARE WITH NO RETURN CORNERS. EXPOSED CONCRETE − FOR EARTHEN LANDSCAPED SPACE, PROVIDE CLOSED CELL FREE DRAINING VOIDED STYROFOAM OF
OR MONITORED BY BMZ STRUCTURAL ENGINEERS. THIS WORK SHALL BE MONITORED BY THE
TOPPING OVER WATERPROOF MEMBRANE TO HAVE SIMILAR SAWCUTS AT 6 FT CENTERS. ALTERNATIVELY, SUITABLE COMPRESSIVE STRENGTH. 4. VERIFY USE OF PROPER MATERIALS,
GEOTECHNICAL CONSULTANT.
ZIP−STRIP OR EQUIVALENT MAY BE USED IF APPROVED BY THE ARCHITECT. ALTERNATIVELY, INTERIOR OR EXTERIOR SPACES CAN BE BUILT−UP WITH SUITABLE STRUCTURAL FRAMING TO DENSITIES AND LIFT THICKNESS
18. REMOVE ALL CONSTRUCTION DEBRIS FROM THE SLAB PRIOR TO CASTING CONCRETE. FORM A VOIDED SPACE. SEE THE ENGINEER FOR DETAILS AND TO CONFIRM LOADING TO THE STRUCTURE. DURING PLACEMENT AND COMPACTION X −
19. HOLES IN SLABS FOR MECHANICAL OR PIPING MUST BE MORE THAN 18 INCHES FROM COLUMN FACES OR PROVIDE SUITABLE DRAINAGE FROM ALL VOID SPACES OF COMPACTED FILL.
THE FACE OF DROP PANELS UNLESS SHOWN ON THE STRUCTURAL DRAWINGS OR OTHERWISE APPROVED PROVIDE WATERPROOFING AS SPECIFIED BY THE ARCHITECT. 5. PRIOR TO PLACEMENT OF COMPACTED
PRIOR TO CONSTRUCTION. FILL, OBSERVE SUBGRADE AND VERIFY
20. GENERAL CONTRACTOR TO REPORT ANY PLANNED OPENINGS WITHIN 4 FEET OF THE COLUMN TO THE THAT SITE HAS BEEN PREPARED − X
19.0 CONCRETE

30925-01
Date APRIL 10TH, 2020

SA
JD
ENGINEER FOR REVIEW PRIOR TO CONSTRUCTION. PROPERLY.
21. CAMBER ALL REINFORCED CONCRETE SLABS, SLAB BANDS AND BEAMS AS INDICATED ON THE DRAWINGS.
WHERE NOT OTHERWISE SHOWN, PROVIDE CAMBER EQUAL TO 1/4 INCH FOR EVERY 10 FT OF SPAN FOR
SPANS UP TO 18 FT. FOR SPANS EXCEEDING 18 FT, PROVIDE 3/8 INCH FOR EVERY 10 FT OF SPAN. FOR
CONCRETE WORK SHALL CONFORM TO THE LATEST EDITIONS OF PROJECT CODES AND STANDARDS 14.0 SPECIALTY PRODUCTS USED IN DESIGN 6. INSTALLATION OF SOIL / CEMENT
MIXED COLUMNS X −
EXAMPLE: 15 FT SPAN REQUIRES 3/8" CAMBER AND 20 FT SPAN REQUIRES 5/8 INCH CAMBER. 28 DAY MAX MAX SLUMP MAX CERTAIN PRODUCTS HAVE BEEN SPECIFIED IN THE DESIGN WHICH ARE SPECIALTY OR PROPRIETARY
22. SLAB OR BEAM CANTILEVERS TO BE CAMBERED DOUBLE THE AMOUNT SHOWN ABOVE. DESIGN STRENGTH WATER/ AIR (IN.) AGGREGATE PRODUCTS. THESE PRODUCTS HAVE RATED CAPACITIES AND CHARACTERISTICS WARRANTED BY THE
23. MAINTAIN MINIMUM SLAB OR BEAM THICKNESS THROUGHOUT THE CAMBERED AREA AND SUBMIT DETAILS MINIMUM CEMENT % (IN.) MANUFACTURER. THESE PRODUCTS HAVE BEEN SELECTED AND SPECIFIED BASED UPON THE
OF CONCRETE PROFILE FOR REVIEW WHERE THERE IS ANY VARIATION IN CONCRETE OUTLINE FROM RATIO MANUFACTURERS REPRESENTATIONS AND BMZ STRUCTURAL ENGINEERS SHALL NOT BECOME GUARANTORS
THAT SHOWN ON THE DRAWINGS. OF THE PRODUCT. SUCH PRODUCTS SHALL BE INSTALLED IN STRICT CONFORMANCE WITH THE
24. THE GENERAL CONTRACTOR SHALL SUPERVISE AND BE RESPONSIBLE FOR THE METHODS AND 4.0 KSI SLAB ON GRADE INTERIOR 0.50 − 4 +/− 1 1 MANUFACTURERS RECOMMENDATIONS AND PROPER WORKMANSHIP OF THE INSTALLATION IIS THE

Project Number
PROCEDURES OF CONCRETE PLACEMENT. ENSURE THAT CONCRETE PLACEMENT DOES NOT DISPLACE 4.0 KSI PARKING SLAB ON GRADE 0.50 − 4 +/− 1 1 RESPONSIBILITY OF THE GENERAL CONTRACTOR.
REINFORCING OR POST−TENSIONING MATERIALS FROM THEIR INTENDED LINE AND POSITION. ENSURE 5.0 KSI SIDEWALKS & DRIVES 0.45 − 4 +/− 1 1

Checked By
THAT CONCRETE IS PROPERLY CONSOLIDATED IN ALL AREAS.
4.0 KSI FOOTINGS U/N. 0.64 − 4 +/− 1 1 ALTERNATE SYSTEMS MAY BE ACCEPTABLE IF THEY PROVIDE EQUAL SAFE WORKING LOADS AND A WRITTEN

Drawn By
25. SEE NOTES FOR SURVEY OF SLAB.
5.0 KSI PARKING SLABS AND RAMPS 0.45 − 4 +/− 1 1 REQUEST IS ACCOMPANIED WITH ENGINEERED DESIGN DATA FOR THE ALTERNATE SYSTEM.
26. CHAIRS FOR REINFORCEMENT IN EXPOSED SOFFITS OR OTHER AREAS EXPOSED TO WEATHER AND VIEW
5.0 KSI REBAR SLABS 0.50 − 4 +/− 1 1
SHALL BE PLASTIC OR EPOXY COATED.
6.0 KSI PT SLABS AND BEAMS 0.50 − 4 +/− 1 1
27. SEE ARCHITECTURAL FOR CONCRETE FINISH REQUIREMENTS AND FLOOR HARDENERS.
4.0 KSI MASONRY CONCRETE FILL − − 9 +/− 1 3/8
28. CONCRETE SHALL NOT BE PLACED ON A POST−TENSIONED SLAB FROM A BUCKET UNLESS A SPECIAL
TOPPING NON−STR’L INT’R. SEE NOTES BELOW
PROCEDURE FOR CHAIRING AND CONCRETE PLACEMENT IS USED SUCH THAT THE POST−TENSIONING
STRANDS AND REBAR ARE NOT DEFLECTED LATERALLY DURING THE CONCRETE PLACEMENT.
3.5 KSI TOPPING FOR STEEL DECK
COLUMNS SEE SCHEDULE

0.45


4 +/− 1
4 +/− 1
3/8
1
15.0 DRILLED ANCHORS
29. CONCRETE SHALL NOT BE PLACED ON A POST−TENSIONED SLAB FROM A PUMP HOSE UNLESS A SPECIAL
SHEARWALLS SEE SCHED. − − 4 +/− 1 1 ALL ANCHORS INTO EXISTING OR NEW CONCRETE/MASONRY SHALL BE SET IN CLEAN DRY HOLES OF STANDARD
PROCEDURE FOR PROTECTING THE CHAIRING IS USED SUCH THAT THE POST−TENSIONING STRANDS ARE
5.0 KSI OTHER WALLS − − 4 +/− 1 1 LENGTH AND SIZE AS INDICATED BY THE PRODUCT MANUFACTURER BUT NOT LESS THAN THE DEPTH SHOWN
NOT DISPLACED DURING THE CONCRETE PLACEMENT.
6.0 KSI BASEMENT EXTERIOR WALLS, U/N 0.50 − 4 +/− 1 1 ON THE STRUCTURAL DRAWINGS.
SPECIAL INSPECTION IS REQUIRED FOR PLACEMENT AND TESTING OF CONCRETE. SEE SPECIAL 6.0 KSI STRUCTURAL SHOTCRETE WALLS − − 4 +/− 1 1
INSPECTION PROGRAM. 3.5 KSI ALL OTHER CONCRETE 0.50 − 4 +/− 1 1 PREDRILLED ANCHORS SHOWN ON THE DRAWINGS ARE HILTI PRODUCTS. ANCHORS SHALL BE INSTALLED IN
STRICT ADHERENCE TO MANUFACTURER’ SPECIFICATIONS. OBTAIN ON−SITE TRAINING OF INSTALLERS BY HILTI
− CONCRETE PROPERTIES TO BE IN ACCORDANCE WITH CALIFORNIA BUILDING CODE . REPRESENTATIVE PRIOR TO ANY INSTALLATION FOR THIS PROJECT. MAINTAIN ON SITE RECORDS OF A
− ALL CONCRETE TO BE NORMAL WEIGHT SILICEOUS AGGREGATE CONCRETE UNLESS NOTED OTHERWISE. CURRENT VALID TRAINING CARD OR LETTER FROM HILTI INDICATING NAMES OF INSTALLERS TRAINED TO

1233 South Grand


− ALL CONCRETE TO CONTAIN TYPE 1 OR TYPE 2 PORTLAND CEMENT. − 150 LBS/CU. FT. INSTALL HILTI PRODUCTS. WHERE IN DOUBT OF SUITABILITY OF ANCHOR FOR INSTALLATION, OBTAIN THE

22.0 CONCRETE CRACKS − CONCRETE IN ALL POST−TENSIONED SLABS TO BE OF A MIX THAT LIMIT LONG TERM SHRINKAGE TO A
MAXIMUM OF 0.45 PERCENT (0.0045 IN./IN), OR CONFIRMS TO ACI 223−98 STANDARD PRACTICE FOR
DIRECTION OF HILTI ENGINEERING SUPPORT AT 1−800−363−4458.

SHRINKAGE COMPENSATING CONCRETE.


ALTERNATE ANCHORS SYSTEMS MAY BE ACCEPTABLE − THE SUBSTITUTION OF AN "EQUIVALENT ITEM" IS
1. UNDER NORMAL CONDITIONS, CONCRETE WILL CRACK WHETHER IT IS REINFORCED WITH REBAR OR − PROVIDE PLASTICIZER TO CONCRETE FOR AREAS OF SHEARWALLS, COLUMNS BEAMS OR SUBJECT TO THE REVIEW AND APPROVAL OF THE ENGINEER OF RECORD AND THE BUILDING DEPARTMENT,
POST−TENSIONING. THE CRACKS FORM AS A RESULT OF INTERNAL TENSION STRESSES IN THE CONCRETE SLABS WHERE REBAR IS CONGESTED OR DUCTS CREATE PLACING DIFFICULTIES. PROVIDE SMALLER PENDING THE SUBMISSION OF A PLAN CHANGE TO THE BUILDING PERMIT, INCLUDING SUPPORTING
DUE TO VARIOUS INFLUENCES INCLUDING SHRINKAGE AND CREEP OF THE CONCRETE AS IT CURES. MAXIMUM AGGREGATE SIZE AS REQUIRED. MAKE APPROPRIATE AIR AND CEMENT CONTENT DOCUMENTATION, ICC OR LADBS NUMBER, AND SUPPORTING CALCULATONS. ALTERNATE SYSTEMS WITHOUT
2. NUMEROUS FACTORS AFFECT THE SUSCEPTIBILITY OF THE CONCRETE TO CRACK AND THE PROPAGATION ADJUSTMENTS. APPROVED DOCUMENTATION WILL NOT BE ACCEPTED.
OF CRACKS ONCE FORMED, AND THEREFORE THE ACCURATE PREDICTION OF CRACKS IS DIFFICULT AND − SLUMPS INDICATED ARE PRIOR TO PLASTICIZER ADDITIVES. ALL ADMIXTURES MUST
SUBJECT TO JUDGEMENT. BE APPROVED IN ADVANCE. IN CASES WHERE HILTI CAPACITY SPECIFICATIONS DO NOT APPLY, SUCH AS WITH EXISTING BRICK OR LOW
3. PROPER REINFORCING DETAILS WHICH INCLUDE: LIMITS ON SPACING OF REINFORCING, PLACEMENT OF − WATER MAY BE ADDED ON SITE TO OBTAIN SPECIFIED SLUMPS ONLY IF IT IS ADDED STRENGTH CONCRETE, ANCHOR TESTS MAY BE REQUIRED TO VERIFY ANCHOR CAPACITY.
CRACK CONTROL JOINTS, EDGE REINFORCING AROUND OPENINGS AND THE MINIMUM REINFORCING WITHIN ONE HOUR OF BATCHING AND SPECIFIED ON THE BATCH REPORT. CONCRETE SHALL NOT BE
REQUIREMENTS NOTED ON THESE DRAWINGS HELP TO PREVENT LARGE CRACKS FROM OCCURRING. PLACED BEYOND 1−1/2 HOURS FOLLOWING BATCHING IN ACCORDANCE WITH ASTM C94 READY CALL FOR INSPECTION OF ALL DRILLED ANCHORS DURING INSTALLATION PROCESS AS NOTED ON THE "SPECIAL
4. CRACKS CAN FORM AS A RESULT OF FORMWORK AND RESHORING PROCEDURES. CONTRACTOR TO MIX CONCRETE. INSPECTION PROGRAM". ANCHORS NOT INSPECTED DURING THE ONGOING INSTALLATION PROCESS MAY
PROVIDE METHODS OF RESHORING THAT MINIMIZE STRESSES ON CONCRETE AND REDUCE CRACKING. − CONCRETE PLACED UNDER WATER SHALL BE IN ACCORDANCE WITH CALIFORNIA BUILDING CODE. REQUIRE PROOF LOAD TESTING AT THE EXPENSE OF THE CONTRACTOR. SPECIAL INSPECTION IS REQUIRED
5. CRACKS NORMALLY DO NOT IMPAIR THE STRUCTURE FROM PROVIDING ITS FUNCTION, ALTHOUGH DUE TO FOR EXPANSION AND ADHESIVE ANCHOR INSTALLATION AS SHOWN ON THE STRUCTURAL DRAWINGS.
COSMETIC REASONS OR OTHER CONCERNS CRACKS MAY NEED TO BE REPAIRED. 1. CONCRETE MIX DESIGNS TO BE SUBMITTED TO THE STRUCTURAL ENGINEER AND SPECIAL INSPECTOR
6. IF CRACKS OCCUR, PROVIDE DETAILED INFORMATION ON THE CRACK PATTERN FOR REVIEW BY THE FOR REVIEW PRIOR TO COMMENCING THE WORK. HILTI HIT HY200 MAX OR HIT−RE500 TO BE USED INTO CONCRETE ONLY AS FOLLOWS:
ENGINEER AND THE ARCHITECT WHO MAY PROVIDE INSTRUCTION ON METHODS OF REPAIRING SOME 2. 56 DAY CONCRETE MIX DESIGNS ALTERNATES MAY BE CONSIDERED FOR MASS CONCRETE POURS SUCH • HY200 MAX − CLEAN, DRY, WITH HOLE DIAMETER TO MATCH TOLERANCE, HAMMER DRILLED HOLE ONLY.
OF THE CRACKS. AS FOUNDATIONS, OR HIGH STRENGTH CONCRETE OF 8KSI OR GREATER. • RE500 − CLEAN, DRY, OVERSIZED, HAMMER DRILLED HOLES ONLY.
3. CONCRETE SHALL BE PROTECTED FROM PREMATURE DRYING AND EXTREME TEMPERATURE, AND SHALL • SPECIAL APPLICATION OF RE500 WITH WET HOLE, OVERSIZED HOLE OR DIAMOND CORED HOLES TO HAVE
BE WET−CURED FOR 7 DAYS OR 70% OF SPECIFIED MIX CONCRETE STRENGTH − UNLESS AN ALTERNATE FULL TIME SUPERVISION BY MATERIALS CONSULTANT TO VERIFY PROPER WORKMANSHIP AND
METHOD OF CURING IS APPROVED BY THE ENGINEER OF RECORD. CLEANLINESS OF THE HOLE.
4. NO CALCIUM CHLORIDE ADDITIVES ARE PERMITTED IN CONCRETE MIXES. • HIT HY20 TO BE USED INTO MASONRY. SITE TESTING IS REQUIRED TO CONFIRM LOAD CAPACITY.
5. SHOTCRETE SHALL NOT BE PERMITTED FOR ANY STRUCTURAL ELEMENTS IN CONTACT WITH SOIL • THREADED RODS ARE B7 ALLTHREAD RODS CLEAN AND FREE OF GREASE OR OTHER SUBSTANCE THAT
BELOW THE GROUNDWATER TABLE. COULD REDUCE BOND, OR HILTI HAS E or HAS SUPER(B7).
6. CONCRETE TO BE TESTED IN ACCORDANCE WITH CALIFORNIA BUILDING CODE & ACI 318. • HILTI TZ ROD − CLEAN DRY WITH HOLE DIAMETER TO MATCH TOLERANCE, HAMMER DRILL HOLE ONLY.
7. CONCRETE IN SUSPENDED SLABS, COLUMNS, AND SHEARWALLS ARE TO BE TESTED FOR MODULUS • NO INSTALLATIONS ARE PERMITTED UNDERWATER OR IN WATER FILLED HOLES OR HOLES NOT CLEANED.

ADDRESS, AVE, SUITE


OF ELASTICITY IN CONFORMANCE WITH THE VALUES SPECIFIED IN THE BUILDING CODE ACI 318−11
FOR CONCRETE STRENGTHS SPECIFIED ON THESE DRAWINGS PER TEST PROTOCOL INSTALLATION:
ASTM C469/C469M−10. CONTRACTOR TO PROVIDE CONFORMING TEST SAMPLES TO THE SATISFACTION • INSTALL IN ACCORDANCE WITH MANUFACTURERS INSTRUCTIONS ACCOMPANYING THE PRODUCT

CITY, STATE, ZIP


OF THE ENGINEER OF RECORD. • INJECTION OF ADHESIVE SHALL BE PERFORMED TO PRODUCE AN AIR−VOID FREE INJECTION. USE HILTI

PROJECT NAME
PROFI KIT FOR PORPER HOLE PREPARATION.
• DRILLING SHALL BE PERFORMED WITH A ROTARY HAMMER DRILL AND CARBIDE TIPPED DRILL BITS
• ALTERNATE DRILLING METHODS MUST BE APPROVED BY THE BMZ STRUCTURAL ENGINEERS.
MINIMUM REQUIRED
• OVERHEAD ANCHORS MUST BE INSTALLED USING THE HILTI PROFI ACCESSORIES TO ENSURE CORRECT
CONCRETE MODULUS OF ELASTICITY
ADHESIVE INJECTION
(PER ACI 318−11 CLAUSE 8.5.1)
• ANCHOR CAPACITY USED IN DESIGN IS BASED ON THE GUIDELINES PUBLISHED BY HILTI. ALTERNATE
SPECIFIED CONCRETE MINIMUM MODULUS FASTENING SYSTEMS PROPOSED BY THE CONTRACTOR SHALL BE SUBMITTED TO THE STRUCTURAL
STRENGTH (f’c;psi) OF ELASTICITY (Ec;ksi) ENGINEER FOR REVIEW AND APPROVAL. MANUFACTURERS PUBLISHED DATA INCLUDING LOAD
RESISTANCE, IN−SERVICE AND INSTALLATION TEMPERATURE, CREEP TESTING, FREEZE/THAW TESTING,

THE LIMITED PURPOSE OF EVALUATION, BIDDING OR REVIEW. THIS DOCUMENT OR ITS CONTENTS MAY NOT BE USED FOR ANY
4000 3605 COMPREHENSIVE INSTALLATION INSTRUCTIONS AND ON SITE TRAINING MUST BE INCLUDED IN PROPOSAL.

THIS DOCUMENT CONTAINS INFORMATION PROPRIETARY TO MVE + PARTNERS, INC. AND IS FURNISHED IN CONFIDENCE FOR
4500 3824 • THE CONTRACTOR SHALL RETAIN A HILTI REPRESENTATIVE TO PROVIDE ONSITE ANCHOR INSTALLATION

OTHER PURPOSE AND MAY NOT BE REPRODUCED OR DISCLOSED TO OTHERS WITHOUT THE PRIOR WRITTEN CONSENT OF
5000 4031
TRAINING FOR ALL INSTALLERS AND SUPERVISORS NOT PREVIOUSLY TRAINED.
5500 4227
6000 4415
6500 4595 ANCHOR TESTING FOR ALL PREDRILLED ANCHORS:
7000 4769 PROVIDE LOAD TESTING OF ALL INSTALLATIONS AS FOLLOWS:
7500 4936 • PROOF LOAD TEST 10% OF ANCHORS BY RANDOM SELECTION.
8000 5098 • TEST TO FAILURE 2% OF ANCHORS (3 MINIMUM) BY RANDOM SELECTION.
8500 5255 • IF ANY PROOF LOAD TESTS FAIL INCREASE TESTING TO 33% OF ANCHORS.
9000 5407 • IF MORE THAN 2% OF ANCHORS FAIL THEN PROOF LOAD TEST 100% OF ANCHORS.
• IF ANY ANCHORS ARE FOUND TO BE INSTALLED WITHOUT COMPLETE EPOXY OR ARE DRILLED SHORTER
THAN 75% OF THE REQUIRED DEPTH, THEN PROOF LOAD TEST 100% OF ANCHORS.
• PROVIDE SPECIAL INSPECTION OF ALL REPAIRS.
• SUBMIT TEST REPORT AND REPAIR REPORT UNDER SEAL TO THE STRUCTURAL ENGINEER.
• ALL COSTS FOR TESTING TO BE PAID BY THE CONTRACTOR INSTALLING THE ANCHORS.

MVE + PARTNERS, INC. ALL RIGHTS RESERVED, © COPYRIGHT 2018.


GENERAL NOTES

1/8" = 1'-0"

08/03/2020 - ISSUED FOR 100% DD PROGRESS SET


SHEET TITLE

Scale
SHEET NUMBER

S1.02
PROJECT NUMBER
30925-01

BRYSON MARKULIN ZICKMANTEL


STRUCTURAL ENGINEERS

#501 - 510 BURRARD STREET, VANCOUVER, B.C. V6C 3A8


(604) 685-9533 WWW.BMZSE.COM CONTACT@BMZSE.COM
STAMP
ISSUES:
NO. DATE DESCRIPTION
A 2020-04-23 ISSUED AS 100% SD
B 2020-06-16 50% DD PROGRESS
SET

31.0 STRUCTURAL STEEL FIELD WORK: MINIMUM SLAB BAND REINFORCING: STRUCTURAL STEEL STRUCTURES: 25.0 FORMWORK AND RESHORING C 2020-08-03 100% DD PROGRESS
SET
1. STRUCTURAL STEEL WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE A.I.S.C. SPECIFICATIONS 40. FIELD PLACEMENT SHALL USE ONLY THE EXACT CHAIR INDICATED ON THE SHOP DRAWING. PROVIDE MINIMUM REINFORCING IN SLAB BANDS AS FOLLOWS 13. HORIZONTAL STEEL STRUCTURE SUCH AS BEAMS AND JOISTS SPECIFIED ON THESE DRAWINGS HAVE 1. DESIGN AND CONSTRUCT FORMWORK TO ACHIEVE TOLERANCES SPECIFIED HEREIN, ELSEWHERE AND TO
FOR THE DESIGN, FABRICATION AND ERECTION OF STRUCTURAL STEEL FOR BUILDINGS, LATEST EDITION 41. PROVIDE 2−STRANDS MINIMUM OVER COLUMNS EACH WAY AND OVER ENDS OF WALLS. BEEN DESIGNED TO CONTROL DEFLECTIONS. ALLOW FOR AT LEAST 3/4 INCHES DEFLECTION AFTER GOOD WORK PRACTICE AS APPROPRIATE.
AND THE "CODE OF STANDARD PRACTICE FOR STEEL BUILDINGS", LATEST EDITION. ( CBC. STD. 22−1 ) 42. WOBBLE OF THE STRAND IN THE FIELD SHALL NOT EXCEED 6 INCHES FROM INTENDED LINE AND SHALL • 4−#6 TOP CONTINUOUS IN ALL SLAB BANDS UP TO 8 FEET WIDE, TENSION LAP MIDSPAN, HOOK 90 STRUCTURE IS COMPLETED. 2. FORMWORK TO PROVIDE FOR MEMBER SIZES AND CONFIGURATION AS SHOWN IN STRUCTURAL DRAWINGS.
2. ALL STRUCTURAL STEEL CONSTRUCTION SHALL CONFORM WITH CHAPTER 22 OF THE CODE AND WITH THE NOT DIVERT HORIZONTALLY MORE THAN 1:12. DEGREES AT ENDS OR SLAB BANDS OR PROJECT 4 FEET BEYOND THE TERMINATION OF THE SLAB BAND 14. UPWARD CAMBER SHOULD BE CONSTRUCTED INTO THE STRUCTURE AS NOTED ON THESE PLANS. THIS CONFIRM SIZES WITH ARCHITECTURAL AND OTHER DRAWINGS AND REPORT ANY DESCREPANCIES TO THE
PROVISIONS OF THE STANDARD SPECIFICATIONS FOR STRUCTURAL STEEL FOR BRIDGES AND BUILDINGS. 43. LIVE END ANCHORS MUST BE PLACED WITH 1/8" TOLERANCE. DEAD END ANCHORS MUST BE PLACED INTO THE SLAB. CAMBER IS EXPECTED TO COME OUT OF THE STRUCTURE ONCE THE ENTIRE STRUCTURE HAS BEEN ENGINEER.
STRENGTHS AND GRADES SHALL BE AS FOLLOWS, UNO: WITH 1/8" TOLERANCE VERTICALLY AND 2" TOLERANCE HORIZONTALLY EXCEPT NEXT TO SLAB EDGES • 6−#6 TOP CONTINUOUS IN ALL SLAB BANDS OVER 8 FEET WIDE UP TO 12 FEET WIDE, TENSION LAP ERECTED, TEMPORARY SHORING HAS BEEN REMOVED AND CONCRETE SHRINKAGE HAS COMPLETED. 3. FORMWORK FOR CURED COLUMNS SHALL NOT BE REMOVED UNTIL COLUMN CONCRETE HAS REACHED 2.5
WHERE SPECIFIED COVER SHALL BE MAINTAINED. MIDSPAN, HOOK 90 DEGREES AT ENDS OR SLAB BANDS OR PROJECT 4 FEET INTO THE SLAB BEYOND. 15. TEMPORARY SHORING IS MEANS AND METHODS OF CONSTRUCTION AND IS THE RESPONSIBILITY OF THE KSI MINIMUM AND CANNOT BE DAMAGED BY THE TOOLS USED. CAREFULLY LOOSEN COLUMN FORMS BY
DESCRIPTION YIELD Fy, KSI ASTM GRADE 44. WHERE STRANDS CURVE HORIZONTALLY IN PLAN, SPACE STRANDS 1 ½" CLEAR BETWEEN EACH STRANDS • #5 @ 12" O/C IN SIDE FACES OF SLAB BANDS 30" DEEP OR DEEPER. GENERAL CONTRACTOR HAND BEFORE EQUIPMENT IS EMPLOYED.
AND TIE INTO POSITION. PROVIDE ADDITIONAL REINFORCING AS INDICATED ON THE SHOP DRAWINGS. • #4 6 LEG TIES @ 12" O/C MINIMUM IN SLAB BANDS 24" DEEP OR DEEPER IN SLAB BANDS UP TO 8 FEET 16. THE CONTRACTOR IS CAUTIONED THAT STRUCTURE DEFLECTION CAN EXCEED THE CALCULATED 4. FORMWORK SUPPORT FOR CURED SLABS SHALL NOT BE REMOVED UNTIL SLAB CONCRETE HAS REACHED A
− BASE PLATES, CONNECTING 36 KSI A36 45. POST−TENSION STRAND SHALL TAKE PRIORITY IN PLACING OVER ANY OTHER EMBEDDED MATERIAL WIDE. PROVIDE 8 LEG TIES FOR SLAB BANDS UP TO 12 FEET WIDE. SEE PLANS FOR HEAVIER TIES AS DEFLECTIONS IF PROPER CONSTRUCTION PROCEDURES ARE NOT FOLLOWED. FOLLOWING ARE SOME MINIMUM OF 75% OF THE MIX DESIGN STRENGTH OR 3.5 KSI .
PLATES & MISC., U.O.N. INCLUDING MILD REINFORCING, IN−SLAB DUCTS, CONDUITS, ETC. WHERE SLEEVES ARE REQUIRED FOR REQUIRED. CONSTRUCTION PROCEDURES THAT CAN AFFECT SLAB FLATNESS: 5. DESIGN FORMWORK TO LIMIT DEFLECTION OF THE FORMED SURFACE TO WITHIN TOLERANCE SUITABLE
MECHANICAL, CONFIRM LOCATIONS WITH THE SPECIAL INSPECTOR PRIOR TO PLACING. • FOR SLAB BANDS WITH CONCENTRATED TRANSFER LOADS SUCH AS COLUMNS OR INTERSECTING SLAB • BEAMS OR JOISTS ARE NOT ERECTED WITH SPECIFIED CAMBER. FOR THE PROJECT AND ACI RECOMMENDATIONS.
− ANGLES, CHANNELS & 36 KSI A36 46. GENERAL CONTRACTOR SHALL PREPARE A DRAWING INDICATING THE AS−BUILT LAYOUT OF DUCTS FOR BANDS, PROVIDE MINIMUM TIES FULL LENGTH. • CONCRETE TOPPING IS NOT CAST WITH SPECIFIED CAMBER 6. DESIGN RESHORING TO LIMIT THE LOAD IMPARTED TO ANY PRIMARY STRUCTURAL MEMBER TO THE
WT SHAPES THE FIRST OF EVERY TYPICAL FLOOR. SUCH LAYOUT SHALL BE REVIEWED ON SITE BY THE SPECIAL • UNINTENDED THICKENING OF SLABS OVER EMBEDDED ITEMS OR AT SUPPORTS SUPERIMPOSED DESIGN LIVE LOAD OF THE MEMBER. FOR EXAMPLE, RESHORING ON SLABS SHALL
INSPECTOR PRIOR TO PLACING THE FIRST FLOOR, AND SHALL BE USED ON ALL SUBSEQUENT LEVELS. 1. ALL REINFORCEMENT TO BE CHAIRED AND TIED IN ITS FINAL POSITION IN ACCORDANCE WITH THE • CURING OF CONCRETE IS NOT PERFORMED EFFECTIVELY ACCOUNT FOR THE LIVE LOAD ONLY, NOT INCLUDING PARTITION LOADS OR OTHER DEAD LOADS UPON THE
− WF COLS & BEAMS, U.O.N. 50 KSI A992 47. THE GENERAL CONTRACTOR SHALL KEEP AN ACCURATE RECORD OF ANY VARIATIONS IN THE DRAWINGS AT NOT MORE THAN 3FT. CENTERS TO PREVENT ANY MOVEMENT DURING THE PLACEMENT OF • SLAB OR BEAMS ARE OVERLOADED WITH CONSTRUCTION MATERIALS OR EQUIPMENT SLAB. SPECIFY INSTALLATION METHODS OF THE RESHORING TO CONTROL LOADING ON THE SLAB AND
PLACEMENT OF POST−TENSION MATERIALS FROM THE SHOP DRAWINGS, MARK UP AN AS−BUILT SET OF CONCRETE. STAPLE ALL CHAIRS TO FORMWORK PRIOR TO PLACING CONCRETE. • SLAB OR BEAMS ARE OVERLOADED BY STOCKPILING FINISHING MATERIALS SUCH AS GYPSUM WALL AVOID EXCESSIVE LOADING AS CAN BE CAUSED BY SUCCESSIVE FLOORS OF RESHORES.
− WF SHAPES IN FRAMES 50 KSI A992 DRAWINGS AND SUBMIT SAME TO THE ENGINEER AND BUILDING OWNER PRIOR TO SUBSTANTIAL 2. PLACEMENT OF REINFORCING AND ALL CUTTING, LAPPING AND BENDING DETAILS TO BE IN ACCORDANCE BOARD, TILES, STONE FINISHES, PRECAST CONCRETE, OR OTHER HEAVY MATERIALS. 7. "RESHORE" SHOWN IN THE DRAWINGS MAY BE INTERPRETED AS FOLLOWS:
COMPLETION OF THE CONTRACT. WITH ACI DETAILING PRACTICE. • DAMAGE TO SLABS OR BEAMS AFTER CONSTRUCTION BY CUTTING, CHIPPING, OR CORING
− BASE PLATES, CONNEC. 50 KSI A572 48. TEARS IN THE POLYETHYLENE WILL BE CAUSE TO REQUIRE REPLACEMENT OF THE STRAND UNLESS IT 3. CHAIRS FOR REINFORCEMENT IN EXPOSED SOFFITS OR OTHER AREAS EXPOSED TO WEATHER AND VIEW • SHORING IS REMOVED BEFORE THE CONCRETE IS ADEQUATELY CURED FOR COMPOSITE MEMBERS.
PLATES AT FRAMES CAN BE SHOWN THAT WATER INGRESS HAS NOT OCCURRED. SHALL BE PLASTIC OR EPOXY COATED. • DEFLECTION OR SUBSIDENCE OF SHORING LEVEL 5
49. WHERE STRANDS HAVE BEEN BENT OR DAMAGED DURING TRANSPORTATION OR ARE OTHERWISE 4. REINFORCEMENT MUST BE CLEAN AND FREE FROM ANY SUBSTANCE WHICH MAY HASTEN RUSTING OR • MISPLACEMENT OF REINFORCING STEEL INCLUDING INADEQUATE CHAIRING OF TOP
− PIPE SECTIONS 35 KSI A53, GR B DEFECTIVE, REPLACE THE STRAND WITH GOOD MATERIALS PRIOR TO CASTING THE CONCRETE. REDUCE CONCRETE BOND. ANY QUESTIONABLE MATERIALS TO BE CLEANED OR REPLACED AT THE REINFORCEMENT. EN
CONTRACTORS EXPENSE TO THE SATISFACTION OF THE CONSULTANT. • IMPROPER MONITORING OF CONCRETE TESTING OP
50. KEEP RECORDS OF STRESSING OPERATIONS AND STRAND ELONGATION AND SUBMIT SAME TO THE
• LEVEL 4
− TUBE SECTIONS 46 KSI A500, GR B SPECIAL INSPECTOR AND ENGINEER. DO NOT CUT STRANDS WHICH DO NOT ACHIEVE ELONGATION 5. MAKE ALL HORIZONTAL REINFORCEMENT CONTINUOUS AT CORNERS AND LAP. LOW CONCRETE STRENGTH
WITHIN 7% OF THE ANTICIPATED ELONGATION. REPORT ALL IRREGULARITIES IN STRESSING TO THE 6. PROVIDE MINIMUM 2 #5 BARS PARALLEL TO ALL EDGES OF SLABS AND WALLS AND AROUND OPENINGS, • ADDITION OF WATER TO CONCRETE ON SITE.
3. SEE ARCHITECTURAL DRAWINGS FOR MISCELLANEOUS STEEL DETAILS AND FOR VERIFICATION OF ALL SPECIAL INSPECTOR AND ENGINEER. VARIATIONS TO BE REVIEWED AND ADVISED BY THE PROFESSIONAL EXTEND 2’−0" BEYOND CORNERS. PROVIDE ONE #5 X 4’ −0" DIAGONAL AT EACH RETURN CORNER OR • ERRORS IN INSTALLATION OR DAMAGE TO STEEL DECKING OP
EN
DIMENSIONS. ENGINEER RESPONSIBLE FOR THE PT SYSTEM. OPENING IN SLAB OR WALL. BEND SLAB OR WALL TRIM BARS CONTINUOUS AROUND OUTSIDE CORNERS. INTERPRETATION OF NOTE:
LEVEL 3
4. ALL STEEL WORK TO BE SHOP PRIMED. TOUCH−UP ALL SCUFFS, WELDS AND SCRAPES IN THE FIELD AFTER 51. STRESS ONLY IN THE SEQUENCE INDICATED OF THE SHOP DRAWINGS. STRESS TWO STRANDS MINIMUM ADDITIONAL BARS MAY BE REQUIRED FOR POST−TENSIONED ANCHORS. PROVIDE CONTINUOUS SUPPORT UNDER LEVEL 1
ERECTION. WELDS TO BE CLEANED OF ALL SLAG PRIOR TO PAINTING. CONFIRM ALL FINISHES AND AT EACH EDGE OF FLOOR PLATE PRIOR TO STRESSING REMAINING STRANDS. 7. PROVIDE DOWELS BETWEEN JOINING CONCRETE SURFACES TO MATCH BARS IN LATER POUR (E.G. STAIR TO CARRY THE LOADS FROM 8 INCH WALL ABOVE +
8" WALL EN
CLEANING WITH THE ARCHITECT. 52. JACKS SHALL BE CALIBRATED FOR EACH PRESSURE GAUGE. SUCH CALIBRATION SHALL NOT BE OLDER LONGITUDINAL REBAR, WALL REINFORCING, ETC.). OP TRIBUTARY SLAB WIEGHT + MEN AND EQUIPMENT
5. HOLLOW MEMBERS SHALL BE SEAL WELDED IN DRY CONDITION IN THE SHOP. PROVIDE WEEP HOLES AT 8. DOWELS FOR CONCRETE WALLS (NOT SHEARWALLS) SHALL PROJECT A TENSION LAP LENGTH ABOVE LEVEL 2 UNTIL LEVEL 5 IS CURED TO ITS SPECIFIED
THAN 1 MONTH AT THE BEGINNING OF THE PROJECT AND MUST BE RECALIBRATED EVERY 6 MONTHS OR
THE LOW END OF ALL HOLLOW MEMBERS IN EXTERIOR CONDITIONS, AND SEAL WELD AROUND ALL MATING
SURFACES IN EXTERIOR CONDITIONS WHETHER COVERED OR OPEN. 53.
WHENEVER THEIR ACCURACY IS SUSPECT.
GROMMET HOLES SHALL BE PREPARED WITH A BONDING AGENT AND FILLED WITH A NON−SHRINK GROUT
FOOTING OR SUPPORT LEVELS. DOWELS FOR SHEARWALLS (INCLUDING ZONES AND WALL STEEL) SHALL
PROJECT A SEISMIC LAP LENGTH ABOVE FOOTINGS. CONTRACTOR TO ENSURE THAT ALL DOWELS ALIGN
27.0 REINFORCING STEEL EN
CONCRETE STRENGTH. RESHORING BELOW THE
WALL SHALL TRANSMIT LOAD TO LEVELS BELOW
OP
6. SEE NOTES RE: TEMPORARY CONDITIONS. PROVIDE GUYING OF THE INCOMPLETE STRUCTURE AS SUCH AS TARGET MACHINE BASE TO COVER AND PROTECT THE CORROSION PROTECTIVE ANCHORAGE. WITH VERTICAL REINFORCING AND WITH THE CORES OF MASONRY WALLS. WHILE UTILIZING ONLY LIVE LOAD TRIBUTARY
REINFORCEMENT SHALL BE DEFORMED BILLET STEEL OF THE FOLLOWING GRADES: LEVEL 1
REQUIRED TO PLUMB AND MAINTAIN THE INCOMPLETE STRUCTURE IN A SAFE FORM UNTIL COMPLETION. 54. NO CHLORIDES, FLUORIDES OR NITRATES TO BE USED IN CONCRETE WHICH RECEIVES POST−TENSIONING 9. SHOP TEST ALL NELSON STUDS OR REBAR ANCHORS APPLIED TO BEAMS OR PLATES IN THE SHOP. FIELD CAPACITY OF EACH LEVEL BELOW.
7. GROUT UNDER BASE PLATES OF COLUMNS WITH A NON−SHRINK FLOWABLE GROUT, TARGET MACHINE MATERIALS. TEST ALL NELSON STUDS OR REBAR ANCHORS APPLIED IN THE FIELD. 60 KSI DEFORMED BARS: − ASTM A615, A616, A617 U.N.O.
BASE OR SIMILAR, CAST UNDER HYDRAULIC HEAD. ENSURE FULL AREA IS GROUTED. PROVIDE 1" UNLESS 55. SPECIAL ATTENTION SHALL BE PAID TO THE PLACING OF CONCRETE TO ENSURE THAT NO VOIDS EXIST IN 10. REINFORCING FOR SIDEWALKS AND EXTERIOR CONCRETE PAVING FOR FOOT TRAFFIC ONLY SHALL BE #4 RESHORE UNTIL
NOTED. FRONT OF ANCHORAGE OR AROUND CONGESTED STRAND PLACEMENT. THE GENERAL CONTRACTOR @ 16" O/C FOR JOINTS UP TO 15’ CENTERS.
− ASTM A706 FOR ALL COLUMNS AND ALL REINFORCING IN SEISMIC
ELEMENTS INCLUDING SHEARWALLS, ZONES, TIES AND HEADERS
LEVEL 5 IS EXAMPLE:RESHORING NOTE
8. CONNECTIONS SHALL BE DETAILED ACCORDING TO THE A.I.S.C. TEXTBOOK OF STRUCTURAL DRAFTING. SHALL ENSURE THAT THE CONCRETE IS PLACED IN A MANNER SUCH THAT THE STRANDS ARE NOT 11. FOR SLAB JOINTS LESS THAN 8’ CENTERS, REINFORCING MAY BE REDUCED TO #4 PERIMETER PLUS 6 X 6 CAST AND CURED
− ASTM A706 FOR ALL REINFORCING TO BE WELDED.
9. ANCHOR BOLTS SHALL CONFORM TO ASTM A−307, UNLESS OTHERWISE NOTED. A36 ROUND BAR STOCK

THESE DRAWINGS ARE NOT TO BE USED FOR


DEFLECTED OR LATERALLY DISPLACED DURING CONCRETE PLACING. X 8/8 WELDED WIRE MESH PLACED MIDHEIGHT OF SLAB.

TENDER, CONTRACT, OR CONSTRUCTION


MAY BE SUBSTITUTED FOR NON−HIGH STRENGTH ANCHOR BOLTS. NUTS FOR A307 BOLTS SHALL CONFORM 56. FORMWORK UNDER POST−TENSIONED SLABS AND BEAMS TO REMAIN IN PLACE UNTIL THE SYSTEM IS 12. ALL REINFORCEMENT IN SHEARWALLS SHALL BE ASTM A706GRADE 60 WELDABLE. 8. SUBMIT SHOP DRAWINGS FOR FORMWORK AND RESHORING TO THE ENGINEER FOR INFORMATION ONLY
PRESTRESSING WIRE: − ASTM A416
TO ASTM A563. FULLY STRESSED. 13. SEE SHEARWALL SCHEDULE FOR ZONE AND SHEARWALL REINFORCING NOTES. INDICATING ALL ELEMENTS OF THE THE FORMWORK AND RESHORING SYSTEM AND THE NET EFFECTIVE
ANCHOR BOLTS: − ASTM A307
10. MAIN MEMBERS SHALL HAVE HIGH STRENGTH BOLTS CONFORMING TO A.I.S.C. SPECS FOR A325SC (SLIP 57. SUBCONTRACTOR SHALL EMPLOY A PERSON RESPONSIBLE FOR THE POST−TENSIONING OPERATIONS LOADING IMPARTED UPON THE STRUCTURE FROM THE FORMWORK AND RESHORING.
HIGH STRENGTH BOLTS: − ASTM A325
CRITICAL) BOLTS, U.O.N. ALL OTHER BOLTS SHALL CONFORM TO ASTM A−307. NUTS FOR HIGH STRENGTH WHO WILL BE PRESENT ON THE FORMED DECK THROUGHOUT SUCH OPERATIONS, INCLUDING PLACING OF SPECIAL INSPECTION IS REQUIRED FOR INSTALLATION OF ALL REINFORCING STEEL SHOWN ON THE 9. SHOP DRAWINGS FOR FORMWORK SHALL BE SEALED BY A QUALIFIED PROFESSIONAL ENGINEER
EPOXY REINFORCING: − ASTM A775
BOLTS SHALL BE HEAVY HEX GRADE C CONFORMING TO ASTM A563. STRUCTURAL DRAWINGS, SEE SPECIAL INSPECTION PROGRAM. REGISTERED IN THE JURISDICTION OF THIS PROJECT WHO HAS EXPERIENCE WITH THE DESIGN AND
CONCRETE AND CORROSION PROTECTING. HE SHALL BE FAMILIAR AND EXPERIENCED WITH THE
11. HIGH STRENGTH BOLTS AND WASHERS SHALL BE TESTED BY A QUALIFIED MATERIALS TESTING LAB PER CONSTRUCTION OF FORMWORK SYSTEMS.
ASTM A325 OR APPROPRIATE STANDARD FOR BOLT BEING TESTED. TEST RESULTS SHALL BE PROVIDED
PARTICULAR POST−TENSIONING SYSTEM USED AND WILL BE RESPONSIBLE FOR MAINTAINING ACCURATE COVER TO PRIMARY REINFORCING: (PER ACI 318−14 CHAPTER 721)

2020-08-26 4:46:00 PM
10. THE FORMWORK AND RESHORING DESIGN ENGINEER SHALL INSPECT THE FORMWORK AND RESHORING IN

PROGRESS
STRESSING RECORDS AND PROPER WORKMANSHIP. DURING CONCRETE PLACING, HE SHALL FOLLOW THE
TO THE ENGINEER OF RECORD AND BUILDING OFFICIAL PRIOR TO INSTALLATION OR USE OF THE BOLTS. THE FIELD AND PROVIDE WRITTEN EVIDENCE OF PROPER WORKMANSHIP IN ACCORDANCE WITH THE SHOP
PLACEMENT TO ENSURE THAT STRANDS ARE NOT DISPLACED. A REPORT FOR EACH FLOOR SHALL BE FIRE RESISTANCE RATING (SEE ARCH)
12. EXTERIOR STRUCTURAL STEEL PERMANENTLY EXPOSED TO THE WEATHER SHALL BE HOT−DIP DRAWINGS AND GOOD WORK PRACTICE. SUBMIT THE FIELD INSPECTION REPORTS TO THE ARCHITECT FOR
MAINTAINED. UP TO 1HR. 2HR. 3HR. 4HR.
GALVANIZED AFTER FABRICATION. ZINC COATING SHALL CONFORM TO ASTM A−123 (G−60 U.O.N.). HIS INFORMATION ONLY.
58. CONNECTIONS TO A POST−TENSIONED SLAB SHALL BE MADE WITH INSERTS EMBEDDED IN THE
13. WELDING DONE AFTER GALVANIZING SHALL BE PROTECTED WITH TWO COATS OF "GALVANIZED"
"GALVALOY", OR EQUAL.
CONCRETE. DO NOT USE POWER DRIVEN ANCHORS OR DRILLED ANCHORS TO THE CONCRETE SLAB
EXCEPT AS SPECIFICALLY APPROVED BY THE ENGINEER. APPROVAL MAY BE GIVEN TO USE POWER
28.0 POST−TENSIONED CONCRETE FACES CAST AGAINST GROUND 3" − − −
11. SLABS: IMMEDIATELY RESHORE ALL SLABS UNTIL CONCRETE HAS REACHED FULL DESIGN STRENGTH AND
IS AT LEAST 28 DAYS OF AGE.
14. STEEL FABRICATION SHALL BE PERFORMED IN A SHOP APPROVED BY THE BUILDING OFFICIAL. 12. SLABS WITH CONCRETE NOT MATURED TO SPECIFIED STRENGTH SHALL NOT BE CONSIDERING FOR LOAD
DRIVEN ANCHORS AT THE DISCRETION OF THE ENGINEER, IF THE ACTUAL PLACEMENT OF THE STRAND IS EXPOSED TO GROUND OR WEATHER:
15. STEEL FABRICATOR SHALL VERIFY DIMENSIONS WITH ARCHITECTURAL AND STRUCTURAL DRAWINGS. 1. POST−TENSION WORK SHALL CONFORM TO PROJECT CODES AND STANDARDS INCLUDING GUIDE CARRYING OF FORMWORK OR RESHORING.
MARKED ON THE SLAB SURFACE FOR LATER REFERENCE OF THE STRAND LOCATION. − #5 OR SMALLER 2" 2" 2" 2"
16. SUBMIT SHOP DRAWINGS TO THE ENGINEER FOR APPROVAL PRIOR TO FABRICATION OR INSTALLATION OF SPECIFICATIONS FOR POST−TENSION MATERIALS BY THE POST−TENSIONING INSTITUTE, ASTM A−416, AND 13. PROVIDE RESHORING PROCEDURES AS REQUIRED TO MAINTAIN LOADING UPON FLOOR SLABS AND BEAMS
59. REPORT ANY STRANDS DAMAGED FROM DRILLING OF ANCHORS OR ANY OTHER CONSTRUCTION − #6 OR LARGER 1 1/2" 1 1/2" 1 1/2" 1 1/2"
STEEL OR ACCESSORIES. CALIFORNIA BUILDING CODE. NOT EXCEEDING THE INTENDED DESIGN LOAD. PROVIDE A MINIMUM OF 3 LEVELS OF RESHORES, OR MORE
PRACTICES THAT DAMAGE THE TENDONS. REPAIR OF ANY DAMAGED TENDONS OR ANCHORS TO BE THE
17. WEB CONNECTIONS OF FRAME BEAMS SHALL NOT BE TIGHTENED UNTIL AFTER FLANGE WELDS ARE 2. STRANDS SHALL BE .5" OR .6" NOMINAL DIAMETER, 270 KSI, LOW RELAXATION, SEVEN WIRE STRAND AS REQUIRED TO MAINTAIN LOAD INTENSITY LESS THAN THE SPECIFIED LIVE LOAD FOR DESIGN.
RESPONSIBILITY OF THE CONTRACTOR. COLUMNS (TO TIES) 1 1/2" 1 1/2" 1 1/2" 2"
COMPLETED ALONG EACH LINE OF COLUMNS AT EACH FLOOR. PROVIDE ERECTION SEQUENCE FOR CONFORMING TO ASTM A−416 UNLESS OTHERWISE APPROVED. DESIGN HAS BEEN PROVIDED FOR .5" 14. PROVIDE WORK PROCEDURES TO PROPERLY IMPLEMENT RESHORING TO THE ENGINEER FOR REVIEW.
BUILDING DEPARTMENT APPROVAL. STRANDS HOWEVER A SUBSTITUTE FOR .6" DIAMETER STRANDS MAY BE MADE. CONSIDER THE FOLLOWING PROPOSED METHOD OF RESHORING TO LIMIT LOAD UPON LOWER SLAB LEVELS.
SPECIAL INSPECTION IS REQUIRED FOR INSTALLATION OF ALL REINFORCING STEEL SHOWN ON THE COLUMNS EXPOSED TO MOVING 2" 2" 2" 2 1/2"
3. STRAND QUANTITIES SHOWN ON PLAN ASSUME 27 KIPS NET EFFECTIVE FORCE WHICH SHALL BE ALL MEANS AND METHODS REMAIN THE RESPONSIBILITY OF THE CONTRACTOR(S).
STRUCTURAL DRAWINGS, SEE SPECIAL INSPECTION PROGRAM. VEHICHLES (TO TIES)
STEEL STAIRS CONSIDERED THE MINIMUM AVERAGE FORCE IN ANY TENDON. WHERE LOSSES RESULT IN LESSER NET 15. FLYASH IN CONCRETE MIXES CAN DELAY STRENGTH AND STIFFNESS GAIN IN CONCRETE. COMPENSATE
EFFECTIVE FORCE, PROVIDE ADDITIONAL STRANDS TO COMPENSATE. PROVIDE TWO−END STRESSING OF FOR DELAYED CURING BY EXTENDING THE LENGTH OF TIME THAT RESHORING REMAINS SUPPORTING THE
18. WHERE CALLED OUT ON PLAN, STEEL STAIRS SHALL BE DESIGNED AND FABRICATED BY THE CONTRACTOR. NON−PRESTRESSED SLABBANDS/BEAMS 3/4" 1 1/2" 1 3/4" 2"
ANY STRANDS OVER 130 FEET LONG. SLABS.
PLANS, DETAILS AND STRUCTURAL CALCULATIONS SHALL BE SUBMITTED TO ARCHITECT / ENGINEER FOR 4. STRANDS SHALL BE PRODUCED FROM A MANUFACTURING PLANT CERTIFIED UNDER THE POST 16. FORMWORK SUPPORT FOR POST−TENSIONED SLABS SHALL NOT BE REMOVED UNTIL ALL OF THE POST
NON−PRESTRESSED SLABS 3/4" 1" 1" 1 1/4"
REVIEW AND TO THE BUILDING DEPARTMENT AS A DEFERRED APPROVAL. STAIRS SHALL BE DESIGNED TO
SUPPORT A LIVE LOAD OF 100 PSF.
29.0 CONCRETE MASONRY BLOCK TENSIONING INSTITUTE PROGRAM OF CERTIFICATION OF PT SUPPLIERS. SUPPLY EVIDENCE OF
CERTIFICATION WITH SHOP DRAWINGS.
TENSIONING HAS BEEN STRESSED AND CONFIRMED ACCEPTABLE.

19. DRAWINGS AND CALCULATIONS SHALL BE SEALED AND SIGNED BY A LICENSED CIVIL OR STRUCTURAL POST TENSIONED SLABS U/N 3/4" 3/4" 1" 1 1/4"
5. POST TENSIONING SYSTEMS SHALL BE FULLY ENCAPSULATED SYSTEMS − STRANDS SHALL BE ENCASED
1. MASONRY TO BE CONSTRUCTED IN ACCORDANCE WITH CALIFORNIA BUILDING CODE , AND DOCUMENTS
ENGINEER, REGISTERED IN CALIFORNIA . IN CONTINUOUS EXTRUDED POLYETHYLENE TUBING WITH THE VOID COMPLETELY FILLED WITH A RUST CL OF COLUMN CL OF COLUMN
REFERENCED THEREIN. WALLS (TO VERTICAL REBAR)
20. REFER TO ARCHITECTURAL DRAWINGS FOR STAIR DIMENSIONS AND PROFILES. INHIBITIVE GREASE CONFORMING TO GUIDE SPECIFICATIONS BY THE POST−TENSIONING INSTITUTE FOR SUPPORTS SUPPORTS
2. TEST MASONRY CONSTRUCTION IN ACCORDANCE WITH CALIFORNIA BUILDING CODE REQUIREMENTS SLAB CURED TO 75%
21. CONTRACTOR SHALL PROVIDE CONNECTIONS, STIFFENERS, INTERMEDIATE BEAMS, HANGARS, ETC., CORROSIVE ENVIRONMENTS. STUFFED SYSTEMS ARE NOT PERMITTED.
INCLUDING GROUT, MORTAR AND CONCRETE BLOCKS. INCLUDE MEN OF ACTUAL MIX
NECESSARY FOR SUPPORT OF THE STAIRS. 6. THE POST−TENSION CONTRACTOR AND THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR THE
3. THESE ENGINEERING DRAWINGS SHOW THE PERMANENT STRUCTURE ONLY AND DO NOT INCLUDE & EQUIPMENT
QUALITY CONTROL AND THE QUALITY OF THE COMPLETED PRE−STRESSED STRUCTURE. DESIGN STRENGTH
COMPONENTS AND PROCEDURES THAT MAY BE REQUIRED FOR SAFETY AND SEQUENCE OF WORK DAY 1 LOADING
METAL DECK DURING THE CONSTRUCTION, WHICH SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR.
7. MINIMUM CONCRETE STRENGTH AT TEH TIME OF PRESTRESS MUST BE NOT LESS THAN 3500 PSI. − REINFORCING COVER NOTED IS FOR FIRE RESISTANCE RATINGS SLAB CAST LEVEL X
USED OR 3.5 KSI MIN.
LEVEL X
8. POWER DRIVEN STEEL ANCHORS SHALL NOT BE USED IN PRESTRESSED OR POST−TENSIONED CONCRETE BASED ON NORMAL WEIGHT SILICEOUS AGGREGATE CONCRETE.
4. MASONRY REQUIRED FOR STRUCTURAL PURPOSES IS SHOWN ON THESE DRAWINGS. MASONRY
22. METAL DECK SHALL BE OF THE TYPE AND GAUGE AS INDICATED ON THE DRAWINGS AND SHALL BE MEMBERS UNLESS PRE−APPROVED BY THE ENGINEER. SEQUENTIALLY
REQUIRED ONLY FOR ARCHITECTURAL PURPOSES IS SHOWN FOR REFERENCE ONLY, SEE − REINFORCING COVER NOTED IS FOR RESTRAINED MEMBERS.
INSTALLED IN ACCORDANCE WITH THE MANUFACTURERS RECOMMENDATIONS AND PUBLISHED ICC 9. CONCRETE SHRINKAGE IN POST−TENSIONED CONCRETE SLABS SHALL HAVE A MAXIMUM LIMIT OF 0.15 FORMWORK REMOVE FORMING
ARCHITECTURAL FOR EXACT LOCATION OF WALLS. FOR BRICKWORK AND VENEER, SEE ARCHITECTURAL. SEE PLAN FOR COVER REQUIREMENTS FOR UN−RESTRAINED MEMBERS
REPORT. PERCENT (CONCRETE STRAIN 0.0015 IN/IN) − OTHERWISE SHRINKAGE COMPENSATING CONCRETE PER ACI AND RESHORE
5. CONCRETE UNIT MASONRY TO ACI STANDARD 21−4 WITH A MINIMUM COMPRESSIVE STRENGTH OF F’M = 223−98 SHALL BE UTILIZED − REFER TO 19.0 CONCRETE FOR FURTHER REQUIREMENTS. − FOR EXTENT AND LOCATION OF FIRE RATINGS SEE ARCHITECTURAL
23. DECK SHALL BE CONTINUOUS OVER THREE SPANS WHEREVER POSSIBLE. SHORE DECK IF RECOMMENDED IMMEDIATELY.
BY THE MANUFACTURER. MINIMUM BEARING AT ENDS IS 2". 1500 PSI BASED ON NET SECTION. DRAWINGS. INSTALL RESHORES
PLACEMENT AND STRESSING OF POST TENSION TENDONS ARE SUBJECT TO SPECIAL INSPECTION REFER TO
24. DECK SHALL BE FACTORY VENTED AT EXTERIOR SLABS AND WHEN INSULATING CONCRETE FILL IS USED, 6. USE ONLY TYPE S MORTAR, TO ACI STANDARD 21−15. SNUG TIGHT BUT NOT
THE SPECIAL INSPECTION PROGRAM
U.O.N. 7. GROUT TO ACI STANDARD 21−19 WITH A MINIMUM COMPRESSIVE STRENGTH OF F’G = 2000 PSI. OVERTIGHT
25. METAL DECK ACCESSORIES SHALL BE FORMED FROM STEEL SHEETS CONFORMING TO ASTM A−446, GRADE 8. JOINT REINFORCEMENT TO ACI STANDARD 21−10 PARTS I AND II.
CORROSION PROTECTION: DESIGNATION OF BARS: RESHORE DESIGN
A. THE FINISH SHALL BE ZINC COATING CONFORMING TO ASTM A−525, CLASS G−60 (G−90). 9. MASONRY WALLS REINFORCING (U.N.O.) AND FIELD REVIEW RESHORE WHEN
26. CONCRETE ADMIXTURES CONTAINING CHLORIDE OR CHLORIDE SALTS SHALL NOT BE USED. − WALLS TO BE RUNNING BOND STRAIGHT BARS: 7−#8 18.6 DENOTES SEVEN − #8 BARS 18’−6" LONG BY FORMWORK HALF SPAN IS REMOVED
10. VARIATIONS FROM THE FOLLOWING REQUIREMENTS WILL BE ACCEPTED ONLY WHEN RESPONSIBILITY
27. METAL DECK SHOP DRAWINGS SHALL BE SUBMITTED TO THE ARCHITECT / ENGINEER FOR REVIEW PRIOR − HORIZONTAL REINFORCING: BENT BARS: 8−C#6 04.6 DENOTES EIGHT − #6 BARS 4’−6" LONG HOOKED ONE END 90 DESIGN ENGINEER −
FOR CORROSION PROTECTION IS ASSUMED BY A REGISTERED PROFESSIONAL ENGINEER. APPROPRIATE
TO FABRICATION. − #5 @ 32" O/C IN BOND BEAM BLOCKS DEGREES. DO NOT ALLOW
SITE SUPERVISION MUST BE PROVIDED BY THE SPECIALTY ENGINEER FOR ANY VARIATIONS.
28. CONTRACTOR SHALL CUT DECK PER STRUCTURAL DETAILS AT ALL OPENINGS, COLUMNS, AND REQUIRED − BOND BEAMS REQUIRED ABOVE AND BELOW ALL OPENINGS. PROVIDE 16 INCHES DEEP WITH 2 #5 NOTE: LENGTH SHOWN INCLUDES THE LENGTH OF A DESIGN FOR EQUAL REMOVAL OF
11. CORROSION PROTECTED ANCHORS TO BE USED FOR LIVE END AND DEAD END ANCHORS THROUGHOUT.
PENETRATIONS AND SHALL SUPPLY NECESSARY ACCESSORY ITEMS SUCH AS CLOSURES, CLIPS, ETC. EXTENDING 2’−0" BEYOND EDGE OF ROUGH OPENING. STANDARD HOOK. LONGER HOOKS REQUIRED AS SHOWN. LOAD TO SLABS NOT FORMWORK IN THE
12. ENSURE THAT THE STRAND END NEAR THE ANCHOR IS FULLY ENCASED WITH RUST INHIBITIVE GREASE
29. HANGERS SUPPORTED BY METAL DECKING ONLY OR METAL DECKING WITH INSULATING FILL SHALL BE − VERTICAL REINFORCING: EXCEEDING DESIGN FULL SPAN
AND WRAP ALL OPENINGS, TEARS AND SPLITS IN POLYETHYLENE TUBING WITH WATERPROOF TAPE. BARS SHOWN SOLID LINE IN TOP OF SLAB AND BEAMS OR NEAR FACE OF WALL
ATTACHED TO STEEL BARS, 3/8" ROUND X 12" OR 1/8" X 12" FLAT, PLACED PERPENDICULAR TO FLUTES. − VERTICAL COREFILLS TO BE REINFORCED WITH: #5 @ 24" O/C FOR WALLS UP TO 8’ −0" HIGH, 2 #5 @ CONCRETE LIVE LOAD BEWTEEN COUMNS
ENSURE THAT WATER HAS NOT PENETRATED ANY STRANDS WHICH HAVE BEEN DAMAGED AND REPLACE
ONLY LIGHT DUCTWORK (12" X 16" MAX), (1−1/2" ROUND PIPING MAX.) OR CEILING MAY BE HUNG FROM SUCH 24" O/C FOR 8’−0" TO 14’−6" HIGH WALLS, AND 2#6 @ 16" O/C FOR WALLS UP TO 20’−0" HIGH. SLABS
ANY QUESTIONABLE STRANDS.
INSTALLATIONS. MAXIMUM WEIGHT PER HANGER SHALL NOT EXCEED 75 LBS. HANGERS MUST BE AT − PROVIDE COREFILLS FULL HEIGHT BESIDES ALL OPENINGS AND AT ALL LOCATIONS OF ANCHOR BARS SHOWN BROKEN LINE IN BOTTOM OF SLAB AND BEAMS OR FAR FACE OF WALL
13. THE PT SYSTEM SHALL BE PROTECTED AGAINST THE INGRESS OF MOISTURE OR SALTS THROUGHOUT
LEAST TWO FLUTES APART ON THE SAME SPAN. BOLTS TO WALLS AND UNDER POINTS OF BEARING ON WALLS.
30. HANGERS SUPPORTED BY METAL DECK WITH STRUCTURAL CONCRETE FILL SHALL BE INSTALLED USING − VERTICAL REBAR TO BE TIED IN POSITION WITH SINGLE BARS AT CENTERLINE OF WALL AND DOUBLE
TRANSPORTATION, HANDLING, STORAGE AND INSTALLATION. APPLY ENCAPSULATED DEAD END ANCHORS
IN THE SHOP AND PROTECT LIVE ENDS BY WRAPPING UNTIL TRIMMED ON SITE. PROVIDE EVIDENCE THAT
STEP 1 STEP 2
ICC APPROVED ANCHORAGE SYSTEMS. SUCH HANGERS SHALL BE USED TO SUPPORT DUCTWORK (15" X BARS PLACED ½" CLEAR COVER TO THE BLOCK EACH FACE.
THE GREASE USED FOR CORROSION PROTECTION IS APPROPRIATE FOR THE APPLICATION. ANY
− TENSION LAP ALL REINFORCING. MINIMUM LAPS (NON−SEISMIC ELEMENTS):

30925-01
Date APRIL 10TH, 2020

SA
JD
16" MAX), PIPING (4" ROUND MAX.), OR CEILINGS. MAXIMUM WEIGHT PER HANGER SHALL NOT EXCEED 250
EVIDENCE OF SALTS OR OTHER CHEMICALS WHICH COULD HASTEN CORROSION WILL BE CAUSE TO CL OF COLUMN CL OF COLUMN
LBS . HANGERS MUST BE AT LEAST TWO FLUTES APART ON THE SAME DECK SPAN. LARGER DUCTWORK − PROVIDE CORNER BARS TO MATCH HORIZONTAL REBAR.
REJECT THE STRAND AND REQUIRE COMPLETE REPLACEMENT. SUPPORTS SUPPORTS
AND PIPING SHALL BE SUPPORTED BY STRUCTURAL BEAMS OR COLUMNS. − PROVIDE DOWELS FROM FOUNDATIONS OR SUSPENDED SLABS TO MATCH WALL VERTICAL
14. WATERPROOFING PROCEDURES SHALL BE THE RESPONSIBILITY OF THE SUPPLIER/MANUFACTURER. −READY TO CAST
REINFORCING.
PROVIDE ALL MATERIALS, DIRECTIONS, GUIDANCE AND ON−SITE CHECKING TO ENSURE THAT PLACERS MINIMUM LAPS OF REINFORCEMENT FOR NON−SEISMIC ELEMENTS (UNLESS NOTED OTHERWISE): LEVEL X SLAB CURING NEXT SLAB
WELDING 10. PROVIDE LATERAL SUPPORT AT THE TOP OF ALL WALLS − SEE TYPICAL DETAILS.
PROPERLY INSTALL THE SYSTEM. THIS TO INCLUDE WATERPROOF TAPE SUPPLIED WITH THE BEGIN FORMING
−ALLOW SLAB BELOW
11. PROVIDE CLEANOUTS AND INSPECTION HOLES AT THE BOTTOM OF ALL CORES CONTAINING REINFORCING TO TAKE UP SELF
POST−TENSIONING MATERIALS. BAR FIRST:
31. WELDING SHALL BE IN ACCORDANCE WITH THE PROVISIONS OF THE AMERICAN WELDING SOCIETY CODE WHERE THE POUR LIFT OF THE CORE EXCEED 5’ −0" IN HEIGHT. CLEAN ALL INTERNAL FINS. TENSION LAPS TENSION LAPS TENSION EMBEDMENT HOOK MASONRY NEXT LEVEL
ERECT FORMWORK WEIGHT BEFORE SLACKEN ALL SHORES
15. TEST CONCRETE TO ENSURE THAT CHLORIDE ION CONTENT DOES NOT EXCEED .06% BY WEIGHT OF SIZE TOP REINF FOR BEAMS OR (UNO) (BASIC LAP) EMBEDMENT EMBEDMENT
D1.1−LATEST EDITION. 12. PROVIDE CLEANOUTS AND SPECIAL PROCEDURES PER CBC SECTION 2104.6 FOR GROUT POURS AND PREPARE SLAB CASTING NEXT SLAB
CEMENT, INCLUDING AGGREGATE. LAPS THIS LEVEL TO ALLOW
32. WELDING SHALL BE PERFORMED BY CERTIFIED WELDERS. 13. OBSERVE THE SLAB DESIGN LIVE LOADS AND DO NOT PLACE MATERIALS ON SLABS WHICH EXCEED THE SLABS > 12" THICK
FOR CASTING SLAB TO DEFLECT
16. PROTECT STRAND TAILS FROM RAIN FOLLOWING INSTALLATION BY COVERING WITH PLASTIC TUBING.
33. WELDING ELECTRODE FOR THE SHIELDED METAL−ARC WELDING (S.M.A.W.) PROCESS AND WELDING DESIGN LIVE LOADS. (inches) (inches) (inches) (inches) (inches)
KEEP THE TUBING TIGHT TO THE ANCHOR BY TAPING AND EXTRA GREASE. STRESS, CUT AND CAP UNDER UNDER SELF WEIGHT

Project Number
ELECTRODE SHALL CONFORM TO SPECIFICATION FOR MILD STEEL COVERED ARC WELDING ELECTRODES, LEVEL X LEVEL X
THE SUPERVISION OF THE MATERIALS CONSULTANT IN ONE OPERATION. STRANDS SHALL NOT REMAIN 7000 6000 5000 4000 3000 7000 6000 5000 4000 3000 7000 6000 5000 4000 3000
A.W.S. A5.1.

Checked By
UNCAPPED BETWEEN WORK SHIFTS. INSTALLATION OF GREASE CAPS IS SUBJECT TO SPECIAL PSI PSI PSI PSI PSI PSI PSI PSI PSI PSI PSI PSI PSI PSI PSI
34. ELECTRODES FILLER MATERIAL SHALL BE A MINIMUM OF E70XX U.O.N., EXCEPT E60XX MAY BE USED FOR
INSPECTION.

Drawn By
UPPER RESHORES
METAL DECK WELDING (PER ICBO 2078). #3 19" 20" 22" 25" 28" 14" 16" 17" 19" 22" 11" 12" 13" 15" 17" 8" 24" THIRD:
17. CONSTRUCTION JOINTS ARE NOT PERMITTED IN POST−TENSIONED FLOORS EXCEPT WHERE REMAIN TIGHT
35. WELDING OF METAL DECK SHALL BE DONE BY CERTIFIED LIGHT GRADE WELDERS IN ACCORDANCE WITH #4 25" 27" 29" 33" 38" 19" 21" 23" 25" 29" 15" 16" 17" 19" 22" 11" 33" RE−TIGHTEN UPPER
SPECIFICALLY SHOWN. WHERE CASTING IS UNAVOIDABLY INTERRUPTED, AND PREVIOUSLY CAST
AWS SPECIFICATIONS FOR WELDING SHEET STEEL IN STRUCTURES, AWS D1.3−81. LEVEL SHORES ONLY
36. SHOP AND FIELD WELDS IN JOINTS OF MOMENT CONNECTIONS, MOMENT RESISTING FRAMES AND
CONNECTIONS, AND COLUMN SPLICE WELDS, SHALL BE TESTED AS PER CBC. SECTION 1705.2.
30.0 STRUCTURAL SHOTCRETE CONCRETE CANNOT BE VIBRATED, CONTACT THE ENGINEER FOR SPECIAL PROCEDURES PRIOR TO
CONTINUING THE POUR.
#5
#6
31"
37"
33"
40"
36"
44"
41"
49"
47"
56"
24"
28"
26"
31"
28"
34"
31"
37"
36"
43"
18"
22"
20"
24"
22"
26"
24"
29"
28"
33"
14"
16"
41"
48"
AFTER LOWEST LEVEL
SHORES ARE REMOVED.
18. ANCHORS MUST BE DUCTILE IRON, CLEAN AND FREE OF RUST, AND CAPABLE OF SAFELY EXECUTING THE
37. WELDS SHALL HAVE A WELD CONTROLLED SEQUENCE AND TECHNIQUE IN ORDER TO MINIMIZE SHRINKAGE 1. SHOTCRETING SHALL CONFORM TO ALL REQUIREMENTS OF "SPECIFICATIONS FOR MATERIALS , #7 54" 58" 63" 71" 81" 41" 45" 49" 54" 63" 32" 34" 38" 42" 48" 19" N/A TIGHTEN SNUG BUT NOT
POST−TENSIONING OPERATION IN CONCRETE OF 2.5 KSI COMPRESSIVE STRENGTH.
STRESSES AND DISTORTION. PROPORTIONS, AND APPLICATION OF SHOTCRETE" ( ACI − 506.2, LATEST EDITION .) #8 61" 66" 72" 81" 93" 47" 51" 56" 62" 72" 36" 39" 43" 48" 55" 22" N/A OVER TIGHT
19. POST−TENSION SUPPLIER TO VERIFY ALL ANCHOR BURSTING REQUIREMENTS AND SUBMIT DETAILS FOR
38. CONTINUOUS SPECIAL INSPECTION BY A CERTIFIED WELDING INSPECTOR IS REQUIRED FOR FIELD 2. PORTLAND CEMENT SHALL CONFORM TO ASTM C−150, TYPE I OR II, ALKALI CONTENT NOT TO EXCEED 0.6%.
BEAM ANCHOR ZONES SEALED BY A PROFESSIONAL ENGINEER LICENSED PRACTICE IN THE STATE OF #9 69" 74" 81" 91" 105" 53" 57" 63" 70" 81" 41" 44" 48" 54" 62" 25" N/A LAST:
WELDING PER CBC CHAPTER 1705.2. UNLESS NOTED OTHERWISE IN THE SPECIAL INSPECTION PROGRAM. 3. SHOTCRETE IS NOT PERMITTED AN ANY STRUCTURAL ELEMENTS IN CONTACT WITH THE GROUND WHEN
CALIFORNIA . REBAR FOR BURSTING REQUIREMENTS AND EXACT ANCHOR LOCATIONS AND ORIENTATION #10 76" 82" 90" 101" 116" 59" 63" 69" 78" 90" 45" 49" 54" 60" 69" 27" N/A CHECK ALL SHORES
LOCATED BELOW THE GROUND WATER TABLE.
TO BE SHOWN ON THE SHOP DRAWINGS AND THE DRAWINGS SEALED BY THE DESIGN ENGINEER. ARE SNUG BEFORE
SHEAR CONNECTORS (WELDED STUDS) 4. WHEN #5 OR SMALLER BARS ARE USED, THERE SHALL BE A MINIMUM CLEARANCE BETWEEN PARALLEL
20. SLAB TRIM STEEL SHALL NOT BE USED AS ANCHOR BURSTING STEEL UNLESS APPROVED BY THE
#11 84" 90" 99" 111" 128" 65" 70" 76" 85" 98" 50" 54" 59" 66" 76" 30" N/A LOWER RESHORES CASTING NEW SLAB
REINFORCEMENT BARS OF 2−1/2 INCHES. WHEN BARS LARGER THAN #5 ARE USED, THERE SHALL BE A REMAIN IN PLACE
ENGINEER PRIOR TO CONSTRUCTION. SEE THESE NOTES FOR REQUIRED INSPECTIONS. WHERE LAP DIMENSIONS ARE SHOWN ON DRAWINGS, SUCH DIMENSIONS SHALL CONTROL. ABOVE
39. SHEAR CONNECTORS SHALL BE NELSON SHEARCONNECTOR STUDS (ESR−2856) OR EQUAL AND SHALL BE MINIMUM CLEARANCE BETWEEN PARALLEL BARS EQUAL TO 6 DIAMETERS OF THE BARS USED. WHEN TWO
MADE FROM COLD ROLLED STEEL AND SHALL CONFORM TO ASTM A108, GRADES 1015−1020 WITH A 21. GENERAL CONTRACTOR SHALL CONFIRM WITH THE STRUCTURAL ENGINEER THE LOCATION AND MULTIPLY ABOVE VALUES BY 1.5 FOR EPOXY COATED REINFORCING.
CURTAINS OF STEEL ARE PROVIDED, THE CURTAIN NEAREST THE NOZZLE SHALL HAVE A MINIMUM
MINIMUM TENSILE STRENGTH 60.000 PSI. STUD WELDING INSPECTIONS AND TESTING SHALL CONFORM TO CONFIGURATION OF CONSTRUCTION JOINTS, STRESSING SEQUENCE, AND THE TIME DELAY BETWEEN MULTIPLY ABOVE VALUES BY 1.3 FOR LIGHTWEIGHT AGGREGATE CONCRETE.
SPACING EQUAL TO 12 BAR DIAMETERS AND THE REMAINING CURTAIN SHALL HAVE A MINIMUM SPACING OF SECOND:
A.W.S. D1−1−86. SUCCESSIVE POURS PRIOR TO COMMENCING WITH THE WORK. MULTIPLY ABOVE VALUES BY 1.2 FOR BUNDLES OF 3 BARS, 1.33 FOR BUNDLES OF 4 BARS.
6 BAR DIAMETERS. REMOVE RESHORES

1233 South Grand


40. STUDS SHALL BE MANUFACTURED OF C−1015 COLD ROLLED STEEL WHICH CONFORMS TO ASTM WHERE f’y>60ksi, MULTIPLY ABOVE VALUES BY 1.15 x fy/60
5. LAP SPLICES IN REINFORCING BARS SHALL BE BY THE NON−CONTACT LAP SPLICE METHOD WITH AT LEAST THIS LEVEL BEFORE
SPECIFICATION A108−58T. SUBMITTALS:
41. STUDS SHALL BE AUTOMATICALLY END WELDED IN ACCORDANCE WITH THE MANUFACTURER’S
2 INCHES CLEARANCE BETWEEN BARS. CONTACT LAP SPLICES MAY BE PERMITTED WHEN NECESSARY
TEMPERATURE REINFORCEMENT: STEP 3 STEP 4 UPPER LEVEL SHORES
FOR THE SUPPORT OF THE REINFORCING PROVIDED IT CAN BE DEMONSTRATED BY MEANS OF ARE RE−TIGHTENED
RECOMMENDATIONS IN SUCH A MANNER AS TO PROVIDE COMPLETE FUSION BETWEEN THE END OF THE WHEN PORTIONS OF THE FOLLOWING SUBMITTALS ARE NOT COMPLETED, THE PROFESSIONAL ENGINEER TEMPERATURE REINFORCEMENT IS REQUIRED AS BOTTOM STEEL IN EACH DIRECTION IN ALL
PRE−CONSTRUCTION TESTING, THAT ADEQUATE ENCASEMENT OF THE BARS AT THE SPLICE CAN BE
STUD AND THE PLATE. THERE SHOULD BE NO POROSITY OF EVIDENCE OF LACK OF FUSION BETWEEN THE RESPONSIBLE FOR THE PT SYSTEM SHALL ENSURE THAT ALL COMPONENTS COMPLY WITH THE SPECIFICATION NON−POST−TENSIONED SLABS, AND AS SHOWN IN POST−TENSIONED SLABS. PROVIDE THE FOLLOWING MINIMUM
ACHIEVED, AND PROVIDED THAT THE SPLICES ARE PLACED SO THAT A LINE THROUGH THE CENTER OF THE
WELDED END OF THE STUD AND THE PLATE. WELDING SHALL BE DONE ONLY BY QUALIFIED WELDERS TWO SPLICED BARS IS PERPENDICULAR TO THE SURFACE OF THE SHOTCRETE WORK. UNLESS OTHERWISE SHOWN:
APPROVED BY THE WELDING INSPECTOR. 22. SHOP DRAWINGS SHALL BE SEALED BY A SPECIALTY ENGINEER REGISTERED TO PRACTICE IN THE STATE
6. ANY REBOUND OR ACCUMULATED LOOSE AGGREGATE SHALL BE REMOVED FROM THE SURFACES TO BE
42. INSPECTION AND TESTING SHALL BE IN ACCORDANCE WITH CBC CHAPTER 1705.2. AND CITY OF SAN DIEGO OF CALIFORNIA . SUBMIT SHOP DRAWINGS FOR REVIEW AT LEAST THREE WEEKS PRIOR TO FABRICATION SLAB THICKNESS TEMPERATURE REINFORCEMENT
COVERED PRIOR TO PLACING THE INITIAL OR ANY SUCCEEDING LAYERS OF SHOTCRETE. REBOUND SHALL
BUILDING NEWSLETTER 17−3 SPECIAL INSPECTION AND REQUIREMENTS FOR STRUCTURAL WELDING, AND
LADBS INFORMATION BULLETIN P/BC 2014−046 COMPOSITE STEEL CONSTRUCTION.
NOT BE USED AS AGGREGATE.
23.
OF THE TENDONS.
SHOP DRAWINGS SHALL SHOW ALL TENDON LOCATIONS AND PROFILES, STRESSING SEQUENCE AND
6" OR LESS
TO 7"
#4 @ 18"
#4 @ 16"
26.0 STRUCTURAL DEFLECTIONS
7. UNFINISHED WORK SHALL NOT BE ALLOWED TO STAND FOR MORE THAN 30 MINUTES UNLESS ALL EDGES
43. INSPECTION OF ALL SHOP AND FIELD WELDING OPERATIONS SHALL BE MADE BY A QUALIFIED WELDING PROCEDURES, TECHNICAL DATA ON TENDONS, BURSTING REINFORCEMENT, REINFORCING AT STRAND TO 8" #4 @ 14"
ARE SLOPED TO A THIN EDGE. BEFORE PLACING ADDITIONAL MATERIAL ADJACENT TO PREVIOUSLY 1. UNDER NORMAL CONDITIONS, CONCRETE SLABS AND BEAMS WILL DEFLECT WHETHER REINFORCED WITH
INSPECTOR SPECIFICALLY APPROVED BY THE BUILDING INSPECTION DEPARTMENT. THE TYPE AND CURVATURES, WOBBLE AND FRICTION COEFFICIENTS, NET EFFECTIVE FORCES, ANCHORAGE, JACKS, TO 9" #4 @ 12"
APPLIED WORK, SLOPING AND SQUARE EDGES SHALL BE CLEANED AND WETTED. REBAR OR POST−TENSIONING. STEEL STRUCTURES WILL DEFLECT UNDER LOAD AND VARIOUS
CAPACITY OF THE WELDING EQUIPMENT SHALL BE MADE IN ACCORDANCE WITH THE MANUFACTURER’S TRIMMING AND CORROSION PROTECTION MEASURES AND PROCEDURES, AND ANY OTHER INFORMATION TO 10" #5 @ 17"
8. IN PLACE SHOTCRETE WHICH EXHIBITS SAGS OR SLOUGHS, SEGREGATION, HONEYCOMBING, SAND ENVIRONMENTAL CONDITIONS. BECAUSE DEFLECTIONS RESULT FROM A WIDE VARIETY OF FACTORS, THE
RECOMMENDATIONS AND SHALL BE CHECKED AND APPROVED BY THE WELDING INSPECTOR. WHICH IS NECESSARY TO COMPLETE THE INSTALLATION WITHOUT REFERENCE TO FURTHER DIRECTION. TO 11" #5 @ 16"
POCKETS OR OTHER OBVIOUS DEFECTS SHALL BE REMOVED AND REPLACED. SHOTCRETE ABOVE SAGS ACCURATE PREDICTION OF THE MAGNITUDE OF DEFLECTIONS IS DIFFICULT. DEFLECTIONS CAN BE
44. AT THE BEGINNING OF EACH DAYS WORK, A MINIMUM OF TWO TEST STUD WELDS SHALL BE MADE. THE 24. SHOP DRAWINGS SHALL INDICATE CHAIR HEIGHTS AND TENDON LAYOUT ON THE SAME DRAWING, NOT ON TO 12" #5 @ 14"
AND SLOUGHS SHALL BE REMOVED AND REPLACED WHILE STILL PLASTIC. UPWARD OR DOWNWARD AND CAN CHANGE OVER TIME, DEPENDING UPON VARIOUS CHARACTERISTICS
TEST STUDS SHALL BE SUBJECTED TO 90 DEGREE BEND TEST BY STRIKING THEM WITH A HEAVY HAMMER. SEPARATE DRAWINGS. CHAIR HEIGHTS SHALL BE GIVEN FOR EVERY STRAND WHERE PROFILES DIFFER.
9. DURING THE CURING PERIODS SPECIFIED HEREIN, OF THE STRUCTURE AND ITS ENVIRONMENT. PROPER ALLOWANCE MUST BE MADE IN FINISHES AND
WELD SECTIONS EXHIBITING TEARING OUT OR CRACKING WILL BE REJECTED. 25. PROVIDE DETAILS OF STRAND PLACEMENT AND CHAIRING REQUIREMENTS THROUGHOUT THE SLABS AND MINIMUM WALL REINFORCING:
− SHOTCRETE SHALL BE MAINTAINED ABOVE 40 DEGREES F AND IN MOIST CONDITION ATTACHED ELEMENTS TO PERMIT THE STRUCTURE TO DEFLECT FREELY WITHOUT DAMAGE TO THE
45. NUMBER OF 3/4" DIA . HEADED STUD SHEAR CONNECTORS ARE SHOWN ON FRAMING PLANS. SPACE SHEAR BEAMS. STRANDS WITHIN BEAMS TO BE LOCATED SUCH THAT THE FLOW OF CONCRETE DURING PROVIDE THE FOLLOWING MINIMUM REINFORCEMENT IN ALL CAST−IN−PLACE CONCRETE WALLS UNLESS
− IN INITIAL CURING , SHOTCRETE SHALL BE KEPT CONTINUOUSLY MOST FOR 24 HOURS AFTER SECONDARY ELEMENTS. THE DETAILS FOR ATTACHMENT OF THESE ELEMENTS ARE PROVIDED BY
CONNECTORS EQUALLY ALONG LENGTH OF BEAM. IF DECK FLUTES PREVENT EQUAL SPACING, STUDS PLACEMENT IS NOT IMPAIRED BY CLUSTERS OF STRANDS. STRANDS TO BE CHAIRED AND TIED SUCH OTHERWISE SHOWN:
PLACEMENT IS COMPLETE OTHERS.
SHALL BE SPACED CLOSER NEAR ENDS OF BEAMS OR STUDS MAY BE SPACED TWO PER FLUTE NEAR ENDS THAT THEY ARE NOT DISPLACED DURING CONCRETE PLACEMENT. MAXIMUM SPACING OF CHAIRS FOR
− FINAL CURING SHALL CONTINUE FOR 7 DAYS AFTER SHOTCRETING, FOR 3 DAYS IF HIGH EARLY 2. DEFLECTIONS DO NOT IMPAIR THE STRUCTURE FROM PROVIDING ITS FUNCTION AND, UNDER NORMAL
IF TOTAL NUMBER EXCEEDS NUMBER OF FLUTES. A SINGLE NUMBER INDICATES UNIFORM SPACING FROM STRAND IN 3 FEET. WALL THICKNESS TEMPERATURE REINFORCEMENT
STRENGTH CEMENT IS USED, OR UNTIL THE SPECIFIED STRENGTH IS OBTAINED. CONDITIONS, ARE NOT AN INDICATION OF A WEAKNESS IN THE STRUCTURE.
END TO END, MULTIPLE NUMBERS INDICATE NUMBER OF STUDS TO BE SPACED UNIFORMLY BETWEEN 26. MATERIAL QUALITY CONTROL SHALL BE MAINTAINED AT ALL TIMES BY THE CONTRACTOR AND UP TO 6" ONE LAYER #4 @ 16" O/C EA. WAY CENTERLINE OF WALL
− FINAL CURING SHALL CONSIST OF A FOG SPRAY OR AN APPROVED MOISTURE RETAINING COVER 3. DEFLECTIONS CAN BE COMPENSATED BY CAMBER AS NOTED ELSEWHERE AND UNDER CERTAIN
BEAM REACTION POINTS AND/OR ENDS OF BEAM. MINIMUM SPACING IN A SINGLE ROW SHALL BE 6X STUD POST−TENSION SUBCONTRACTOR. SUBMIT DETAILS OF THE PROPOSED POST−TENSION SYSTEM UP TO 8" ONE LAYER #4 @ 12" O/C EA. WAY CENTERLINE OF WALL
OR MEMBRANE. CONDITIONS TOPPING MATERIALS CAN BE USED TO LEVEL SLAB SURFACES.
DIAMETER OR 5". COMPLETE WITH ALL TECHNICAL DATA ON TEST REPORTS TO PROVE THE SUITABILITY OF THE SYSTEM TO UP TO 10" ONE LAYER #4 @ 10" O/C EA. WAY CENTERLINE OF WALL
− IN SECTIONS OF A DEPTH IN EXCESS OF 12 INCHES, FINAL CURING SHALL BE THE SAME AS THAT FOR 4. MAKE ALLOWANCE IN FINISHES AND ANY REQUIRED ATTACHMENTS TO THE PRIMARY STRUCTURE TO
THE SPECIFICATIONS. UP TO 12" TWO LAYER #4 @ 16" EA. WAY EA. FACE
INITIAL CURING. DEFLECT WITHOUT RESISTANCE. ALLOW A DEFLECTION ALLOWANCE OF AT LEAST SPAN/240 OR 3/4 INCH
SHOP DRAWINGS 9. STRENGTH TEST FOR SHOTCRETE SHALL BE MADE BY AN APPROVED AGENCY ON SPECIMENS WHICH ARE
27. PROVIDE A STRESS−STRAIN DIAGRAM AND MODULUS OF ELASTICITY FOR EACH PACK OF STRAND USED UP TO 14" TWO LAYER #4 @ 14" EA. WAY EA. FACE MINIMUM UNLESS OTHERWISE PROVIDED.
ON THE PROJECT. SUBMIT MILL TEST CERTIFICATES FOR STRAND CORRELATED WITH THOSE SUPPLIED UP TO 16" TWO LAYER #4 @ 12" EA. WAY EA. FACE
REPRESENTATIVE OF AND IN ACCORDANCE WITH THE CBC AND SAN DIEGO BUILDING NEWSLETTER 17−2 5. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO ENSURE THEY HAVE FULL AND SUFFICIENT
46. THE CONTRACTOR SHALL SUBMIT STRUCTURAL STEEL SHOP DRAWINGS PRIOR TO FABRICATION AS TO THE SITE. INDICATE FLOOR LEVEL AND STRAND NUMBER.
SPECIAL INSPECTION FOR TESTING OF CONCRETE AND SHOTCRETE, AND LADBS INFORMATION BULLETIN INFORMATION ABOUT THE LONGTERM PERFORMANCE OF THE SLAB SYSTEM. WHEN IN DOUBT, OBTAIN

ADDRESS, AVE, SUITE


REQUIRED BY THE WRITTEN SPECIFICATIONS 28. SUBMIT TEST DATA CONFIRMING WATER TIGHTNESS OF THE STANDARD ANCHORAGE ASSEMBLY USED
P/BC 2014−051 WET MIX SHOTCRETE. ANTICIPATED DESIGN DEFLECTION ALLOWANCES FROM THE ENGINEER.
47. STEEL REINFORCING LISTS AND QUANTITIES AND LENGTHS OF ALL MATERIALS SHALL BE THE FOR THE PROJECT.
10. WHEN SHOTCRETE IS USED FOR STRUCTURAL MEMBERS, SPECIAL INSPECTION IS REQUIRED IN 6. AREAS SENSITIVE TO FLOOR LEVELNESS MAY REQUIRE GRINDING OR TOPPING TO ACHIEVE
RESPONSIBILITY OF THE CONTRACTOR TO ASSURE COMPLIANCE WITH THE PLANS. ENGINEER WILL NOT 29. STRAND PROFILE TO BE SMOOTH AND PARABOLIC BETWEEN HIGH AND LOW POINTS. STRAND HEIGHTS

CITY, STATE, ZIP


ACCORDANCE WITH CBC CHAPTER 17 . THE SPECIAL INSPECTOR SHALL PROVIDE CONTINUOUS TOLERANCES.
REVIEW. SHOWN ON THE DRAWINGS ARE TO THE UNDERSIDE OF THE STRAND. ONLY EXACT CHAIR HEIGHTS SHALL

PROJECT NAME
INSPECTION OF THE PLACEMENT OF THE REINFORCEMENT AND SHOTCRETING AND SHALL SUBMIT A
48. SHOP DRAWINGS SUBMITTED TO THE ARCHITECT / ENGINEER FOR REVIEW SHALL BE STAMPED AND BE USED AT HIGH AND LOW POINTS.
SIGNED BY THE CONTRACTOR INDICATING THAT THE SUBMITTAL IS IN ACCORDANCE WITH THE CONTRACT
STATEMENT INDICATING COMPLIANCE WITH THE PLANS AND SPECIFICATIONS, SEE THE SUMMARY OF
30. TOLERANCES IN SELECTION OF CHAIR HEIGHTS FOR SHOP DRAWINGS TO BE PLUS 1/8" AT HIGH POINTS
CONCRETE STRUCTURES:
DOCUMENTS.
SPECIAL INSPECTION.
AND MINUS 1/8" AT LOW POINTS. MAINTAIN MINIMUM COVER FOR FIRE RATING REQUIREMENTS.
STANDARD HOOK GEOMETRY
7. HORIZONTAL CONCRETE STRUCTURE SUCH AS SLABS AND BEAMS SPECIFIED ON THESE DRAWINGS HAVE
TYPE OF BEEN DESIGNED TO CONTROL DEFLECTIONS. CONTRACTORS TO ALLOW FOR AT LEAST 3/4 INCH
SPECIAL INSPECTION IS REQUIRED FOR INSTALLATION OF ALL STRUCTURAL STEEL SHOWN ON THE STRUCTURAL PREQUALIFICATIONS AND SUBSTITUTIONS: BAR HOOK VERTICAL DEFLECTION AFTER FORMWORK AND RESHORING HAS BEEN REMOVED OR GREATER AS NOTED
DRAWINGS, SEE SPECIAL INSPECTION PROGRAM. STANDARD TYPE OF STANDARD HOOK
SIZE LENGTH
31. THE FOLLOWING POST−TENSION SYSTEMS ARE QUALIFIED AS ACCEPTABLE SYSTEMS:
HOOK ON THE DRAWINGS.
8. UPWARD CAMBER SHOULD BE PROVIDED AS NOTED. THIS CAMBER IS EXPECTED TO COME OUT AS THE
UNBONDED FULLY ENCAPSULATED STRANDS WITH GREASE CONFORMING TO PTI STANDARDS FOR
#4 9" SLABS OR BEAMS CARRY THEIR SELF WEIGHT AFTER FORMWORK IS REMOVED.
CORROSIVE ENVIRONMENTS FULLY FILLING THE VOID INSIDE A CONTINUOUS PLASTIC EXTRUDED
9. SEE NOTES ON FORMWORK AND RESHORING.

THE LIMITED PURPOSE OF EVALUATION, BIDDING OR REVIEW. THIS DOCUMENT OR ITS CONTENTS MAY NOT BE USED FOR ANY
SHEATH OF .06" MINIMUM THICKNESS, AND A "QUALIFIED" PLACER. #5 12"

THIS DOCUMENT CONTAINS INFORMATION PROPRIETARY TO MVE + PARTNERS, INC. AND IS FURNISHED IN CONFIDENCE FOR
10. SEE NOTES ON TOLERANCES

LENGTH

OTHER PURPOSE AND MAY NOT BE REPRODUCED OR DISCLOSED TO OTHERS WITHOUT THE PRIOR WRITTEN CONSENT OF
32. OTHER SYSTEMS SUBMITTED AND ACCEPTED PRIOR TO BID CLOSING OF. STUFFED SYSTEMS WILL NOT

HOOK
#6 14" 11. SEE NOTES ON SLAB SURVEY CONTROL
BE ACCEPTED UNDER ANY CIRCUMSTANCES. BONDED SYSTEMS MAY BE ACCEPTABLE PROVIDED
12. THE CONTRACTOR IS CAUTIONED THAT SLAB DEFLECTION CAN EXCEED THE CALCULATED DEFLECTIONS
SUITABLE TECHNICAL SUPPORT IS PROVIDED. #7 16"
90° HOOK IF PROPER CONSTRUCTION PROCEDURES ARE NOT FOLLOWED. FOLLOWING ARE SOME CONSTRUCTION
33. THE POST−TENSION PLACER SHALL BE EXPERIENCED IN THE PLACING OF POST TENSION MATERIALS AND ER
#8 18" M ET PROCEDURES THAT CAN AFFECT SLAB FLATNESS AND LEVELNESS:
SHALL HAVE ATTENDED AND POSSESS A CERTIFICATE OF COMPLETION OF A COURSE ON THE A
DI • SLABS NOT CAST WITH SPECIFIED CAMBER
FUNDAMENTALS OF POST TENSIONING. #9 23" • UNINTENDED THICKENING OF SLABS OVER TOP REINFORCING MATS
34. ALTERNATE STRAND DIAMETERS OR POST−TENSIONING SYSTEMS MAY BE ACCEPTED AS SUBSTITUTES HOOK EMBEDMENT
#10 25" • DEFLECTION OR SUBSIDENCE OF FORMWORK
FOR THE SPECIFIED SYSTEM PROVIDED THEY ARE APPROVED BY THE ENGINEER. SYSTEMS NOT
• CURING OF CONCRETE IS NOT PERFORMED EFFECTIVELY
PRE−APPROVED MAY BE REJECTED AT THE SOLE DISCRETION OF THE ENGINEER. #11 28" • RESHORING OF SLABS OR BEAMS ARE NOT ERECTED IMMEDIATELY AFTER FORMS ARE REMOVED
• SLABS OR BEAM FORMS ARE FULLY REMOVED BEFORE RESHORES ARE INSTALLED
LONG TERM MAINTENANCE OF BUILDING: #4 6" •
ER INADEQUATE NUMBER OF FLOORS ARE ENGAGED FOR SHORING SUPPORT
#5 7" HOOK EMBEDMENT M ET • RESHORING IS NOT TIGHTENED BETWEEN SLABS
35. THE BUILDING MANAGER SHALL POSSESS A COPY OF THE STRUCTURAL DRAWINGS FOR THE PURPOSE DIA
• RESHORING IS OVER−TIGHTENED BETWEEN SLABS
OF IDENTIFYING THE TYPE OF CONSTRUCTION OF EACH AREA. THE BUILDING MANAGER SHALL ALSO #6 8" • RESHORING IS TEMPORARILY REMOVED
POSSESS A COPY OF THE POST−TENSION SHOP DRAWINGS INDICATING THE LOCATION OF
#7 9" • RESHORING IS REMOVED BEFORE THE SLAB IS ADEQUATELY CURED
POST−TENSIONED STRANDS, TOGETHER WITH A COPY OF THE CONTRACTORS RECORD OF VARIATIONS IN
180° HOOK • RESHORING POSTS ARE NOT ALIGNED BETWEEN FLOOR LEVELS
THE PLACEMENT OF POST−TENSION MATERIALS. #8 10" • SLABS OR BEAMS ARE OVERLOADED WITH CONSTRUCTION MATERIALS AFTER SHORES HAVE BEEN
36. WHERE ANY DRILLING OR PENETRATIONS ARE TO BE MADE TO THE POST−TENSIONED SLAB THE
#9 14" REMOVED
ENGINEER SHALL APPROVE THE LOCATION AND PROCEDURE OF MAKING SUCH PENETRATIONS.

MVE + PARTNERS, INC. ALL RIGHTS RESERVED, © COPYRIGHT 2018.


• SLAB OR BEAMS ARE OVERLOADED BY STOCKPILING FINISHING MATERIALS SUCH AS GYPSUM WALL
PENETRATIONS ARE NOT TO BE MADE WITHOUT THE CONSENT OF THE ENGINEER.
#10 15" HOOK BOARD, TILES, STONE FINISHES, PRECAST CONCRETE, OR OTHER HEAVY MATERIALS.
37. DEMOLITION OF ANY PORTION OF THE BUILDING SHALL NOT PROCEED WITHOUT THE APPROVAL AND
LENGTH • DAMAGE TO SLABS OR BEAMS AFTER CASTING BY CUTTING, CHIPPING, OR CORING OF HOLES
SUPERVISION OF THE ENGINEER. #11 22"
• EARLY AGE DRYING OR EXCESSIVE HEATING OF THE TOP SURFACE
38. ANY DAMAGE TO THE STRUCTURE OR ANY SIGNS OF CORROSION SUCH AS RUST STAINING OR SPALLING
• MISPLACEMENT OF REINFORCING STEEL INCLUDING INADEQUATE CHAIRING OF TOP

GENERAL NOTES

1/8" = 1'-0"
CONCRETE SHALL IMMEDIATELY BE REPORTED TO THE ENGINEER FOR HIS REVIEW.
REINFORCEMENT.
39. THE BUILDING MANAGER SHALL MAINTAIN ALL WATERPROOFING AND EXTERIOR BUILDING SEALS
• IMPROPER MONITORING OF CONCRETE TESTING
INCLUDING SLAB EDGES WHERE POST−TENSIONED ANCHORS EXIST.
• LOW CONCRETE STRENGTH
• ADDITION OF WATER TO CONCRETE ON SITE.

08/03/2020 - ISSUED FOR 100% DD PROGRESS SET


• DAMAGE TO POST−TENSIONING TENDONS

SHEET TITLE

Scale
SHEET NUMBER

S1.03
PROJECT NUMBER
30925-01

BRYSON MARKULIN ZICKMANTEL


STRUCTURAL ENGINEERS

#501 - 510 BURRARD STREET, VANCOUVER, B.C. V6C 3A8


(604) 685-9533 WWW.BMZSE.COM CONTACT@BMZSE.COM
KEY FROM 2 X 4 WATERSTOP IF REQUIRED.
SEE ARCH SPECS.

STAMP
HIGH CHAIRS AT CONTINUOUS TOP BARS BOTTOM BAR MAY 32.0 CONDUITS, PIPES AND SLEEVES

SEE PLAN
3’−6" o.c. TYP. 4−#6 LAP 18" AT MIDSPANS BE RAISED UP & USED
HOOK AT END SUPPORTS. AS A SUPPORT BAR.
EMBEDDED IN CONCRETE 2 2
INSIDE FACE OF WALL
EXCEPT WHEN APPROVED BY THE STRUCTURAL ENGINEER, PIPES, CONDUITS, AND SLEEVES EMBEDDED IN
MIN. MIN. ISSUES:
ALL HORIZONTAL BARS TO BE 1 1
CONTINUOUS THRU JOINT. CONCRETE SHALL BE INSTALLED IN ACCORDANCE WITH THE FOLLOWING GUIDELINES: NO. DATE DESCRIPTION
OTHERWISE PROVIDE FOR FULL A 2020-04-23 ISSUED AS 100% SD
TENSION SPLICE. WHERE EXPOSED 1. GENERAL MAX. 6" MAX. 6"
FOOTING DIMENSION B 2020-06-16 50% DD PROGRESS
A. NOT WITHSTANDING THE SATISFYING OF THESE GUIDELINES, THE CONDUIT, SLEEVES, PIPES, ETC.
PLAN CHAMFER SLAB REINF. SHOWN ON SET
3/4" x 3/4" DOWELS TO MATCH SHALL NOT IMPAIR THE STRUCTURAL STRENGTH AND SHALL BE MOVED IF SO DIRECTED BY THE
STRUCTURAL DRAWING C 2020-08-03 100% DD PROGRESS
VERTS. ABOVE. STRUCTURAL ENGINEER.
SLAB BOLSTERS SET
B. CENTERLINE SPACING TO BE NOT LESS THAN 3 DIAMETERS.
WALL CONSTRUCTION JOINT EMBEDMENT 16 DIA.
OR 12" MIN. TYP.
@ 3’−0" o.c. EXTRA DOWELS WHERE C. CENTERLINE SPACING BETWEEN PARALLEL CONDUIT AND REINFORCING BARS TO BE 3 DIAMETERS.
REQUIRED, SEE PLAN.
SLAB BAND
D. ADD REINFORCING AT POINTS OF CONGESTION AS DIRECTED BY THE STRUCTURAL ENGINEER.
E. NO CONDUITS, IN−SLAB DUCTS, SLEEVES, ETC., SHALL BE PLACED WITHIN 12" OF POST−TENSIONING
1 FOOTING DETAIL
COLUMN REINFORCING. ANCHORAGES. S1.04 N.T.S.
F. FOR TOPPINGS ON STEEL DECK, THE CONCRETE THICKNESS IS MEASURED FROM THE TOP OF THE
REGION OF WELL FOR WALLS BELOW GRADE FILL DECK FLUTE.
DRAINED, FREE DRAINING NOTCH WITH CAULKING OR 2. FOR SLABS − CONDUITS IN THE PLANE OF THE SLAB:
MATERIAL BELOW GRADE. DAMP−PROOFING TO ARCH’S 7 TYPICAL OFFSET COLUMN SECTION A. LOCATE BETWEEN TOP AND BOTTOM REINFORCING.
SPECS. SECTION N.T.S. B. MAXIMUM SIZE IN ONE LAYER TO BE NOT MORE THAN 1/4 CONCRETE THICKNESS.
S1.04 C. THREE LAYERS OR MORE CROSSING WILL NOT BE PERMITTED.
3. FOR COLUMNS − ELECTRICAL BOXES, CONDUIT, SLEEVES OR EMBEDDED PIPES ARE NOT ALLOWED FTG. DEPTH
LAYOUT OF TYPICAL ALTERNATE− SLOPE TOP
WITHOUT THE WRITTEN APPROVAL OF THE STRUCTURAL ENGINEER.
4#6M TOP SUPPORT BARS OF FOOTING.
4. FOR BEAMS − THE TOTAL MAXIMUM SIZE OF HORIZ. CONDUIT PARALLEL TO THE BEAM NOT TO EXCEED 4%
TOP REINF. TOP REINF.
TOP REINF. OF THE AREA. NO SLEEVES THRU ANY BEAMS OR SLAB BANDS UNLESS APPROVED IN WRITING BY THE
INSIDE FACE OF WALL FLOOR STRENGTH CONCRETE STRUCTURAL ENGINEER.
ALL HORIZONTAL BARS TO BE 5. FOR SHEAR WALLS − ELECTRICAL BOXES, CONDUIT, SLEEVES OR EMBEDDED PIPES ARE NOT ALLOWED MAX. STEP
FLOOR STRENGTH CONC.
NOTCH 3/4" X 1 1/2" CONTINUOUS THRU JOINT. 24" HATCHED AREA INDICATES WITHOUT THE WRITTEN APPROVAL OF THE STRUCTURAL ENGINEER. 24"
DEEP ON EA. FACE MIN. EXTENT OF COLUMN STRENGTH 6. FOR NON−SHEAR WALLS − CONDUIT, SLEEVES OR EMBEDDED PIPES:
−MAX. DIAMETER = 1/4 WALL THICKNESS 1 1
PLAN NOTE:
CONCRETE IN FLOOR.
2
SEE PLAN FOR LOCATION. −NO HORIZONTAL RUNS PERMITTED 2
CONTRACTOR TO TIME POUR −VERTICAL RUNS TO HAVE MINIMUM 2" CONCRETE COVER AND SHALL HAVE A MINIMUM CLEAR SPACING MAX. SLOPE
MAX. SLOPE
SUCH THAT NO COLD JOINTS
OF 4 DIAMETERS.
WALL CONTROL JOINT STAGGER BOTTOM BARS BOTTOM REINFORCING OCCUR IN FLOOR BETWEEN
7. SPACING OF SLEEVES THROUGH FLAT SLABS TO BE NOT LESS THAN THE FOLLOWING:

MIN.
TYPE NO. 1 TYPE NO. 2

24"
FLOOR STRENGTH AND
FOR EXTERIOR WALLS BELOW GRADE AND EXTERIOR WALLS EXPOSED COLUMN STRENGTH CONCRETE.
TO WEATHER ABOVE GRADE. TYPICAL INTERIOR SPAN TYPICAL EXTERIOR SPAN THE INTERFACE BETWEEN THE COLUMNS
SPACE AT 20’−0" CENTERS MAX. UNLESS OTHERWISE NOTED ON PLAN. DIFFERENT CONCRETES TO BE
PLAN 2D 2D 2D 2D TYPICAL STEPPED FOOTINGS (WALLS)
PLAN OF TYPICAL SLAB BAND REINFORCING THOROUGHLY VIBRATED TO
ENSURE CONTINUITY.

14 WALL JOINT

4" MIN.
‘D’
2D 2D 2D
SLAB AS PER PLAN
S1.04 N.T.S. 10 TYPICAL SLAB BAND - U.N.O.

2D
S1.04 N.T.S.

‘D’
NOTE: ALL SLABBANDS TO HAVE 4#6 TOP CONT.
LAP 18" AT MIDSPAN AND HOOK 90° AT
CONTINUOUS TOP BARS FAR FACE OF END SUPPORT. COLUMN CONCRETE STRENGTH IN 4" MIN. 4" MIN. EDGE OF
WHERE APPICABLE. 24" CROSS−HATCHED AREA TO BE EXCAVATION
COLUMN
6" LEG, TYP. MIN. PLACED PRIOR TO FLOOR
SLAB REINF. STRENGTH CONCRETE.

GUIDELINES FOR SLEEVES 1


APPROVED BEARING

CARRY
MATERIALS BY SOILS 2

BARS
− SLEEVES IN FLAT SLABS NOT TO BE LOCATED NEXT TO COLUMNS UNLESS APPROVED BY ENGINEER. MAX. SLOPE
ENGINEER IN WRITING

THESE DRAWINGS ARE NOT TO BE USED FOR


TYP. EMBED. 6" MIN.
BEAM TOP REINF. TRANSMISSION OF HIGH STRENGTH COLUMNS

TENDER, CONTRACT, OR CONSTRUCTION


− CLEAR DIMENSION FOR SLEEVES TO COLUMNS TO BE 3’−0" MIN. U.N.O. ON STRUCTURAL LINE OF UNDISTURBED
DRAWINGS.
X X X 8 THRU FLOOR SYSTEMS SOIL MUST BE ABOVE

1/3
STIRRUPS BEAM SIDES MAY BE 12" MAX. WIDTH SLOPE LINE.
SLOPED 1 IN 20 FOR N.T.S.
CHAMFER BEAMS EASE IN STRIPPING TYP.
S1.04
(USE WHEN COLUMN STRENGTHS ARE 8 ksi OR GREATER)
3/4" x 3/4" #5−03.0 @ 18" EXTRA 2 TYPICAL FTG. ADJACENT TO EXCAVATION

BASIC TOP BARS ( INCLUDES 2 CARRY BARS )


TYP. WHERE BEAM BOT. REINF. OVER DUCTS WHERE TOP

1" CL.
STEEL DOES NOT OCCUR S1.04 EDGE OF ADJACENT EXCAVATION FOR FOOTINGS, SUMPS, BASEMENT,
EXPOSED.

2020-08-26 4:46:04 PM
PROGRESS
FOR MAT SIZE SEE DRAWINGS
SITE SERVICES, ETC.
BEAM WIDTH, SEE PLAN

EXTRA TOP BARS


D = MAXIMUM

D
X
OUTSIDE
INTERIOR DIMENSION
X X CENTER DUCTS IN

1/3
SLAB REINF. MIDDLE OF SLAB.

X 2.5" MIN. CLEAR #5−03.0 @ 18" EXTRA


LAP SPLICE BOTTOM BARS CENTERED
CONTINUOUS TOP BARS BELOW DUCTS.
UNLESS NOTED. FULL SPACE UNDER DUCTS TYPICAL
WHERE APPICABLE. SLAB REINF. COLUMN VERTS.

START 1/2 SPACE COLUMN TIES

GUIDELINES FOR IN−SLAB DUCTS COLUMN DOWELS


HOOK TO BOTTOM
COLUMN SPLICE
STIRRUPS TYP. EMBED. 6" MIN. X X X UNLESS NOTED.
SLOPE 1 : 6 OF FOOTING

1/3
− MAXIMUM SIZE = 1 3/4" OUTSIDE DIMENSION INCLUDING ALL INSULATION AND WRAPS.
MAXIMUM 3"
2 SPACES @ 3"
START CRANK AT − MINIMUM CLEAR SPACING = 2’−0" BETWEEN DUCTS.
CARRY TOP OF SLAB.
CHAMFER BEAMS
BARS − MINIMUM CLEAR SPACING TO COLUMNS AND WALLS = 3’−0" U.N.O. ON STRUCTURAL DRAWINGS.
3/4" x 3/4" FULL SPACE
TYP. WHERE BEAM BOT. REINF.
EXPOSED. 2 EXTRA TIES − NO IN−SLAB DUCTS ALLOWED IN AREAS BOUNDED BY STUDRAILS 12" MINIMUM
EXTRA TOP BARS

12"
BEAM WIDTH, SEE PLAN 50mm TYP. AT OFFSET.
COLUMN VERTS.
1/3 1/3 1/3

3" CL.
EXTERIOR
BASIC TOP BARS ( INCLUDES 2 CARRY BARS )
SPLICE AT INTERIOR - BEAMS 4 SIDES
15 TYPICAL BEAM - U.N.O. FOR MAT SIZE SEE DRAWINGS
BEAM WIDTHS COLUMN WIDTHS - OTHERWISE
S1.04 N.T.S. AS PER EXTERIOR COLUMN 3" CL.
APPROVED BEARING
MATERIAL BY SOIL
ENGINEER. EXTEND TIES 12" INTO FOOTING

ARCH.
2#5 TOP CONT. SEE
11 TYPICAL MAT LAYOUT WITHOUT DROP PANEL
LAP 2’−6"
S1.04 N.T.S. PROVIDE GROUND SEAL
CONCENTRATE EXTRA TOP BARS IN MIDDLE 1/3 OF MAT. LAP SPLICE WHERE REQ’D BY
’X’ INDICATES POSITION & MINIMUM NUMBER OF HIGH UNLESS NOTED. SITE CONDITIONS.
FULL SPACE
CHAIRS TO BE PLACED PER MAT.
START 1/2 SPACE
3 TYPICAL COLUMN FOOTING
33.0 COLUMN NOTES U.N.O.
BUT 3’−6" MAX.

N.T.S.
SEE ARCH.

SEE ARCH. DWGS. S1.04


EXCEPT AS NOTED.
1/2 SPACE MAXIMUM 1. CONCRETE STRENGTH IN COLUMNS IS INDICATED IN COLUMN SCHEDULE.
CURB, WHERE FOR SPLICE AND EMBEDMENT LENGTHS,
FOR EXPOSED WALLS, SEE OR ADD EXTRA TIES 2. TIE COLUMN CAGES TO FORMS AND SQUARE BEFORE PLACING CONCRETE.
OCCURS SEE SEE TABLES ON STRUCTURAL DRAWINGS.
ARCHITECTURAL DRAWINGS FOR SLOPE 1 : 6 3. CONDUITS, BOXES OR OTHER INSERTS MAY NOT BE PLACED IN COLUMNS UNLESS OTHERWISE APPROVED
PLANS & ARCH. #5 @ 18" HORIZ. CONT. 2 SPACES @ 3"
REVEALS ETC. MAXIMUM 3" BY THE STRUCTURAL ENGINEER.
DRAWINGS LAP 2’−6"
START CRANK AT
REINF. AS 2 / S1.05 4. UNLESS OTHERWISE NOTED ON COLUMN SCHEDULE, ALL COLUMN SPLICES SHALL BE AS STANDARD

30925-01
Date APRIL 10TH, 2020

SA
JD
8" TOP OF SLAB.
FULL SPACE DETAILS SHOWN ON THE STRUCTURAL DRAWINGS.
WALL REINFORCING WALL REINFORCING
5. HOOKS ON TIES SHALL BE BENT AT LEAST 135 . MULTIPLE TIES ARRANGED AS ON STANDARD DETAILS OR
1#5 TOP 2" CLR. 2 EXTRA TIES
SEE ARCH. DWGS. COLUMN SCHEDULE.
CONT. LEAVE SURFACE ROUGH LEAVE SURFACE AT OFFSET.

SEE PLAN
FOR GOOD BOND. ROUGH FOR GOOD 6. UNLESS OTHERWISE NOTED, PARKADE COLUMNS SHALL BE CHAMFERED (3/4" x 3/4")
#5 @ 9" VERT. CONT. BOND. COLUMN VERTS. 7. UNLESS OTHERWISE NOTED, ALL COLUMN SPLICES SHALL BE COMPRESSION SPLICES.
BUT 36" MAX.

H.1.E. 14" MIN.


SEE ARCH.

8. WHERE COLUMNS DO NOT EXTEND OVER, EXTEND VERTICAL REINFORCING 2’−0" INTO UNDERSIDE OF
BEAMS OR TO WITHIN 1" OF TOP OF SLABS. HOOK TO TOP OF SLAB.
MIN.
12"

#5 @ 24" 2" CLR.


H.2.E. 18" SPLICE AT EXTERIOR COLUMNS
2

Project Number
1"
SEE DRAWINGS FOR SEE DRAWINGS FOR

2’−0"
1 SLAB REINFORCING. SLAB REINFORCING. MAXIMUM PROJECTION OF PREVIOUSLY CAST

Checked By
2" CLR.
10"

C#5 @ 9" + COLUMN OR WALL CONCRETE AT WALLS OR COLUMNS IS 1/2"

Drawn By
3#5 L.W. TOP INTO SLAB. CHIP CONCRETE DOWN TO SUIT
IF REQUIRED DUE TO OVER POUR.
CLR.

6"
EXTERIOR INTERIOR
3"

LAP SPLICE
MIN. 8" 8"
UNLESS NOTED. FULL SPACE 9. UNLESS NOTED OTHERWISE, COLUMNS SHOULD BE CENTERED ON COLUMNS BELOW.
SLAB, SLABBAND,
16 SLAB ON GRADE STEP DETAIL DROP PANEL
START 1/2 SPACE
4 SLAB DETAIL
S1.04 N.T.S.
S1.04 3/4" = 1'-0" 12 SLAB POUR JOINTS
N.T.S. COLUMN TIE ARRANGEMENTS - U.N.O.
S1.04 1/2 SPACE MAXIMUM
(UNLESS OTHERWISE NOTED)
SLOPE 1 : 6 OR ADD EXTRA TIES
4 BAR COL 6 BAR COL 8 BAR COL 10 BAR COL 12 BAR COL
MAXIMUM 3"
6"

2 SPACES @ 3"
START CRANK AT
TOP OF SLAB.
#5 @ 12" EACH
FULL SPACE
WAY CONTINUOUS

1233 South Grand


2 EXTRA TIES
COMPACTED FILL KEY FROM 2 x 2 FOR SLABS UP TO 5 1/2" AT OFFSET. COLUMN VERTS.
KEY FROM 2 x 3 FOR SLABS 6" TO 7 1/2"
KEY FROM 2 x 4 FOR SLABS 8" TO 9 1/2"
FOR SLABS 10" AND OVER USE KEY MAXIMUM ONE 6" DIA OR TWO 3" DIA
1/3 THE SLAB DEPTH. 'CANS' NEXT TO COLUMN
MINIMUM TOP REINF. THRU
3"
C

CONSTRUCTION JOINT TO BE
SPLICE AT SLABS, SLABBANDS, DROP PANELS
LR

#506.6 @ 24" o.c.


.
18"

DOWELS REQ’D IF
STEP IS GREATER
RUN BOTTOM REINF. THAN 3"
CONT. THROUGH JOINT.
LAP SPLICE
12"
THRU SLABS UNLESS NOTED. FULL SPACE
SLAB, SLABBAND,
SEE ARCH. DWGS. FOR NUMBER OF RISERS DROP PANEL OTHER 'CANS' ARE PERMITTED IN LINE
START 1/2 SPACE NOTE: WITH 'CAN' NEXT TO COLUMN
CONT. KEY FROM SLAB. MAXIMUM CLEAR DISTANCE BETWEEN VERTICAL SEE DETAIL FOR REINFORCING
INTERRUPT SLAB
AROUND 'CANS'
17 TYPICAL STAIRS ON GRADE KEY AT BEAMS. SIZE AS NOTED ABOVE.
3" MAXIMUM 1/2 SPACE MAXIMUM
BARS ENCLOSED BY THE CORNER OF A TIE
IS 8".
N.T.S. a b c
S1.04 OR ADD EXTRA TIES
MAXIMUM ONE BAR MAY BE PLACED BETWEEN
BEAM DEPTH

COMPRESSION 2 SPACES @ 3"


SEE PLAN BUT a, b, c = 8" MAX. THESE TIED BARS.
5 EQ. SP.

EMBEDMENT TYP.
8" MIMIMUM UNLESS NOTED TYP. AT ALL TIES −
ALL TIES TO HAVE 135° HOOKS
TYPICAL SLAB PENETRATIONS
CURB, WHERE OCCURS ANY SIDE OF COLUMN.
SEE PLANS & ARCH. DWGS.
SEE ARCH. DWGS.
2#5 TOP CONT.
FULL SPACE
CLOSED TIES MAY ALWAYS BE SUBSTITUTED
OF FLAT PLATE FLOORS
REINF. AS 2 / S1.05 2 EXTRA TIES
LAP 2’−6" RUN ALL SLAB BAND AT OFFSET. FOR CROSS−TIES. 5 AT COLUMNS U.N.O.

ADDRESS, AVE, SUITE


COLUMN VERTS.
REINF. THRU JOINT.
SEE PLAN BUT N.T.S.
SEE ARCH. DWGS. C#5−03.11 @ 18" MIN. 2 SHEAR KEYS START S1.04

CITY, STATE, ZIP


2" FROM EACH FACE

PROJECT NAME
OF BEAM. 2 x 4 KEY
SEE PLAN LENGTH 6" SHORTER 8" M
RUN BEAM REINF. HO IN. BT
THAN SLAB BAND WIDTH. OK
CONT. THRU JOINT. S. WN.
SEE PLAN

1 1/2" COLUMN STEP AT SLAB, SLABBANDS,


DROP PANELS BEAMS SIMILAR
SEE PLAN BUT
C#5−03.11 @ #5 @ 12" VERT. H.2.E. 2’−6" THRU BEAMS THRU SLAB BANDS TYPICAL ROUND OR OCTAGONAL COLUMN TIES
18" MIN. #5 @ 12" HORZ. CONT.
LAP 2’−6"

THE LIMITED PURPOSE OF EVALUATION, BIDDING OR REVIEW. THIS DOCUMENT OR ITS CONTENTS MAY NOT BE USED FOR ANY
CONSTRUCTION JOINTS

THIS DOCUMENT CONTAINS INFORMATION PROPRIETARY TO MVE + PARTNERS, INC. AND IS FURNISHED IN CONFIDENCE FOR

OTHER PURPOSE AND MAY NOT BE REPRODUCED OR DISCLOSED TO OTHERS WITHOUT THE PRIOR WRITTEN CONSENT OF
SEE PLAN
13 THROUGH SLABS, SLAB BANDS, AND BEAMS 9 COLUMN SPLICE DETAILS - U.N.O. 6 TYPICAL COLUMN DETAILS
N.T.S. N.T.S. S1.04 N.T.S.
S1.04 S1.04
U.N.O. ON PLAN
2#5 BOT. CONT.
KEEP FULLY SHORED LAP 2’−6"
UNTIL UPPER SLAB HAS
REACHED DESIGN STRENGTH

18 STEP DETAIL
S1.04 1/2" = 1'-0"

MVE + PARTNERS, INC. ALL RIGHTS RESERVED, © COPYRIGHT 2018.


TYPICAL DETAILS

1/8" = 1'-0"

08/03/2020 - ISSUED FOR 100% DD PROGRESS SET


SHEET TITLE

Scale
SHEET NUMBER

S1.04
PROJECT NUMBER
30925-01

BRYSON MARKULIN ZICKMANTEL


STRUCTURAL ENGINEERS

#501 - 510 BURRARD STREET, VANCOUVER, B.C. V6C 3A8


(604) 685-9533 WWW.BMZSE.COM CONTACT@BMZSE.COM
STAMP
ISSUES:
NO. DATE DESCRIPTION
A 2020-04-23 ISSUED AS 100% SD
B 2020-06-16 50% DD PROGRESS
SET
C 2020-08-03 100% DD PROGRESS
SET
8" 9" OR WIDER
WALL SEE PLAN BUT
SEE PLAN 12" MIMIMUM 2’−0"
GURADRAIL EXTERIOR WALL
BY OTHERS SYSTEM BY OTHERS CURB, WHERE OCCURS SEE ARCH. DWGS.
#5 @ 12" EACH WAY
SEE PLANS & ARCH. DWGS.
TENSION SPLICE
REINF. AS 2 / S1.05
SEE PLAN BUT
SEE ARCH. DWGS. C#5 x L.V. @
18" MIN.
NOT USED SEE WALL SCHEDULE
4#6 TOP CONT.
NOTE: #4 "U−BARS" @ 6" FOR REINFORCING SEE PLAN
LAP 2’−6"
CONTRACTOR TO ENSURE

24"

SEE PLAN
POST. TENSION TENDONS
ARE NOT DAMAGED FROM SEE PLAN PROVIDE #5 @ 12" STIRRUPS
22 DRILLED ANCHORS. #4 @ 10"x10" GRID
H.2.E. 7"
S1.05 SLOPE DOWN SEE PLAN BUT
#4 @ 12" HORIZ.
EACH FACE
C#5 x L.V. @
SEE ARCH. 18" MIN.

ARCH
#5 @ 12" HORIZ.

SEE

2’−6"
6 1/2"
#5 U−BARS TO MATCH U.N.O. ON PLAN

MIN.
SEE PLAN
WALL VERT. REINFORCING SEE PLAN 4#6 BOT. CONT.
LAP 2’−6" WITH VERT. BARS LAP 2’−6"
#5 @ 12" HORIZ.
30"

SEE PLAN
2#5 CONT. AT SLAB SLAB REINF. SEE PLAN 2’−0" KEEP FULLY SHORED
EDGE. SEE PLAN #5 @ 10" H.2.E. 10" UNTIL UPPER SLAB HAS
REACHED DESIGN STRENGTH
HOOK BOTTOM REINF.
AS SHOWN.
SEE PLAN

16 TYPICAL BALCONY DETAIL

STEP
SEE PLAN 1 STEP DETAIL
NOT USED S1.05 3/4" = 1'-0"
SEE PLAN S1.05 3/4" = 1'-0"

11 SLAB STEP DETAIL

2" CLR.
23 S1.05 1/2" = 1'-0"

1" CLR.
S1.05
NOTE: ALL CURBS OR ARCH’L CONCRETE UPSTAND
WALLS LOCATED ON CANTILEVERED BALCONY
SLABS TO BE CAST ONLY AFTER CONCRETE
SLAB HAS REACHED DESIGN STRENGTH AND
SHORING HAS BEEN REMOVED. PROVIDE A

THESE DRAWINGS ARE NOT TO BE USED FOR


PROVIDE VERTICAL 2#6 CONT. BOT.
BOND BREAKER OR 1" GAP BETWEEN ENDS

TENDER, CONTRACT, OR CONSTRUCTION


CONTINUOUS KEY SEE PLAN PROVIDE KEEP FULLY SHORED CONT. LAP 2’−6" 1#4 TOP HORIZ.
#4 @ 10"x10" GRID OF CURBS/WALLS AND ANY VERTICAL
INFILL SLAB REINFORCING TO MATCH PER DET. 13 / S1.04 UNTIL WALL HAS REACHED CONT. LAP 2’−0",
#5 @ 10" H.2.E. 10" H.2.E. 7" DESIGN STRENGTH STRUCTURAL ELEMENTS.
ORIGINAL SLAB REINFORCING CALLED TYP. U.N.O. HOOK AT CORNERS.
UP ON PLANS. SEE PLAN 10M @ 24" VERTS.
DRILL AND GROUT
C#5 @ 16" VERTS
6 STARTER WALL DETAIL

ARCH
#5 @ 12" HORIZ. 4" INTO SLAB.

SEE
SEE PLAN

2020-08-26 4:46:08 PM
EQ. EQ. S1.05 3/4" = 1'-0"

PROGRESS
SEE PLAN EMBEDDED PLATES BUT 6" MIN.

SEE ARCH’L.
FOR HANDRAILS, IF ANY,
SEE ARCH’L. DWGS.
#5 @ 12" HORIZ.
30"
FULL STRENGTH
COUPLERS #5 @ 16" HORZ. CONT. #5 @ 10" H.2.E. 10" 2#4 TOP CONT. 6" OR 8"
TYP. EACH SIDE NOTE: SEE ARCH.
CRANE INFILL SLAB TO
BE IN PLACE PRIOR TO EQ. EQ.

MAX. SEE ARCH.


FROM 30" T0 48"
SEE PLAN FOR 1#5 TOP HORIZ.
LANDSCAPE LOADING #4 @ 12" HORIZ.
REINFORCING CONT. LAP 2’−6",
8" CONT.
SEE PLAN

MAX. SEE ARCH.


FROM 12" T0 30"
EQ. EQ. HOOK AT CORNERS.
2#5 HORZ. CONT.

2’−6"
C#5 @ 16" VERT.
24 CRANE OPENING POUR JOINT #5 @ 12" U−BARS CENTERD IN UPSTAND #4 @ 12" HORIZ.
CONT. LAP 2’−0",
S1.05 1/2" = 1'-0" 12 SLAB STEP DETAIL HOOK AT CORNERS.
SEE PLAN IF NO BARS CALLED
8" MIN. S1.05 1/2" = 1'-0" UP ON PLAN, PROVIDE C#4 @ 10" VERTS.
C#5−03.11 @ 18"

17 TYPICAL ARCHITECTURAL DOWNTURN 1#5 CONT. IN BEND

SEE PLAN

1"CL.
S1.05 3/4" = 1'-0"
#5 @ 16"
(SEE ARCH’L. DWGS. FOR DETAILS) EACH FACE HORIZ.

REPLACE C#5 TOP BAR


TYPICAL ARCHITECTURAL
WITH #5-3.11 DOWELS SEE PLAN
UPSTAND OR PLANTER WALL TYPICAL CONCRETE CURB
DRILL & EPOXY USING
2" 6" (SEE ARCH’L. DRAWINGS FOR LOCATIONS AND EXACT PROFILES)
HILTI RE500 ADHESIVE SEE PLAN
EMBED. 6"
2#6 BOT. CONT.
TYPICAL ARCH. UPSTAND,
2 PLANTER WALL OR CURB
SLAB AND REINF. KEEP FULLY SHORED 3/4" = 1'-0"
PER PLAN UNTIL WALL HAS REACHED S1.05
RAMP SLAB AND REINF. 2’−6"
DESIGN STRENGTH
PER PLAN

SEE ARCH.
#5 @ 18"
#5-03.0 DOWELS
DRILL & EPOXY USING EQ. EQ.
HORIZ. & VERT. 7 STARTER WALL DETAIL 6" 8" 10" or

3/4" CLR. TOP


H.2.E. AS SHOWN
HILTI RE500 ADHESIVE 1#5 TOP & BOT. S1.05 1/2" = 1'-0" GREATER
EMBED. 6" SLAB REINF. CONT. AROUND PERIMETER
2#5 BOT CONT. SEE PLAN OF SLAB. PROJECT 3’−0"
PAST RE−ENTRANT CORNERS
SLOPE
SEE ARCH.
6" MIN.
8" MAX. SEE ARCH. MIN. 6 1/2" WALL REINF. WALL REINF.
DEEP AT SLAB EDGE SEE PLAN FOR SEE PLANS SEE PLANS
WALL REINFORCING WALL REINF.
SEE PLANS
1'-0"
25 DETAIL AT RAMPING SLAB 18 TYPICAL DOWNTURN

2’−6" LAP

2’−6" LAP

2’−6" LAP

30925-01
Date APRIL 10TH, 2020

SA
JD
#5 U−BARS TO MATCH
S1.05 1/2" = 1'-0" 3/4" = 1'-0"
S1.05 WALL VERT. REINFORCING

2’−6"
HOOK BARS

SEE PLAN
TO MATCH
SEE PLAN #4 U−BARS U−BARS TO
WALL VERTS.
TO MATCH WALL MATCH WALL
VERTICAL REINF. VERTICALS
SPACING.
2#5 TOP &
BOTTOM CONT.
SEE ARCH.

SLAB

SLAB
#5 @ 18"
13 TYPICAL ARCHITECTURAL EYEBROW

Project Number
HORIZ. & VERT. S1.05 N.T.S.

Checked By
(SEE ARCH’L. DWGS. FOR LOCATIONS AND DETAILS)

2" CLR.

1" CLR.

1" CLR.
COLLECTOR REINF. SEE PLAN

Drawn By
PER PLAN

KEEP FULLY SHORED UNLESS OTHERWISE KEEP FULLY SHORED UNLESS OTHERWISE
UNTIL SLAB ABOVE NOTED PROVIDE UNTIL SLAB ABOVE NOTED PROVIDE
2#6 CONT. BOT. 2#6 CONT. BOT.
SEE PLAN

4 1/4" o.c. HAS REACHED DESIGN HAS REACHED DESIGN


TYP. U.N.O. STRENGTH STRENGTH
VARIES
SEE PLAN
8 WALL STARTER BAR DETAIL
SEE PLAN
SEE ARCH.

FOR SLAB STEEL


S1.05 3/8" = 1'-0"
TYPICAL STARTER DOWELS
EQ. EQ.
3 FOR WALLS STARTING AT SLABS
3 1/2"
CLR.
TYP.

SLAB REINF. N.T.S.


PER PLAN S1.05
2#5 BOT CONT.

SEE PLAN
SLAB
WITHOUT TRANSVERSE REINFORCING CRANK TOP REINF.
6" MIN. TO SUIT

1233 South Grand


TENSION SP SEE PLAN 6" 8" 10" or
8" MAX. LIC E
TENSION SP GREATER
COLLECTOR REINF. LIC E

PLAN
SEE
PER PLAN
COLLECTOR TIES, 19 TYPICAL DOWNTURN
SIZE & SPACING 4 1/4" o.c. S1.05 3/4" = 1'-0"
PER PLAN
TYP. U.N.O.

SEE PLAN
#4 @ 12"

SLAB
EACH WAY CAPITAL WALL REINF. WALL REINF.
SLAB REINF. SEE PLANS SEE PLANS
SEE PLAN

SEE PLAN WALL REINF.


SEE PLANS
WALL REINFORCING SPLICE BOTTOM REINF.
COLUMN FOR SLAB SLOPES

2’−6" LAP

2’−6" LAP

2’−6" LAP
GREATER THAN 5°
OR 1:12
C#5 @ 12"
3 1/2"
CLR.

HOOK BARS
TYP.

5" MIN.

2" CLR.

SLAB REINF. #4 @ 12" CONT. TO MATCH


#4 U−BARS U−BARS TO
WALL VERTS.

P L AN
S EE
PER PLAN TO MATCH WALL MATCH WALL
CRANK BOT. REINF. VERTICAL REINF. VERTICALS
1#5 CONT. TO SUIT SPACING.
WITH TRANSVERSE REINFORCING ANCHOR BAR SEE PLAN
14 TYPICAL COLUMN CAPITAL SEE PLAN BUT
MIN. #5 IN CRANK
SLAB REINF.
SEE PLAN
2" CLR. S1.05 3/4" = 1'-0"

SLAB

SLAB

SLAB
26 TYPICAL COLLECTOR REINFORCING
S1.05 3/4" = 1'-0" 36" MAX.

2" CLR.

1" CLR.

1" CLR.
TENSION SP
LIC E
TENSION SP KEEP FULLY SHORED UNLESS OTHERWISE KEEP FULLY SHORED UNLESS OTHERWISE

ADDRESS, AVE, SUITE


LIC E
UNTIL SLAB ABOVE NOTED PROVIDE UNTIL SLAB ABOVE NOTED PROVIDE
HAS REACHED DESIGN 2#6 CONT. BOT. HAS REACHED DESIGN 2#6 CONT. BOT.
STRENGTH STRENGTH

CITY, STATE, ZIP


SEE ARCH. MIN. 6 1/2"
DEEP AT SLAB EDGE

PROJECT NAME
GURARAIL
BY OTHERS 9 TYPICAL SLOPED SLAB
20 TYPICAL CONCRETE EYEBROW SLOPED CONCRETE
SEE ARCH. FOR TYPICAL STARTER DOWELS
TOPPING, CAST 1/2" = 1'-0"
S1.05 3/4" = 1'-0"
(NOTE: SEE ARCH’L FOR LOCATIONS)
MONOLITHIC WITH SLAB
DETAILS. S1.05 4 FOR WALLS STARTING AT SLABS
S1.05 N.T.S.
2#5 CONT.
MAX.

SLOPE SEE ARCH.


2"

FINISHES SEE ARCH. AT SLAB EDGE

2" CLR.

2" CLR.
HOOK WALL VERTS. HOOK WALL VERTS.

TYP.

TYP.

THE LIMITED PURPOSE OF EVALUATION, BIDDING OR REVIEW. THIS DOCUMENT OR ITS CONTENTS MAY NOT BE USED FOR ANY
WALL REINFORCING INTO TOP OF SLAB INTO TOP OF SLAB

THIS DOCUMENT CONTAINS INFORMATION PROPRIETARY TO MVE + PARTNERS, INC. AND IS FURNISHED IN CONFIDENCE FOR

OTHER PURPOSE AND MAY NOT BE REPRODUCED OR DISCLOSED TO OTHERS WITHOUT THE PRIOR WRITTEN CONSENT OF
SEE ARCH’L. SLAB REINF.

SLAB

SLAB
BEND ALL STEEL

3" MAX.
SEE PLAN TO SUIT
2" CLR.

FOR STEP REINF.


SLAB REINF. SEE DET. 1 / S1.05
SEE PLAN
2" CLR.
6"

6" OR 8" WALL 10" WALL OR WIDER


1
C#5 @ 18" 6

2#5 CONT.
SECTION AT 8" MIN.

15 ROOF TOP BALCONY


3/4" = 1'-0"
21 TYPICAL DETAIL EYEBROW S1.05 10 TYPICAL SMALL SLAB STEP

MVE + PARTNERS, INC. ALL RIGHTS RESERVED, © COPYRIGHT 2018.


S1.05 3/4" = 1'-0" 3/4" = 1'-0"
(NOTE: SEE ARCH’L FOR LOCATIONS) S1.05
5 TYPICAL TOP OF WALL DETAIL
S1.05 N.T.S.

TYPICAL DETAILS

As indicated

08/03/2020 - ISSUED FOR 100% DD PROGRESS SET


SHEET TITLE

Scale
SHEET NUMBER

S1.05
PROJECT NUMBER
30925-01

BRYSON MARKULIN ZICKMANTEL


STRUCTURAL ENGINEERS

#501 - 510 BURRARD STREET, VANCOUVER, B.C. V6C 3A8


(604) 685-9533 WWW.BMZSE.COM CONTACT@BMZSE.COM
STAMP
CONDUIT PLACED FLUSH
WITH UNDERSIDE OF
SLAB OR FACE OF WALL ISSUES:
BOND BEAM HORIZ. REINF.
SPLICE 8" AT JOINT
ELEVATOR NOTES CONTINUED... 6" ’D’ ’D’ MIN.
1#4 CONT. NO. DATE DESCRIPTION
TYP. TYP.
EACH SIDE A 2020-04-23 ISSUED AS 100% SD
1#5 VERT. EACH SIDE B 2020-06-16 50% DD PROGRESS
OF JOINT. FILL VERT. SET
CELL WITH CONCRETE. C 2020-08-03 100% DD PROGRESS
MAX. LOAD CAPACITY 4" x 8" x 3/8"
OF HOOK IS 6,000lbs. PLATE SET

#4 @ 12"
H2E AS SHOWN

CONTROL JOINT
NOTE:

5" MIN.
PROVIDE 8" LG. PLASTIC #5 @ 12" CONT.
OR METAL SLEEVE DISCONTINUE HORIZ. LADDER (MINIMUM 3)
REINF. EVERY SECOND LAYER. 5" MIN.
AROUND REBAR.

4" MIN.
1" A307
BENT BAR
TYPICAL MASONRY WALL CONTROL JOINT CONCRETE THICKENING FOR
2#503.0

6" MIN.
PLAN SECTION TAKEN THROUGH BOND BEAM.
6" EACH WAY ELECTRICAL CONDUIT UNDER
SPACE CONTROL JOINTS AT 33’−0" o.c. MAX. UNLESS
NOTED OTHERWISE ON PLAN.
1 SUSPENDED SLAB & ON WALLS
S1.06 3/4" = 1'-0"
NOTES:

3/4" GAP CONCRETE SLAB


ELEVATOR HOIST HOOK 1. SEE ELECTRICAL FOR CONDUIT ROUTING AND QUANTITIES.
B 2. THIS DETAIL APPLIES TO CONDUIT THICKENINGS (RACEWAYS)
3/4" GAP CONCRETE SLAB 1" = 1’−0" ONLY. SEE ALSO "CONDUIT, PIPES AND SLEEVES EMBEDDED
IN CONCRETE" NOTES ON COVER SHEETS FOR ALL CONDUIT
PLACED WITHIN SLABS (WITHOUT THICKENING RACEWAYS).

PLATE 3" x 3/8" x 0’−10" C/W

3"
5 1/2" THREADED INSERT 2−3/4"Ø HILTI ANCHORS
CAST INTO U/S SLAB
L4" X 3" X 1/4" DRILL SECURE WITH HILTI ADHESIVE SEE MECHANICAL FOR
X 6" LG. 1/4"

1"
3/4" Ø REDI−ROD

OF DOWEL
#4 DOWELS @ 24" O.C. ALL AROUND PLAN DIMENSIONS.
EACH SIDE

3/4" GAP
OR THREADED REBAR

AT BOT.
PERIMETER OF PAD.
2" C/W DOWEL INSIDE PLASTIC

4"
WEDGE ANCHORS. SLEEVE TO ALLOW FOR #4 @ 12" EACH WAY STRUCTURAL SLAB

4"
FORMED POCKET
2" EMBED 2" VERTICAL MOVEMENT.

4"
IN CORE WALL

1"

TO SUIT
HSS 8x6x.375 4"
PLAN

4"

4"
ALTERNATE 1 ALTERNATE 2 FILL POCKET WITH NON−SHRINK
GROUT AFTER BEAM INSTALLED

3/4" GAP CONCRETE SLAB

TYPE 1

THESE DRAWINGS ARE NOT TO BE USED FOR


TENDER, CONTRACT, OR CONSTRUCTION
1/4" HSS 8x6x.375

3"
LOBBY SLAB DRILL SECURE WITH HILTI ADHESIVE SEE MECHANICAL FOR
1/4" CORE WALL #4 DOWELS @ 24" O.C. ALL AROUND PLAN DIMENSIONS.
1/4" PLATE NOT USED PERIMETER OF PAD.

4" MAX.
1/4" X 8" WIDE 1 1/2" 4 1/2" 4 1/2" 1 1/2"
#4 @ 12" EACH WAY STRUCTURAL SLAB

2020-08-26 4:46:11 PM
PROGRESS
6" C/W
HILTI ANCHORS
2" @ 6". EMBED 2".
5 C D

4"

4"
S1.06

ALTERNATE 3
(AT EDGES OF SLABS) TYPE 2
SUPPORT DETAILS AT TOP OF BLOCK

FORMED POCKET
WALL NON-LOAD BEARING PARTITIONS 2 TYPICAL MECH'L. HOUSEKEEPING PAD

IN CORE WALL
FILL POCKET WITH NON−SHRINK
DIVIDER WALL GROUT AFTER BEAM INSTALLED 3/4" = 1'-0"
SEE ARCHITECTURAL DRAWINGS FOR ALL FIRE−STOPPING REQUIREMENTS BARS S1.06
’A’ ’B’ ’C’ ’D’ ’E’ ’F’ ’T’ (NOTE: FOR CONNECTION OF MECHANICAL UNITS
RISERS
(NOTE: ALL CONNECTIONS TO BE AT 48" O.C. MAX. 1 1/2" 1’−6" #4 @ 12" BOT. TO PAD REFER TO 8 / S6.03 U.N.O. ON MECHANICAL DRAWINGS.)
7#5 3#6 #4@12" 5#4 4#4 6#5 6" EACH WAY MIN.
AT FILLED CELLS UNLESS NOTED OTHERWISE.) UP TO 14
7#5 3#6 #4@12" 5#4 5#4 7#5 7" ’D’ BARS AT INTERMEDIATE 1/4"
15 TO 16
LANDING
17 TO 19 6#6 4#6 #4@12" 5#4 5#5 8#5 8"

NOTES
’B’ BARS
USE CONCRETE (150 PCY) WITH 28 DAY STRENGTH OF 4 ksi
CONCRETE BLOCK WALL ’A’ BARS
DOWELS FOR BLOCK MIN. CONC. STRENGTH AT TIME OF LIFTING TO BE 10 MPa.
’C’ BARS
4 1/2"
HSS 8x6x.375
WALL TO MATCH VERTS. REINF. GRADE TO BE 60 ksi. PRE−CAST STAIRS TO BE
1 1/2"

’T ’
ERECTED BEFORE PLACING NEXT LANDING. 5#4 TOP CORE WALL

BUT 4" MIN.


BARS EXTENDED DRILL & EPOXY
SLAB REINFORCING

SEE PLAN
1 " P.
#4 @ 12" #4 @ 12" WITH

TY
CL
SEE DWGS. INTO SLAB. TAB PLATE 8" x 6" x 3/8" 4"
EACH WAY HILTI ADHESIVE OR

.
#4@16" TEMP. C/W 2−3/4"Ø HILTI ANCHORS @ 6" O/C
EQUIVALENT. EMBED 4".
ALT. TOP & BOT. TYP. DN. FLIGHT. 5" TO WALL EMBED 5"

5#4 TOP
GROUT

’T ’
4"
GROUT
’E’ BARS WITH ALTERNATE DETAIL TO 'C'
E

1" CLR.
’F’ BARS 1#4 SUPPORT
#4 @ 12"
2#5 BOT. CONT. WITH 1#4 ’A’ BARS EACH WAY
2" 2" ’D’ BARS
SUPPORT

1"
DRILL & EPOXY

1"

SEE ARCH.
4" INTO SLAB

5"

5"
WITH HILTI
TYPICAL SLAB ON GRADE UNDER ’B’ BARS ’C’ BARS 2#5
ADHESIVE RIGID INSULATION
OR VOIDING TO SUIT
2#5 TOP TYP. 3"
BLOCK PARTITION WALLS U.N.O. ’C’ BARS IN EDGE.
’B’ BARS TOP IN
EDGE 1/4"
4"
’D’ BARS VOID

EQ.

5"
SLAB

M
DIVIDER WALL PROFILE TO MATCH

IN
STAIR SOFFIT.

4"
DOWN FLIGHT DETAILS AS
8 TYPICAL MASONRY WALL DETAILS - U.N.O. SHOWN ABOVE
S1.06 N.T.S.
UP FLIGHT (STAG. RISERS) UP FLIGHT (EVEN RISERS)

EQ.

30925-01
Date APRIL 10TH, 2020

SA
JD
DIVIDER BEAM HSS 8x6x0.375
MAX. SPAN BETWEEN SUPPORTS = 8’−0"
CORE WALL
PROVIDE ADDITIONAL 4" WIDE
6 PRECAST STAIRS END PLATE 16" x 9" x 3/8" SUPPORT WALLS IF REQUIRED
3" CONCRETE TOPPING ON N.T.S.
8" WATER PROOF MEMBRANE S1.06 C/W 4−3/4"Ø HILTI HIT EPOXY
ANCHORS, EMBED 6"
SEE ARCHITECTURAL
END PLATE 1/4" x 3" x 9"
FOR GRATE, SEE MECHANICAL DRAWINGS
24" TYP. WIDE x HEIGHT TO SUIT. 3 TYPICAL BUILT-UP SLAB
C/W 2−3/4"Ø HILTI
EMBED ANGLE 1 1/2" x 1 1/2" x 3/16" N.T.S.
ANCHORS, EMBED 6" S1.06

Project Number
C/W 1/2"Ø NELSON STUDS @ 18" O.C. ’C’ ’C’ ’D’ ’C’ ’D’
SEE ARCHITECTURAL DRAWINGS

’F’+1#5
SUPP.
SEE ARCH. ALTERNATE ELEVATOR DIVIDER

Checked By
DN. DWGS. FOR DN. FOR ALL FIRE−STOPPING REQUIREMENTS

’B’

’B’
BEAM CONNECTION DETAIL

Drawn By
’E’
STAIR DIMS.
ETC. F

2#5 TOP CONT.

’F’+ 1#5

’G’+ 1#5
SUPP.
SUPP.
UP UP HOLE IN BEAM HSS 8x6x.375

’B’

’E’

’E’
#5 @ 12" FOR WALL
’D’
HORIZONTAL SLAB EDGE
9" MIN.

REINFORCING BEYOND
SUMP PIT BEYOND. 8" MIN. 8" MIN. 4#6 BOTTOM CONT. TO RUN THRU
REINFORCE SIMILAR
TO TRENCH PIT.

1 1/2" KEY ON POCKET E. S.


8" x 6" x 4" ELEVATOR NOTES
3 SIDES
INTO WALL. PART PLAN

8"
( STAGGERED RISERS ) 1. SEE ELEVATOR SHOP DRAWINGS FOR ELEVATOR REQUIREMENTS, IN PARTICULAR:

1233 South Grand


− CONFIRM SHAFT DIMENSIONS
TYPICAL PLAN 6" MIN.
3"x1" HOLE AT BOTTOM
6"
− CONFIRM PIT DEPTH
( EVEN RISERS) OF BEAM FOR − CONFIRM LOCATION OF DIVIDER BEAMS
− CONFIRM ROUGH OPENING SIZE FOR DOORS
9 TRENCH DRAIN DETAIL 2#6 SLAB BOTTOM
BARS TO RUN THRU
S1.06 3/4" = 1'-0" 2. ELEVATOR DIVIDER BEAM:
1’−0"
PROVIDE DIVIDER BEAMS TO SUPPORT ELEVATOR GUIDE RAILS
ALTERNATE ELEVATOR DIVIDER BETWEEN ELEVATORS IN SHAFTS CONTAINING MORE THAN ONE

6"
NOTES ’B’ BARS BEAM CONNECTION DETAIL DET. C ELEVATOR. DIVIDER BEAMS TO BE HSS 8x6x.375 AT ALL FLOORS,

ASSUMED FLIGHT WIDTH TO BE 3’−8" G DET. D


INCLUDING THE ELEVATOR PIT. WHERE FLOOR TO FLOOR
HEIGHT EXCEEDS 12’−0", PROVIDE INTERMEDIATE DIVIDER BEAMS
DESIGN LIVE LOAD TO BE 1OO P.S.F. DET. D BETWEEN FLOORS. CONFIRM LOCATION WITH ELEVATOR SHOP
SEE ARCH. DWGS. FOR LAYOUT AND ’C’ BARS
DRAWINGS. CONNECT DIVIDER BEAMS TO CONCRETE WALL AT ONE
EXACT NUMBER OF RISERS. #4 @ 16" BARS ’D’ BARS DET. C END AND TO TOP OF SLAB OR EDGE BEAM AT OTHER END. SEE
DET. C DETAILS C TO H BELOW.
’A’ BARS
’F’ BARS WITH
1#5 SUPPORT
0"

’T ’
BEAM AND BOLT ATTACHMENTS 2’− 3. PROVIDE AN S8 x 18.4 HOIST BEAM IN THE CEILING OF THE ELEVATOR MACHINE ROOM,
BY MECH. UNIT CONTRACTORS,
WHEN FLOOR/FLOOR HEIGHT EXCEEDS 12 FT, SPANNING OVER THE ELEVATOR SHAFT. THE HOIST BEAM SHALL BE SUPPORTED AT EACH

1"
SUBMIT SIGNED & SEALED PROVIDE HSS 12 x 6 x 3/8" BEAM TO SUPPORT

CL
’E’ BARS END BY EMBEDDING INTO POCKETS IN THE WALLS. IF THE SPAN EXCEEDS 9’−0", PROVIDE
SHOP DRAWINGS FOR REVIEW

.
MID−HEIGHT DIVIDER BEAMS.
6"

INTERMEDIATE SUPPORTS TO THE SLAB OVER AT 9’−0" CENTERS.


WELD ALL AROUND TO EMBED PLATES EACH
END WITH 1/4" FILLET. EMBED PLATES ARE
RISERS ’A’ ’B’ ’E’ ’C’ ’D’ ’T’ ’F’ ’G’ 12" WIDE x 18" HIGH x 3/8", C/W

MAX.
8−3/4"Ø x 8" N. STUDS AT 8"x5"x5"x5" GRID. EXACT INTERMEDIATE SUPPORT.

9’−0"
2#5 TOP CONT. #4 @ 12" BOT. 4#5 5#4 2#6 #4 @ 12" 5" 3#5 4#5 POSITION TO BE CONFIRMED WITH ARCH.
’D’ BARS 1#5 TOP 7 TO 8 SEE DET. A BELOW
EACH WAY MIN.
’C’ BARS SUPPORT BARS
AT INTERMEDIATE 9 TO 11 5#5 5#4 3#6 #4 @ 12" 6" 4#5 5#5
LANDING
SEE ARCH.
(18" MAX.)

#5 @ 12", H.2.E. 10" 1 1/2" KEY DIVIDER BEAM


24" MIN. 12 TO 13 6#5 5#4 3#6 #4 @ 12" 6" 4#5 6#5 AT SLAB AND

ADDRESS, AVE, SUITE


MID−HEIGHT
#5 @ 12" HORIZ.
(MAX. 12’−0" o.c.)
EACH FACE ’B’ BARS
1’−0"

CITY, STATE, ZIP


DOWN FLIGHT

PROJECT NAME
3 1/4" 3 1/4"
SEE PLAN

6"

2#5−05.10
#6 U−BAR TOP & BOT.
THREADED AT

1" CL.
#4 @ 16" BARS
EACH END.
’C’ BARS
’D’ BARS
MID-HEIGHT DIVIDER BEAM PLAN
’F’ OR ’G’ BARS WITH H
.
CL

PROVIDE #5−06.6 @ 12" TOP 1#5 SUPPORT


1"

AT LOCATIONS WHERE NO TOP 2’−


’T’

0"

THE LIMITED PURPOSE OF EVALUATION, BIDDING OR REVIEW. THIS DOCUMENT OR ITS CONTENTS MAY NOT BE USED FOR ANY
REINFORCING CALLED UP ON PLANS

THIS DOCUMENT CONTAINS INFORMATION PROPRIETARY TO MVE + PARTNERS, INC. AND IS FURNISHED IN CONFIDENCE FOR

OTHER PURPOSE AND MAY NOT BE REPRODUCED OR DISCLOSED TO OTHERS WITHOUT THE PRIOR WRITTEN CONSENT OF
2" CL.
’A’ BARS
3#8−09.10 ExTRA

10 ROOF CURB FOR MECH'L UNIT SUPPORT


TYPICAL DETAILS FOR PLATE 3 x 3/4 x 0’−10"
6"

DOUBLE NUTS
1"

S1.06 3/4" = 1'-0" AND TACK WELD.


4 ELEVATOR DIVIDER BEAMS 1/4
1#5 TOP ’C’ BARS ’E’ BARS
UP FLIGHT SUPPORT BAR ’D’ BARS
S1.06 3/4" = 1'-0"
S8 x 18.4

TYPICAL HOIST BEAM DETAIL


7 CAST INSITU STAIRS HALF FLIGHT AND LANDING A
1" = 1’−0"
S1.06 N.T.S.

MVE + PARTNERS, INC. ALL RIGHTS RESERVED, © COPYRIGHT 2018.


TYPICAL DETAILS

08/03/2020 - ISSUED FOR 100% DD PROGRESS SET


SHEET TITLE

Scale
SHEET NUMBER

S1.06
PROJECT NUMBER
30925-01

BRYSON MARKULIN ZICKMANTEL


STRUCTURAL ENGINEERS

#501 - 510 BURRARD STREET, VANCOUVER, B.C. V6C 3A8


(604) 685-9533 WWW.BMZSE.COM CONTACT@BMZSE.COM
STAMP
ISSUES:
3'-0" MAXIMUM CHAIR SPACING TO BE INDICATED ON SHOP DRAWINGS
NO. DATE DESCRIPTION
A 2020-04-23 ISSUED AS 100% SD
CHAIR HEIGHTS TO BE POST-TENSIONING NOTES B 2020-06-16 50% DD PROGRESS
P.T. STRAND P.T. STRAND STAGGER ALTERNATE SET
SHOWN ON SHOP SEE SHOP DRAWING FOR LOCATION DEAD END ANCHORAGES C 2020-08-03 100% DD PROGRESS
DRAWINGS (LOCATE @ 1/4 SPAN UNLESS SHOWN OTHERWISE) WHEN MORE THAN TWO 1. SEE GENERAL NOTES FOR ADDITIONAL P. T. NOTES. SET
ARE PLACED
2. STRANDS SHALL BE GROUPED:
.6" (15mm) STRAND - GROUPS OF 3 MAXIMUM

MIN
10"
CONTINUOUS .5" (12mm) STRAND - GROUPS OF 5 MAXIMUM
STRAND
3. CHAIR ALL DEAD END ANCHORS WHERE THE NEXT ADJACENT STRESSING END
ANCHORAGE IS MORE THAN 18" AWAY ON EACH SIDE.

PLAN
SEE
2#5 EXTRA AT EACH
DEAD END ANCHOR 4. POST TENSION SUPPLIER TO VERIFY ALL ANCHOR BURSTING
REQUIREMENTS. SHOW ANCHORAGE ZONE REINFORCEMENT ON THE SHOP
DRAWINGS.
5. LIVE END ANCHORS MUST BE PLACED WITH 1/8" TOLERANCE ON LOCATION AND

PLAN
SEE
STANDARD CHAIR DEAD END ANCHORS WITH 1/8" TOLERANCE WITHIN THE THICKNESS OF SLAB AND
STANDARD CHAIR 2" TOLERANCE ON LOCATION WITHIN THE SLAB AREA.
6. ENSURE THAT STRAND AND ANCHORAGES ARE PROTECTED AGAINST
CORROSION AT ALL TIMES. ANY EVIDENCE OF SALTS OR OTHER
SUPPORT BAR SUPPORT BAR CHEMICALS WHICH COULD HASTEN CORROSION IS CAUSE TO REJECT
THE STRAND AND REQUIRE COMPLETE REPLACEMENT.
BELOW STRANDS ABOVE STRANDS 'ADDED' 7. WHERE STRANDS CURVE HORIZONTALLY IN PLAN, SPACE STRANDS 1.5" CLEAR
STRANDS BETWEEN EACH STRAND AND TIE INTO POSITION.
8. WHERE STRANDS HAVE BEEN BENT OR DAMAGED DURING

MIN
10"
TRANSPORTATION OR ARE OTHERWISE DEFECTIVE, REPLACE THE
STRAND WITH GOOD MATERIALS PRIOR TO CASTING THE CONCRETE.
SUPPORT BARS 9. KEEP RECORDS OF STRESSING OPERATIONS AND STRAND ELONGATIONS
CHAIR SPACING TO BE AND SUBMIT SAME TO THE ENGINEER. MAKE SPECIFIC MENTION OF ANY
INDICATED ON SHOP DWG'S. STRANDS WHICH DO NOT ACHIEVE THE CALCULATED ELONGATION WITHIN
18" 12" 3'-0" 7%. STRAND CUTTING OPERATION TO BE SUPERVISED BY THE MATERIALS
3'-0" MINIMUM
MIN CONSULTANT WHO MAY REVIEW ELONGATIONS AND PERMIT CUTTING AND
CAPPING.
P.T. STRAND 10. SPECIAL ATTENTION SHALL BE PAID TO PLACING OF CONCRETE TO ENSURE
FOR GROUPS OF ANCHORS: THAT NO VOIDS EXIST IN ANCHOR REGIONS OR AROUND CONGESTED STRAND
BURSTING BARS
UP TO 4 ANCHORS: 5'-0" PLACEMENT. THE GENERAL CONTRACTOR SHALL ENSURE THAT THE
#5 T&B (CONT)
HEIGHTS SHOWN 5 TO 8 ANCHORS: 8'-0" CONCRETE IS CAREFULLY PLACED SUCH THAT THE STRANDS ARE NOT
OR SIZE AS SHOWN
ON PLAN ARE 9 OR MORE ANCHORS: 11'-0" DEFLECTED OR LATERALLY DISPLACED DURING CONCRETING.
ON SHOP DRAWINGS
CHAIR HEIGHTS
TO UNDERSIDE OF 11. CONNECTIONS TO A POST-TENSIONED SLAB SHALL BE MADE ONLY WITH
CHAIR HEIGHTS STRAND SHOWN INSERTS EMBEDDED IN THE CONCRETE. DO NOT USE POWER DRIVEN
TO BE SHOWN ON IN MILLIMETRES ANCHORS OR DRILLED ANCHORS TO THE CONCRETE SLAB EXCEPT AS
SHOP DRAWINGS EXTRA BARS AT SPECIFICALLY APPROVED BY THE ENGINEER.
FOR USE WITH PLAN DETAIL

THESE DRAWINGS ARE NOT TO BE USED FOR


METRIC CHAIRS DEAD END ANCHORS

TENDER, CONTRACT, OR CONSTRUCTION


AS NOTED ABOVE

THICKNESS
ONLY.

SLAB
SLAB BOLSTER CHAIRS

2020-08-26 4:46:14 PM
PROGRESS
NOTE:

t
t/2 t/2
PROVIDE SUFFICIENT CHAIRING SUCH THAT STRANDS ARE NOT
DISPLACED DURING CONCRETE CASTING BY WORKMEN
STANDING UPON STRANDS, BY THE FORCE OF PUMPED OR
BUCKET PLACED CONCRETE, OR BY OTHER MEANS.
18"

CHAIR BOTTOM
BAR
CONTINUOUS
STRAND BEYOND
6 TENDEN SUPPORT AT MID-SPAN BURSTING BARS ONLY
AS REQUIRED BY
S1.07 N.T.S. PT SUPPLIER
2-#4 MIN. AT EVERY ANCHOR

SECTION DETAIL

REPAIR ALL TEARS IN TUBING


- REPACK TORN STRAND AREA 3 ADDED STRAND ANCHORAGE DETAIL
WITH GREASE. N.T.S.
S1.07
- SPLIT A SECTION OF POLY TUBING
EXTENDING 6" BEYOND TORN
SECTION OF STRAND. LOCATE
WITH SPLIT IN TUBE DOWNWARD.
- WRAP CONTINUOUSLY
WITH ADHESIVE TAPE ,
3M PRODUCT NO. 226
CUT STRAND WITH 3/4" CLEAR FOR SIZE OF OPENING SEE PLAN
CONFIRM WITH ARCH DRAWINGS
WATER TIGHT BARREL AND MECHANICAL DRAWINGS
WATERPROOF PLASTIC CAP 3'-0" 3'-0"
COMPLETELY FILLED WITH
WATERPROOF GREASE
BURSTING BARS #5 T&B
CONT OR AS SHOWN ON 2#5 T&B FOR #5 04.0 CORNER
3" MIN BEAM 12" MIN REQD
SHOP DRAWINGS ALL OPENINGS DIAGONALS TYP

TYP
2" MIN SLAB FOR STRESSING

2'-0"
CL

30925-01
Date APRIL 10TH, 2020

SA
JD
BEGIN CURVE STRAIGHT STRANDS GROUP STRANDS

t/2

t/2
12" 12" PER SHOP DWG'S

2 1/2"
CLR
MIN
GROUT VOID COMPLETELY MIN MIN

THICKNESS
t=SLAB
WITH TARGET NON-SHRINK
HIGH STRENGTH GROUT.
GROUTING TO BE DONE

t/2

t/2
6" CLR
WITHIN 3 WORKING DAYS
BETWEEN

CLR
OF STRAND CUTTING - SPECIAL

2"
INSPECTION REQUIRED BANDED
PRODUCT SUPPLIER TO CONFIRM NO TENDONS 6

Project Number
AIR VOIDS IN ANY PART OF THE TENDON 1 MAX
TYPICAL UNO

Checked By
1 1/2" MIN SLAB HOLE TO SUIT P/T

Drawn By
CHAIR BOTTOM CHAIR SYSTEM MIDHEIGHT
SLAB EDGE REINF 3" MIN BEAM
AS INDICATED ON BAR AT OF BULKHEAD
OBTAIN MATERIAL ENGINEERS APPROVAL TO CUT STRAND FOLLOWING SUBMITTAL OF STRESSING RESULTS. PLAN (2-#5 CONT. MIN.) ANCHORAGE P/T STRAND BANDED GROUP (DISTRIBUTED STRANDS SIMILIAR)
STRANDS TO BE STRESSED, CUT AND CAPPED IN ONE OPERATION IN DRY WORKING CONDITIONS. 1'-3"

GROMMET
1 TENDON LAYOUT AROUND OPENINGS
S1.07 N.T.S.
7 ANCHORAGE ALL STRUCTURES DEAD-END ANCHORAGE STRESSING ANCHORAGE
S1.07 N.T.S.

4 TENDON SUPPORT
S1.07 N.T.S.

1233 South Grand


PLACE DUCTS NO CLOSER THAN 5 x SLAB TENDON TO MAINTAIN A SMOOTH PROFILE
THICKNESS FROM FACE OF SUPPORT IN ORIGINAL POSITION AS INDICATED

4'-0" (MINIMUM) 1'-3" 1'-0"


LENGTH OF TRANSITION CURVE STRAIGHT MINIMUM
MINIMUM 4#5 MINIMUM
PLACE ANCHORS WITHIN THIS
TO SUIT STRAND PROFILE 2'-0" MIN OR 4 x SLAB DIMENSION
2'-0" MIN OR 4xSLAB VERTICALLY FOR COLUMN DIMENSION + 3t
THICKNESS MIN THICK SLABS
THICKNESS MIN

6 1.5t COL 1.5t


1 MAX
MIN
1"

CL

1" MIN CLEAR TYP MAINTAIN COVER TO


VENTILATION DUCT P.T. AND REBAR AS
UNIFORMLY SPACED SHOWN ON PLANS
TENDONS
CENTRELINE SUPPORT BARS OR GROMMETS REQUIRED
SPACING FOR MECHANICAL DUCTS

THICKNESS
OF STRAND SLAB BOLSTER AT STRESSING ENDS
GROUPS (SEE SHOP DRAWINGS ONLY
(SEE PLAN) FOR SIZE & LOCATION)

ADDRESS, AVE, SUITE


SLAB
NOTE:

CITY, STATE, ZIP


1" MIN CLEAR

PROJECT NAME
t
EXACT LOCATION OF DUCTS BURSTING BARS #5 T & B
OVER OR UNDER TO BE COORDINATED WITH CONT. OR AS SHOWN ON
DUCT TYP UNO 4" CLEAR MIN MECHANICAL ENGINEER SHOP DWG'S
AND CONTRACTOR TO SUIT
PROFILES OF TENDONS.
SUBMIT LAYOUT DRAWINGS STRAND HEIGHT GIVEN
CL FROM UNDERSIDE OF
FOR REVIEW.
SLAB

NOTE: 1 MAX 2 TENDONS THROUGH


CL OF COLUMN MINIMUM

THE LIMITED PURPOSE OF EVALUATION, BIDDING OR REVIEW. THIS DOCUMENT OR ITS CONTENTS MAY NOT BE USED FOR ANY
UNO

THIS DOCUMENT CONTAINS INFORMATION PROPRIETARY TO MVE + PARTNERS, INC. AND IS FURNISHED IN CONFIDENCE FOR
SEE DET 5 / S1.04 6 REBAR IN DIRECTION

OTHER PURPOSE AND MAY NOT BE REPRODUCED OR DISCLOSED TO OTHERS WITHOUT THE PRIOR WRITTEN CONSENT OF
FOR REINF. PLACE ANCHOR
OF DISTRIBUTED
HORIZONTALLY
FOR THIN SLABS
P.T. TENDON VENTILATION DUCT
NOTE:
ALL DUCT PLACEMENT TO BE CONFIRMED / REVIEWED
CLEARANCES BY ENGINEER OF RECORD BEFORE CASTING CONCRETE.
SPACING TO SUIT P.T. SYSTEM SEE SHOP DRAWINGS 3/4" MIN CLEAR BETWEEN ANCHORS

2 SLAB TENDON PLACEMENT AT COLUMNS


8 TYPICAL MECH. DUCTS IN SLABS 5 TENDON FLARE AT ANCHORAGE S1.07 N.T.S.

N.T.S. S1.07 N.T.S.


S1.07

MVE + PARTNERS, INC. ALL RIGHTS RESERVED, © COPYRIGHT 2018.


TYPICAL DETAILS

08/03/2020 - ISSUED FOR 100% DD PROGRESS SET


SHEET TITLE

Scale
SHEET NUMBER

S1.07
PROJECT NUMBER
30925-01

BRYSON MARKULIN ZICKMANTEL


STRUCTURAL ENGINEERS

#501 - 510 BURRARD STREET, VANCOUVER, B.C. V6C 3A8


(604) 685-9533 WWW.BMZSE.COM CONTACT@BMZSE.COM
STAMP
ISSUES:
NO. DATE DESCRIPTION
A 2020-04-23 ISSUED AS 100% SD
REBAR LENGTHS SEE PLAN B 2020-06-16 50% DD PROGRESS
SET
(SEE PLAN FOR OTHER LENGTH REQUIREMENTS)
C 2020-08-03 100% DD PROGRESS
SET
L1 END L2 INTERIOR L3 CANTILEVER

1'-6" .20 x SPAN EQUAL EQUAL .20 x SPAN 1'-6"


STRAIGHT LENGTH MIN .20 x LONGER SPAN MIN. .20 x LONGER SPAN MIN. LENGTH MIN. STRAIGHT MIN.

.10 x L1 .10 x L2 .10 x L2 .20 x L3

SEE PLAN FOR


REINF AND P.T.
COLUMN STRAND INFLEXION
OR WALL POINT - TYPICAL

SLAB
THICKNESS

t/2

t/2

t
t/2

t/2
NOT USED
BOTTOM REINF MAY OCCUR IN SPACE TOP BARS WITHIN 1.5 x SLAB STRAND PROFILE TO BE A
ANY BAY. SEE PLAN. CENTRE THICKNESS OF FACE OF COLUMNS. SMOOTH PARABOLIC
4" MIN. BAR IN SPAN TYP UNO SEE 'TYP SLAB TENDON PLACEMENT VERTICAL CURVE
4 AT COLUMNS'
S1.08
NOTE: ADDED REINF BARS MAY BE REQUIRED
AT SLEEVES AND OTHER OPENINGS

THESE DRAWINGS ARE NOT TO BE USED FOR


TENDER, CONTRACT, OR CONSTRUCTION
2020-08-26 4:46:16 PM
PROGRESS
1 TYPICAL PT FLAT PL SLAB REBAR PROFILE
S1.08 N.T.S.

BANDED TENDONS

6" CLEAR BETWEEN


BANDED TENDONS
UNIFORMLY SPACED
STRAND GROUPS 2#5 CONT AT ADDED TENDON ANCHORS.
TENDONS AND
SEE NOTES AND SUPPORT AT MIDHEIGHT OF SLAB.
SUPPORTS
SHOP DRAWINGS SEE ADDED STRAND ANCHORAGE DETAIL.

FOR COVER
SEE PLANS SLAB
*MAINTAIN* THICKNESS

t/2

t
t/2
SLAB BOLSTER @ 3'-0" o/c MAX. OR AS
CL SPAN CL SUPPORT REQD TO MAINTAIN STRAND POSITION
STRAND LOW POINT STRAND HIGH POINT DURING CONCRETE PLACEMENT. SEE
SHOP DRAWINGS. SEE 'DETAIL - TENDON
SUPPORT'.

30925-01
Date APRIL 10TH, 2020

SA
JD
OPTIONAL SUPPORT BARS ON CHAIRS.
SEE NOTE: DETAIL-TENDON SUPPORT

NOTE: NOTE:
CRITICAL DIMENSIONS GIVEN ON PLAN ARE TO UNDERSIDE OF ALL TENDON PROFILES TO BE SMOOTH
STRAND MEASURED FROM TOP SURFACE OF SLAB FORMWORK. PARABOLIC VERTICAL CURVES UNLESS
TIE-WIRE TENDONS TO SUPPORT BARS AND CHAIRS AT ALL OTHERWISE SHOWN.

Project Number
INTERSECTIONS. STAPLE ALL CHAIRS AND SLAB BOLSTERS TO

Checked By
AVOID MOVEMENT DURING CONCRETE PLACEMENT.

Drawn By
2 TYPICAL FLAT PL SLAB TENDON SUPPORT
S1.08 N.T.S.

PLACE 4 BARS MINIMUM TOP REINF. BARS IN THIS DIRECTION PLACED AT


LOWER ONE DISTRIBUTED TENDON LOWER LAYER. AT COLUMN, THREAD THROUGH
GROUP AT CL COLUMN AND TIED TO TOP EA. WAY THUS

1233 South Grand


TENDON TO MAINTAIN HIGHEST POSSIBLE POSITION.
UNDERSIDE OFBANDED TENDONS
(2 STRANDS MINIMUM)
EQUAL TO
1.5 x SLAB
PROVIDE 2" CLEAR BETWEEN ALL THICKNESS
BARS AND TENDON GROUPS - TYPICAL
TOP REINF. BARS IN THIS DIRECTION ARE UPPERMOST
AND IN SAME LAYER AS BANDED TENDONS.

NOTE:
PLACE DISTRIBUTED TENDONS BEFORE
PLACING ANY REINFORCING BARS.

ORDER OF PLACEMENT:

1. LAY DISTRIBUTED STRANDS AT CL COLUMN ONLY.

2. LAY BANDED TENDONS.

3. LAY REMAINING DISTRIBUTION TENDONS.

ADDRESS, AVE, SUITE


BANDED TENDONS
PLACED SYMMETRICALLY 4. LAY REBAR IN BANDED TENDON DIRECTION IN
AROUND CL COLUMNS SAME PLANE AS BANDED TENDONS.

CITY, STATE, ZIP


PROJECT NAME
5. LAY REBAR PERPENDICULAR BELOW BANDED REBAR
(AT COLUMN THREAD THROUGH AS REQUIRED).

THE LIMITED PURPOSE OF EVALUATION, BIDDING OR REVIEW. THIS DOCUMENT OR ITS CONTENTS MAY NOT BE USED FOR ANY
THIS DOCUMENT CONTAINS INFORMATION PROPRIETARY TO MVE + PARTNERS, INC. AND IS FURNISHED IN CONFIDENCE FOR

OTHER PURPOSE AND MAY NOT BE REPRODUCED OR DISCLOSED TO OTHERS WITHOUT THE PRIOR WRITTEN CONSENT OF
UNIFORMLY SPACED TENDONS

SPACE TENDONS FROM COLUMN CL AS CL COLUMN


REQUIRED TO AVOID TENDON CONFLICT

MVE + PARTNERS, INC. ALL RIGHTS RESERVED, © COPYRIGHT 2018.


3 TENDON AND REBAR LAYOUT AT COLUMNS
S1.08 N.T.S.

TYPICAL DETAILS

08/03/2020 - ISSUED FOR 100% DD PROGRESS SET


SHEET TITLE

Scale
SHEET NUMBER

S1.08
PROJECT NUMBER
30925-01

BRYSON MARKULIN ZICKMANTEL


STRUCTURAL ENGINEERS

#501 - 510 BURRARD STREET, VANCOUVER, B.C. V6C 3A8


(604) 685-9533 WWW.BMZSE.COM CONTACT@BMZSE.COM
A B B.2 C D E F
PROJECT
NORTH

TRUE NORTH

STAMP
A B C D E F A B C D E F
ISSUES:
NO. DATE DESCRIPTION
A 2020-04-23 ISSUED AS 100% SD
B 2020-06-16 50% DD PROGRESS
21'-10" 30'-6" 21'-4" 29'-11" 19'-11" 21'-10" 30'-6" 21'-4" 29'-11" 19'-11" SET
C 2020-08-03 100% DD PROGRESS
SET
1 2
WALL
ELEVATION S5.01 S6.01

12"

12"
WALL
ELEVATION
1 11 2
S5.01

"
PC1 PC1

ER 48
ER 8"
PC1

ER "

ER "
ST 4
ST 48

ST 48

ST x
LA x
ER 8"

ER 8"

LA "
PI 16
LA x

PI 6"

LA x
ST 4

ST 4
PI 6"

PI 6"
1
LA x

LA x
1

1
PI 6"

PI 6"
1

1
213'-9"
218'-0"
219'-0"

217'-0"
28'-6"

28'-6"
5'-0"
48" WATER
FIRE SLAB
16" DN. 16" DN. TANK
P2-03
14" 14" 636 SF 14"
218'-5 9/16"

"

"

"

"
72

72

72

72
x

x
"

"
42

42
"

"

"

"
16

16

16

16
x

x
2 3

"

"
30

30
4
2 22

CL

STEP
10"

10"

63"
20' - 0"

THESE DRAWINGS ARE NOT TO BE USED FOR


5'-0"
6'-0" 6'-0"

TENDER, CONTRACT, OR CONSTRUCTION


25'-6"

25'-6"
48" SLAB

24' - 8"

2020-09-04 5:17:29 PM
PROGRESS
UP
UP UP

24"

24"
60" SLAB

3 33 24' - 6" 0" 0"

13'-0"

13'-0"
22"

22"
217'-4 1/2"
"

"
30

30
x

x
3.3
"

"
24

24
24" UP 5 24" UP UP

24" 12" 24"


STEP
219'-0"
28'-0"

28'-0"
60" SLAB
14"

3'-6"

3'-6"
14" 14" 14" 14"
8"

8"
ALL HEADER BEAMS

VARIES
TO BE 30" DP. INCLUDING
20"

20"
STEP
14" SLAB DEPTH ON ALL
LEVELS

"

"
6' - 0"
48

48
x

x
24" 24"
24" 24"

"

"
8

24

24
11' - 1"
96"

96"

108" 8' - 0"

46' - 8"
4 44

STEP
4'-0" 4'-0"
STEP
108"

4'-0" 4'-0"
48" SLAB

1' - 5"
CL

4' - 9"
"

"
30

30
219'-7 1/4"
x

x
132" DP CORE
"

"

29' - 4"
6' - 8"
24

24

CL
7 FOOTING 72" DP CORE

20' - 0"
4.5

4' - 9"
FOOTING
RAMP UP TO LEVEL P1

RAMP UP TO LEVEL P1

1' - 5"
14" 10'-0" 14" 10'-0"
28'-0"

28'-0"
10'-0" 10'-0"

STEP
STEP

8' - 0" 108"


108"

29' - 4"

6' - 10"
"

"
30

30
24" 24" 24" 24"

11' - 7"
1 1

30925-01
Date APRIL 10TH, 2020

SA
JD
x

x
"

"
24

24
S6.01 S6.01
9
4'-0"

4'-0"
4.7

3' - 4"

3' - 4"

3' - 4"
8"

26"
26"

60" SLAB
60" SLAB

13'-0"

13'-0"
5 55

Project Number
24' - 6"
10'-0"

10'-0"

Checked By
24"

24"

Drawn By
24' - 8"

24' - 8"
UP UP

48" SLAB
25'-6"

25'-6"
219'-0"
220'-1" 219'-9 3/8"
20' - 0" 29' - 2"
4"

4"
"

"
96

96
"

"
"

"
11

11
72

72
72

72
x

x
"x

"x
x

x
x

x
"

"
16

16
"

"
"

"
24

24
16

16
16

16

CL

1233 South Grand


11 12 13
21' - 4" 14

6 66
13'-0"

13'-0"
4
S5.01
7 77 WALL
12"

12"
PROPERTY ELEVATION PROPERTY
LINE LINE

2 3 WALL
S6.01 S5.01 ELEVATION

ADDRESS, AVE, SUITE


CITY, STATE, ZIP
PROJECT NAME
LEVEL P2PLAN - REINFORCING LEVEL P2

THE LIMITED PURPOSE OF EVALUATION, BIDDING OR REVIEW. THIS DOCUMENT OR ITS CONTENTS MAY NOT BE USED FOR ANY
THIS DOCUMENT CONTAINS INFORMATION PROPRIETARY TO MVE + PARTNERS, INC. AND IS FURNISHED IN CONFIDENCE FOR

OTHER PURPOSE AND MAY NOT BE REPRODUCED OR DISCLOSED TO OTHERS WITHOUT THE PRIOR WRITTEN CONSENT OF
FOUNDATION NOTES:
1. FOUNDATION MATERIAL STRENGTH:

LEVEL P2 - FOUNDATION PLAN AND


4000 PSI CONCRETE U.N.O.
60,000 PSI REINFORCING
REFER TO GENERAL NOTES FOR FURTHER REQUIREMENTS

2. DESIGN BEARING PRESSURE:


8,800 PSF STRIP FOOTINGS
10,000 PSF SPREAD FOOTINGS
12,000 PSF MAT FOUNDATION
16,000 PSF SEISMIC PRESSURE AT ULTIMATE
REFER TO GEOTECH REPORT AND GENERAL NOTES FOR FURTHER
REQUIREMENTS. BEARING PRESSURES TO BE CONFIRMED ON SITE BY
GEOTECH CONSULTANT PRIOR TO PLACING CONCRETE IN FOUNDATIONS.

3. PROVIDE 2” SKIM COAT TO FOOTING EXCAVATIONS UNLESS OTHERWISE

MVE + PARTNERS, INC. ALL RIGHTS RESERVED, © COPYRIGHT 2018.


APPROVED BY GEOTECH CONSULTANT.

REINFORCING PLAN
4. DEPTH OF FOUNDATIONS ARE NOTED ON PLAN – DEPTH DOES NOT INCLUDE
SKIM COAT.

1/8" = 1'-0"
5. MAINTAIN 2:1 SLOPE TO ADJACENT FOOTING PER DETAIL 2/S1.04. FOOTINGS
MAY EXCEED THICKNESSES SHOWN IN ORDER TO MAINTAIN 2:1 SLOPE OF
SUPPORTING SOILS.
PARKING COLUMN SCHEDULE
6. REFER TO S1.00 SERIES DRAWING FOR TYPICAL DETAILS.

08/03/2020 - ISSUED FOR 100% DD PROGRESS SET


CONCRETE MARK SIZE REINFORCING TIE ARRANGEMENT 7. IF CONDITIONS PERMIT FOUNDATIONS MAY BE CAST AGAINST SIDES OF
STRENGTH
EXCAVATIONS PER DETAIL 1/S1.04 – MAINTAIN MINIMUM FOUNDATION
DIMENSIONS AS NOTED.
7 ksi PC1 16" x 48" 8#6 VERT'S.
#4 @ 4" TIES 8. SEE PLAN FOR EXACT SIZE, POSITION, AND DETAILS OF REINFORCING OF
FOUNDATIONS.

SHEET TITLE
7 ksi PC2 14" x 48" 8#6 VERT'S. 9. REFER TO FOOTING SCHEDULE FOR SIZE AND REINFORCING OF SPREAD
#4 @ 4" TIES FOOTINGS AND STRIP FOOTINGS.

Scale
10. SPREAD FOOTINGS AND STRIP FOOTINGS TO BE CENTERED UNDER
COLUMNS AND/OR WALLS UNLESS SHOWN OTHERWISE.

11. CONFIRM ALL SLAB ELEVATIONS, STEPS, SLOPES, AND OPENINGS WITH
NOTE: FOR ALL COLUMNS THAT START ON THIS FLOOR, PROVIDE HOOKED DOWELS SHEET NUMBER
ARCHITECTURAL AND OTHER CONSULTANTS DRAWINGS.
TO MATCH VERTICAL REINFORCEMENT. HOOK INTO BOT. OF SLAB, SLAB BAND
OR FTG.
12. FOR ALL DRAINAGE AND WATER PROOFING REQUIREMENTS REFER TO THE
ARCHITECT.
S2.01.1
13. CONFIRM ALL MECHANICAL AND ELECTRICAL OPENINGS AND SLEEVES WITH
CONSULTANTS DRAWINGS. CONFIRM ALL OPENINGS AND ELEMENTS NOT
SHOWN ON THE STRUCTURAL DRAWINGS WITH BMZ STRUCTURAL PROJECT NUMBER
ENGINEERS PRIOR TO CONSTRUCTION.
CONCRETE COLUMN REFERENCE NOTE: 30925-01
14. FOR SHEARWALL REINFORCING DETAILS AND ELEVATIONS SEE DRAWING
1. COLUMN WITH SYMBOL 50 DENOTES TOWER SERIES S3.00 UNLESS NOTED OTHERWISE ON PLAN.
CONCRETE COLUMN. TYPE VARIES
15. FOR COLUMN REINFORCING AND DETAILS SEE DRAWING SERIES S4.00
INSIDE CIRCLE
UNLESS NOTED OTHERWISE ON PLAN.
2. SEE DRAWINGS S4.01, S4.02 AND S4.03 FOR ALL THE
TOWER CONCRETE COLUMNS, U.N.O. 16. FOR BASEMENT WALL ELEVATIONS AND OTHER WALLS SEE DRAWING
SERIES S5.00 UNLESS NOTED OTHERWISE ON PLAN.
BRYSON MARKULIN ZICKMANTEL
17. REFER TO GENERAL NOTES FOR FURTHER REQUIREMENTS. STRUCTURAL ENGINEERS

#501 - 510 BURRARD STREET, VANCOUVER, B.C. V6C 3A8


(604) 685-9533 WWW.BMZSE.COM CONTACT@BMZSE.COM
PROJECT
NORTH

TRUE NORTH

STAMP
A B C D E F
ISSUES:
NO. DATE DESCRIPTION
A 2020-08-03 100% DD PROGRESS
SET
21'-10" 30'-6" 21'-4" 29'-11" 19'-11"

1 2
WALL
ELEVATION S5.01 S6.01

12"
WALL
ELEVATION
1 2
S5.01

28'-6"
5'-0"
16" DN.

14"
14"

10"

THESE DRAWINGS ARE NOT TO BE USED FOR


5'-0"
6'-0"

TENDER, CONTRACT, OR CONSTRUCTION


25'-6"

2020-09-04 5:17:31 PM
PROGRESS
UP

24"
3

13'-0"
22"
24" UP

24"

28'-0"
14"

3'-6"
14" 14"

8"

20"
24"
24"

96"
4
4'-0"
4'-0"

RAMP UP TO LEVEL P1
14" 10'-0"

28'-0"
10'-0"

24" 24"
1 1

30925-01
Date APRIL 10TH, 2020

SA
JD
S6.01 S6.01

4'-0"
26"

13'-0"
5

Project Number
10'-0"

Checked By
24"

Drawn By
25'-6"

1233 South Grand


6

13'-0"
4
S5.01
7 WALL

12"
ELEVATION PROPERTY
LINE

2 3 WALL
S6.01 S5.01 ELEVATION

ADDRESS, AVE, SUITE


CITY, STATE, ZIP
PROJECT NAME

THE LIMITED PURPOSE OF EVALUATION, BIDDING OR REVIEW. THIS DOCUMENT OR ITS CONTENTS MAY NOT BE USED FOR ANY
FOUNDATION NOTES:

THIS DOCUMENT CONTAINS INFORMATION PROPRIETARY TO MVE + PARTNERS, INC. AND IS FURNISHED IN CONFIDENCE FOR

OTHER PURPOSE AND MAY NOT BE REPRODUCED OR DISCLOSED TO OTHERS WITHOUT THE PRIOR WRITTEN CONSENT OF
1. FOUNDATION MATERIAL STRENGTH:
4000 PSI CONCRETE U.N.O.
60,000 PSI REINFORCING
REFER TO GENERAL NOTES FOR FURTHER REQUIREMENTS

LEVEL P2 - STIRRUP REINFORCING


2. DESIGN BEARING PRESSURE:
8,800 PSF STRIP FOOTINGS
10,000 PSF SPREAD FOOTINGS
12,000 PSF MAT FOUNDATION
16,000 PSF SEISMIC PRESSURE AT ULTIMATE
REFER TO GEOTECH REPORT AND GENERAL NOTES FOR FURTHER
REQUIREMENTS. BEARING PRESSURES TO BE CONFIRMED ON SITE BY
GEOTECH CONSULTANT PRIOR TO PLACING CONCRETE IN FOUNDATIONS.

3. PROVIDE 2” SKIM COAT TO FOOTING EXCAVATIONS UNLESS OTHERWISE


APPROVED BY GEOTECH CONSULTANT.

4. DEPTH OF FOUNDATIONS ARE NOTED ON PLAN – DEPTH DOES NOT INCLUDE

MVE + PARTNERS, INC. ALL RIGHTS RESERVED, © COPYRIGHT 2018.


SKIM COAT.

5. MAINTAIN 2:1 SLOPE TO ADJACENT FOOTING PER DETAIL 2/S1.04. FOOTINGS


MAY EXCEED THICKNESSES SHOWN IN ORDER TO MAINTAIN 2:1 SLOPE OF
SUPPORTING SOILS.

1/8" = 1'-0"
6. REFER TO S1.00 SERIES DRAWING FOR TYPICAL DETAILS.

7. IF CONDITIONS PERMIT FOUNDATIONS MAY BE CAST AGAINST SIDES OF


EXCAVATIONS PER DETAIL 1/S1.04 – MAINTAIN MINIMUM FOUNDATION

08/03/2020 - ISSUED FOR 100% DD PROGRESS SET


DIMENSIONS AS NOTED.

8. SEE PLAN FOR EXACT SIZE, POSITION, AND DETAILS OF REINFORCING OF


FOUNDATIONS.
ALTERNATIVE 80 ksi FOR
LEGEND : CORE FOOTINGS REINFORCING SCHEDULE (f'c = 6 ksi)
BAR PLACING ORDER
9. REFER TO FOOTING SCHEDULE FOR SIZE AND REINFORCING OF SPREAD
REINF. IN FOUNDATION FOOTINGS AND STRIP FOOTINGS.

SHEET TITLE

PLAN
fy = 60 ksi REBAR fy = 80 ksi REBAR
U.N.O. ON PLAN 10. SPREAD FOOTINGS AND STRIP FOOTINGS TO BE CENTERED UNDER
FOOTING TYPE REINFORCEMENT COLUMNS AND/OR WALLS UNLESS SHOWN OTHERWISE.

Scale
HATCHING AREA INDICATES EXTENTS OF
SG1 #11 @ 6" #11 @ 8"
#5 STIRRUPS @ 12" x 12" GRID. TOP UPPERMOST LAYER 11. CONFIRM ALL SLAB ELEVATIONS, STEPS, SLOPES, AND OPENINGS WITH
#11 @ 12" EACH WAY BOT. CONT., STAG. LAP 5'-10", ARCHITECTURAL AND OTHER CONSULTANTS DRAWINGS.
#11 @ 8" #11 @ 11" EXTEND BOT. BARS 8'-0" INTO THICKER FOOTING.
60" DP. FOOTINGS #9 @ 12" EACH WAY TOP CONT., STAG. LAP 6'-2".
#11 @ 12" #11 @ 16" TOP NEXT UPPERMOST LAYER 12. FOR ALL DRAINAGE AND WATER PROOFING REQUIREMENTS REFER TO THE SHEET NUMBER
PLUS EXTRA REINF. SHOWN ON PLAN AND DETAILS. ARCHITECT.

SG2
HATCHING AREA INDICATES EXTENTS OF
#5 STIRRUPS @ 10" x 10" GRID.
#9 @ 12" #9 @ 16"
47" DP. FOOTINGS #11 @ 6" EACH WAY BOT. CONT., STAG. LAP 5'-10",
#11 @ 12" EACH WAY TOP CONT., STAG. LAP 7'-6".
BOT. NEXT LOWERMOST LAYER 13. CONFIRM ALL MECHANICAL AND ELECTRICAL OPENINGS AND SLEEVES WITH
CONSULTANTS DRAWINGS. CONFIRM ALL OPENINGS AND ELEMENTS NOT
S2.01.2
NOTE: 1. 60 ksi REBAR SPACING NOTED ON PLAN; 72" DP. FOOTINGS SHOWN ON THE STRUCTURAL DRAWINGS WITH BMZ STRUCTURAL
EXTEND TOP BARS 7'-0" INTO THINNER FOOTINGS. BOT. LOWERMOST LAYER ENGINEERS PRIOR TO CONSTRUCTION.
2. SPLICE LENGTHS NOTED ON PLANS TO BE PLUS EXTRA REINF. SHOWN ON PLAN AND DETAILS.
INCREASED BY 54 PERCENT FOR 80 ksi
REINFORCING. SEE ALSO GENERAL NOTES. 14. FOR SHEARWALL REINFORCING DETAILS AND ELEVATIONS SEE DRAWING PROJECT NUMBER
SERIES S3.00 UNLESS NOTED OTHERWISE ON PLAN.
30925-01
15. FOR COLUMN REINFORCING AND DETAILS SEE DRAWING SERIES S4.00
UNLESS NOTED OTHERWISE ON PLAN.

16. FOR BASEMENT WALL ELEVATIONS AND OTHER WALLS SEE DRAWING
SERIES S5.00 UNLESS NOTED OTHERWISE ON PLAN.

17. REFER TO GENERAL NOTES FOR FURTHER REQUIREMENTS.

BRYSON MARKULIN ZICKMANTEL


STRUCTURAL ENGINEERS

#501 - 510 BURRARD STREET, VANCOUVER, B.C. V6C 3A8


(604) 685-9533 WWW.BMZSE.COM CONTACT@BMZSE.COM
A B B.2 C D E F
PROJECT
NORTH

TRUE NORTH

STAMP
A B C D E F A B C D E F
ISSUES:
NO. DATE DESCRIPTION
A 2020-04-23 ISSUED AS 100% SD
B 2020-06-16 50% DD PROGRESS
21'-10" 30'-6" 21'-4" 29'-11" 19'-11" 21'-10" 30'-6" 21'-4" 29'-11" 19'-11" SET
C 2020-08-03 100% DD PROGRESS
SET
1 WALL 1
S5.01 ELEVATION S5.01
4' - 0" 5' - 6"
WALL

12"

12"
ELEVATION
1 2
11
2
1
S5.01 S5.01
PC1 PC1

ER "

ER "
PC1

ER "

ER "
ST 48

ST 48
16 ILA

16 ILA
ST 48

ST 48
P

P
" x ST

" x ST
PI " x

PI " x
PI " x

PI " x
12' - 2"
16

16
48 ER

48 ER
LA

LA
16

16
LA

LA
"

"
FIRE PUMP
P1-03
28'-6"

28'-6"
16" 16" 329 SF

"

"

"

"
72

72

72

72
x

x
"

"
UP

42

42
"

"

"

"
UP UP

16

16

16

16
x

x
2 3

"

"
11' - 4"
30

30
4
2 22 2

3' - 0"
DN. DN.
DN
227'-8 3/16" 228'-9 7/16"
229'-6"

DN. DN.

THESE DRAWINGS ARE NOT TO BE USED FOR


TENDER, CONTRACT, OR CONSTRUCTION
227'-4"
25'-6"

25'-6"

2020-09-04 5:17:34 PM
PROGRESS
10" SLAB

7' - 6"
24"

24"
3 33 3

22"

22"
"

"
30

30

8"
x

x
3.3 3.3
"

"
24

24
TO LEVEL P2

TO LEVEL P2
UP 5 UP
RAMP DN.

RAMP DN.
24" 24"
24" 24"
DN. DN.
DN
28'-0"

28'-0"
14" 14"

14" 14" HSS 6x4x.375

ALL HEADER BEAMS TO BE 30" DP.


INCLUDING SLAB DEPTH ON ALL
20"

20"
VARIES
LEVELS

STEP
"

"
14" 14"

48

48
24"

24"
x

x
24" 24"

"

"
24

24
8
4 44 4
14" 24" 14" 24"
"

"
229'-6"
30

30
229'-6"
x

x
"

"
24

24
7
4.5 4.5
RAMP UP TO LEVEL 1

RAMP UP TO LEVEL 1
28'-0"

28'-0"
"

"
30

30
24" 24"
1 24" 1 24"

30925-01
Date APRIL 10TH, 2020

JD
ML
x

x
"

"
24

24
S6.01 S6.01
9
4.7
26"

26"
24"

24"
5 55

Project Number

Checked By
Drawn By
229'-6"
14" 14"

14" 10" SLAB 14"


25'-6"

25'-6"
4"

4"
11

11
"

"

"

"
"

"
72

72

72

72
96

96
"x

"x
14
x

x
24

24
x

x
"

"

"

"
"

"
16

16

16

16
16

16

1233 South Grand


11 12 13

6 66
10"

10"
OPEN OPEN
13'-0"

13'-0"
12" 229'-6"
12"
12"

4 4
12"

12"
12"

12"
S5.01 S5.01
7 77 WALL
12"

12"
PROPERTY ELEVATION PROPERTY
LINE LINE
SLAB NOTES:
3 1. SEE PLAN FOR SLAB THICKNESS 3 WALL
S5.01 S5.01 ELEVATION
CLEAR COVER TO REINFORCING:
1” CLEAR COVER TOP – TO UPPER MOST TOP REINF.
1” CLEAR COVER BOTTOM – TO LOWERMOST BOTTOM REINF.

ADDRESS, AVE, SUITE


ALL INTERIOR SPANS TO BE CONSIDERED "RESTRAINED" ALL END SPANS
PERPENDICULAR TO BASEMENT WALLS TO BE CONSIDERED
"UNRESTRAINED" (INCREASE BOTTOM COVER TO 1 1/4").

CITY, STATE, ZIP


PROJECT NAME
2. DROP BARS FOR CHAIRING PURPOSES ARE TO BE CONSIDERED
ACCESSORIES SUPPLIED BY THE CONTRACTOR. REFER TO BAR PLACING
ORDER FOR FURTHER REQUIREMENTS.
LEVEL P1 PLAN - REINFORCING LEVEL P1 3. PROVIDE TEMPERATURE REBAR EACH DIRECTION BOTTOM MINIMUM IN ALL
SLABS UNLESS NOTED OTHERWISE ON PLAN OR IN DETAILS. REFER TO
REINFORCING STEEL SECTION OF THE GENERAL NOTES. PROVIDE
STAGGERED SPLICES AS REQUIRED.

4. PROVIDE CAMBER TO SLABS AS SHOWN ON PLAN AND AS NOTED IN THE

THE LIMITED PURPOSE OF EVALUATION, BIDDING OR REVIEW. THIS DOCUMENT OR ITS CONTENTS MAY NOT BE USED FOR ANY
THIS DOCUMENT CONTAINS INFORMATION PROPRIETARY TO MVE + PARTNERS, INC. AND IS FURNISHED IN CONFIDENCE FOR
CONCRETE SLAB SECTION OF THE GENERAL NOTES.

OTHER PURPOSE AND MAY NOT BE REPRODUCED OR DISCLOSED TO OTHERS WITHOUT THE PRIOR WRITTEN CONSENT OF
5. ALL SLABS TO BE MONITORED DURING CONSTRUCTION FOR FLATNESS AND
DECON STUD RAIL REFERENCE NOTE:

LEVEL P1 PLAN - CONCRETE OUTLINE


LEVELNESS AS NOTE IN THE SLAB SURVEY CONTROL SECTION OF THE
GENERAL NOTES. SUBMIT SURVEY DATA TO BMZ STRUCTURAL ENGINEERS
1. SEE DRAWING S1.11 FOR DECON STUD RAIL SCHEDULE. FOR REVIEW.

6. ALL MAT REINFORCING INDICATED ON PLANS ARE TOP REINF. REFER TO


DETAIL 11/S1.04 FOR FURTHER DETAILS.

LEVEL P1 PLAN - REINFORCING


7. FOR STUDRAIL REINFORCING REFER TO STUD RAIL SCHEDULE ON PLAN.
INTEGRITY STEEL REFERENCE NOTE: 8. CONFIRM ALL SLAB ELEVATIONS, STEPS, SLOPES, AND OPENINGS WITH
ARCHITECTURAL DRAWINGS.
1. SEE DRAWING S1.11 FOR INTEGRITY STEEL SCHEDULE.
9. FOR BUILTUP STRUCTURES SHOWN ON PLAN REFER TO DETAILS 2/S1.06
& 3/S1.06

10. FOR ALL DRAINAGE AND WATER PROOFING REQUIREMENTS REFER TO THE
ARCHITECT.

MVE + PARTNERS, INC. ALL RIGHTS RESERVED, © COPYRIGHT 2018.


BAR PLACING ORDER 11. SEE ARCHITECTURAL DRAWINGS FOR SIZE AND LOCATION OF ALL
U.N.O. ON PLAN ARCHITECTURAL CURBS, UPSTANDS AND ARCHITECTURAL FEATURES.

12. REFER TO ARCHITECTURAL DRAWINGS FOR EXACT LOCATION OF MASONRY


TOP UPPER LAYER

1/8" = 1'-0"
WALLS. ALL MASONRY WALLS TO BE 8” MINIMUM THICKNESS. REFER TO
CONCRETE MASONRY BLOCK GENERAL NOTES FOR REINFORCING. REFER
TO DETAIL 8/S1.06 FOR FURTHER REQUIREMENTS.
TOP LOWER LAYER
13. CONFIRM ALL MECHANICAL AND ELECTRICAL OPENINGS AND SLEEVES WITH

08/03/2020 - ISSUED FOR 100% DD PROGRESS SET


CONSULTANTS DRAWINGS. CONFIRM ALL OPENINGS AND ELEMENTS NOT
BOT. UPPER LAYER SHOWN ON THE STRUCTURAL DRAWINGS WITH BMZ STRUCTURAL
ENGINEERS PRIOR TO CONSTRUCTION.

BOT. LOWER LAYER 14. REFER TO MECHANICAL DRAWINGS FOR LOCATIONS OF IN-SLAB DUCTS.
REFER TO DETAIL 5/S1.04 FOR CLEARANCE REQUIREMENTS TO DUCTS AND
PARKING COLUMN SCHEDULE EXTRA REINFORCING REQUIRED AT IN-SLAB DUCTS.

SHEET TITLE
CONCRETE 15. FOR SHEARWALL REINFORCING DETAILS AND ELEVATIONS SEE DRAWING
MARK SIZE REINFORCING TIE ARRANGEMENT
STRENGTH SERIES S3.00 UNLESS NOTED OTHERWISE ON PLAN.

Scale
CONCRETE COLUMN REFERENCE NOTE: 16. FOR COLUMN REINFORCING AND DETAILS SEE DRAWING SERIES S4.00
7 ksi PC1 16" x 48" 8#6 VERT'S. UNLESS NOTED OTHERWISE ON PLAN.
1. COLUMN WITH SYMBOL PC9 DENOTES PARKADE #4 @ 4" TIES
CONCRETE COLUMN. 17. FOR BASEMENT WALL ELEVATIONS AND OTHER WALLS SEE DRAWING SHEET NUMBER
TYPE VARIES SERIES S5.00 UNLESS NOTED OTHERWISE ON PLAN.
SEE PLAN. INSIDE CIRCLE 7 ksi PC2 14" x 48" 8#6 VERT'S.

2. COLUMN WITH SYMBOL 50 DENOTES TOWER


#4 @ 4" TIES
18. PROVIDE SHORING AND RESHORING PROCEDURES TO ENSURE
CONSTRUCTION LOADS DO NOT EXCEED THE SPECIFIED DESIGN LIVE LOAD.
S2.02.1
CONCRETE COLUMN. TYPE VARIES
REFER TO THE FORMWORK AND RESHORING SECTION OF THE GENERAL
NOTES FOR FURTHER REQUIREMENTS.
INSIDE CIRCLE
3. SEE DRAWINGS S4.01, S4.02 AND S4.03 FOR ALL THE NOTE: FOR ALL COLUMNS THAT START ON THIS FLOOR, PROVIDE HOOKED DOWELS 19. MINIMUM UNOBSTRUCTED HEADROOM CLEARANCE OF 7’-0” IS REQUIRED IN PROJECT NUMBER
TOWER CONCRETE COLUMNS, U.N.O. TO MATCH VERTICAL REINFORCEMENT. HOOK INTO BOT. OF SLAB, SLAB BAND ALL FLOOR AREAS ACCESSIBLE TO VEHICLE TRAFFIC (8’-2” WHEN ACCESS
FOR DISABLED IS REQUIRED). CLEARANCE IS TO BE PROVIDED ABOVE THE
30925-01
OR FTG.
FINISHED FLOOR TO ANY STRUCTURAL ELEMENTS, CEILINGS, PIPES, OR
SIMILAR OBSTRUCTIONS. REFER TO THE ARCHITECT AND OTHER
CONSULTANTS DRAWINGS FOR COMPONENTS NOT PART OF THE BASE
BUILDING STRUCTURE.

20. REFER TO GENERAL NOTES FOR FURTHER REQUIREMENTS.

21. THE TWO-WAY FLAT SLAB SHOWN ON THIS PLAN IS CONSIDERED PART OF
THE PRIMARY STRUCTURAL FRAME AND HAS BEEN REINFORCED FOR 3hr BRYSON MARKULIN ZICKMANTEL
FIRE RESISTANCE RATING IN ACCORDANCE WITH CBC 2016 CHAPTER 721. STRUCTURAL ENGINEERS

22. FOR EMBED PLATES, SEE DET. 5 / S1.11 #501 - 510 BURRARD STREET, VANCOUVER, B.C. V6C 3A8
(604) 685-9533 WWW.BMZSE.COM CONTACT@BMZSE.COM

23. FOR SLAB BAND REINF. SCHEDULE INCLUDING STIRRUPS, SEE DET. 7 / S1.11
7
6
5
4
3
2
1

13'-0" 25'-6" 28'-0" 28'-0" 25'-6" 28'-6"


1
S6.01

4
S5.01

WALL
WALL

ELEVATION
ELEVATION

14"
A

14"
S5.01
21'-10"

RAMP UP TO LEVEL 1 RAMP DN.


TO LEVEL P2
B

16
16"

" x
72
"
14"
14"

24 24 24
" x " x " x
30 30 30
" " "

STEP
30'-6"

VARIES

24"

12"
24"

24"
24"
C

P
16
12"

" 16 16 ILA
x " x
" x ST
72
12" " 72 48 ER
" "

20"
26"
HSS 6x4x.375

22"
21'-4"

12"
DN.
UP

16
PI " x
LA 12"
ST 48
ER "
D

16
DN.

24"

24"

" 16
24"

x " x
96 72
" "

10"

12"
29'-11"

16
PI " x
LA
ST 48
ER "
E

24
"x
30
11 24 " x
4" " x 42
48 "
" 24"
24"
19'-11"

OPEN

SYMBOL "
3
UP

DN.

".
S5.01
F

14"
14"

WALL
ELEVATION
LINE
WALL

2
S5.01

PROPERTY
ELEVATION

COLLECTOR REINF. REFERENCE NOTE:


1. SEE DET. 26 / S1.05 FOR ALL REINFORCING WITH THE

TRUE NORTH
NORTH
PROJECT

(604) 685-9533

SHEET TITLE PROJECT NAME STAMP


A

Project Number
NO.

30925-01
LEVEL P1 - DIAPHRAGM REINFORCING
ISSUES:

Date APRIL 10TH, 2020


DATE

1233 South Grand PROGRESS


30925-01

PLAN Drawn By
WWW.BMZSE.COM

SA THESE DRAWINGS ARE NOT TO BE USED FOR


SET

Checked By TENDER, CONTRACT, OR CONSTRUCTION


S2.02.2

JD
SHEET NUMBER

Scale 2020-09-04 5:17:36 PM


PROJECT NUMBER

STRUCTURAL ENGINEERS

1/8" = 1'-0"
THIS DOCUMENT CONTAINS INFORMATION PROPRIETARY TO MVE + PARTNERS, INC. AND IS FURNISHED IN CONFIDENCE FOR
#501 - 510 BURRARD STREET, VANCOUVER, B.C. V6C 3A8

THE LIMITED PURPOSE OF EVALUATION, BIDDING OR REVIEW. THIS DOCUMENT OR ITS CONTENTS MAY NOT BE USED FOR ANY
OTHER PURPOSE AND MAY NOT BE REPRODUCED OR DISCLOSED TO OTHERS WITHOUT THE PRIOR WRITTEN CONSENT OF
ADDRESS, AVE, SUITE
DESCRIPTION

MVE + PARTNERS, INC. ALL RIGHTS RESERVED, © COPYRIGHT 2018. CITY, STATE, ZIP
BRYSON MARKULIN ZICKMANTEL
2020-08-03 100% DD PROGRESS

CONTACT@BMZSE.COM

08/03/2020 - ISSUED FOR 100% DD PROGRESS SET


A B B.2 C D E F
PROJECT
NORTH

TRUE NORTH

STAMP
A B C D E F A B C D E F
ISSUES:
NO. DATE DESCRIPTION
A 2020-04-23 ISSUED AS 100% SD
B 2020-06-16 50% DD PROGRESS
21'-10" 30'-6" 21'-4" 29'-11" 19'-11" 21'-10" 30'-6" 21'-4" 29'-11" 19'-11" SET
C 2020-08-03 100% DD PROGRESS
SET
1 WALL 1
+239.87' +240.42'
S5.01 ELEVATION S5.01
17' - 4" 4' - 8" 20' - 0" 6' - 8" 4' - 8" 24' - 10" 1' - 8" 12' - 0" 1' - 6" 4' - 4" 2' - 4" 13' - 4" 2' - 4" 4' - 10"
WALL
ELEVATION
1 11

4' - 0" 8"2' - 6"


2 2

RAMP DN. TO

RAMP DN. TO
S5.01 S5.01

7' - 10"

7' - 10"
RAMP UP TO

RAMP UP TO
PC1 PC1 PC1

10' - 10"
"

"

"

"
LEVEL P1

LEVEL P1
16

16
48

48

48

48
4' - 8"
LEVEL 2

LEVEL 2
DN. 5' - 8" DWP DN.

"

" 13' - 2"


x

x
x

x
8' - 0"
"

"

"

"
DN

48

48
TRANSFORMER

16

16

16

16
"

"
20' - 0" 9' - 4" 16' - 8" 123
619 SF

21' - 2"
4' - 2" 1' - 6" 19' - 6"

SWITCH
16' - 8" 6' - 8" 21' - 0" 16' - 0"
28'-6"

28'-6"
16" 16" 122

29' - 2"

29' - 10"
241'-0"
14" 14" 446 SF
4"

17.58%
STEP 240'-8"
GENERATOR
121
480 SF

"
"

"

"

72
72

72

72
236'-3"

x
x

"
"

"

"

16
16

16

16

"
42
3

"
42
2

8' - 0"
x
x

"
30
"
4

30
2 22

STEP
2

1' - 4"
+245.17'

4"
236'-0"
ATS
119
127 SF

12' - 0"
8" CMU 14" 8" CMU 14"
INFILL WALL INFILL WALL
MAIN ELEC.

THESE DRAWINGS ARE NOT TO BE USED FOR


241'-0" 125

TENDER, CONTRACT, OR CONSTRUCTION


ST ST 496 SF
VA EP VA EP

"
25'-6"

25'-6"

48
"

RIE RIE
48

S S

x
18 18
x

"
14
"M "M
"
14

IN IN 12" SLAB
. .
PC2

2020-09-04 5:17:38 PM
PROGRESS
6' - 11 1/4" 21' - 0 3/4"

24"

24"
8" CMU 8" CMU
INFILL WALL INFILL WALL
3 33 3

6' - 0"

28' - 11 3/8"

28' - 11 3/8"
22"

22"
"

"
30

30
x

x
3.3 3.3
"

"
24

24
DN. 8" CMU DN. 8" CMU
INFILL WALL INFILL WALL
24" 24" 5 24" 24"

UP 241'-0" UP
28'-0"

28'-0"

20' - 8"
HSS 6x4x.375

ALL HEADER BEAMS TO BE 30" DP.


INCLUDING SLAB DEPTH ON ALL PC2
20"

20"
LEVELS

"

"
48

48
x

x
14" 14"

"

"
"

"
14

14
56

56
8" CMU 8" CMU

x
INFILL WALL INFILL WALL

"

"
14" 14"

24

24
8
4 44
24" 24" 24" 24"
"

"
30

30
x

x
"

"
24

24
7
4.5 PC2 4.5

"

"
48

48
28'-0"

28'-0"
x

x
"

"
14

14
"

"
30

30
24" 24"

30925-01
Date APRIL 10TH, 2020
24" 24"

JD
ML
x

x
8" CMU 8" CMU
"

"
24

24
14" INFILL WALL 14" INFILL WALL
9
4.7
26"

26"
24"

24"
5 55

Project Number

Checked By
8" CMU 8" CMU

"

Drawn By
48
INFILL WALL INFILL WALL
"
48

" x
x

14
"
14

PC2

14" 14"
25'-6"

25'-6"
8" CMU 8" CMU
INFILL WALL INFILL WALL
2.6.2
4"

4"
11

11
3.6.2
4"

4"
10"

10"
"
UP UP
"

"

72
"x

"x
11

11
72

72
"
72

24

24
x
"x

"x
x

"
x
"

"

16
16

16
16

16
"

1233 South Grand


16

STEP
11 12 13
14

60"
14" 14"

6 66
21'-0"

21'-0"
236'-0"
power assist

STEP
60"

60"
12" 12" STEP closer
13'-0"

13'-0"
12"
12"
STEP

STEP
240'-4" 8"
12" SLAB
8"

8"
STEP
4 4
S5.01 S5.01
7 77 WALL
PROPERTY ELEVATION PROPERTY
LINE LINE
SLAB NOTES:
3 1. SEE PLAN FOR SLAB THICKNESS 3 WALL
S5.01 S5.01 ELEVATION
CLEAR COVER TO REINFORCING:
1” CLEAR COVER TOP – TO UPPER MOST TOP REINF.
1” CLEAR COVER BOTTOM – TO LOWERMOST BOTTOM REINF.

ADDRESS, AVE, SUITE


ALL INTERIOR SPANS TO BE CONSIDERED "RESTRAINED" ALL END SPANS
PERPENDICULAR TO BASEMENT WALLS TO BE CONSIDERED
"UNRESTRAINED" (INCREASE BOTTOM COVER TO 1 1/4").

CITY, STATE, ZIP


PROJECT NAME
2. DROP BARS FOR CHAIRING PURPOSES ARE TO BE CONSIDERED
ACCESSORIES SUPPLIED BY THE CONTRACTOR. REFER TO BAR PLACING
ORDER FOR FURTHER REQUIREMENTS.
LEVEL 1 PLAN - REINFORCING LEVEL 1 3. PROVIDE TEMPERATURE REBAR EACH DIRECTION BOTTOM MINIMUM IN ALL
SLABS UNLESS NOTED OTHERWISE ON PLAN OR IN DETAILS. REFER TO
REINFORCING STEEL SECTION OF THE GENERAL NOTES. PROVIDE
STAGGERED SPLICES AS REQUIRED.

4. PROVIDE CAMBER TO SLABS AS SHOWN ON PLAN AND AS NOTED IN THE

THE LIMITED PURPOSE OF EVALUATION, BIDDING OR REVIEW. THIS DOCUMENT OR ITS CONTENTS MAY NOT BE USED FOR ANY
THIS DOCUMENT CONTAINS INFORMATION PROPRIETARY TO MVE + PARTNERS, INC. AND IS FURNISHED IN CONFIDENCE FOR
CONCRETE SLAB SECTION OF THE GENERAL NOTES.

OTHER PURPOSE AND MAY NOT BE REPRODUCED OR DISCLOSED TO OTHERS WITHOUT THE PRIOR WRITTEN CONSENT OF
5. ALL SLABS TO BE MONITORED DURING CONSTRUCTION FOR FLATNESS AND

LEVEL 01 PLAN - CONCRETE OUTLINE


LEVELNESS AS NOTE IN THE SLAB SURVEY CONTROL SECTION OF THE
GENERAL NOTES. SUBMIT SURVEY DATA TO BMZ STRUCTURAL ENGINEERS
FOR REVIEW.

6. ALL MAT REINFORCING INDICATED ON PLANS ARE TOP REINF. REFER TO


DETAIL 11/S1.04 FOR FURTHER DETAILS.

LEVEL 01 PLAN - REINFORCING


7. FOR STUDRAIL REINFORCING REFER TO STUD RAIL SCHEDULE ON PLAN.

8. CONFIRM ALL SLAB ELEVATIONS, STEPS, SLOPES, AND OPENINGS WITH


ARCHITECTURAL DRAWINGS.

9. FOR BUILTUP STRUCTURES SHOWN ON PLAN REFER TO DETAILS 2/S1.06


& 3/S1.06

10. FOR ALL DRAINAGE AND WATER PROOFING REQUIREMENTS REFER TO THE
ARCHITECT.

MVE + PARTNERS, INC. ALL RIGHTS RESERVED, © COPYRIGHT 2018.


11. SEE ARCHITECTURAL DRAWINGS FOR SIZE AND LOCATION OF ALL
ARCHITECTURAL CURBS, UPSTANDS AND ARCHITECTURAL FEATURES.

12. REFER TO ARCHITECTURAL DRAWINGS FOR EXACT LOCATION OF MASONRY

1/8" = 1'-0"
WALLS. ALL MASONRY WALLS TO BE 8” MINIMUM THICKNESS. REFER TO
CONCRETE MASONRY BLOCK GENERAL NOTES FOR REINFORCING. REFER
TO DETAIL 8/S1.06 FOR FURTHER REQUIREMENTS.

13. CONFIRM ALL MECHANICAL AND ELECTRICAL OPENINGS AND SLEEVES WITH

08/03/2020 - ISSUED FOR 100% DD PROGRESS SET


CONSULTANTS DRAWINGS. CONFIRM ALL OPENINGS AND ELEMENTS NOT
SHOWN ON THE STRUCTURAL DRAWINGS WITH BMZ STRUCTURAL
ENGINEERS PRIOR TO CONSTRUCTION.

14. REFER TO MECHANICAL DRAWINGS FOR LOCATIONS OF IN-SLAB DUCTS.


REFER TO DETAIL 5/S1.04 FOR CLEARANCE REQUIREMENTS TO DUCTS AND
PARKING COLUMN SCHEDULE EXTRA REINFORCING REQUIRED AT IN-SLAB DUCTS.

SHEET TITLE
CONCRETE 15. FOR SHEARWALL REINFORCING DETAILS AND ELEVATIONS SEE DRAWING
MARK SIZE REINFORCING TIE ARRANGEMENT
STRENGTH SERIES S3.00 UNLESS NOTED OTHERWISE ON PLAN.

Scale
16. FOR COLUMN REINFORCING AND DETAILS SEE DRAWING SERIES S4.00
CONCRETE COLUMN REFERENCE NOTE: 7 ksi PC1 16" x 48" 8#6 VERT'S. UNLESS NOTED OTHERWISE ON PLAN.
#4 @ 4" TIES
1. COLUMN WITH SYMBOL PC9 DENOTES PARKADE 17. FOR BASEMENT WALL ELEVATIONS AND OTHER WALLS SEE DRAWING SHEET NUMBER
CONCRETE COLUMN. 7 ksi PC2 14" x 48" 8#6 VERT'S. SERIES S5.00 UNLESS NOTED OTHERWISE ON PLAN.
TYPE VARIES
SEE PLAN. INSIDE CIRCLE #4 @ 4" TIES
18. PROVIDE SHORING AND RESHORING PROCEDURES TO ENSURE
CONSTRUCTION LOADS DO NOT EXCEED THE SPECIFIED DESIGN LIVE LOAD.
S2.03.1
2. COLUMN WITH SYMBOL 50 DENOTES TOWER REFER TO THE FORMWORK AND RESHORING SECTION OF THE GENERAL
CONCRETE COLUMN. NOTES FOR FURTHER REQUIREMENTS.
TYPE VARIES
INSIDE CIRCLE 19. MINIMUM UNOBSTRUCTED HEADROOM CLEARANCE OF 7’-0” IS REQUIRED IN PROJECT NUMBER
NOTE: FOR ALL COLUMNS THAT START ON THIS FLOOR, PROVIDE HOOKED DOWELS
3. SEE DRAWINGS S4.01, S4.02 AND S4.03 FOR ALL THE TO MATCH VERTICAL REINFORCEMENT. HOOK INTO BOT. OF SLAB, SLAB BAND ALL FLOOR AREAS ACCESSIBLE TO VEHICLE TRAFFIC (8’-2” WHEN ACCESS
30925-01
TOWER CONCRETE COLUMNS, U.N.O. OR FTG. FOR DISABLED IS REQUIRED). CLEARANCE IS TO BE PROVIDED ABOVE THE
FINISHED FLOOR TO ANY STRUCTURAL ELEMENTS, CEILINGS, PIPES, OR
SIMILAR OBSTRUCTIONS. REFER TO THE ARCHITECT AND OTHER
CONSULTANTS DRAWINGS FOR COMPONENTS NOT PART OF THE BASE
BUILDING STRUCTURE.

20. REFER TO GENERAL NOTES FOR FURTHER REQUIREMENTS.

21. THE TWO-WAY FLAT SLAB SHOWN ON THIS PLAN IS CONSIDERED PART OF
THE PRIMARY STRUCTURAL FRAME AND HAS BEEN REINFORCED FOR 3hr BRYSON MARKULIN ZICKMANTEL
FIRE RESISTANCE RATING IN ACCORDANCE WITH CBC 2016 CHAPTER 721. STRUCTURAL ENGINEERS

22. FOR EMBED PLATES, SEE DET. 5 / S1.11 #501 - 510 BURRARD STREET, VANCOUVER, B.C. V6C 3A8
(604) 685-9533 WWW.BMZSE.COM CONTACT@BMZSE.COM

23. FOR SLAB BAND REINF. SCHEDULE INCLUDING STIRRUPS, SEE DET. 7 / S1.11
7
6
5
4
3
2
1

13'-0" 25'-6" 28'-0" 28'-0" 25'-6" 28'-6"


4
S5.01

WALL
WALL

ELEVATION

21'-0"
14"
ELEVATION

14"
A

14"
S5.01

14 14
" " x
x 48
48
" "

RAMP UP TO
21'-10"

LEVEL 2
B

16
"
16"

x
72
"
14"

24 24 24
" " " x
x x 30
30 30
" " "
RAMP DN. TO
LEVEL P1
18
30'-6"

"M
IN
.

12"
24"

24"
24"
C

16 16
"
16
x " x x "
72 72
"
48
" "

20"
UP

26"
HSS 6x4x.375

12"

22"
21'-4"

UP
DN.

16
" x
48
"
D

16 16
"
24"

24"
24"

"x x
11 72
4" "
4"
STEP
29'-11"

4"
STEP 16
" x
48
"
E

24
"x
11 30
24 " x
4" " x 42
10" 56 "
24" " 24"
19'-11"

SYMBOL "

14 14
" x " x
3
DN.

48 48
" "
".
S5.01
F

14"
14"
14"

WALL
ELEVATION
LINE
WALL

2
S5.01

PROPERTY
ELEVATION

COLLECTOR REINF. REFERENCE NOTE:


1. SEE DET. 26 / S1.05 FOR ALL REINFORCING WITH THE

TRUE NORTH
NORTH
PROJECT

(604) 685-9533

SHEET TITLE PROJECT NAME STAMP


A

Project Number
NO.

30925-01
LEVEL 01 PLAN - DIAPHRAGM
ISSUES:

Date APRIL 10TH, 2020


DATE

1233 South Grand PROGRESS


30925-01

REINFORCING Drawn By
WWW.BMZSE.COM

SA THESE DRAWINGS ARE NOT TO BE USED FOR


SET

Checked By TENDER, CONTRACT, OR CONSTRUCTION


S2.03.2

JD
SHEET NUMBER

Scale 2020-09-04 5:17:40 PM


PROJECT NUMBER

STRUCTURAL ENGINEERS

1/8" = 1'-0"
THIS DOCUMENT CONTAINS INFORMATION PROPRIETARY TO MVE + PARTNERS, INC. AND IS FURNISHED IN CONFIDENCE FOR
#501 - 510 BURRARD STREET, VANCOUVER, B.C. V6C 3A8

THE LIMITED PURPOSE OF EVALUATION, BIDDING OR REVIEW. THIS DOCUMENT OR ITS CONTENTS MAY NOT BE USED FOR ANY
OTHER PURPOSE AND MAY NOT BE REPRODUCED OR DISCLOSED TO OTHERS WITHOUT THE PRIOR WRITTEN CONSENT OF
ADDRESS, AVE, SUITE
DESCRIPTION

MVE + PARTNERS, INC. ALL RIGHTS RESERVED, © COPYRIGHT 2018. CITY, STATE, ZIP
BRYSON MARKULIN ZICKMANTEL
2020-08-03 100% DD PROGRESS

CONTACT@BMZSE.COM

08/03/2020 - ISSUED FOR 100% DD PROGRESS SET


PROJECT
NORTH

TRUE NORTH

STAMP
A B C D E F A B C D E F
ISSUES:
NO. DATE DESCRIPTION
A 2020-08-03 100% DD PROGRESS
SET

1 1
S5.01 S5.01

1 2
1 2
S5.01 S5.01

RAMP UP

RAMP UP
PC1

"

"

"
PC1 PC1

48

48

48
x

x
"

"

"
16

16

16
16" 16"

14" 14"

"
72

"
72
x

x
"
16

"
14" 14"

16

"
42
x
2 3

"
30
2 2
4

8" CMU 8" CMU


INFILL WALL INFILL WALL

THESE DRAWINGS ARE NOT TO BE USED FOR


TENDER, CONTRACT, OR CONSTRUCTION
"
48
" x
14

2020-09-04 5:17:42 PM
PC2

PROGRESS
24"

24"
8" CMU 8" CMU
INFILL WALL INFILL WALL
3 3

22"
"
30
" x
24
8" CMU 8" CMU
INFILL WALL 5 INFILL WALL

24"
24"

"
48
"x
14
14" 14"

20"
PC2

"
56
x
8" CMU 8" CMU

"
24
INFILL WALL 24" 8 INFILL WALL

4 4
24"

"
48
"
30

x
x

"
14
"
24
14" 14"
7
PC2
14"

"
30

30925-01
Date APRIL 10TH, 2020

Author
Checker
x
8" CMU 24" 8" CMU

"
24
INFILL WALL INFILL WALL
9

26"
24"

24"
5 5

Project Number

Checked By
"
8" CMU 8" CMU

48

Drawn By
INFILL WALL INFILL WALL

" x
14
PC2
14" 14"

8" CMU 8" CMU


INFILL WALL INFILL WALL

4"
4"

11
"

"
UP UP

72

72

11

"x
x

"x

24
"

"
16

16

16

1233 South Grand


11 12 13 14

6 6

12" 12"

12" 12"

4 4
S5.01 S5.01
7 7
SLAB NOTES:
3 1. SEE PLAN FOR SLAB THICKNESS 3
S5.01 S5.01
CLEAR COVER TO REINFORCING:
1” CLEAR COVER TOP – TO UPPER MOST TOP REINF.
1” CLEAR COVER BOTTOM – TO LOWERMOST BOTTOM REINF.

ADDRESS, AVE, SUITE


ALL INTERIOR SPANS TO BE CONSIDERED "RESTRAINED" ALL END SPANS
PERPENDICULAR TO BASEMENT WALLS TO BE CONSIDERED
Level 1.5 - REINFORCING Level 1.5 "UNRESTRAINED" (INCREASE BOTTOM COVER TO 1 1/4").

CITY, STATE, ZIP


PROJECT NAME
2. DROP BARS FOR CHAIRING PURPOSES ARE TO BE CONSIDERED
ACCESSORIES SUPPLIED BY THE CONTRACTOR. REFER TO BAR PLACING
ORDER FOR FURTHER REQUIREMENTS.

3. PROVIDE TEMPERATURE REBAR EACH DIRECTION BOTTOM MINIMUM IN ALL


SLABS UNLESS NOTED OTHERWISE ON PLAN OR IN DETAILS. REFER TO
REINFORCING STEEL SECTION OF THE GENERAL NOTES. PROVIDE
STAGGERED SPLICES AS REQUIRED.

4. PROVIDE CAMBER TO SLABS AS SHOWN ON PLAN AND AS NOTED IN THE

THE LIMITED PURPOSE OF EVALUATION, BIDDING OR REVIEW. THIS DOCUMENT OR ITS CONTENTS MAY NOT BE USED FOR ANY
THIS DOCUMENT CONTAINS INFORMATION PROPRIETARY TO MVE + PARTNERS, INC. AND IS FURNISHED IN CONFIDENCE FOR
CONCRETE SLAB SECTION OF THE GENERAL NOTES.

OTHER PURPOSE AND MAY NOT BE REPRODUCED OR DISCLOSED TO OTHERS WITHOUT THE PRIOR WRITTEN CONSENT OF
5. ALL SLABS TO BE MONITORED DURING CONSTRUCTION FOR FLATNESS AND

LEVEL 1.5 PLAN - CONCRETE OUTLINE


LEVELNESS AS NOTE IN THE SLAB SURVEY CONTROL SECTION OF THE
GENERAL NOTES. SUBMIT SURVEY DATA TO BMZ STRUCTURAL ENGINEERS
FOR REVIEW.

6. ALL MAT REINFORCING INDICATED ON PLANS ARE TOP REINF. REFER TO


DETAIL 11/S1.04 FOR FURTHER DETAILS.

LEVEL 1.5 PLAN - REINFORCING


7. FOR STUDRAIL REINFORCING REFER TO STUD RAIL SCHEDULE ON PLAN.

8. CONFIRM ALL SLAB ELEVATIONS, STEPS, SLOPES, AND OPENINGS WITH


ARCHITECTURAL DRAWINGS.

9. FOR BUILTUP STRUCTURES SHOWN ON PLAN REFER TO DETAILS 2/S1.06


& 3/S1.06

10. FOR ALL DRAINAGE AND WATER PROOFING REQUIREMENTS REFER TO THE
ARCHITECT.

MVE + PARTNERS, INC. ALL RIGHTS RESERVED, © COPYRIGHT 2018.


11. SEE ARCHITECTURAL DRAWINGS FOR SIZE AND LOCATION OF ALL
ARCHITECTURAL CURBS, UPSTANDS AND ARCHITECTURAL FEATURES.

12. REFER TO ARCHITECTURAL DRAWINGS FOR EXACT LOCATION OF MASONRY

1/8" = 1'-0"
WALLS. ALL MASONRY WALLS TO BE 8” MINIMUM THICKNESS. REFER TO
CONCRETE MASONRY BLOCK GENERAL NOTES FOR REINFORCING. REFER
TO DETAIL 8/S1.06 FOR FURTHER REQUIREMENTS.

13. CONFIRM ALL MECHANICAL AND ELECTRICAL OPENINGS AND SLEEVES WITH

08/03/2020 - ISSUED FOR 100% DD PROGRESS SET


CONSULTANTS DRAWINGS. CONFIRM ALL OPENINGS AND ELEMENTS NOT
SHOWN ON THE STRUCTURAL DRAWINGS WITH BMZ STRUCTURAL
ENGINEERS PRIOR TO CONSTRUCTION.

14. REFER TO MECHANICAL DRAWINGS FOR LOCATIONS OF IN-SLAB DUCTS.


REFER TO DETAIL 5/S1.04 FOR CLEARANCE REQUIREMENTS TO DUCTS AND
PARKING COLUMN SCHEDULE EXTRA REINFORCING REQUIRED AT IN-SLAB DUCTS.

SHEET TITLE
CONCRETE 15. FOR SHEARWALL REINFORCING DETAILS AND ELEVATIONS SEE DRAWING
MARK SIZE REINFORCING TIE ARRANGEMENT
STRENGTH SERIES S3.00 UNLESS NOTED OTHERWISE ON PLAN.

Scale
16. FOR COLUMN REINFORCING AND DETAILS SEE DRAWING SERIES S4.00
CONCRETE COLUMN REFERENCE NOTE: 7 ksi PC1 16" x 48" 8#6 VERT'S. UNLESS NOTED OTHERWISE ON PLAN.
#4 @ 4" TIES
1. COLUMN WITH SYMBOL PC9 DENOTES PARKADE 17. FOR BASEMENT WALL ELEVATIONS AND OTHER WALLS SEE DRAWING SHEET NUMBER
CONCRETE COLUMN. 7 ksi PC2 14" x 48" 8#6 VERT'S. SERIES S5.00 UNLESS NOTED OTHERWISE ON PLAN.
TYPE VARIES
SEE PLAN. INSIDE CIRCLE #4 @ 4" TIES
18. PROVIDE SHORING AND RESHORING PROCEDURES TO ENSURE
CONSTRUCTION LOADS DO NOT EXCEED THE SPECIFIED DESIGN LIVE LOAD.
S2.04.1
2. COLUMN WITH SYMBOL 50 DENOTES TOWER REFER TO THE FORMWORK AND RESHORING SECTION OF THE GENERAL
CONCRETE COLUMN. NOTES FOR FURTHER REQUIREMENTS.
TYPE VARIES
INSIDE CIRCLE 19. MINIMUM UNOBSTRUCTED HEADROOM CLEARANCE OF 7’-0” IS REQUIRED IN PROJECT NUMBER
NOTE: FOR ALL COLUMNS THAT START ON THIS FLOOR, PROVIDE HOOKED DOWELS
3. SEE DRAWINGS S4.01, S4.02 AND S4.03 FOR ALL THE TO MATCH VERTICAL REINFORCEMENT. HOOK INTO BOT. OF SLAB, SLAB BAND ALL FLOOR AREAS ACCESSIBLE TO VEHICLE TRAFFIC (8’-2” WHEN ACCESS
30925-01
TOWER CONCRETE COLUMNS, U.N.O. OR FTG. FOR DISABLED IS REQUIRED). CLEARANCE IS TO BE PROVIDED ABOVE THE
FINISHED FLOOR TO ANY STRUCTURAL ELEMENTS, CEILINGS, PIPES, OR
SIMILAR OBSTRUCTIONS. REFER TO THE ARCHITECT AND OTHER
CONSULTANTS DRAWINGS FOR COMPONENTS NOT PART OF THE BASE
BUILDING STRUCTURE.

20. REFER TO GENERAL NOTES FOR FURTHER REQUIREMENTS.

21. THE TWO-WAY FLAT SLAB SHOWN ON THIS PLAN IS CONSIDERED PART OF
THE PRIMARY STRUCTURAL FRAME AND HAS BEEN REINFORCED FOR 3hr BRYSON MARKULIN ZICKMANTEL
FIRE RESISTANCE RATING IN ACCORDANCE WITH CBC 2016 CHAPTER 721. STRUCTURAL ENGINEERS

22. FOR EMBED PLATES, SEE DET. 5 / S1.11 #501 - 510 BURRARD STREET, VANCOUVER, B.C. V6C 3A8
(604) 685-9533 WWW.BMZSE.COM CONTACT@BMZSE.COM

23. FOR SLAB BAND REINF. SCHEDULE INCLUDING STIRRUPS, SEE DET. 7 / S1.11
A B B.2 C D E F
PROJECT
NORTH

TRUE NORTH

STAMP
A B C D E F A B C D E F
ISSUES:
NO. DATE DESCRIPTION
A 2020-04-23 ISSUED AS 100% SD
B 2020-06-16 50% DD PROGRESS
21'-10" 30'-6" 21'-4" 29'-11" 19'-11" 21'-10" 30'-6" 21'-4" 29'-11" 19'-11" SET
C 2020-08-03 100% DD PROGRESS
SET
1 WALL 1
S5.01 ELEVATION S5.01

WALL
ELEVATION
1 2
11 2
1
S5.01 S5.01
PC1 PC1 PC1 PC1

"

"

"

"
48

48

48

48
"

"
"

"
48

48
48

48
x

x
x

x
"

"

"

"
x

x
16

16

16

16
"

"
"

"
16

16
16

16
28'-6"

28'-6"
14" 14"

14" 14"

"

"
"

"

"

"
72

72
72

72

72

72
x

"
x

42
"
"

"
42
"

"

"

"
16

16
16

16

16

16

x
2 3

x
1

"
30
"
4

30
2 22 2

UP UP

8" CMU 8" CMU 10" 9' - 2" 9' - 2" 258'-4"
INFILL WALL INFILL WALL

THESE DRAWINGS ARE NOT TO BE USED FOR


257'-4"

TENDER, CONTRACT, OR CONSTRUCTION


25'-6"

25'-6"
259'-0 5/16"
"

"
48

48
x

x
259'-4" 10" SLAB
"

"
14

14
PC2

2020-09-04 5:17:45 PM
PROGRESS
257'-10 11/16"

24"

24"
8" CMU 8" CMU
INFILL WALL INFILL WALL
3 33 3

22"

22"
"

"
30

30
x

x
3.3 3.3
"

"
24

24
RAMP UP TO

RAMP UP TO
8" CMU 8" CMU
DN. INFILL WALL 5 UP DN. INFILL WALL
LEVEL 3

LEVEL 3
9.90%
24" 24"
24" 24"
UP DN UP
28'-0"

28'-0"
14" 14"

"

"
48

48
x

x
"

"
14

14
HSS ALL HEADER BEAMS TO BE 30" DP.
6x4x.375 PC2
INCLUDING SLAB DEPTH ON ALL

18.47%
LEVELS
24"

24"
"

"
56

56
VARIES
20"

20"
8" CMU 8" CMU

STEP
x

x
INFILL WALL INFILL WALL

"

"
24

24
8
4 44

"

"
"

"
48

48
30

30

3' - 4" 3' - 4"


x

x
x

x
"

"
"

"
14

14
24

24

CL
7
4.5 PC2 4.5
RAMP DN. TO LEVEL 1

RAMP DN. TO LEVEL 1


257'-4"
14" 14"
28'-0"

28'-0"
257'-4"
24" 24" 24" 24"
"

"
30

30

30925-01
Date APRIL 10TH, 2020

JD
ML
x

x
8" CMU 8" CMU
"

"
24

24
INFILL WALL INFILL WALL
9
4.7
26"

26"
+257.33'

24"

24"
5 55

Project Number

Checked By
8" CMU 8" CMU

Drawn By
INFILL WALL INFILL WALL
"

"
48

48
x

x
"

"
14

14
PC2
14" 10" SLAB 14"
25'-6"

25'-6"

UPSTAND BEAM

UPSTAND BEAM

UPSTAND BEAM
8" CMU 8" CMU
INFILL WALL INFILL WALL

12" x 36"

12" x 36"

12" x 36"
4"

4"
4"

4"
"

"

"

"
11

11
72

72

72

72
11

11
"x

"x
x

x
"x

"x
"

"

"

"
24

24
16

16

16

16
16

16

1233 South Grand


12
14
11 13
OPEN OPEN
6 66
DN.

DN.
UP
21'-0"

21'-0"
UP

UP
14" 14"
OPEN OPEN

EXHAUST HERE
13'-0"

13'-0"
SOMEWHERE
12" 12"
12"
12"

4 4 HSS8x6x0.375
S5.01 S5.01
7 77 WALL
PROPERTY ELEVATION PROPERTY
LINE LINE
SLAB NOTES:
3 1. SEE PLAN FOR SLAB THICKNESS 3 WALL
S5.01 S5.01 ELEVATION
CLEAR COVER TO REINFORCING:
1” CLEAR COVER TOP – TO UPPER MOST TOP REINF.
LEVEL 2 PLAN - REINFORCING LEVEL 2 1” CLEAR COVER BOTTOM – TO LOWERMOST BOTTOM REINF.

ADDRESS, AVE, SUITE


ALL INTERIOR SPANS TO BE CONSIDERED "RESTRAINED" ALL END SPANS
PERPENDICULAR TO BASEMENT WALLS TO BE CONSIDERED
"UNRESTRAINED" (INCREASE BOTTOM COVER TO 1 1/4").

CITY, STATE, ZIP


PROJECT NAME
2. DROP BARS FOR CHAIRING PURPOSES ARE TO BE CONSIDERED
ACCESSORIES SUPPLIED BY THE CONTRACTOR. REFER TO BAR PLACING
ORDER FOR FURTHER REQUIREMENTS.

3. PROVIDE TEMPERATURE REBAR EACH DIRECTION BOTTOM MINIMUM IN ALL


SLABS UNLESS NOTED OTHERWISE ON PLAN OR IN DETAILS. REFER TO
REINFORCING STEEL SECTION OF THE GENERAL NOTES. PROVIDE
STAGGERED SPLICES AS REQUIRED.

4. PROVIDE CAMBER TO SLABS AS SHOWN ON PLAN AND AS NOTED IN THE

THE LIMITED PURPOSE OF EVALUATION, BIDDING OR REVIEW. THIS DOCUMENT OR ITS CONTENTS MAY NOT BE USED FOR ANY
THIS DOCUMENT CONTAINS INFORMATION PROPRIETARY TO MVE + PARTNERS, INC. AND IS FURNISHED IN CONFIDENCE FOR
CONCRETE SLAB SECTION OF THE GENERAL NOTES.

OTHER PURPOSE AND MAY NOT BE REPRODUCED OR DISCLOSED TO OTHERS WITHOUT THE PRIOR WRITTEN CONSENT OF
5. ALL SLABS TO BE MONITORED DURING CONSTRUCTION FOR FLATNESS AND

LEVEL 02 PLAN - CONCRETE OUTLINE


LEVELNESS AS NOTE IN THE SLAB SURVEY CONTROL SECTION OF THE
GENERAL NOTES. SUBMIT SURVEY DATA TO BMZ STRUCTURAL ENGINEERS
FOR REVIEW.

6. ALL MAT REINFORCING INDICATED ON PLANS ARE TOP REINF. REFER TO


DETAIL 11/S1.04 FOR FURTHER DETAILS.

LEVEL 02 PLAN - REINFORCING


7. FOR STUDRAIL REINFORCING REFER TO STUD RAIL SCHEDULE ON PLAN.

8. CONFIRM ALL SLAB ELEVATIONS, STEPS, SLOPES, AND OPENINGS WITH


ARCHITECTURAL DRAWINGS.

9. FOR BUILTUP STRUCTURES SHOWN ON PLAN REFER TO DETAILS 2/S1.06


& 3/S1.06

10. FOR ALL DRAINAGE AND WATER PROOFING REQUIREMENTS REFER TO THE
ARCHITECT.

MVE + PARTNERS, INC. ALL RIGHTS RESERVED, © COPYRIGHT 2018.


11. SEE ARCHITECTURAL DRAWINGS FOR SIZE AND LOCATION OF ALL
ARCHITECTURAL CURBS, UPSTANDS AND ARCHITECTURAL FEATURES.

12. REFER TO ARCHITECTURAL DRAWINGS FOR EXACT LOCATION OF MASONRY

1/8" = 1'-0"
WALLS. ALL MASONRY WALLS TO BE 8” MINIMUM THICKNESS. REFER TO
CONCRETE MASONRY BLOCK GENERAL NOTES FOR REINFORCING. REFER
TO DETAIL 8/S1.06 FOR FURTHER REQUIREMENTS.

13. CONFIRM ALL MECHANICAL AND ELECTRICAL OPENINGS AND SLEEVES WITH

08/03/2020 - ISSUED FOR 100% DD PROGRESS SET


CONSULTANTS DRAWINGS. CONFIRM ALL OPENINGS AND ELEMENTS NOT
SHOWN ON THE STRUCTURAL DRAWINGS WITH BMZ STRUCTURAL
ENGINEERS PRIOR TO CONSTRUCTION.

14. REFER TO MECHANICAL DRAWINGS FOR LOCATIONS OF IN-SLAB DUCTS.


REFER TO DETAIL 5/S1.04 FOR CLEARANCE REQUIREMENTS TO DUCTS AND
PARKING COLUMN SCHEDULE EXTRA REINFORCING REQUIRED AT IN-SLAB DUCTS.

SHEET TITLE
CONCRETE COLUMN REFERENCE NOTE: CONCRETE
MARK SIZE REINFORCING TIE ARRANGEMENT
15. FOR SHEARWALL REINFORCING DETAILS AND ELEVATIONS SEE DRAWING
STRENGTH SERIES S3.00 UNLESS NOTED OTHERWISE ON PLAN.

Scale
1. COLUMN WITH SYMBOL PC9 DENOTES PARKADE 16. FOR COLUMN REINFORCING AND DETAILS SEE DRAWING SERIES S4.00
CONCRETE COLUMN. 7 ksi PC1 16" x 48" 8#6 VERT'S. UNLESS NOTED OTHERWISE ON PLAN.
TYPE VARIES #4 @ 4" TIES
SEE PLAN. INSIDE CIRCLE
17. FOR BASEMENT WALL ELEVATIONS AND OTHER WALLS SEE DRAWING SHEET NUMBER
SERIES S5.00 UNLESS NOTED OTHERWISE ON PLAN.
2. COLUMN WITH SYMBOL 50 DENOTES TOWER 7 ksi PC2 14" x 48" 8#6 VERT'S.
CONCRETE COLUMN. TYPE VARIES
INSIDE CIRCLE
#4 @ 4" TIES
18. PROVIDE SHORING AND RESHORING PROCEDURES TO ENSURE
CONSTRUCTION LOADS DO NOT EXCEED THE SPECIFIED DESIGN LIVE LOAD.
S2.05.1
REFER TO THE FORMWORK AND RESHORING SECTION OF THE GENERAL
3. SEE DRAWINGS S4.01, S4.02 AND S4.03 FOR ALL THE NOTES FOR FURTHER REQUIREMENTS.
TOWER CONCRETE COLUMNS, U.N.O.
NOTE: FOR ALL COLUMNS THAT START ON THIS FLOOR, PROVIDE HOOKED DOWELS 19. MINIMUM UNOBSTRUCTED HEADROOM CLEARANCE OF 7’-0” IS REQUIRED IN PROJECT NUMBER
TO MATCH VERTICAL REINFORCEMENT. HOOK INTO BOT. OF SLAB, SLAB BAND ALL FLOOR AREAS ACCESSIBLE TO VEHICLE TRAFFIC (8’-2” WHEN ACCESS
FOR DISABLED IS REQUIRED). CLEARANCE IS TO BE PROVIDED ABOVE THE
30925-01
OR FTG.
FINISHED FLOOR TO ANY STRUCTURAL ELEMENTS, CEILINGS, PIPES, OR
SIMILAR OBSTRUCTIONS. REFER TO THE ARCHITECT AND OTHER
CONSULTANTS DRAWINGS FOR COMPONENTS NOT PART OF THE BASE
BUILDING STRUCTURE.

20. REFER TO GENERAL NOTES FOR FURTHER REQUIREMENTS.

21. THE TWO-WAY FLAT SLAB SHOWN ON THIS PLAN IS CONSIDERED PART OF
THE PRIMARY STRUCTURAL FRAME AND HAS BEEN REINFORCED FOR 3hr BRYSON MARKULIN ZICKMANTEL
FIRE RESISTANCE RATING IN ACCORDANCE WITH CBC 2016 CHAPTER 721. STRUCTURAL ENGINEERS

22. FOR EMBED PLATES, SEE DET. 5 / S1.11 #501 - 510 BURRARD STREET, VANCOUVER, B.C. V6C 3A8
(604) 685-9533 WWW.BMZSE.COM CONTACT@BMZSE.COM

23. FOR SLAB BAND REINF. SCHEDULE INCLUDING STIRRUPS, SEE DET. 7 / S1.11
7
6
5
4
3
2
1

13'-0" 25'-6" 28'-0" 28'-0" 25'-6" 28'-6"


4
S5.01

WALL
WALL

ELEVATION

21'-0"
ELEVATION

14"
A

14 14
14"
S5.01

" x " x
48 48
" "
21'-10"

RAMP DN. TO LEVEL 1 RAMP UP TO


LEVEL 3

16
" x
48
"
B

16 16
" x " x
72 72
" "
OPEN
14"
14"

24 24 24
" x " x " x
30 30 30
" " "
30'-6"

24"

16
" x
12"

48
24"

"
C

16
DN.
" x
16
72 " x
24"

" 72
"
UP 20"

22"
21'-4"

12"

26"
UP
DN.

16
"
24"

x
48
"
UP
D

16
16
24"

"x
11 " x
4" 72
"
29'-11"

OPEN

16
" x
48
"
E

24
"x 30
11
24
" " x
4" x 42
56
" "
24" 24"
19'-11"

SYMBOL "
3

".
S5.01
F

14"

14 14
14"

" x " x
WALL

48 48
" "
ELEVATION
LINE
WALL

2
S5.01

PROPERTY
ELEVATION

COLLECTOR REINF. REFERENCE NOTE:


1. SEE DET. 26 / S1.05 FOR ALL REINFORCING WITH THE

TRUE NORTH
NORTH
PROJECT

(604) 685-9533

SHEET TITLE PROJECT NAME STAMP


A

Project Number
NO.

30925-01
LEVEL 02 - DIAPHRAGM REINFORCING
ISSUES:

Date APRIL 10TH, 2020


DATE

1233 South Grand PROGRESS


30925-01

PLAN Drawn By
WWW.BMZSE.COM

SA THESE DRAWINGS ARE NOT TO BE USED FOR


SET

Checked By TENDER, CONTRACT, OR CONSTRUCTION


S2.05.2

JD
SHEET NUMBER

Scale 2020-09-04 5:17:47 PM


PROJECT NUMBER

STRUCTURAL ENGINEERS

1/8" = 1'-0"
THIS DOCUMENT CONTAINS INFORMATION PROPRIETARY TO MVE + PARTNERS, INC. AND IS FURNISHED IN CONFIDENCE FOR
#501 - 510 BURRARD STREET, VANCOUVER, B.C. V6C 3A8

THE LIMITED PURPOSE OF EVALUATION, BIDDING OR REVIEW. THIS DOCUMENT OR ITS CONTENTS MAY NOT BE USED FOR ANY
OTHER PURPOSE AND MAY NOT BE REPRODUCED OR DISCLOSED TO OTHERS WITHOUT THE PRIOR WRITTEN CONSENT OF
ADDRESS, AVE, SUITE
DESCRIPTION

MVE + PARTNERS, INC. ALL RIGHTS RESERVED, © COPYRIGHT 2018. CITY, STATE, ZIP
BRYSON MARKULIN ZICKMANTEL
2020-08-03 100% DD PROGRESS

CONTACT@BMZSE.COM

08/03/2020 - ISSUED FOR 100% DD PROGRESS SET


A B B.2 C D E F
PROJECT
NORTH

TRUE NORTH

STAMP
A B C D E F A B C D E F
ISSUES:
NO. DATE DESCRIPTION
A 2020-04-23 ISSUED AS 100% SD
B 2020-06-16 50% DD PROGRESS
21'-10" 30'-6" 21'-4" 29'-11" 19'-11" 21'-10" 30'-6" 21'-4" 29'-11" 19'-11" SET
C 2020-08-03 100% DD PROGRESS
SET
1 WALL 1
S5.01 ELEVATION S5.01

"
48

"
"

"

"

"

"

"
48
48

48

48

48

48

48
x
WALL

x
x

x
"
16

"
ELEVATION

"

"

"

"

"

"
16
16

16

16

16

16

16
1 2
11 2
S5.01 S5.01
PC1 PC1 PC1 PC1

14" 14"
28'-6"

28'-6"

"
72
"

"

"

"
72

72

72

72
x
"

"
72

x
16
"

"
42

42
"

"

"

"
16

16

16

16
x
1

"
2 3

x
16

"

"
30

30
2 22 4

UP UP
14" 14"
8" CMU 8" CMU
INFILL WALL INFILL WALL 10" SLAB

THESE DRAWINGS ARE NOT TO BE USED FOR


TENDER, CONTRACT, OR CONSTRUCTION
25'-6"

25'-6"

"
48
"
48

" x
x

14
"
14

PC2

2020-09-04 5:17:50 PM
PROGRESS
24"

24"
8" CMU 8" CMU
INFILL WALL INFILL WALL
3 33

22"

22"
"

"
30

30
x

x
RAMP UP TO

RAMP UP TO
3.3
"

"
24

24
8" CMU 8" CMU
5 UP
LEVEL 4

LEVEL 4
DN. INFILL WALL DN. INFILL WALL

24" 24" 24" 24"


UP UP
28'-0"

28'-0"
14" 14"

"

"
48

48
x

x
"

"
14

14
HSS ALL HEADER BEAMS TO BE 30" DP.
6x4x.375 PC2
INCLUDING SLAB DEPTH ON ALL
20"

20"
LEVELS
24"

24"
14" 14"

"

"
56

56
VARIES
8" CMU 8" CMU

STEP
x

x
INFILL WALL INFILL WALL

"

"
24

24
46' - 8"
8
4 44

"

"
"

"
48

48
30

30
x

x
x

x
"

"
"

"
14

14
24

24
7 PC2
4.5
RAMP DN. TO LEVEL 2

RAMP DN. TO LEVEL 2


28'-0"

28'-0"
14" 14"
"

"
30

24"

30
24"
24" 24"

30925-01
Date APRIL 10TH, 2020

JD
ML
x

x
8" CMU 8" CMU
"

"
24

24
INFILL WALL INFILL WALL
9
4.7
26"

26"
5 55

Project Number

Checked By
24"

24"
8" CMU 8" CMU

Drawn By
"
INFILL WALL INFILL WALL

48
"
48

x
x

"
14
"
14

PC2
14" 14"
10" SLAB
25'-6"

25'-6"
8" CMU 8" CMU
INFILL WALL INFILL WALL
4"

4"
4"

4"

4"

4"
11

11
11

11

11

11
"x

"x
"x

"x

"x

"x
16

16
16

16

16

16

1233 South Grand


11 12 13
14" 14" 14

6 DN. UP 66

DN.

UP
DN UP
21'-0"

21'-0"
32

32
GARAGE EXHAUST
13'-0"

13'-0"
"

"
12"
x

x
OPEN OPEN
88

88
12" 12" 12"
"

"
4 4 HSS8x6x0.375
S5.01 S5.01
7 77 WALL
ELEVATION

SLAB NOTES:
3 1. SEE PLAN FOR SLAB THICKNESS 3 WALL
S5.01 S5.01 ELEVATION
CLEAR COVER TO REINFORCING:
1” CLEAR COVER TOP – TO UPPER MOST TOP REINF.
LEVEL 3 PLAN - REINFORCING LEVEL 3 1” CLEAR COVER BOTTOM – TO LOWERMOST BOTTOM REINF.

ADDRESS, AVE, SUITE


ALL INTERIOR SPANS TO BE CONSIDERED "RESTRAINED" ALL END SPANS
PERPENDICULAR TO BASEMENT WALLS TO BE CONSIDERED
"UNRESTRAINED" (INCREASE BOTTOM COVER TO 1 1/4").

CITY, STATE, ZIP


PROJECT NAME
2. DROP BARS FOR CHAIRING PURPOSES ARE TO BE CONSIDERED
ACCESSORIES SUPPLIED BY THE CONTRACTOR. REFER TO BAR PLACING
ORDER FOR FURTHER REQUIREMENTS.

3. PROVIDE TEMPERATURE REBAR EACH DIRECTION BOTTOM MINIMUM IN ALL


SLABS UNLESS NOTED OTHERWISE ON PLAN OR IN DETAILS. REFER TO
REINFORCING STEEL SECTION OF THE GENERAL NOTES. PROVIDE
STAGGERED SPLICES AS REQUIRED.

4. PROVIDE CAMBER TO SLABS AS SHOWN ON PLAN AND AS NOTED IN THE

THE LIMITED PURPOSE OF EVALUATION, BIDDING OR REVIEW. THIS DOCUMENT OR ITS CONTENTS MAY NOT BE USED FOR ANY
THIS DOCUMENT CONTAINS INFORMATION PROPRIETARY TO MVE + PARTNERS, INC. AND IS FURNISHED IN CONFIDENCE FOR
CONCRETE SLAB SECTION OF THE GENERAL NOTES.

OTHER PURPOSE AND MAY NOT BE REPRODUCED OR DISCLOSED TO OTHERS WITHOUT THE PRIOR WRITTEN CONSENT OF
5. ALL SLABS TO BE MONITORED DURING CONSTRUCTION FOR FLATNESS AND

LEVEL 03 PLAN - CONCRETE OUTLINE


LEVELNESS AS NOTE IN THE SLAB SURVEY CONTROL SECTION OF THE
GENERAL NOTES. SUBMIT SURVEY DATA TO BMZ STRUCTURAL ENGINEERS
FOR REVIEW.

6. ALL MAT REINFORCING INDICATED ON PLANS ARE TOP REINF. REFER TO


DETAIL 11/S1.04 FOR FURTHER DETAILS.

LEVEL 03 PLAN - REINFORCING


7. FOR STUDRAIL REINFORCING REFER TO STUD RAIL SCHEDULE ON PLAN.

8. CONFIRM ALL SLAB ELEVATIONS, STEPS, SLOPES, AND OPENINGS WITH


ARCHITECTURAL DRAWINGS.

9. FOR BUILTUP STRUCTURES SHOWN ON PLAN REFER TO DETAILS 2/S1.06


& 3/S1.06

10. FOR ALL DRAINAGE AND WATER PROOFING REQUIREMENTS REFER TO THE
ARCHITECT.

MVE + PARTNERS, INC. ALL RIGHTS RESERVED, © COPYRIGHT 2018.


11. SEE ARCHITECTURAL DRAWINGS FOR SIZE AND LOCATION OF ALL
ARCHITECTURAL CURBS, UPSTANDS AND ARCHITECTURAL FEATURES.

12. REFER TO ARCHITECTURAL DRAWINGS FOR EXACT LOCATION OF MASONRY

1/8" = 1'-0"
WALLS. ALL MASONRY WALLS TO BE 8” MINIMUM THICKNESS. REFER TO
CONCRETE MASONRY BLOCK GENERAL NOTES FOR REINFORCING. REFER
TO DETAIL 8/S1.06 FOR FURTHER REQUIREMENTS.

13. CONFIRM ALL MECHANICAL AND ELECTRICAL OPENINGS AND SLEEVES WITH

08/03/2020 - ISSUED FOR 100% DD PROGRESS SET


CONSULTANTS DRAWINGS. CONFIRM ALL OPENINGS AND ELEMENTS NOT
SHOWN ON THE STRUCTURAL DRAWINGS WITH BMZ STRUCTURAL
ENGINEERS PRIOR TO CONSTRUCTION.

14. REFER TO MECHANICAL DRAWINGS FOR LOCATIONS OF IN-SLAB DUCTS.


REFER TO DETAIL 5/S1.04 FOR CLEARANCE REQUIREMENTS TO DUCTS AND
PARKING COLUMN SCHEDULE EXTRA REINFORCING REQUIRED AT IN-SLAB DUCTS.

SHEET TITLE
CONCRETE 15. FOR SHEARWALL REINFORCING DETAILS AND ELEVATIONS SEE DRAWING
MARK SIZE REINFORCING TIE ARRANGEMENT
STRENGTH SERIES S3.00 UNLESS NOTED OTHERWISE ON PLAN.

Scale
16. FOR COLUMN REINFORCING AND DETAILS SEE DRAWING SERIES S4.00
7 ksi PC1 16" x 48" 8#6 VERT'S. UNLESS NOTED OTHERWISE ON PLAN.
#4 @ 4" TIES
CONCRETE COLUMN REFERENCE NOTE: 17. FOR BASEMENT WALL ELEVATIONS AND OTHER WALLS SEE DRAWING SHEET NUMBER
7 ksi PC2 14" x 48" 8#6 VERT'S. SERIES S5.00 UNLESS NOTED OTHERWISE ON PLAN.
1. COLUMN WITH SYMBOL PC9 DENOTES PARKADE
CONCRETE COLUMN.
SEE PLAN.
TYPE VARIES
INSIDE CIRCLE
#4 @ 4" TIES
18. PROVIDE SHORING AND RESHORING PROCEDURES TO ENSURE
CONSTRUCTION LOADS DO NOT EXCEED THE SPECIFIED DESIGN LIVE LOAD.
S2.06.1
REFER TO THE FORMWORK AND RESHORING SECTION OF THE GENERAL
NOTES FOR FURTHER REQUIREMENTS.
2. COLUMN WITH SYMBOL 50 DENOTES TOWER
CONCRETE COLUMN. TYPE VARIES NOTE: FOR ALL COLUMNS THAT START ON THIS FLOOR, PROVIDE HOOKED DOWELS 19. MINIMUM UNOBSTRUCTED HEADROOM CLEARANCE OF 7’-0” IS REQUIRED IN PROJECT NUMBER
INSIDE CIRCLE TO MATCH VERTICAL REINFORCEMENT. HOOK INTO BOT. OF SLAB, SLAB BAND ALL FLOOR AREAS ACCESSIBLE TO VEHICLE TRAFFIC (8’-2” WHEN ACCESS
FOR DISABLED IS REQUIRED). CLEARANCE IS TO BE PROVIDED ABOVE THE
30925-01
OR FTG.
3. SEE DRAWINGS S4.01, S4.02 AND S4.03 FOR ALL THE FINISHED FLOOR TO ANY STRUCTURAL ELEMENTS, CEILINGS, PIPES, OR
TOWER CONCRETE COLUMNS, U.N.O. SIMILAR OBSTRUCTIONS. REFER TO THE ARCHITECT AND OTHER
CONSULTANTS DRAWINGS FOR COMPONENTS NOT PART OF THE BASE
BUILDING STRUCTURE.

20. REFER TO GENERAL NOTES FOR FURTHER REQUIREMENTS.

21. THE TWO-WAY FLAT SLAB SHOWN ON THIS PLAN IS CONSIDERED PART OF
THE PRIMARY STRUCTURAL FRAME AND HAS BEEN REINFORCED FOR 3hr BRYSON MARKULIN ZICKMANTEL
FIRE RESISTANCE RATING IN ACCORDANCE WITH CBC 2016 CHAPTER 721. STRUCTURAL ENGINEERS

22. FOR EMBED PLATES, SEE DET. 5 / S1.11 #501 - 510 BURRARD STREET, VANCOUVER, B.C. V6C 3A8
(604) 685-9533 WWW.BMZSE.COM CONTACT@BMZSE.COM

23. FOR SLAB BAND REINF. SCHEDULE INCLUDING STIRRUPS, SEE DET. 7 / S1.11
7
6
5
4
3
2
1

13'-0" 25'-6" 28'-0" 28'-0" 25'-6" 28'-6"


4
S5.01

WALL
WALL

21'-0"
ELEVATION
ELEVATION

14"
14"

14"
A

1
S5.01

14 14
" x " x
48 48
" "
21'-10"

RAMP DN. TO LEVEL 2 RAMP UP TO


LEVEL 4
B

16 16 16
"x " " x
x 48
11 72
14"

"
14"

4" "

24 24 24
" x " x " x
30 30 30
" " "
30'-6"

24"
12"
24"

24"
C

16 16
16 " x
DN.
"x
" x 48
11
4" 72 "
"

UP 20"
22"
21'-4"

26"
12"
DN.

UP

24"
UP
D

16 16
16 "
24"

"x " x
11 x 48
4" 72 "
"
OPEN
29'-11"
E

16
32 " x
" 48
x 24 30
" "
88
" " x x
56 42
" "
24" 24"
19'-11"

SYMBOL "
3

".
S5.01
F

14 14
14"
14"

" x " x
WALL

48 48
" "
ELEVATION
WALL

2
S5.01
ELEVATION

COLLECTOR REINF. REFERENCE NOTE:


1. SEE DET. 26 / S1.05 FOR ALL REINFORCING WITH THE

TRUE NORTH
NORTH
PROJECT

(604) 685-9533

SHEET TITLE PROJECT NAME STAMP


A

Project Number
NO.

30925-01
LEVEL 03 - DIAPHRAGM REINFORCING
ISSUES:

Date APRIL 10TH, 2020


DATE

1233 South Grand PROGRESS


30925-01

PLAN Drawn By
WWW.BMZSE.COM

SA THESE DRAWINGS ARE NOT TO BE USED FOR


SET

Checked By TENDER, CONTRACT, OR CONSTRUCTION


S2.06.2

JD
SHEET NUMBER

Scale 2020-09-04 5:17:52 PM


PROJECT NUMBER

STRUCTURAL ENGINEERS

1/8" = 1'-0"
THIS DOCUMENT CONTAINS INFORMATION PROPRIETARY TO MVE + PARTNERS, INC. AND IS FURNISHED IN CONFIDENCE FOR
#501 - 510 BURRARD STREET, VANCOUVER, B.C. V6C 3A8

THE LIMITED PURPOSE OF EVALUATION, BIDDING OR REVIEW. THIS DOCUMENT OR ITS CONTENTS MAY NOT BE USED FOR ANY
OTHER PURPOSE AND MAY NOT BE REPRODUCED OR DISCLOSED TO OTHERS WITHOUT THE PRIOR WRITTEN CONSENT OF
ADDRESS, AVE, SUITE
DESCRIPTION

MVE + PARTNERS, INC. ALL RIGHTS RESERVED, © COPYRIGHT 2018. CITY, STATE, ZIP
BRYSON MARKULIN ZICKMANTEL
2020-08-03 100% DD PROGRESS

CONTACT@BMZSE.COM

08/03/2020 - ISSUED FOR 100% DD PROGRESS SET


A B B.2 C D E F
PROJECT
NORTH

TRUE NORTH

STAMP
A B C D E F A B C D E F
ISSUES:
NO. DATE DESCRIPTION
A 2020-04-23 ISSUED AS 100% SD
B 2020-06-16 50% DD PROGRESS
21'-10" 30'-6" 21'-4" 29'-11" 19'-11" 21'-10" 30'-6" 21'-4" 29'-11" 19'-11" SET
C 2020-08-03 100% DD PROGRESS
SET
1 WALL 1
S5.01 ELEVATION S5.01

"

"

"

"

"

"

"

"
48

48

48

48

48

48

48

48
WALL

x
ELEVATION

"

"

"

"

"

"

"

"
16

16

16

16

16

16

16

16
1 2
11 2
S5.01 S5.01
PC1 PC1 PC1 PC1

14" 14"
28'-6"

28'-6"
14" 14"
10" SLAB

"

"
72

72
x

x
"

"
"

"
72

72
29

29
"

"
72

72
x

x
"

"
42

42
"

"
16

16
x

x
"

"
x

x
16

16
"

"
30

30
2 22
1 2 3 4

8" CMU 8" CMU


INFILL WALL UP INFILL WALL UP 275'-4"

THESE DRAWINGS ARE NOT TO BE USED FOR


TENDER, CONTRACT, OR CONSTRUCTION
25'-6"

25'-6"

"
48
"
48

277'-4"

x
x

"
277'-0 9/16"

14
"
14

276'-4"
PC2

2020-09-04 5:17:54 PM
PROGRESS
0"

24"

24"
8" CMU 8" CMU
INFILL WALL INFILL WALL 24' - 6" 0"
3 33

22"

22"
"

"
30

30
x

x
3.3
"

"
24

24
RAMP UP TO

RAMP UP TO
8" CMU 8" CMU
DN. INFILL WALL 5 UP DN. INFILL WALL
LEVEL 5

LEVEL 5
24" 24" 24" 24"

UP DN UP
28'-0"

28'-0"
14" 14"

"

"
48

48
x

x
"

"
14

14
HSS HSS ALL HEADER BEAMS TO BE 30" DP.
6x4x.375 6x4x.375 PC2
INCLUDING SLAB DEPTH ON ALL
LEVELS
24"

24"
"

"
56

56
20"

20"
VARIES
14" 8" CMU 14" 8" CMU

STEP
x

x
24" INFILL WALL 24" INFILL WALL

"

"
24

24
24" 24" 8
4 44

"

"
"

"
48

48
30

30

3' - 4" L3' - 4"


x

x
x

x
"

"
"

"
14

14
24

24

C
PC2
4.5 7
RAMP DN. TO LEVEL 3

RAMP DN. TO LEVEL 3


28'-0"

28'-0"
14" 14"
"

"
30

30
24" 24" 24" 24"

30925-01
Date APRIL 10TH, 2020

JD
ML
x

x
8" CMU 8" CMU
"

"
24

24
INFILL WALL INFILL WALL
9
4.7
26"

26"
5 55

Project Number

Checked By
24"

24"
8" CMU 8" CMU

Drawn By
"
INFILL WALL INFILL WALL

48
"
48

x
x

"
14
"
14

PC2
14" 10" SLAB 14"
25'-6"

25'-6"
8" CMU 8" CMU
INFILL WALL INFILL WALL

4"

4"
4"

4"
11

11
11

11
"x

"x
"x

"x
16

16
16

16

1233 South Grand


4"

4"

11 12 13
11

11
"x

"x
16

16

14" 14"

6 DN. UP 66 DN. UP
DN UP 14
21'-0"

21'-0"
12" 12"
32

32
13'-0"

13'-0"
"

"
x

x
OPEN OPEN
88

88
12" 12"
"

"
4 4 HSS8x6x0.375
S5.01 S5.01
7 77 WALL
ELEVATION

SLAB NOTES:
3 1. SEE PLAN FOR SLAB THICKNESS 3 WALL
S5.01 S5.01 ELEVATION
CLEAR COVER TO REINFORCING:
1” CLEAR COVER TOP – TO UPPER MOST TOP REINF.
LEVEL 4 PLAN - REINFORCING LEVEL 4 1” CLEAR COVER BOTTOM – TO LOWERMOST BOTTOM REINF.

ADDRESS, AVE, SUITE


ALL INTERIOR SPANS TO BE CONSIDERED "RESTRAINED" ALL END SPANS
PERPENDICULAR TO BASEMENT WALLS TO BE CONSIDERED
"UNRESTRAINED" (INCREASE BOTTOM COVER TO 1 1/4").

CITY, STATE, ZIP


PROJECT NAME
2. DROP BARS FOR CHAIRING PURPOSES ARE TO BE CONSIDERED
ACCESSORIES SUPPLIED BY THE CONTRACTOR. REFER TO BAR PLACING
ORDER FOR FURTHER REQUIREMENTS.

3. PROVIDE TEMPERATURE REBAR EACH DIRECTION BOTTOM MINIMUM IN ALL


SLABS UNLESS NOTED OTHERWISE ON PLAN OR IN DETAILS. REFER TO
REINFORCING STEEL SECTION OF THE GENERAL NOTES. PROVIDE
STAGGERED SPLICES AS REQUIRED.

4. PROVIDE CAMBER TO SLABS AS SHOWN ON PLAN AND AS NOTED IN THE

THE LIMITED PURPOSE OF EVALUATION, BIDDING OR REVIEW. THIS DOCUMENT OR ITS CONTENTS MAY NOT BE USED FOR ANY
THIS DOCUMENT CONTAINS INFORMATION PROPRIETARY TO MVE + PARTNERS, INC. AND IS FURNISHED IN CONFIDENCE FOR
CONCRETE SLAB SECTION OF THE GENERAL NOTES.

OTHER PURPOSE AND MAY NOT BE REPRODUCED OR DISCLOSED TO OTHERS WITHOUT THE PRIOR WRITTEN CONSENT OF
5. ALL SLABS TO BE MONITORED DURING CONSTRUCTION FOR FLATNESS AND

LEVEL 04 PLAN - CONCRETE OUTLINE


LEVELNESS AS NOTE IN THE SLAB SURVEY CONTROL SECTION OF THE
GENERAL NOTES. SUBMIT SURVEY DATA TO BMZ STRUCTURAL ENGINEERS
FOR REVIEW.

6. ALL MAT REINFORCING INDICATED ON PLANS ARE TOP REINF. REFER TO


DETAIL 11/S1.04 FOR FURTHER DETAILS.

LEVEL 04 PLAN - REINFORCING


7. FOR STUDRAIL REINFORCING REFER TO STUD RAIL SCHEDULE ON PLAN.

8. CONFIRM ALL SLAB ELEVATIONS, STEPS, SLOPES, AND OPENINGS WITH


ARCHITECTURAL DRAWINGS.

9. FOR BUILTUP STRUCTURES SHOWN ON PLAN REFER TO DETAILS 2/S1.06


& 3/S1.06

10. FOR ALL DRAINAGE AND WATER PROOFING REQUIREMENTS REFER TO THE
ARCHITECT.

MVE + PARTNERS, INC. ALL RIGHTS RESERVED, © COPYRIGHT 2018.


11. SEE ARCHITECTURAL DRAWINGS FOR SIZE AND LOCATION OF ALL
ARCHITECTURAL CURBS, UPSTANDS AND ARCHITECTURAL FEATURES.

12. REFER TO ARCHITECTURAL DRAWINGS FOR EXACT LOCATION OF MASONRY

1/8" = 1'-0"
WALLS. ALL MASONRY WALLS TO BE 8” MINIMUM THICKNESS. REFER TO
CONCRETE MASONRY BLOCK GENERAL NOTES FOR REINFORCING. REFER
TO DETAIL 8/S1.06 FOR FURTHER REQUIREMENTS.

13. CONFIRM ALL MECHANICAL AND ELECTRICAL OPENINGS AND SLEEVES WITH

08/03/2020 - ISSUED FOR 100% DD PROGRESS SET


CONSULTANTS DRAWINGS. CONFIRM ALL OPENINGS AND ELEMENTS NOT
SHOWN ON THE STRUCTURAL DRAWINGS WITH BMZ STRUCTURAL
ENGINEERS PRIOR TO CONSTRUCTION.

14. REFER TO MECHANICAL DRAWINGS FOR LOCATIONS OF IN-SLAB DUCTS.


REFER TO DETAIL 5/S1.04 FOR CLEARANCE REQUIREMENTS TO DUCTS AND
PARKING COLUMN SCHEDULE EXTRA REINFORCING REQUIRED AT IN-SLAB DUCTS.

SHEET TITLE
CONCRETE 15. FOR SHEARWALL REINFORCING DETAILS AND ELEVATIONS SEE DRAWING
MARK SIZE REINFORCING TIE ARRANGEMENT
STRENGTH SERIES S3.00 UNLESS NOTED OTHERWISE ON PLAN.

Scale
CONCRETE COLUMN REFERENCE NOTE: 7 ksi PC1 16" x 48" 8#6 VERT'S.
16. FOR COLUMN REINFORCING AND DETAILS SEE DRAWING SERIES S4.00
UNLESS NOTED OTHERWISE ON PLAN.
#4 @ 4" TIES
1. COLUMN WITH SYMBOL PC9 DENOTES PARKADE 17. FOR BASEMENT WALL ELEVATIONS AND OTHER WALLS SEE DRAWING SHEET NUMBER
CONCRETE COLUMN. TYPE VARIES 7 ksi PC2 14" x 48" 8#6 VERT'S. SERIES S5.00 UNLESS NOTED OTHERWISE ON PLAN.
SEE PLAN. INSIDE CIRCLE #4 @ 4" TIES
18. PROVIDE SHORING AND RESHORING PROCEDURES TO ENSURE
CONSTRUCTION LOADS DO NOT EXCEED THE SPECIFIED DESIGN LIVE LOAD.
S2.07.1
2. COLUMN WITH SYMBOL 50 DENOTES TOWER REFER TO THE FORMWORK AND RESHORING SECTION OF THE GENERAL
CONCRETE COLUMN. TYPE VARIES NOTES FOR FURTHER REQUIREMENTS.
INSIDE CIRCLE
NOTE: FOR ALL COLUMNS THAT START ON THIS FLOOR, PROVIDE HOOKED DOWELS 19. MINIMUM UNOBSTRUCTED HEADROOM CLEARANCE OF 7’-0” IS REQUIRED IN PROJECT NUMBER
3. SEE DRAWINGS S4.01, S4.02 AND S4.03 FOR ALL THE TO MATCH VERTICAL REINFORCEMENT. HOOK INTO BOT. OF SLAB, SLAB BAND ALL FLOOR AREAS ACCESSIBLE TO VEHICLE TRAFFIC (8’-2” WHEN ACCESS
30925-01
TOWER CONCRETE COLUMNS, U.N.O. OR FTG. FOR DISABLED IS REQUIRED). CLEARANCE IS TO BE PROVIDED ABOVE THE
FINISHED FLOOR TO ANY STRUCTURAL ELEMENTS, CEILINGS, PIPES, OR
SIMILAR OBSTRUCTIONS. REFER TO THE ARCHITECT AND OTHER
CONSULTANTS DRAWINGS FOR COMPONENTS NOT PART OF THE BASE
BUILDING STRUCTURE.

20. REFER TO GENERAL NOTES FOR FURTHER REQUIREMENTS.

21. THE TWO-WAY FLAT SLAB SHOWN ON THIS PLAN IS CONSIDERED PART OF
THE PRIMARY STRUCTURAL FRAME AND HAS BEEN REINFORCED FOR 3hr BRYSON MARKULIN ZICKMANTEL
FIRE RESISTANCE RATING IN ACCORDANCE WITH CBC 2016 CHAPTER 721. STRUCTURAL ENGINEERS

22. FOR EMBED PLATES, SEE DET. 5 / S1.11 #501 - 510 BURRARD STREET, VANCOUVER, B.C. V6C 3A8
(604) 685-9533 WWW.BMZSE.COM CONTACT@BMZSE.COM

23. FOR SLAB BAND REINF. SCHEDULE INCLUDING STIRRUPS, SEE DET. 7 / S1.11
PROJECT
NORTH

TRUE NORTH

STAMP
A B C D E F
ISSUES:
NO. DATE DESCRIPTION
A 2020-08-03 100% DD PROGRESS
SET
21'-10" 30'-6" 21'-4" 29'-11" 19'-11"

WALL 1
ELEVATION S5.01

"

"

"

"
48

48

48

48
WALL

x
ELEVATION

"

"

"

"
16

16

16

16
1 2
S5.01

14"

28'-6"
14"

"
72
x

"
"

72
29
"
72

"
42
"
16
x"

x
16

"
30
2

UP

THESE DRAWINGS ARE NOT TO BE USED FOR


TENDER, CONTRACT, OR CONSTRUCTION
25'-6"

"
48
" x
14

2020-09-04 5:17:56 PM
PROGRESS
24"
3

22"
"
30
" x
24
RAMP UP TO
DN.

LEVEL 5
24" 24"

UP

28'-0"
14"

"
48
"x
14
24"

"
56
20"
14"

x
24"

"
24
24"
4

"
"

48
30

x
x

"
"

14
24
RAMP DN. TO LEVEL 3
28'-0"
14"

"
30
24" 24"

30925-01
Date APRIL 10TH, 2020

JD
ML
" x
24

26"
5

Project Number

Checked By
24"

Drawn By
"
48
" x
14
14"

25'-6"

4"

4"

4"
11

11

11
"x

"x

"x
16

16

16

1233 South Grand


14"

6 DN. UP

21'-0"
12"

32
13'-0"

" x
OPEN

88
12"

"
4
S5.01
7 WALL
ELEVATION
SLAB NOTES:
1. SEE PLAN FOR SLAB THICKNESS
3 WALL
CLEAR COVER TO REINFORCING: S5.01 ELEVATION
1” CLEAR COVER TOP – TO UPPER MOST TOP REINF.
1” CLEAR COVER BOTTOM – TO LOWERMOST BOTTOM REINF.

ALL INTERIOR SPANS TO BE CONSIDERED "RESTRAINED" ALL END SPANS

ADDRESS, AVE, SUITE


PERPENDICULAR TO BASEMENT WALLS TO BE CONSIDERED
"UNRESTRAINED" (INCREASE BOTTOM COVER TO 1 1/4").

CITY, STATE, ZIP


PROJECT NAME
2. DROP BARS FOR CHAIRING PURPOSES ARE TO BE CONSIDERED
ACCESSORIES SUPPLIED BY THE CONTRACTOR. REFER TO BAR PLACING
ORDER FOR FURTHER REQUIREMENTS.

3. PROVIDE TEMPERATURE REBAR EACH DIRECTION BOTTOM MINIMUM IN ALL


SLABS UNLESS NOTED OTHERWISE ON PLAN OR IN DETAILS. REFER TO
REINFORCING STEEL SECTION OF THE GENERAL NOTES. PROVIDE
STAGGERED SPLICES AS REQUIRED.

4. PROVIDE CAMBER TO SLABS AS SHOWN ON PLAN AND AS NOTED IN THE


CONCRETE SLAB SECTION OF THE GENERAL NOTES.

THE LIMITED PURPOSE OF EVALUATION, BIDDING OR REVIEW. THIS DOCUMENT OR ITS CONTENTS MAY NOT BE USED FOR ANY
THIS DOCUMENT CONTAINS INFORMATION PROPRIETARY TO MVE + PARTNERS, INC. AND IS FURNISHED IN CONFIDENCE FOR

OTHER PURPOSE AND MAY NOT BE REPRODUCED OR DISCLOSED TO OTHERS WITHOUT THE PRIOR WRITTEN CONSENT OF
5. ALL SLABS TO BE MONITORED DURING CONSTRUCTION FOR FLATNESS AND
LEVELNESS AS NOTE IN THE SLAB SURVEY CONTROL SECTION OF THE
GENERAL NOTES. SUBMIT SURVEY DATA TO BMZ STRUCTURAL ENGINEERS
FOR REVIEW.

6. ALL MAT REINFORCING INDICATED ON PLANS ARE TOP REINF. REFER TO


DETAIL 11/S1.04 FOR FURTHER DETAILS.

7. FOR STUDRAIL REINFORCING REFER TO STUD RAIL SCHEDULE ON PLAN.

8. CONFIRM ALL SLAB ELEVATIONS, STEPS, SLOPES, AND OPENINGS WITH

LEVEL 04 PLAN - DIAPHRAGM


ARCHITECTURAL DRAWINGS.

9. FOR BUILTUP STRUCTURES SHOWN ON PLAN REFER TO DETAILS 2/S1.06


& 3/S1.06

10. FOR ALL DRAINAGE AND WATER PROOFING REQUIREMENTS REFER TO THE
ARCHITECT.

MVE + PARTNERS, INC. ALL RIGHTS RESERVED, © COPYRIGHT 2018.


11. SEE ARCHITECTURAL DRAWINGS FOR SIZE AND LOCATION OF ALL
ARCHITECTURAL CURBS, UPSTANDS AND ARCHITECTURAL FEATURES.

12. REFER TO ARCHITECTURAL DRAWINGS FOR EXACT LOCATION OF MASONRY


WALLS. ALL MASONRY WALLS TO BE 8” MINIMUM THICKNESS. REFER TO

1/8" = 1'-0"
CONCRETE MASONRY BLOCK GENERAL NOTES FOR REINFORCING. REFER
TO DETAIL 8/S1.06 FOR FURTHER REQUIREMENTS.

REINFORCING
13. CONFIRM ALL MECHANICAL AND ELECTRICAL OPENINGS AND SLEEVES WITH
CONSULTANTS DRAWINGS. CONFIRM ALL OPENINGS AND ELEMENTS NOT

08/03/2020 - ISSUED FOR 100% DD PROGRESS SET


SHOWN ON THE STRUCTURAL DRAWINGS WITH BMZ STRUCTURAL
ENGINEERS PRIOR TO CONSTRUCTION.

14. REFER TO MECHANICAL DRAWINGS FOR LOCATIONS OF IN-SLAB DUCTS.


REFER TO DETAIL 5/S1.04 FOR CLEARANCE REQUIREMENTS TO DUCTS AND
EXTRA REINFORCING REQUIRED AT IN-SLAB DUCTS.

SHEET TITLE
15. FOR SHEARWALL REINFORCING DETAILS AND ELEVATIONS SEE DRAWING
SERIES S3.00 UNLESS NOTED OTHERWISE ON PLAN.

Scale
16. FOR COLUMN REINFORCING AND DETAILS SEE DRAWING SERIES S4.00
UNLESS NOTED OTHERWISE ON PLAN.

17. FOR BASEMENT WALL ELEVATIONS AND OTHER WALLS SEE DRAWING
SERIES S5.00 UNLESS NOTED OTHERWISE ON PLAN. SHEET NUMBER
18. PROVIDE SHORING AND RESHORING PROCEDURES TO ENSURE
CONSTRUCTION LOADS DO NOT EXCEED THE SPECIFIED DESIGN LIVE LOAD.
REFER TO THE FORMWORK AND RESHORING SECTION OF THE GENERAL
S2.07.2
NOTES FOR FURTHER REQUIREMENTS.

19. MINIMUM UNOBSTRUCTED HEADROOM CLEARANCE OF 7’-0” IS REQUIRED IN


ALL FLOOR AREAS ACCESSIBLE TO VEHICLE TRAFFIC (8’-2” WHEN ACCESS PROJECT NUMBER
FOR DISABLED IS REQUIRED). CLEARANCE IS TO BE PROVIDED ABOVE THE COLLECTOR REINF. REFERENCE NOTE: 30925-01
FINISHED FLOOR TO ANY STRUCTURAL ELEMENTS, CEILINGS, PIPES, OR
SIMILAR OBSTRUCTIONS. REFER TO THE ARCHITECT AND OTHER 1. SEE DET. 26 / S1.05 FOR ALL REINFORCING WITH THE
CONSULTANTS DRAWINGS FOR COMPONENTS NOT PART OF THE BASE SYMBOL " ".
BUILDING STRUCTURE.

20. REFER TO GENERAL NOTES FOR FURTHER REQUIREMENTS.

21. THE TWO-WAY FLAT SLAB SHOWN ON THIS PLAN IS CONSIDERED PART OF
THE PRIMARY STRUCTURAL FRAME AND HAS BEEN REINFORCED FOR 3hr
FIRE RESISTANCE RATING IN ACCORDANCE WITH CBC 2016 CHAPTER 721. BRYSON MARKULIN ZICKMANTEL
STRUCTURAL ENGINEERS
22. FOR EMBED PLATES, SEE DET. 5 / S1.11
#501 - 510 BURRARD STREET, VANCOUVER, B.C. V6C 3A8
(604) 685-9533 WWW.BMZSE.COM CONTACT@BMZSE.COM
23. FOR SLAB BAND REINF. SCHEDULE INCLUDING STIRRUPS, SEE DET. 7 / S1.11
A B B.2 C D E F
PROJECT
NORTH

TRUE NORTH

STAMP
A B C D E F A B C D E F
ISSUES:
NO. DATE DESCRIPTION
A 2020-04-23 ISSUED AS 100% SD
B 2020-06-16 50% DD PROGRESS
21'-10" 30'-6" 21'-4" 29'-11" 19'-11" 21'-10" 30'-6" 21'-4" 29'-11" 19'-11" SET
C 2020-08-03 100% DD PROGRESS
SET
1 WALL 1
S5.01 ELEVATION S5.01

"

"

"

"

"

"

"

"
48

48

48

48

48

48

48

48
WALL

x
"

"

"

"

"

"

"

"
ELEVATION

16

16

16

16

16

16

16

16
1 2
11 2
S5.01 S5.01
PC1 PC1 PC1 PC1

14" 14"
28'-6"

28'-6"
10" SLAB
14" 14"

"
72
"

"
72

72

x
"
x

x
72

"
"

16
"

"
72
29

29
x
"
72

"
x

16
"

"
3

42

42
"
16
x
2

"

x
1

16

"

"
30

30
2 22 4

UP UP

8" CMU 8" CMU


INFILL WALL INFILL WALL

THESE DRAWINGS ARE NOT TO BE USED FOR


TENDER, CONTRACT, OR CONSTRUCTION
25'-6"

25'-6"

"
48
"
48

x
x

"
14
"
14

PC2

2020-09-04 5:17:59 PM
PROGRESS
8" CMU 8" CMU
INFILL WALL INFILL WALL
3 33

24"

24"
"
48

"
22"

22"
48
x

x
"
24

"
24
8" CMU
3.3 5
8" CMU
DN. INFILL WALL DN. INFILL WALL
24" 24"

UP DN UP
28'-0"

28'-0"
"

"
UPSTAND

UPSTAND
48

48
12" x 36"

12" x 36"
x

x
14" 14"

"

"
14

14
HSS ALL HEADER BEAMS TO BE 30" DP.
6x4x.375 PC2
INCLUDING SLAB DEPTH ON ALL
14" 14"
LEVELS
24"

24"
DN

"

"
56

56
20"

20"
8" CMU 8" CMU

x
VARIES
INFILL WALL INFILL WALL

"

"
24

24
STEP
8
4 24"
24"
44 24"
24"

"

"
"

"
48

48
30

30

3' - 4" 3' - 4"


x

x
x

x
"

"
"

"
14

14
24

24

CL
7 PC2
4.5
RAMP DN. TO LEVEL 4

RAMP DN. TO LEVEL 4


28'-0"

28'-0"
"

"
30

30
24" 24"

30925-01
Date APRIL 10TH, 2020

JD
ML
24" 24"
x

x
8" CMU 8" CMU
"

"
24

24
INFILL WALL INFILL WALL
9
26"

26"
4.7

5 55

Project Number

Checked By
24"

24"
8" CMU 8" CMU

"

Drawn By
48
INFILL WALL INFILL WALL
"
48

" x
x

14
10" SLAB
"
14

PC2
14" 14"
25'-6"

25'-6"
8" CMU 8" CMU
INFILL WALL INFILL WALL

4"

4"

4"
11

11

11
"x

"x

"x
16

16

16

1233 South Grand


4"

4"

4"

11 12 13
11

11

11
"x

"x

"x
16

16

16

6 66
DN.

DN.
DN
UP

UP
14
21'-0"

21'-0"
UP
14" 14"
32

32
13'-0"

13'-0"
"

"
12"
x

x
88

88
12"
"

"
12"
12"
4 4 HSS8x6x0.375
S5.01 S5.01
7 77 WALL
ELEVATION

SLAB NOTES:
3 1. SEE PLAN FOR SLAB THICKNESS 3 WALL
S5.01 S5.01 ELEVATION
CLEAR COVER TO REINFORCING:
1” CLEAR COVER TOP – TO UPPER MOST TOP REINF.
1” CLEAR COVER BOTTOM – TO LOWERMOST BOTTOM REINF.

ADDRESS, AVE, SUITE


ALL INTERIOR SPANS TO BE CONSIDERED "RESTRAINED" ALL END SPANS
PERPENDICULAR TO BASEMENT WALLS TO BE CONSIDERED
"UNRESTRAINED" (INCREASE BOTTOM COVER TO 1 1/4").

CITY, STATE, ZIP


PROJECT NAME
LEVEL 5 PLAN - REINFORCING LEVEL 5 2. DROP BARS FOR CHAIRING PURPOSES ARE TO BE CONSIDERED
ACCESSORIES SUPPLIED BY THE CONTRACTOR. REFER TO BAR PLACING
ORDER FOR FURTHER REQUIREMENTS.

3. PROVIDE TEMPERATURE REBAR EACH DIRECTION BOTTOM MINIMUM IN ALL


SLABS UNLESS NOTED OTHERWISE ON PLAN OR IN DETAILS. REFER TO
REINFORCING STEEL SECTION OF THE GENERAL NOTES. PROVIDE
STAGGERED SPLICES AS REQUIRED.

4. PROVIDE CAMBER TO SLABS AS SHOWN ON PLAN AND AS NOTED IN THE

THE LIMITED PURPOSE OF EVALUATION, BIDDING OR REVIEW. THIS DOCUMENT OR ITS CONTENTS MAY NOT BE USED FOR ANY
THIS DOCUMENT CONTAINS INFORMATION PROPRIETARY TO MVE + PARTNERS, INC. AND IS FURNISHED IN CONFIDENCE FOR
CONCRETE SLAB SECTION OF THE GENERAL NOTES.

OTHER PURPOSE AND MAY NOT BE REPRODUCED OR DISCLOSED TO OTHERS WITHOUT THE PRIOR WRITTEN CONSENT OF
5. ALL SLABS TO BE MONITORED DURING CONSTRUCTION FOR FLATNESS AND

LEVEL 05 PLAN - CONCRETE OUTLINE


LEVELNESS AS NOTE IN THE SLAB SURVEY CONTROL SECTION OF THE
GENERAL NOTES. SUBMIT SURVEY DATA TO BMZ STRUCTURAL ENGINEERS
FOR REVIEW.

6. ALL MAT REINFORCING INDICATED ON PLANS ARE TOP REINF. REFER TO


DETAIL 11/S1.04 FOR FURTHER DETAILS.

LEVEL 05 PLAN - REINFORCING


7. FOR STUDRAIL REINFORCING REFER TO STUD RAIL SCHEDULE ON PLAN.

8. CONFIRM ALL SLAB ELEVATIONS, STEPS, SLOPES, AND OPENINGS WITH


ARCHITECTURAL DRAWINGS.

9. FOR BUILTUP STRUCTURES SHOWN ON PLAN REFER TO DETAILS 2/S1.06


& 3/S1.06

10. FOR ALL DRAINAGE AND WATER PROOFING REQUIREMENTS REFER TO THE
ARCHITECT.

MVE + PARTNERS, INC. ALL RIGHTS RESERVED, © COPYRIGHT 2018.


11. SEE ARCHITECTURAL DRAWINGS FOR SIZE AND LOCATION OF ALL
ARCHITECTURAL CURBS, UPSTANDS AND ARCHITECTURAL FEATURES.

12. REFER TO ARCHITECTURAL DRAWINGS FOR EXACT LOCATION OF MASONRY

1/8" = 1'-0"
WALLS. ALL MASONRY WALLS TO BE 8” MINIMUM THICKNESS. REFER TO
CONCRETE MASONRY BLOCK GENERAL NOTES FOR REINFORCING. REFER
TO DETAIL 8/S1.06 FOR FURTHER REQUIREMENTS.

13. CONFIRM ALL MECHANICAL AND ELECTRICAL OPENINGS AND SLEEVES WITH

08/03/2020 - ISSUED FOR 100% DD PROGRESS SET


CONSULTANTS DRAWINGS. CONFIRM ALL OPENINGS AND ELEMENTS NOT
SHOWN ON THE STRUCTURAL DRAWINGS WITH BMZ STRUCTURAL
ENGINEERS PRIOR TO CONSTRUCTION.

14. REFER TO MECHANICAL DRAWINGS FOR LOCATIONS OF IN-SLAB DUCTS.


REFER TO DETAIL 5/S1.04 FOR CLEARANCE REQUIREMENTS TO DUCTS AND
PARKING COLUMN SCHEDULE EXTRA REINFORCING REQUIRED AT IN-SLAB DUCTS.

SHEET TITLE
CONCRETE 15. FOR SHEARWALL REINFORCING DETAILS AND ELEVATIONS SEE DRAWING
MARK SIZE REINFORCING TIE ARRANGEMENT
STRENGTH SERIES S3.00 UNLESS NOTED OTHERWISE ON PLAN.
CONCRETE COLUMN REFERENCE NOTE:

Scale
16. FOR COLUMN REINFORCING AND DETAILS SEE DRAWING SERIES S4.00
1. COLUMN WITH SYMBOL 50 DENOTES TOWER 7 ksi PC1 16" x 48" 8#6 VERT'S. UNLESS NOTED OTHERWISE ON PLAN.
#4 @ 4" TIES
CONCRETE COLUMN. TYPE VARIES 17. FOR BASEMENT WALL ELEVATIONS AND OTHER WALLS SEE DRAWING SHEET NUMBER
INSIDE CIRCLE SERIES S5.00 UNLESS NOTED OTHERWISE ON PLAN.
7 ksi PC2 14" x 48" 8#6 VERT'S.
2. SEE DRAWINGS S4.01, S4.02 AND S4.03 FOR ALL THE
TOWER CONCRETE COLUMNS, U.N.O.
#4 @ 4" TIES
18. PROVIDE SHORING AND RESHORING PROCEDURES TO ENSURE
CONSTRUCTION LOADS DO NOT EXCEED THE SPECIFIED DESIGN LIVE LOAD.
S2.08.1
REFER TO THE FORMWORK AND RESHORING SECTION OF THE GENERAL
NOTES FOR FURTHER REQUIREMENTS.

NOTE: FOR ALL COLUMNS THAT START ON THIS FLOOR, PROVIDE HOOKED DOWELS 19. MINIMUM UNOBSTRUCTED HEADROOM CLEARANCE OF 7’-0” IS REQUIRED IN PROJECT NUMBER
TO MATCH VERTICAL REINFORCEMENT. HOOK INTO BOT. OF SLAB, SLAB BAND ALL FLOOR AREAS ACCESSIBLE TO VEHICLE TRAFFIC (8’-2” WHEN ACCESS
FOR DISABLED IS REQUIRED). CLEARANCE IS TO BE PROVIDED ABOVE THE
30925-01
OR FTG.
FINISHED FLOOR TO ANY STRUCTURAL ELEMENTS, CEILINGS, PIPES, OR
SIMILAR OBSTRUCTIONS. REFER TO THE ARCHITECT AND OTHER
CONSULTANTS DRAWINGS FOR COMPONENTS NOT PART OF THE BASE
BUILDING STRUCTURE.

20. REFER TO GENERAL NOTES FOR FURTHER REQUIREMENTS.

21. THE TWO-WAY FLAT SLAB SHOWN ON THIS PLAN IS CONSIDERED PART OF
THE PRIMARY STRUCTURAL FRAME AND HAS BEEN REINFORCED FOR 3hr BRYSON MARKULIN ZICKMANTEL
FIRE RESISTANCE RATING IN ACCORDANCE WITH CBC 2016 CHAPTER 721. STRUCTURAL ENGINEERS

22. FOR EMBED PLATES, SEE DET. 5 / S1.11 #501 - 510 BURRARD STREET, VANCOUVER, B.C. V6C 3A8
(604) 685-9533 WWW.BMZSE.COM CONTACT@BMZSE.COM

23. FOR SLAB BAND REINF. SCHEDULE INCLUDING STIRRUPS, SEE DET. 7 / S1.11
7
6
5
4
3
2
1

13'-0" 25'-6" 28'-0" 28'-0" 25'-6" 28'-6"


4
S5.01

WALL
WALL

21'-0"
ELEVATION
ELEVATION

14"

14"
14"
A

14
S5.01

14
" " x
x 48
48
" "

12" x 36"
21'-10"

UPSTAND
RAMP DN. TO LEVEL 4
B

16 16
"x 16 " x
" x 48
11
"
14"

4" 72
"

24 24 24
" x " x " x
30 30 48
" " "
30'-6"

24"
12"
24"
C

16 16
DN.
29 " x
"x " x 48
24"

11
24"

4" 72 "
"
26" 20"
UP
22"
21'-4"

12"
DN.

UP

24"

24"
UP
D

16 16
"x " x
16
"
11 72 x
4" " 48
"
29'-11"
E

16
32 " x
" 48
x 24 30
" "
88
" " x x
56 42
" "

24"
19'-11"

24"
SYMBOL "
3
S5.01

".
F

14 14
14"

14"

" x " x
WALL

48 48
" "
ELEVATION
WALL

2
S5.01
ELEVATION

COLLECTOR REINF. REFERENCE NOTE:

TRUE NORTH
1. SEE DET. 26 / S1.05 FOR ALL REINFORCING WITH THE
NORTH
PROJECT

(604) 685-9533

SHEET TITLE PROJECT NAME STAMP


A

Project Number
NO.

30925-01
LEVEL 05 - DIAPHRAGM REINFORCING
ISSUES:

Date APRIL 10TH, 2020


DATE

1233 South Grand PROGRESS


30925-01

PLAN Drawn By
WWW.BMZSE.COM

ML THESE DRAWINGS ARE NOT TO BE USED FOR


SET

Checked By TENDER, CONTRACT, OR CONSTRUCTION


S2.08.2

JD
SHEET NUMBER

Scale 2020-09-04 5:18:01 PM


PROJECT NUMBER

STRUCTURAL ENGINEERS

1/8" = 1'-0"
THIS DOCUMENT CONTAINS INFORMATION PROPRIETARY TO MVE + PARTNERS, INC. AND IS FURNISHED IN CONFIDENCE FOR
#501 - 510 BURRARD STREET, VANCOUVER, B.C. V6C 3A8

THE LIMITED PURPOSE OF EVALUATION, BIDDING OR REVIEW. THIS DOCUMENT OR ITS CONTENTS MAY NOT BE USED FOR ANY
OTHER PURPOSE AND MAY NOT BE REPRODUCED OR DISCLOSED TO OTHERS WITHOUT THE PRIOR WRITTEN CONSENT OF
ADDRESS, AVE, SUITE
DESCRIPTION

MVE + PARTNERS, INC. ALL RIGHTS RESERVED, © COPYRIGHT 2018. CITY, STATE, ZIP
BRYSON MARKULIN ZICKMANTEL
2020-08-03 100% DD PROGRESS

CONTACT@BMZSE.COM

08/03/2020 - ISSUED FOR 100% DD PROGRESS SET


A B B.2 C D E F
PROJECT
NORTH

TRUE NORTH

STAMP
A B C D E F A B C D E F
ISSUES:
NO. DATE DESCRIPTION
A 2020-04-23 ISSUED AS 100% SD
B 2020-06-16 50% DD PROGRESS
21'-10" 30'-6" 21'-4" 29'-11" 19'-11" 21'-10" 30'-6" 21'-4" 29'-11" 19'-11" SET
C 2020-08-03 100% DD PROGRESS
SET
1 WALL 1
S5.01 ELEVATION S5.01

WALL
ELEVATION
1 2
11 2
S5.01 S5.01

14" SLAB
28'-6"

28'-6"

STEP
8"
"

"

"

"
72

72

72

72
x

x
"

"

"

"
12

12

12

12
Ø
Ø

Ø
2 3

"
"

"
36
24

24
4
2 22
1

A4 B3
601 602 8"
STEP

THESE DRAWINGS ARE NOT TO BE USED FOR


735 SF 1,138 SF DW

TENDER, CONTRACT, OR CONSTRUCTION


25'-6"

25'-6"
14" SLAB
DW

FITNESS

2020-09-04 5:18:03 PM
PROGRESS
610
1,646 SF

"

"
48

48
x

x
"

"
24

24
6
3 33 ELEC.
612

22"

22"
"

"
48

48
x

x
"

"
14

14
3.3 5
DN. DN.
STAIR #1
24" 24" 24" 6S1 24"

DW
UP 14" SLAB UP 14" SLAB
28'-0"

28'-0"
A1 8"
603 STEP
578 SF
HSS ALL HEADER BEAMS TO BE 30" DP.
6x4x.375
8"
INCLUDING SLAB DEPTH ON ALL
STEP LEVELS

"

"
30

30
x

x
20"

20"
"

"
24

24
MECH. 8
4 24" 24"
44 24"
615
24"
S1.1
DW
604
S1 455 SF
609
"

"
444 SF
48

48

3' - 4" 3' - 4"


x

x
ELEV.
"

"
18

18
DW
7 LOBBY

CL
4.5 600
28'-0"

28'-0"
S1.2

"
48
"
48

24" 24" 608 24" 24"

30925-01
Date APRIL 10TH, 2020

JD
ML
x
x

"
450 SF

18
"
18

26"

26"
4.7 9

"

"
48

48
x

x
"

"
24

24
10
MECH.
DW 617
5 55

Project Number

Checked By
Drawn By
UP
STAIR #2UP
6S2
25'-6"

25'-6"
14" SLAB

DW

8"

1233 South Grand


B5
"

"
DN
84

84
DN. 607 DN.
x

x
Ø
936 SF
"

"
Ø

Ø
13
12

12
"
36
"

"
24

24
6 66 11 B2
605

DW
1,076 SF 14

DW
"

"
84

84
S2
13'-0"

13'-0"
x

x
8" 606
"

"
12

12
STEP 12 495 SF

4 4 HSS8x6x0.375
S5.01 S5.01
7 77 WALL
ELEVATION

SLAB NOTES:
3 1. SEE PLAN FOR SLAB THICKNESS 3 WALL
S5.01 S5.01 ELEVATION
CLEAR COVER TO REINFORCING:
1” CLEAR COVER TOP – TO UPPER MOST TOP REINF.
1” CLEAR COVER BOTTOM – TO LOWERMOST BOTTOM REINF.

ADDRESS, AVE, SUITE


ALL INTERIOR SPANS TO BE CONSIDERED "RESTRAINED" ALL END SPANS
PERPENDICULAR TO BASEMENT WALLS TO BE CONSIDERED
"UNRESTRAINED" (INCREASE BOTTOM COVER TO 1 1/4").

CITY, STATE, ZIP


PROJECT NAME
LEVEL 6 PLAN - REINFORCING LEVEL 6 2. DROP BARS FOR CHAIRING PURPOSES ARE TO BE CONSIDERED
ACCESSORIES SUPPLIED BY THE CONTRACTOR. REFER TO BAR PLACING
ORDER FOR FURTHER REQUIREMENTS.

3. PROVIDE TEMPERATURE REBAR EACH DIRECTION BOTTOM MINIMUM IN ALL


SLABS UNLESS NOTED OTHERWISE ON PLAN OR IN DETAILS. REFER TO
REINFORCING STEEL SECTION OF THE GENERAL NOTES. PROVIDE
STAGGERED SPLICES AS REQUIRED.

4. PROVIDE CAMBER TO SLABS AS SHOWN ON PLAN AND AS NOTED IN THE

THE LIMITED PURPOSE OF EVALUATION, BIDDING OR REVIEW. THIS DOCUMENT OR ITS CONTENTS MAY NOT BE USED FOR ANY
THIS DOCUMENT CONTAINS INFORMATION PROPRIETARY TO MVE + PARTNERS, INC. AND IS FURNISHED IN CONFIDENCE FOR
CONCRETE SLAB SECTION OF THE GENERAL NOTES.

OTHER PURPOSE AND MAY NOT BE REPRODUCED OR DISCLOSED TO OTHERS WITHOUT THE PRIOR WRITTEN CONSENT OF
5. ALL SLABS TO BE MONITORED DURING CONSTRUCTION FOR FLATNESS AND

LEVEL 06 PLAN - CONCRETE OUTLINE


LEVELNESS AS NOTE IN THE SLAB SURVEY CONTROL SECTION OF THE
GENERAL NOTES. SUBMIT SURVEY DATA TO BMZ STRUCTURAL ENGINEERS
FOR REVIEW.

6. ALL MAT REINFORCING INDICATED ON PLANS ARE TOP REINF. REFER TO


DETAIL 11/S1.04 FOR FURTHER DETAILS.

LEVEL 06 PLAN - REINFORCING


7. FOR STUDRAIL REINFORCING REFER TO STUD RAIL SCHEDULE ON PLAN.

8. CONFIRM ALL SLAB ELEVATIONS, STEPS, SLOPES, AND OPENINGS WITH


ARCHITECTURAL DRAWINGS.

9. FOR BUILTUP STRUCTURES SHOWN ON PLAN REFER TO DETAILS 2/S1.06


& 3/S1.06

10. FOR ALL DRAINAGE AND WATER PROOFING REQUIREMENTS REFER TO THE
ARCHITECT.

MVE + PARTNERS, INC. ALL RIGHTS RESERVED, © COPYRIGHT 2018.


11. SEE ARCHITECTURAL DRAWINGS FOR SIZE AND LOCATION OF ALL
ARCHITECTURAL CURBS, UPSTANDS AND ARCHITECTURAL FEATURES.

12. REFER TO ARCHITECTURAL DRAWINGS FOR EXACT LOCATION OF MASONRY

1/8" = 1'-0"
WALLS. ALL MASONRY WALLS TO BE 8” MINIMUM THICKNESS. REFER TO
CONCRETE MASONRY BLOCK GENERAL NOTES FOR REINFORCING. REFER
TO DETAIL 8/S1.06 FOR FURTHER REQUIREMENTS.

13. CONFIRM ALL MECHANICAL AND ELECTRICAL OPENINGS AND SLEEVES WITH

08/03/2020 - ISSUED FOR 100% DD PROGRESS SET


CONSULTANTS DRAWINGS. CONFIRM ALL OPENINGS AND ELEMENTS NOT
SHOWN ON THE STRUCTURAL DRAWINGS WITH BMZ STRUCTURAL
ENGINEERS PRIOR TO CONSTRUCTION.

14. REFER TO MECHANICAL DRAWINGS FOR LOCATIONS OF IN-SLAB DUCTS.


REFER TO DETAIL 5/S1.04 FOR CLEARANCE REQUIREMENTS TO DUCTS AND
EXTRA REINFORCING REQUIRED AT IN-SLAB DUCTS.

SHEET TITLE
15. FOR SHEARWALL REINFORCING DETAILS AND ELEVATIONS SEE DRAWING
SERIES S3.00 UNLESS NOTED OTHERWISE ON PLAN.

Scale
16. FOR COLUMN REINFORCING AND DETAILS SEE DRAWING SERIES S4.00
UNLESS NOTED OTHERWISE ON PLAN.

17. FOR BASEMENT WALL ELEVATIONS AND OTHER WALLS SEE DRAWING SHEET NUMBER
SERIES S5.00 UNLESS NOTED OTHERWISE ON PLAN.
CONCRETE COLUMN REFERENCE NOTE:
1. COLUMN WITH SYMBOL 50 DENOTES TOWER
18. PROVIDE SHORING AND RESHORING PROCEDURES TO ENSURE
CONSTRUCTION LOADS DO NOT EXCEED THE SPECIFIED DESIGN LIVE LOAD.
S2.09.1
REFER TO THE FORMWORK AND RESHORING SECTION OF THE GENERAL
CONCRETE COLUMN. TYPE VARIES NOTES FOR FURTHER REQUIREMENTS.
INSIDE CIRCLE
19. MINIMUM UNOBSTRUCTED HEADROOM CLEARANCE OF 7’-0” IS REQUIRED IN PROJECT NUMBER
2. SEE DRAWINGS S4.01, S4.02 AND S4.03 FOR ALL THE ALL FLOOR AREAS ACCESSIBLE TO VEHICLE TRAFFIC (8’-2” WHEN ACCESS
TOWER CONCRETE COLUMNS, U.N.O. FOR DISABLED IS REQUIRED). CLEARANCE IS TO BE PROVIDED ABOVE THE
30925-01
FINISHED FLOOR TO ANY STRUCTURAL ELEMENTS, CEILINGS, PIPES, OR
SIMILAR OBSTRUCTIONS. REFER TO THE ARCHITECT AND OTHER
CONSULTANTS DRAWINGS FOR COMPONENTS NOT PART OF THE BASE
BUILDING STRUCTURE.

20. REFER TO GENERAL NOTES FOR FURTHER REQUIREMENTS.

21. THE TWO-WAY FLAT SLAB SHOWN ON THIS PLAN IS CONSIDERED PART OF
THE PRIMARY STRUCTURAL FRAME AND HAS BEEN REINFORCED FOR 3hr BRYSON MARKULIN ZICKMANTEL
FIRE RESISTANCE RATING IN ACCORDANCE WITH CBC 2016 CHAPTER 721. STRUCTURAL ENGINEERS

22. FOR EMBED PLATES, SEE DET. 5 / S1.11 #501 - 510 BURRARD STREET, VANCOUVER, B.C. V6C 3A8
(604) 685-9533 WWW.BMZSE.COM CONTACT@BMZSE.COM

23. FOR SLAB BAND REINF. SCHEDULE INCLUDING STIRRUPS, SEE DET. 7 / S1.11
7
6
5
4
3
2
1

13'-0" 25'-6" 28'-0" 28'-0" 25'-6" 28'-6"


4
S5.01

WALL
WALL

ELEVATION
ELEVATION
A

1
S5.01
21'-10"
B

36 36
" " Ø
Ø

18 18
" x " x
14
"
48 48 x
" " 48
"
30'-6"

12
" x
84
"
24"
24"
C

12
" x
72
DN.

"
24"

20"
UP

26"

22"
21'-4"

UP
DN.

24"

24"
D

12
12 "
24"

" x x
72
84
" "
29'-11"
E

8"

24 24 24
24
" "
24
" " " Ø
Ø x x x
STEP

48 30 48
" " "

8"
19'-11"

SYMBOL "
3
S5.01

".
F

WALL
ELEVATION
WALL

2
S5.01
ELEVATION

COLLECTOR REINF. REFERENCE NOTE:


1. SEE DET. 26 / S1.05 FOR ALL REINFORCING WITH THE

TRUE NORTH
NORTH
PROJECT

(604) 685-9533

SHEET TITLE PROJECT NAME STAMP


A

Project Number
NO.

30925-01
LEVEL 06 - DIAPHRAGM REINFORCING
ISSUES:

Date APRIL 10TH, 2020


DATE

1233 South Grand PROGRESS


30925-01

PLAN Drawn By
WWW.BMZSE.COM

ML THESE DRAWINGS ARE NOT TO BE USED FOR


SET

Checked By TENDER, CONTRACT, OR CONSTRUCTION


S2.09.2

JD
SHEET NUMBER

Scale 2020-09-04 5:18:05 PM


PROJECT NUMBER

STRUCTURAL ENGINEERS

1/8" = 1'-0"
THIS DOCUMENT CONTAINS INFORMATION PROPRIETARY TO MVE + PARTNERS, INC. AND IS FURNISHED IN CONFIDENCE FOR
#501 - 510 BURRARD STREET, VANCOUVER, B.C. V6C 3A8

THE LIMITED PURPOSE OF EVALUATION, BIDDING OR REVIEW. THIS DOCUMENT OR ITS CONTENTS MAY NOT BE USED FOR ANY
OTHER PURPOSE AND MAY NOT BE REPRODUCED OR DISCLOSED TO OTHERS WITHOUT THE PRIOR WRITTEN CONSENT OF
ADDRESS, AVE, SUITE
DESCRIPTION

MVE + PARTNERS, INC. ALL RIGHTS RESERVED, © COPYRIGHT 2018. CITY, STATE, ZIP
BRYSON MARKULIN ZICKMANTEL
2020-08-03 100% DD PROGRESS

CONTACT@BMZSE.COM

08/03/2020 - ISSUED FOR 100% DD PROGRESS SET


A B B.2 C D E F
PROJECT
NORTH

TRUE NORTH

STAMP
A B C D E F A B C D E F
ISSUES:
NO. DATE DESCRIPTION
A 2020-04-23 ISSUED AS 100% SD
B 2020-06-16 50% DD PROGRESS
21'-10" 30'-6" 21'-4" 29'-11" 19'-11" 21'-10" 30'-6" 21'-4" 29'-11" 19'-11" SET
C 2020-08-03 100% DD PROGRESS
SET

1 11
28'-6"

28'-6"
"

"

"

"
72

72

72

72
x

x
Ø

Ø
"

"

"

"
12

12

12

12
"

"
Ø

Ø
24

24
2 3

"

"
24

24
2 22 1 4

B4 B3

DW
A4
711 701 702
952 SF 735 SF 1,141 SF

THESE DRAWINGS ARE NOT TO BE USED FOR


DW

TENDER, CONTRACT, OR CONSTRUCTION


25'-6"

25'-6"
8" P/T SLAB
DW

2020-09-04 5:18:07 PM
PROGRESS
3 33 ELEC.
A2.1

DW
"

"
48

48
710 712
"

"
22"

22"
48

48
x

x
582 SF 6

"

"
x

x
24

16
"

"
14

14
5
DN.
3.3 STAIR
DN. #1
UP
7S1
24" 24" 24" 24"

DW
UP UP A1
28'-0"

28'-0"
703
579 SF

HSS ALL HEADER BEAMS TO BE 30" DP.


6x4x.375
INCLUDING SLAB DEPTH ON ALL
LEVELS
20"

20"
24"
MECH. 24"
715
4 24" 44 S1 24"
709

"

"
30

48
444 SF

x
8

"

"
24

16
"

"
48

48
CORRIDOR CORRIDOR
x

x
718 719
"

"
ELEV.
18

18
7
DW
LOBBY
4.5 700
28'-0"

28'-0"
24" 24" A1.1
"

"
48

48
24" 24"

30925-01
Date APRIL 10TH, 2020

JD
ML
704
x

x
585 SF
"

"
18

18
9
4.7
26"

26"
DW
A2
708 VEST. MECH.
579 SF 716 717
5 55

Project Number
"

"
48

48

Checked By
x

x
" 10

"

Drawn By
24

16
STAIR #2
UP DW UP
7S2

DN. DN. UP
25'-6"

25'-6"
8" P/T SLAB
DW

DW

1233 South Grand


"

"

"

"
84

84

84

84
DW A3 B2
x

x
706 705
"

"

"

"
Ø
12

12

12

12
Ø

Ø
12 635 SF 13 1,082 SF

"
"

"
24
24

24
6 66 B1
11 14
707
989 SF
13'-0"

13'-0"
POST-TENSIONED SLAB NOTES:
1. SEE PLAN FOR SLAB THICKNESS

2. CLEAR COVER TO REINFORCING:


7 77 1" CLEAR COVER TOP – TO UPPER MOST TOP REINF.
1" CLEAR COVER BOTTOM – TO LOWERMOST BOTTOM REINF.
1 1/2" CLEAR COVER BOTTOM TO P/T
DROP BARS FOR CHAIRING PURPOSES ARE TO BE CONSIDERED
ACCESSORIES SUPPLIED BY THE CONTRACTOR. REFER TO BAR PLACING
ORDER FOR FURTHER REQUIREMENTS.

3. DIMENSIONS FOR P/T PROFILE SHOWN ON PLAN ARE CHAIR HEIGHTS


SHOWN IN INCHES. CHAIR HEIGHTS SPECIFIED ARE TO UNDERSIDE OF
TENDON SHEATHING.

4. PROVIDE 0.5" DIA LOW RELAXATION OR SUBSTITUTE 0.6" DIA LOW

ADDRESS, AVE, SUITE


RELAXATION STRAND AND MAKE ADJUSTMENTS TO CHAIR HEIGHTS.

5. WHERE P/T STRAND QUANTITIES ARE SHOWN ON PLAN, THE ASSUMED

CITY, STATE, ZIP


PROJECT NAME
STRAND NET EFFECTIVE FORCE IS 27 KIPS.
LEVEL 7 PLAN - REINFORCING LEVEL 7
6. MAINTAIN SMOOTH PROFILES OF ALL STRANDS.

7. WHERE STRANDS ARE CURVED IN PLAN, SPREAD TENDONS 1" CLEAR


BETWEEN THROUGHOUT CURVE.

8. RUN STRANDS STRAIGHT PAST OPENINGS.

9. DEVIATE STRANDS 1:6 MAXIMUM UNLESS NOTED.

THE LIMITED PURPOSE OF EVALUATION, BIDDING OR REVIEW. THIS DOCUMENT OR ITS CONTENTS MAY NOT BE USED FOR ANY
THIS DOCUMENT CONTAINS INFORMATION PROPRIETARY TO MVE + PARTNERS, INC. AND IS FURNISHED IN CONFIDENCE FOR
10. TWO TENDONS MINIMUM TO BE PLACED OVER ALL WALLS AND COLUMNS –

OTHER PURPOSE AND MAY NOT BE REPRODUCED OR DISCLOSED TO OTHERS WITHOUT THE PRIOR WRITTEN CONSENT OF
SEE TYPICAL INTEGRITY REINF. DETAIL – EXCEPT AS NOTED ON PLAN.

LEVEL 07 PLAN - CONCRETE OUTLINE


11. ALL ANCHORS TO BE PLACED MID-HEIGHT OF SLAB, BANDED ANCHORS
HAVE PRIORITY OVER DISTRIBUTED ANCHORS AT CORNERS OF SLAB.

12. PLACE DISTRIBUTED STRANDS ABOVE BANDED STRANDS WHERE THEY


CONFLICT AT MID-HEIGHT OF SLAB.

13. SEE SHOP DRAWINGS FOR SYSTEM SPECIFIC REQUIREMENTS INCLUDING

LEVEL 07 PLAN - REINFORCING


BURSTING STEEL, CORROSION PREVENTION, ETC.

14. PROVIDE FULLY ENCAPSULATED POST-TENSION SYSTEM. ALTERNATE NON-


ENCAPSULATED SYSTEMS WILL BE REJECTED.

15. STORE POST-TENSION CABLES IN A DRY ENVIRONMENT.

16. STRANDS OVER 130 FT IN LENGTH TO BE STRESSED TWO ENDS. SHORTER


STRANDS ALTERNATE STRESSING EACH END WHERE POSSIBLE.

MVE + PARTNERS, INC. ALL RIGHTS RESERVED, © COPYRIGHT 2018.


17. PROVIDE CAMBER TO SLABS AS SHOWN ON PLAN AND AS NOTED IN THE
CONCRETE SLAB SECTION OF THE GENERAL NOTES.

18. ALL SLABS TO BE MONITORED DURING CONSTRUCTION FOR FLATNESS AND


LEVELNESS AS NOTED IN THE SLAB SURVEY CONTROL SECTION OF THE

1/8" = 1'-0"
GENERAL NOTES. SUBMIT SURVEY DATA TO BMZ STRUCTURAL ENGINEERS
FOR REVIEW.

19. FOR STUDRAIL REINFORCING REFER TO STUD RAIL SCHEDULE ON PLAN.

08/03/2020 - ISSUED FOR 100% DD PROGRESS SET


20. CONFIRM ALL SLAB ELEVATIONS, STEPS, SLOPES, AND OPENINGS WITH
ARCHITECTURAL DRAWINGS.

21. FOR BUILTUP STRUCTURES SHOWN ON PLAN REFER TO DETAILS 2 / S1.06


& 3 / S1.06

22. FOR ALL DRAINAGE AND WATER PROOFING REQUIREMENTS REFER TO THE

SHEET TITLE
ARCHITECT.

23. SEE ARCHITECTURAL DRAWINGS FOR SIZE AND LOCATION OF ALL

Scale
ARCHITECTURAL CURBS, UPSTANDS AND ARCHITECTURAL FEATURES.

24. CONFIRM ALL MECHANICAL AND ELECTRICAL OPENINGS AND SLEEVES WITH
CONSULTANTS DRAWINGS. CONFIRM ALL OPENINGS AND ELEMENTS NOT
SHOWN ON THE STRUCTURAL DRAWINGS WITH BMZ STRUCTURAL SHEET NUMBER
ENGINEERS PRIOR TO CONSTRUCTION.

CONCRETE COLUMN REFERENCE NOTE: 25. REFER TO MECHANICAL DRAWINGS FOR LOCATIONS OF IN-SLAB DUCTS.
REFER TO DETAIL 5 / S1.04 FOR CLEARANCE REQUIREMENTS TO DUCTS AND
S2.10.1
EXTRA REINFORCING REQUIRED AT IN-SLAB DUCTS.
1. COLUMN WITH SYMBOL 50 DENOTES TOWER
CONCRETE COLUMN. 26. FOR SHEARWALL REINFORCING DETAILS AND ELEVATIONS SEE DRAWING
TYPE VARIES SERIES S3.00 UNLESS NOTED OTHERWISE ON PLAN. PROJECT NUMBER
INSIDE CIRCLE
30925-01
2. SEE DRAWINGS S4.01, S4.02 AND S4.03 FOR ALL THE 27. FOR COLUMN REINFORCING AND DETAILS SEE DRAWING SERIES S4.00
UNLESS NOTED OTHERWISE ON PLAN.
TOWER CONCRETE COLUMNS, U.N.O.
28. PROVIDE SHORING AND RESHORING PROCEDURES TO ENSURE
CONSTRUCTION LOADS DO NOT EXCEED THE SPECIFIED DESIGN LIVE LOAD.
REFER TO THE FORMWORK AND RESHORING SECTION OF THE GENERAL
NOTES FOR FURTHER REQUIREMENTS.

29. REFER TO GENERAL NOTES FOR FURTHER REQUIREMENTS.


BRYSON MARKULIN ZICKMANTEL
30. THE TWO-WAY FLAT SLAB SHOWN ON THIS PLAN IS CONSIDERED PART OF STRUCTURAL ENGINEERS
THE PRIMARY STRUCTURAL FRAME AND HAS BEEN REINFORCED FOR 3hr
FIRE RESISTANCE RATING IN ACCORDANCE WITH CBC 2016 CHAPTER 722. #501 - 510 BURRARD STREET, VANCOUVER, B.C. V6C 3A8
(604) 685-9533 WWW.BMZSE.COM CONTACT@BMZSE.COM

31. FOR EMBED PLATE, SEE 5 / S1.11


7
6
5
4
3
2
1

13'-0" 25'-6" 28'-0" 28'-0" 25'-6" 28'-6"


A

21'-10"
B

24 24
" " Ø
Ø

18 18 14
" " x "
x 48 x
48 48
" " "
30'-6"

24"
C

12
12 " x
" x 72
"
24"
24"

84
" 22"
DN.

20"
26"
UP
21'-4"

DN.

UP

24"
D

12
24"
24"

" x
12
"
84 x
" 72
"
29'-11"

16
" x 16
16 48 "
" x " x
48 48
" "
E

24 24
" " Ø
Ø
19'-11"

SYMBOL " ".


F

COLLECTOR REINF. REFERENCE NOTE:


1. SEE DET. 26 / S1.05 FOR ALL REINFORCING WITH THE

TRUE NORTH
NORTH
PROJECT

(604) 685-9533

SHEET TITLE PROJECT NAME STAMP


A

Project Number
NO.

30925-01
LEVEL 07 - DIAPHRAGM REINFORCING
ISSUES:

Date APRIL 10TH, 2020


DATE

1233 South Grand PROGRESS


30925-01

PLAN Drawn By
WWW.BMZSE.COM

ML THESE DRAWINGS ARE NOT TO BE USED FOR


SET

Checked By TENDER, CONTRACT, OR CONSTRUCTION


S2.10.2

JD
SHEET NUMBER

Scale 2020-09-04 5:18:09 PM


PROJECT NUMBER

STRUCTURAL ENGINEERS

1/8" = 1'-0"
THIS DOCUMENT CONTAINS INFORMATION PROPRIETARY TO MVE + PARTNERS, INC. AND IS FURNISHED IN CONFIDENCE FOR
#501 - 510 BURRARD STREET, VANCOUVER, B.C. V6C 3A8

THE LIMITED PURPOSE OF EVALUATION, BIDDING OR REVIEW. THIS DOCUMENT OR ITS CONTENTS MAY NOT BE USED FOR ANY
OTHER PURPOSE AND MAY NOT BE REPRODUCED OR DISCLOSED TO OTHERS WITHOUT THE PRIOR WRITTEN CONSENT OF
ADDRESS, AVE, SUITE
DESCRIPTION

MVE + PARTNERS, INC. ALL RIGHTS RESERVED, © COPYRIGHT 2018. CITY, STATE, ZIP
BRYSON MARKULIN ZICKMANTEL
2020-08-03 100% DD PROGRESS

CONTACT@BMZSE.COM

08/03/2020 - ISSUED FOR 100% DD PROGRESS SET


A B B.2 C D E F
PROJECT
NORTH

TRUE NORTH

STAMP
A B C D E F A B C D E F
ISSUES:
NO. DATE DESCRIPTION
A 2020-04-23 ISSUED AS 100% SD
B 2020-06-16 50% DD PROGRESS
21'-10" 30'-6" 21'-4" 29'-11" 19'-11" 21'-10" 30'-6" 21'-4" 29'-11" 19'-11" SET
C 2020-08-03 100% DD PROGRESS
SET

1 11
28'-6"

28'-6"
7'-0 1/2"

7'-0 1/2"
"

"

"

"
72

72

72

72
x

x
"

"

"

"
12

12

12

12
Ø

Ø
Ø

Ø
"

"
2

"

"
24

24
24

24
3

2 22 1 4

B4 A4 B3

DW
811 801 802
952 SF 735 SF 1,141 SF

THESE DRAWINGS ARE NOT TO BE USED FOR


DW

TENDER, CONTRACT, OR CONSTRUCTION


25'-6"

25'-6"
8" P/T SLAB
DW

2020-09-04 5:18:11 PM
PROGRESS
"
48
x"
16
3 33 ELEC. 6
A2.1

DW
810 812
"

"
22"

22"
48

48
582 SF
x

x
"

"
14

14
5
3.3 STAIR #1
DN UP DN
24" 24" 24" 8S1 24"

DW
UP DN UP A1
28'-0"

28'-0"
803
579 SF

CHUTES HSSVEST. ALL HEADER BEAMS TO BE 30" DP.


813 6x4x.375
814 INCLUDING SLAB DEPTH ON ALL
LEVELS

"
20"

20"

48
x
24" 24"

"
MECH.

16
24" 24"
4 44 S1
815
8
809
446 SF
"

"
CORRIDOR
48

48
CORRIDOR
x

x
818 ELEV. 819
"

"
12

12
DW
7 LOBBY
4.5 800
28'-0"

28'-0"
24" 24" A1.1
"

"
48

48

30925-01
Date APRIL 10TH, 2020

JD
ML
24" 24" 804
x

x
585 SF
"

"
14

14
4.7
26"

26"
9

"
48
DW

x"
A2

16
808 VEST. MECH.
580 SF
10
816 817
5 55

Project Number

Checked By
Drawn By
STAIR #2
UP DW UPDN
8S2

DN. UP
DN.
25'-6"

25'-6"
8" P/T SLAB
B1 DW
807
989 SF DW

1233 South Grand


"

"

"

"
84

84

84

84
DW A3 B2
x

x
"

"

"

"
806 805

Ø
Ø

Ø
12

12

12

12
12 13

"
"

"
635 SF 1,082 SF

24
24

24
6 66 11
14
13'-0"

13'-0"
7'-11 1/2"

7'-11 1/2"
POST-TENSIONED SLAB NOTES:
1. SEE PLAN FOR SLAB THICKNESS

2. CLEAR COVER TO REINFORCING:


7 77 1" CLEAR COVER TOP – TO UPPER MOST TOP REINF.
1" CLEAR COVER BOTTOM – TO LOWERMOST BOTTOM REINF.
1 1/2" CLEAR COVER BOTTOM TO P/T
DROP BARS FOR CHAIRING PURPOSES ARE TO BE CONSIDERED
ACCESSORIES SUPPLIED BY THE CONTRACTOR. REFER TO BAR PLACING
ORDER FOR FURTHER REQUIREMENTS.

3. DIMENSIONS FOR P/T PROFILE SHOWN ON PLAN ARE CHAIR HEIGHTS


SHOWN IN INCHES. CHAIR HEIGHTS SPECIFIED ARE TO UNDERSIDE OF
TENDON SHEATHING.

LEVEL 8 PLAN - REINFORCING LEVEL 8 4. PROVIDE 0.5" DIA LOW RELAXATION OR SUBSTITUTE 0.6" DIA LOW

ADDRESS, AVE, SUITE


RELAXATION STRAND AND MAKE ADJUSTMENTS TO CHAIR HEIGHTS.

5. WHERE P/T STRAND QUANTITIES ARE SHOWN ON PLAN, THE ASSUMED

CITY, STATE, ZIP


PROJECT NAME
STRAND NET EFFECTIVE FORCE IS 27 KIPS.

6. MAINTAIN SMOOTH PROFILES OF ALL STRANDS.

7. WHERE STRANDS ARE CURVED IN PLAN, SPREAD TENDONS 1" CLEAR


BETWEEN THROUGHOUT CURVE.

8. RUN STRANDS STRAIGHT PAST OPENINGS.

9. DEVIATE STRANDS 1:6 MAXIMUM UNLESS NOTED.

THE LIMITED PURPOSE OF EVALUATION, BIDDING OR REVIEW. THIS DOCUMENT OR ITS CONTENTS MAY NOT BE USED FOR ANY
THIS DOCUMENT CONTAINS INFORMATION PROPRIETARY TO MVE + PARTNERS, INC. AND IS FURNISHED IN CONFIDENCE FOR
10. TWO TENDONS MINIMUM TO BE PLACED OVER ALL WALLS AND COLUMNS –

OTHER PURPOSE AND MAY NOT BE REPRODUCED OR DISCLOSED TO OTHERS WITHOUT THE PRIOR WRITTEN CONSENT OF
SEE TYPICAL INTEGRITY REINF. DETAIL – EXCEPT AS NOTED ON PLAN.

LEVEL 08 PLAN - CONCRETE OUTLINE


11. ALL ANCHORS TO BE PLACED MID-HEIGHT OF SLAB, BANDED ANCHORS
HAVE PRIORITY OVER DISTRIBUTED ANCHORS AT CORNERS OF SLAB.

12. PLACE DISTRIBUTED STRANDS ABOVE BANDED STRANDS WHERE THEY


CONFLICT AT MID-HEIGHT OF SLAB.

13. SEE SHOP DRAWINGS FOR SYSTEM SPECIFIC REQUIREMENTS INCLUDING

LEVEL 08 PLAN - REINFORCING


BURSTING STEEL, CORROSION PREVENTION, ETC.

14. PROVIDE FULLY ENCAPSULATED POST-TENSION SYSTEM. ALTERNATE NON-


ENCAPSULATED SYSTEMS WILL BE REJECTED.

15. STORE POST-TENSION CABLES IN A DRY ENVIRONMENT.

16. STRANDS OVER 130 FT IN LENGTH TO BE STRESSED TWO ENDS. SHORTER


STRANDS ALTERNATE STRESSING EACH END WHERE POSSIBLE.

MVE + PARTNERS, INC. ALL RIGHTS RESERVED, © COPYRIGHT 2018.


17. PROVIDE CAMBER TO SLABS AS SHOWN ON PLAN AND AS NOTED IN THE
CONCRETE SLAB SECTION OF THE GENERAL NOTES.

18. ALL SLABS TO BE MONITORED DURING CONSTRUCTION FOR FLATNESS AND


LEVELNESS AS NOTED IN THE SLAB SURVEY CONTROL SECTION OF THE

1/8" = 1'-0"
GENERAL NOTES. SUBMIT SURVEY DATA TO BMZ STRUCTURAL ENGINEERS
FOR REVIEW.

19. FOR STUDRAIL REINFORCING REFER TO STUD RAIL SCHEDULE ON PLAN.

08/03/2020 - ISSUED FOR 100% DD PROGRESS SET


20. CONFIRM ALL SLAB ELEVATIONS, STEPS, SLOPES, AND OPENINGS WITH
ARCHITECTURAL DRAWINGS.

21. FOR BUILTUP STRUCTURES SHOWN ON PLAN REFER TO DETAILS 2 / S1.06


& 3 / S1.06

22. FOR ALL DRAINAGE AND WATER PROOFING REQUIREMENTS REFER TO THE

SHEET TITLE
ARCHITECT.

23. SEE ARCHITECTURAL DRAWINGS FOR SIZE AND LOCATION OF ALL

Scale
ARCHITECTURAL CURBS, UPSTANDS AND ARCHITECTURAL FEATURES.

24. CONFIRM ALL MECHANICAL AND ELECTRICAL OPENINGS AND SLEEVES WITH
CONCRETE COLUMN REFERENCE NOTE: CONSULTANTS DRAWINGS. CONFIRM ALL OPENINGS AND ELEMENTS NOT
SHOWN ON THE STRUCTURAL DRAWINGS WITH BMZ STRUCTURAL SHEET NUMBER
ENGINEERS PRIOR TO CONSTRUCTION.
1. COLUMN WITH SYMBOL 50 DENOTES TOWER
CONCRETE COLUMN. TYPE VARIES
INSIDE CIRCLE
25. REFER TO MECHANICAL DRAWINGS FOR LOCATIONS OF IN-SLAB DUCTS.
REFER TO DETAIL 5 / S1.04 FOR CLEARANCE REQUIREMENTS TO DUCTS AND
S2.11.1
EXTRA REINFORCING REQUIRED AT IN-SLAB DUCTS.
2. SEE DRAWINGS S4.01, S4.02 AND S4.03 FOR ALL THE
TOWER CONCRETE COLUMNS, U.N.O. 26. FOR SHEARWALL REINFORCING DETAILS AND ELEVATIONS SEE DRAWING
SERIES S3.00 UNLESS NOTED OTHERWISE ON PLAN. PROJECT NUMBER
30925-01
27. FOR COLUMN REINFORCING AND DETAILS SEE DRAWING SERIES S4.00
UNLESS NOTED OTHERWISE ON PLAN.

28. PROVIDE SHORING AND RESHORING PROCEDURES TO ENSURE


CONSTRUCTION LOADS DO NOT EXCEED THE SPECIFIED DESIGN LIVE LOAD.
REFER TO THE FORMWORK AND RESHORING SECTION OF THE GENERAL
NOTES FOR FURTHER REQUIREMENTS.

29. REFER TO GENERAL NOTES FOR FURTHER REQUIREMENTS.


BRYSON MARKULIN ZICKMANTEL
30. THE TWO-WAY FLAT SLAB SHOWN ON THIS PLAN IS CONSIDERED PART OF STRUCTURAL ENGINEERS
THE PRIMARY STRUCTURAL FRAME AND HAS BEEN REINFORCED FOR 3hr
FIRE RESISTANCE RATING IN ACCORDANCE WITH CBC 2016 CHAPTER 722. #501 - 510 BURRARD STREET, VANCOUVER, B.C. V6C 3A8
(604) 685-9533 WWW.BMZSE.COM CONTACT@BMZSE.COM

31. FOR EMBED PLATE, SEE 5 / S1.11


7
6
5
4
3
2
1

13'-0" 25'-6" 28'-0" 28'-0" 25'-6" 28'-6"


A

21'-10"
B

24
24
" " Ø
Ø

12 14
14
" " x
" x x 48
48 48 "
" "
30'-6"

7'-0 1/2"
24"
24"
C

12
12 " x
7'-11 1/2" " x 72
84 "
24"

"
20" 22"
26"
UP

DN.
21'-4"

DN

UP
24"
D

12
24"
24"

" 12
x " x
84 72
" "
29'-11"
E

24 16 16 16 24
" " x " x " x "
Ø 48 48 48 Ø
" " "
19'-11"

SYMBOL " ".


F

COLLECTOR REINF. REFERENCE NOTE:


1. SEE DET. 26 / S1.05 FOR ALL REINFORCING WITH THE

TRUE NORTH
NORTH
PROJECT

(604) 685-9533

SHEET TITLE PROJECT NAME STAMP


A

Project Number
NO.

30925-01
LEVEL 08 PLAN - DIAPHRAGM
ISSUES:

Date APRIL 10TH, 2020


DATE

1233 South Grand PROGRESS


30925-01

REINFORCING PLAN Drawn By


WWW.BMZSE.COM

ML THESE DRAWINGS ARE NOT TO BE USED FOR


SET

Checked By TENDER, CONTRACT, OR CONSTRUCTION


S2.11.2

JD
SHEET NUMBER

Scale 2020-09-04 5:18:13 PM


PROJECT NUMBER

STRUCTURAL ENGINEERS

1/8" = 1'-0"
THIS DOCUMENT CONTAINS INFORMATION PROPRIETARY TO MVE + PARTNERS, INC. AND IS FURNISHED IN CONFIDENCE FOR
#501 - 510 BURRARD STREET, VANCOUVER, B.C. V6C 3A8

THE LIMITED PURPOSE OF EVALUATION, BIDDING OR REVIEW. THIS DOCUMENT OR ITS CONTENTS MAY NOT BE USED FOR ANY
OTHER PURPOSE AND MAY NOT BE REPRODUCED OR DISCLOSED TO OTHERS WITHOUT THE PRIOR WRITTEN CONSENT OF
ADDRESS, AVE, SUITE
DESCRIPTION

MVE + PARTNERS, INC. ALL RIGHTS RESERVED, © COPYRIGHT 2018. CITY, STATE, ZIP
BRYSON MARKULIN ZICKMANTEL
2020-08-03 100% DD PROGRESS

CONTACT@BMZSE.COM

08/03/2020 - ISSUED FOR 100% DD PROGRESS SET


A B B.2 C D E F
PROJECT
NORTH

TRUE NORTH

STAMP
A B C D E F A B C D E F
ISSUES:
NO. DATE DESCRIPTION
A 2020-04-23 ISSUED AS 100% SD
B 2020-06-16 50% DD PROGRESS
21'-10" 30'-6" 21'-4" 29'-11" 19'-11" 21'-10" 30'-6" 21'-4" 29'-11" 19'-11" SET
C 2020-08-03 100% DD PROGRESS
SET

1 11
28'-6"

28'-6"
10-C15M23.0@12" C15M18.0@18" 10-C15M23.0@12"

"
72

"
72
" x
12

x
U-7

"
12
"

Ø
24
2 3

"
24
U-7
2 16-15M36.0@ 22 1
12" STG 36" 8'-6"
O OF 4
R
O
8-C15M11.9@18" B4
O OF 9
L 10 T B3
EXTRA TOP 8-C15M11.9@18" 911 R E 902
A4 LEV EL

DW
10-15M21.4 EXTRA TOP 9 O
10-15M21.4 L 10 T " V
@9" EXTRA @9" EXTRA E
V L x 72 " LE
901
TOP TOP LE VE " 72
" 12 " x
72 " LE

THESE DRAWINGS ARE NOT TO BE USED FOR


x 10 DW
72

TENDER, CONTRACT, OR CONSTRUCTION


"
12 " x
25'-6"

25'-6"
10
DW
C15M5.10@18" F
15 O O
TO R

2020-09-04 5:18:15 PM
PROGRESS
8" P/T SLAB
9 TO
L 5
C15M5.10@18" EVE L 1
L VE
2#5-7.10 8-C15M11.9@18"
48" LE
EXTRA TOP F "
EXTRA BOT. 15 O O " x 48
TO R 14 " x
9 TO 911 902 12
3 6-15M14.9@18"
STG 24" 33 L 5
VE 1
A2.1 LE EL ELEC.

5'-0"

DW
2#5-8.5 V 912
EXTRA BOT.
"
91048 " LE 912 901 6

"
22"

22"

48
" x 48
14 " x

" x
14
10-C15M16.4@12" C15M9.10
10-15M16.4@12" 12 910
@18" 3.3 5 STAIR #1
DN UP DN

"
48
24" 24" 9S2
24" 24"

"x
2#5-21.4 EXTRA BOT

DW
14
2#5-8.5 UP DN UP A1
28'-0"

28'-0"
EXTRA BOT. 903
9S1 903
C15M13.9
@18"
CHUTES
HSSVEST. F
2#5-7.10 913
6x4x.375
ALL HEADER BEAMS TO BE 30" DP. 15 O O
914 R
913 914 INCLUDING SLAB DEPTH ON ALL TO
EXTRA BOT. 9 TO
LEVELS L 5
EVE L 1
909 L VE
16-C15M13.9@18"
48" LE
"
20"

20"
" x 48
24"
24"
24" MECH.
24"
14 " x
12
4 44 S1
915
C15M9.10

"
10-15M16.4@12" 8

48
909
@18"

x"
915

14
"
2#5-15.9 EXTRA

48
CORRIDOR CORRIDOR
BOT

x
918 ELEV. 919

"
12
2#5-13.1 DW 900B 900A
15M14.9@18" 7 LOBBY
STG 24"
EXTRA BOT
15M14.9@18" 4.5 15 O O
F 900
2#5-23.0 EXTRA BOT STG 24" 8" NON-P/T SLAB R/W #5@12" TO R
8 TO 904
20-C15M16.4@12" EACHWAY BOT LAP 2'-0" PLUS L 5
28'-0"

28'-0"
EVE L 1
EXTRA REINF AS SHOWN ON E
8 " L EV
PLANS AND DETAILS 4 " L A1.1
24" 24" " x 48 24" 24"

30925-01
Date APRIL 10TH, 2020

JD
ML
C15M9.10 4 904
2#5-7.10 1 "x F
@18"
EXTRA BOT. 12 15 O O
26"

26"
4.7 9
TO
9 TO
R
8-C15M11.9@18" L 5
VE L 1

"
908 DW

48
EXTRA TOP E
L VE

x
2#5-8.5 A2 8" LE

"
4

14
"
5'-0"

EXTRA BOT.
2#5-7.10 908 916 VEST. 917 " x 48
EXTRA BOT MECH. 14 " x
5-15M16.4 916 917 12
5 55

Project Number
@18" 907
9S2

"
10

Checked By
48

Drawn By
x
STAIR #2

"
UP UP DN

14
10-15M16.4@12" DW 9S1
2#5-23.0
905
EXTRA BOT
DN. UP
DN.
906

C15M5.10@18"
25'-6"

25'-6"
8" P/T SLAB
2#5-19.8 2#5-14.9
EXTRA BOT
OF OF
EXTRA BOT
B1 RO RO DW
C15M5.10@18" O O
9 9
907
E L 10 T E L 10 T
V L DW V L
LE VE LE VE

1233 South Grand


10-15M21.4@9" 10-15M21.4@9"
EXTRA TOP "
4 LE "
4 LE B2
x 8 84" x 8 84"
EXTRA TOP DW
" " 905
8-C15M11.9@18" 12 " x 12 " x

Ø
Ø
10 10

"
"
EXTRA TOP

24
16-15M36.0@

24
6 12" STG 36" 66 A3
11 14
8'-6" 906 U-7
16-15M36.0
@12" STG 12 13
36" U-7
13'-0"

13'-0"
8-C15M11.9@18"

"

"
84

84
EXTRA TOP

x
POST-TENSIONED SLAB NOTES:

"

"
12

12
1. SEE PLAN FOR SLAB THICKNESS

2. CLEAR COVER TO REINFORCING:


7 10-C15M23.0@12" 10-C15M23.0@12"
77 1" CLEAR COVER TOP – TO UPPER MOST TOP REINF.
1" CLEAR COVER BOTTOM – TO LOWERMOST BOTTOM REINF.
1 1/2" CLEAR COVER BOTTOM TO P/T
DROP BARS FOR CHAIRING PURPOSES ARE TO BE CONSIDERED
ACCESSORIES SUPPLIED BY THE CONTRACTOR. REFER TO BAR PLACING
ORDER FOR FURTHER REQUIREMENTS.

3. DIMENSIONS FOR P/T PROFILE SHOWN ON PLAN ARE CHAIR HEIGHTS


8" P/T SLAB R/W #5@24" SHOWN IN INCHES. CHAIR HEIGHTS SPECIFIED ARE TO UNDERSIDE OF
EACHWAY BOT LAP 2'-0" PLUS TENDON SHEATHING.
EXTRA REINF AS SHOWN ON LEVEL 9-19 TYP. FLOOR - REINFORCING LEVEL 9-19 TYP. FLOOR
4. PROVIDE 0.5" DIA LOW RELAXATION OR SUBSTITUTE 0.6" DIA LOW

ADDRESS, AVE, SUITE


PLANS AND DETAILS RELAXATION STRAND AND MAKE ADJUSTMENTS TO CHAIR HEIGHTS.

5. WHERE P/T STRAND QUANTITIES ARE SHOWN ON PLAN, THE ASSUMED

CITY, STATE, ZIP


PROJECT NAME
STRAND NET EFFECTIVE FORCE IS 27 KIPS.

6. MAINTAIN SMOOTH PROFILES OF ALL STRANDS.

7. WHERE STRANDS ARE CURVED IN PLAN, SPREAD TENDONS 1" CLEAR


BETWEEN THROUGHOUT CURVE.

8. RUN STRANDS STRAIGHT PAST OPENINGS.

9. DEVIATE STRANDS 1:6 MAXIMUM UNLESS NOTED.

THE LIMITED PURPOSE OF EVALUATION, BIDDING OR REVIEW. THIS DOCUMENT OR ITS CONTENTS MAY NOT BE USED FOR ANY
THIS DOCUMENT CONTAINS INFORMATION PROPRIETARY TO MVE + PARTNERS, INC. AND IS FURNISHED IN CONFIDENCE FOR
10. TWO TENDONS MINIMUM TO BE PLACED OVER ALL WALLS AND COLUMNS –

OTHER PURPOSE AND MAY NOT BE REPRODUCED OR DISCLOSED TO OTHERS WITHOUT THE PRIOR WRITTEN CONSENT OF
SEE TYPICAL INTEGRITY REINF. DETAIL – EXCEPT AS NOTED ON PLAN.

11. ALL ANCHORS TO BE PLACED MID-HEIGHT OF SLAB, BANDED ANCHORS


HAVE PRIORITY OVER DISTRIBUTED ANCHORS AT CORNERS OF SLAB.

LEVEL 09-19 TYP. PLAN - CONCRETE


12. PLACE DISTRIBUTED STRANDS ABOVE BANDED STRANDS WHERE THEY
CONFLICT AT MID-HEIGHT OF SLAB.

13. SEE SHOP DRAWINGS FOR SYSTEM SPECIFIC REQUIREMENTS INCLUDING


BURSTING STEEL, CORROSION PREVENTION, ETC.

14. PROVIDE FULLY ENCAPSULATED POST-TENSION SYSTEM. ALTERNATE NON-

OUTLINE AND REINFORCING


ENCAPSULATED SYSTEMS WILL BE REJECTED.

15. STORE POST-TENSION CABLES IN A DRY ENVIRONMENT.

16. STRANDS OVER 130 FT IN LENGTH TO BE STRESSED TWO ENDS. SHORTER


STRANDS ALTERNATE STRESSING EACH END WHERE POSSIBLE.

MVE + PARTNERS, INC. ALL RIGHTS RESERVED, © COPYRIGHT 2018.


17. PROVIDE CAMBER TO SLABS AS SHOWN ON PLAN AND AS NOTED IN THE
CONCRETE SLAB SECTION OF THE GENERAL NOTES.

18. ALL SLABS TO BE MONITORED DURING CONSTRUCTION FOR FLATNESS AND


LEVELNESS AS NOTED IN THE SLAB SURVEY CONTROL SECTION OF THE

1/8" = 1'-0"
GENERAL NOTES. SUBMIT SURVEY DATA TO BMZ STRUCTURAL ENGINEERS
FOR REVIEW.

19. FOR STUDRAIL REINFORCING REFER TO STUD RAIL SCHEDULE ON PLAN.

08/03/2020 - ISSUED FOR 100% DD PROGRESS SET


20. CONFIRM ALL SLAB ELEVATIONS, STEPS, SLOPES, AND OPENINGS WITH
ARCHITECTURAL DRAWINGS.

21. FOR BUILTUP STRUCTURES SHOWN ON PLAN REFER TO DETAILS 2 / S1.06


& 3 / S1.06

22. FOR ALL DRAINAGE AND WATER PROOFING REQUIREMENTS REFER TO THE

SHEET TITLE
ARCHITECT.

23. SEE ARCHITECTURAL DRAWINGS FOR SIZE AND LOCATION OF ALL

Scale
ARCHITECTURAL CURBS, UPSTANDS AND ARCHITECTURAL FEATURES.

24. CONFIRM ALL MECHANICAL AND ELECTRICAL OPENINGS AND SLEEVES WITH
CONSULTANTS DRAWINGS. CONFIRM ALL OPENINGS AND ELEMENTS NOT
CONCRETE COLUMN REFERENCE NOTE: SHOWN ON THE STRUCTURAL DRAWINGS WITH BMZ STRUCTURAL SHEET NUMBER
ENGINEERS PRIOR TO CONSTRUCTION.
1. COLUMN WITH SYMBOL 50 DENOTES TOWER
CONCRETE COLUMN. TYPE VARIES
25. REFER TO MECHANICAL DRAWINGS FOR LOCATIONS OF IN-SLAB DUCTS.
REFER TO DETAIL 5 / S1.04 FOR CLEARANCE REQUIREMENTS TO DUCTS AND
S2.12.1
INSIDE CIRCLE EXTRA REINFORCING REQUIRED AT IN-SLAB DUCTS.
2. SEE DRAWINGS S4.01, S4.02 AND S4.03 FOR ALL THE 26. FOR SHEARWALL REINFORCING DETAILS AND ELEVATIONS SEE DRAWING
TOWER CONCRETE COLUMNS, U.N.O. SERIES S3.00 UNLESS NOTED OTHERWISE ON PLAN. PROJECT NUMBER
30925-01
27. FOR COLUMN REINFORCING AND DETAILS SEE DRAWING SERIES S4.00
UNLESS NOTED OTHERWISE ON PLAN.

28. PROVIDE SHORING AND RESHORING PROCEDURES TO ENSURE


CONSTRUCTION LOADS DO NOT EXCEED THE SPECIFIED DESIGN LIVE LOAD.
REFER TO THE FORMWORK AND RESHORING SECTION OF THE GENERAL
NOTES FOR FURTHER REQUIREMENTS.

29. REFER TO GENERAL NOTES FOR FURTHER REQUIREMENTS.


BRYSON MARKULIN ZICKMANTEL
30. THE TWO-WAY FLAT SLAB SHOWN ON THIS PLAN IS CONSIDERED PART OF STRUCTURAL ENGINEERS
THE PRIMARY STRUCTURAL FRAME AND HAS BEEN REINFORCED FOR 3hr
FIRE RESISTANCE RATING IN ACCORDANCE WITH CBC 2016 CHAPTER 722. #501 - 510 BURRARD STREET, VANCOUVER, B.C. V6C 3A8
(604) 685-9533 WWW.BMZSE.COM CONTACT@BMZSE.COM

31. FOR EMBED PLATE, SEE 5 / S1.11


7
6
5
4
3
2
1

13'-0" 25'-6" 28'-0" 28'-0" 25'-6" 28'-6"


A

21'-10"
B

24 24
" " Ø
Ø

14
" x
12
" 14
x "
48
" 48 x
" 48
"
30'-6"

24"

24"

24"
C

12
12 " x
" x 72
84 "
"
26"
20"
UP

DN.

22"
21'-4"

DN

UP
D

24"

12
24"

24"

" x
12
"
84 x
" 72
"
29'-11"

14
" x
48 14
14 " " x
" x 48
48 "
"
E

24 24
" " Ø
Ø
19'-11"

SYMBOL " ".


F

COLLECTOR REINF. REFERENCE NOTE:


1. SEE DET. 26 / S1.05 FOR ALL REINFORCING WITH THE

TRUE NORTH
NORTH
PROJECT

(604) 685-9533

SHEET TITLE PROJECT NAME STAMP


A

Project Number
NO.

30925-01
LEVEL 09-19 PLAN - DIAPHRAGM
ISSUES:

Date APRIL 10TH, 2020


DATE

1233 South Grand PROGRESS


30925-01

REINFORCING Drawn By
WWW.BMZSE.COM

ML THESE DRAWINGS ARE NOT TO BE USED FOR


SET

Checked By TENDER, CONTRACT, OR CONSTRUCTION


S2.12.2

JD
SHEET NUMBER

Scale 2020-09-04 5:18:17 PM


PROJECT NUMBER

STRUCTURAL ENGINEERS

1/8" = 1'-0"
THIS DOCUMENT CONTAINS INFORMATION PROPRIETARY TO MVE + PARTNERS, INC. AND IS FURNISHED IN CONFIDENCE FOR
#501 - 510 BURRARD STREET, VANCOUVER, B.C. V6C 3A8

THE LIMITED PURPOSE OF EVALUATION, BIDDING OR REVIEW. THIS DOCUMENT OR ITS CONTENTS MAY NOT BE USED FOR ANY
OTHER PURPOSE AND MAY NOT BE REPRODUCED OR DISCLOSED TO OTHERS WITHOUT THE PRIOR WRITTEN CONSENT OF
ADDRESS, AVE, SUITE
DESCRIPTION

MVE + PARTNERS, INC. ALL RIGHTS RESERVED, © COPYRIGHT 2018. CITY, STATE, ZIP
BRYSON MARKULIN ZICKMANTEL
2020-08-03 100% DD PROGRESS

CONTACT@BMZSE.COM

08/03/2020 - ISSUED FOR 100% DD PROGRESS SET


A B B.2 C D E F
PROJECT
NORTH

TRUE NORTH

STAMP
A B C D E F A B C D E F
ISSUES:
NO. DATE DESCRIPTION
A 2020-04-23 ISSUED AS 100% SD
B 2020-06-16 50% DD PROGRESS
21'-10" 30'-6" 21'-4" 29'-11" 19'-11" 21'-10" 30'-6" 21'-4" 29'-11" 19'-11" SET
C 2020-08-03 100% DD PROGRESS
SET

1 11
28'-6"

28'-6"
7'-0 1/2"

7'-0 1/2"

"

"
72

72
"

"
72

72

x
Ø

"

"
x

10

10
"

"

"
10

10

24
Ø

Ø
2 3

"

1' - 4"
24

"
24
2 22 1 4

Ø"
24

THESE DRAWINGS ARE NOT TO BE USED FOR


DW

TENDER, CONTRACT, OR CONSTRUCTION


25'-6"

25'-6"
DW
8" P/T SLAB

2020-09-04 5:18:19 PM
PROGRESS
"
48
"
48

x"
x

12
"
DW

12
6
3 33

22"

22"
"

"
48

48
x

x
"

"
12

12
5
3.3
DN. DN DN.
24" 24"
24" 24"

DW
UP UP
DN
28'-0"

28'-0"
HSS ALL HEADER BEAMS TO BE 30" DP.
6x4x.375
INCLUDING SLAB DEPTH ON ALL
LEVELS

"
48
"
48

x
20"

20"

"
12
x"
24" 24" 24" 24"

12
8
4 44
"

"
48

48
x

x
DW
"

"
12

12
4.5 7
28'-0"

28'-0"
24" 24"
"

"
48

48

30925-01
Date APRIL 10TH, 2020

JD
ML
24" 24"
x

x
"

"
12

12
4.7 9

"
DW

48
"
48

x
26"

26"

"
x

12
"
12
10
5 55

Project Number
DW

Checked By
Drawn By
UP UP

DN. DN.
25'-6"

25'-6"
8" P/T SLAB
DW

DW

1233 South Grand


"

"

"

"
84

84

84

84
x

x
"

"

"

"
10

10

10

10
Ø

Ø
Ø

"

"
Ø

24

24
12 13
"

6 66
"

24
24

11 14
13'-0"

13'-0"
7'-11 1/2"

7'-11 1/2"
POST-TENSIONED SLAB NOTES:
1. SEE PLAN FOR SLAB THICKNESS

2. CLEAR COVER TO REINFORCING:


7 77 1" CLEAR COVER TOP – TO UPPER MOST TOP REINF.
1" CLEAR COVER BOTTOM – TO LOWERMOST BOTTOM REINF.
3' - 0" 1 1/2" CLEAR COVER BOTTOM TO P/T
DROP BARS FOR CHAIRING PURPOSES ARE TO BE CONSIDERED
ACCESSORIES SUPPLIED BY THE CONTRACTOR. REFER TO BAR PLACING
85' - 8"
ORDER FOR FURTHER REQUIREMENTS.

3. DIMENSIONS FOR P/T PROFILE SHOWN ON PLAN ARE CHAIR HEIGHTS


SHOWN IN INCHES. CHAIR HEIGHTS SPECIFIED ARE TO UNDERSIDE OF
TENDON SHEATHING.

4. PROVIDE 0.5" DIA LOW RELAXATION OR SUBSTITUTE 0.6" DIA LOW

ADDRESS, AVE, SUITE


RELAXATION STRAND AND MAKE ADJUSTMENTS TO CHAIR HEIGHTS.
LEVEL 20 - PH PLAN - REINFORCING
5. WHERE P/T STRAND QUANTITIES ARE SHOWN ON PLAN, THE ASSUMED

CITY, STATE, ZIP


LEVEL 20 - PH

PROJECT NAME
STRAND NET EFFECTIVE FORCE IS 27 KIPS.

6. MAINTAIN SMOOTH PROFILES OF ALL STRANDS.

7. WHERE STRANDS ARE CURVED IN PLAN, SPREAD TENDONS 1" CLEAR


BETWEEN THROUGHOUT CURVE.

8. RUN STRANDS STRAIGHT PAST OPENINGS.

9. DEVIATE STRANDS 1:6 MAXIMUM UNLESS NOTED.

LEVEL 20-PH PLAN - CONCRETE OUTLINE

THE LIMITED PURPOSE OF EVALUATION, BIDDING OR REVIEW. THIS DOCUMENT OR ITS CONTENTS MAY NOT BE USED FOR ANY
THIS DOCUMENT CONTAINS INFORMATION PROPRIETARY TO MVE + PARTNERS, INC. AND IS FURNISHED IN CONFIDENCE FOR
10. TWO TENDONS MINIMUM TO BE PLACED OVER ALL WALLS AND COLUMNS –

OTHER PURPOSE AND MAY NOT BE REPRODUCED OR DISCLOSED TO OTHERS WITHOUT THE PRIOR WRITTEN CONSENT OF
SEE TYPICAL INTEGRITY REINF. DETAIL – EXCEPT AS NOTED ON PLAN.

11. ALL ANCHORS TO BE PLACED MID-HEIGHT OF SLAB, BANDED ANCHORS


HAVE PRIORITY OVER DISTRIBUTED ANCHORS AT CORNERS OF SLAB.

12. PLACE DISTRIBUTED STRANDS ABOVE BANDED STRANDS WHERE THEY

LEVEL 20-PH PLAN - REINFORCING


CONFLICT AT MID-HEIGHT OF SLAB.

13. SEE SHOP DRAWINGS FOR SYSTEM SPECIFIC REQUIREMENTS INCLUDING


BURSTING STEEL, CORROSION PREVENTION, ETC.

14. PROVIDE FULLY ENCAPSULATED POST-TENSION SYSTEM. ALTERNATE NON-


ENCAPSULATED SYSTEMS WILL BE REJECTED.

15. STORE POST-TENSION CABLES IN A DRY ENVIRONMENT.

16. STRANDS OVER 130 FT IN LENGTH TO BE STRESSED TWO ENDS. SHORTER


STRANDS ALTERNATE STRESSING EACH END WHERE POSSIBLE.

MVE + PARTNERS, INC. ALL RIGHTS RESERVED, © COPYRIGHT 2018.


17. PROVIDE CAMBER TO SLABS AS SHOWN ON PLAN AND AS NOTED IN THE
CONCRETE SLAB SECTION OF THE GENERAL NOTES.

18. ALL SLABS TO BE MONITORED DURING CONSTRUCTION FOR FLATNESS AND


LEVELNESS AS NOTED IN THE SLAB SURVEY CONTROL SECTION OF THE

1/8" = 1'-0"
GENERAL NOTES. SUBMIT SURVEY DATA TO BMZ STRUCTURAL ENGINEERS
FOR REVIEW.

19. FOR STUDRAIL REINFORCING REFER TO STUD RAIL SCHEDULE ON PLAN.

08/03/2020 - ISSUED FOR 100% DD PROGRESS SET


20. CONFIRM ALL SLAB ELEVATIONS, STEPS, SLOPES, AND OPENINGS WITH
ARCHITECTURAL DRAWINGS.

21. FOR BUILTUP STRUCTURES SHOWN ON PLAN REFER TO DETAILS 2 / S1.06


& 3 / S1.06

22. FOR ALL DRAINAGE AND WATER PROOFING REQUIREMENTS REFER TO THE

SHEET TITLE
ARCHITECT.

23. SEE ARCHITECTURAL DRAWINGS FOR SIZE AND LOCATION OF ALL

Scale
ARCHITECTURAL CURBS, UPSTANDS AND ARCHITECTURAL FEATURES.

24. CONFIRM ALL MECHANICAL AND ELECTRICAL OPENINGS AND SLEEVES WITH
CONSULTANTS DRAWINGS. CONFIRM ALL OPENINGS AND ELEMENTS NOT
SHOWN ON THE STRUCTURAL DRAWINGS WITH BMZ STRUCTURAL SHEET NUMBER
ENGINEERS PRIOR TO CONSTRUCTION.

CONCRETE COLUMN REFERENCE NOTE:


25. REFER TO MECHANICAL DRAWINGS FOR LOCATIONS OF IN-SLAB DUCTS.
REFER TO DETAIL 5 / S1.04 FOR CLEARANCE REQUIREMENTS TO DUCTS AND
S2.13.1
EXTRA REINFORCING REQUIRED AT IN-SLAB DUCTS.

1. COLUMN WITH SYMBOL 50 DENOTES TOWER 26. FOR SHEARWALL REINFORCING DETAILS AND ELEVATIONS SEE DRAWING
CONCRETE COLUMN. SERIES S3.00 UNLESS NOTED OTHERWISE ON PLAN. PROJECT NUMBER
TYPE VARIES
INSIDE CIRCLE 30925-01
27. FOR COLUMN REINFORCING AND DETAILS SEE DRAWING SERIES S4.00
2. SEE DRAWINGS S4.01, S4.02 AND S4.03 FOR ALL THE UNLESS NOTED OTHERWISE ON PLAN.
TOWER CONCRETE COLUMNS, U.N.O.
28. PROVIDE SHORING AND RESHORING PROCEDURES TO ENSURE
CONSTRUCTION LOADS DO NOT EXCEED THE SPECIFIED DESIGN LIVE LOAD.
REFER TO THE FORMWORK AND RESHORING SECTION OF THE GENERAL
NOTES FOR FURTHER REQUIREMENTS.

29. REFER TO GENERAL NOTES FOR FURTHER REQUIREMENTS.


BRYSON MARKULIN ZICKMANTEL
30. THE TWO-WAY FLAT SLAB SHOWN ON THIS PLAN IS CONSIDERED PART OF STRUCTURAL ENGINEERS
THE PRIMARY STRUCTURAL FRAME AND HAS BEEN REINFORCED FOR 3hr
FIRE RESISTANCE RATING IN ACCORDANCE WITH CBC 2016 CHAPTER 722. #501 - 510 BURRARD STREET, VANCOUVER, B.C. V6C 3A8
(604) 685-9533 WWW.BMZSE.COM CONTACT@BMZSE.COM

31. FOR EMBED PLATE, SEE 5 / S1.11


7
6
5
4
3
2
1

13'-0" 25'-6" 28'-0" 28'-0" 25'-6" 28'-6"


A

21'-10"
B

24
" Ø 24
" Ø

12 12
" x
12 " x
48 " x 48
" 48 "
"
30'-6"

7'-11 1/2" 7'-0 1/2"


24"
24"

24"
C

10 10
" " x
x 72
84
" "

26" 20"
DN.
UP

22"
21'-4"

UP
DN.

24"
24"
D

10
24"

" x
10
"
84 x
" 72
"
29'-11"
E

24 12 12 12 24
" Ø " x " " x "
48 x 48 Ø
48
" " "
19'-11"

SYMBOL " ".


F

COLLECTOR REINF. REFERENCE NOTE:


1. SEE DET. 26 / S1.05 FOR ALL REINFORCING WITH THE

TRUE NORTH
NORTH
PROJECT

(604) 685-9533

SHEET TITLE PROJECT NAME STAMP


A

Project Number
NO.

30925-01
LEVEL 20 - DIAPHRAGM REINFORCING
ISSUES:

Date APRIL 10TH, 2020


DATE

1233 South Grand PROGRESS


30925-01

PLAN Drawn By
WWW.BMZSE.COM

ML THESE DRAWINGS ARE NOT TO BE USED FOR


SET

Checked By TENDER, CONTRACT, OR CONSTRUCTION


S2.13.2

JD
SHEET NUMBER

Scale 2020-09-04 5:18:21 PM


PROJECT NUMBER

STRUCTURAL ENGINEERS

1/8" = 1'-0"
THIS DOCUMENT CONTAINS INFORMATION PROPRIETARY TO MVE + PARTNERS, INC. AND IS FURNISHED IN CONFIDENCE FOR
#501 - 510 BURRARD STREET, VANCOUVER, B.C. V6C 3A8

THE LIMITED PURPOSE OF EVALUATION, BIDDING OR REVIEW. THIS DOCUMENT OR ITS CONTENTS MAY NOT BE USED FOR ANY
OTHER PURPOSE AND MAY NOT BE REPRODUCED OR DISCLOSED TO OTHERS WITHOUT THE PRIOR WRITTEN CONSENT OF
ADDRESS, AVE, SUITE
DESCRIPTION

MVE + PARTNERS, INC. ALL RIGHTS RESERVED, © COPYRIGHT 2018. CITY, STATE, ZIP
BRYSON MARKULIN ZICKMANTEL
2020-08-03 100% DD PROGRESS

CONTACT@BMZSE.COM

08/03/2020 - ISSUED FOR 100% DD PROGRESS SET


A B B.2 C D E F
PROJECT
NORTH

TRUE NORTH

STAMP
A B C D E F A B C D E F
ISSUES:
NO. DATE DESCRIPTION
A 2020-04-23 ISSUED AS 100% SD
B 2020-06-16 50% DD PROGRESS
21'-10" 30'-6" 21'-4" 29'-11" 19'-11" 21'-10" 30'-6" 21'-4" 29'-11" 19'-11" SET
C 2020-08-03 100% DD PROGRESS
SET

1 11

5
37
0.
28'-6"

28'-6"

3x
4x
SS

.
YP
H
T
HSS4x2x0.125

24"
2 22
18" WIDE
12" SLAB BEAM RECESSED POOL
24" 24"

50"

18"
12" SLAB
50" 12" SLAB STEP
STEP

THESE DRAWINGS ARE NOT TO BE USED FOR


50"
50"

TENDER, CONTRACT, OR CONSTRUCTION


STEP

37
STEP 24" WIDE

0.
25'-6"

25'-6"
BEAM

3x
12" SLAB

x
18"

P. 4
TY SS
18" WIDE

H
BEAM

2020-09-04 5:18:23 PM
PROGRESS
18"

24"
18" WIDE 24" WIDE
BEAM

5
BEAM

37
0.
3 33

3x
x
P. 4
TY SS

STEP
22"

22"

24"

10"
3.3 STAIR #1
15

Ø
"

Ø
DN. DN.
24

"
21S1

24
"

"
24

24
x

x
"
12

"
12
24"
5 POOL EQUIP 24"
UP UP
28'-0"

28'-0"
2111 HSS FRAME BEHIND
WINDOW WALL UPSTAND
EVERY OTHER MULLION,
AS SHOWN.
ALL HEADER BEAMS HSS4x3x0.375 VERTS. &
CHUTES
10" HSS
10"
TO BE 30" DP. INCLUDING HSS4x2x0.125 HORIZ.
STEP 2113 6x4x.375 SLAB DEPTH ON ALL
"

"
24

24
STEP
LEVELS
x

x
"

"
12

12
16
20"

20"
Ø

Ø
24"
12" SLAB 24"
12" SLAB

"

"
ACCELEROGRAPH

24

24
24" 24"
4 44 2115 15

WOMEN'S MEN'S
2109 2110
ELEV. HATCHED AREA DENOTES

HSS4x2x0.125
LOBBY 10"
10" STEP BUILT UP 4" SLAB OVER
2100
4.5 STEP RIGID INSULATION.
AMENITY
"

"

HSS4x2x0.125
24

24
2101
x

x
28'-0"

28'-0"
"

"
12

12
7
24" 24" CORRIDOR 24" 24"

30925-01
Date APRIL 10TH, 2020

JD
ML
"

"
2108

24

24
ELEV.
15
26"

4.7

26"
ELEC. CONTROL
2107 2106
"

"
24

24
x

x
DW
"

"
12

12
9 MECH.
16 2117
"

"
24

24
5 55

Project Number
x

x
"

"

Checked By
5
12

12
37

Drawn By
0.
6x
UP UP

8x
"

"
SS
24

24
STAIR #2

H
x

x
21S2
"

"
12

12
DN. DN.
12" SLAB
16

Ø
Ø

5
25'-6"

25'-6"

EQ.

"
37
"

24
24

0.
6x
15

8x
SS
H
"

"
24

24
16
x

x
"

"
12" SLAB
12

12

1233 South Grand


CENTRAL HSS6x4x0.250

5
EQ.

37
PLANT HSS 6x6x0.375

0.
6x
2105 COL.

8x
"

"
6 66
39

39
SS
x

x
"

H
24
"

"
12

12
" x
20

12
13'-0"

13'-0"

"
24
HSS10x6x0.375

75
13

x
POST-TENSIONED SLAB NOTES:

.3

"
20
x03
P. 4x
1. SEE PLAN FOR SLAB THICKNESS

TY S
S
H
2. CLEAR COVER TO REINFORCING:
7 77 HSS4x2x0.125
1" CLEAR COVER TOP – TO UPPER MOST TOP REINF.
1" CLEAR COVER BOTTOM – TO LOWERMOST BOTTOM REINF.
1 1/2" CLEAR COVER BOTTOM TO P/T
DROP BARS FOR CHAIRING PURPOSES ARE TO BE CONSIDERED
ACCESSORIES SUPPLIED BY THE CONTRACTOR. REFER TO BAR PLACING
ORDER FOR FURTHER REQUIREMENTS.

3. DIMENSIONS FOR P/T PROFILE SHOWN ON PLAN ARE CHAIR HEIGHTS


SHOWN IN INCHES. CHAIR HEIGHTS SPECIFIED ARE TO UNDERSIDE OF
TENDON SHEATHING.

4. PROVIDE 0.5" DIA LOW RELAXATION OR SUBSTITUTE 0.6" DIA LOW

ADDRESS, AVE, SUITE


RELAXATION STRAND AND MAKE ADJUSTMENTS TO CHAIR HEIGHTS.

5. WHERE P/T STRAND QUANTITIES ARE SHOWN ON PLAN, THE ASSUMED

CITY, STATE, ZIP


PROJECT NAME
STRAND NET EFFECTIVE FORCE IS 27 KIPS.

6. MAINTAIN SMOOTH PROFILES OF ALL STRANDS.


LEVEL 21 - ROOF PLAN - REINFORCING LEVEL 21 - ROOF
7. WHERE STRANDS ARE CURVED IN PLAN, SPREAD TENDONS 1" CLEAR
BETWEEN THROUGHOUT CURVE.

8. RUN STRANDS STRAIGHT PAST OPENINGS.

9. DEVIATE STRANDS 1:6 MAXIMUM UNLESS NOTED.

THE LIMITED PURPOSE OF EVALUATION, BIDDING OR REVIEW. THIS DOCUMENT OR ITS CONTENTS MAY NOT BE USED FOR ANY
THIS DOCUMENT CONTAINS INFORMATION PROPRIETARY TO MVE + PARTNERS, INC. AND IS FURNISHED IN CONFIDENCE FOR
10. TWO TENDONS MINIMUM TO BE PLACED OVER ALL WALLS AND COLUMNS –

OTHER PURPOSE AND MAY NOT BE REPRODUCED OR DISCLOSED TO OTHERS WITHOUT THE PRIOR WRITTEN CONSENT OF
SEE TYPICAL INTEGRITY REINF. DETAIL – EXCEPT AS NOTED ON PLAN.

11. ALL ANCHORS TO BE PLACED MID-HEIGHT OF SLAB, BANDED ANCHORS


HAVE PRIORITY OVER DISTRIBUTED ANCHORS AT CORNERS OF SLAB.

LEVEL 21-ROOF PLAN - CONCRETE


12. PLACE DISTRIBUTED STRANDS ABOVE BANDED STRANDS WHERE THEY

OUTLINE AND REINFORCING PLAN


CONFLICT AT MID-HEIGHT OF SLAB.

13. SEE SHOP DRAWINGS FOR SYSTEM SPECIFIC REQUIREMENTS INCLUDING


BURSTING STEEL, CORROSION PREVENTION, ETC.

14. PROVIDE FULLY ENCAPSULATED POST-TENSION SYSTEM. ALTERNATE NON-


ENCAPSULATED SYSTEMS WILL BE REJECTED.

15. STORE POST-TENSION CABLES IN A DRY ENVIRONMENT.

16. STRANDS OVER 130 FT IN LENGTH TO BE STRESSED TWO ENDS. SHORTER


STRANDS ALTERNATE STRESSING EACH END WHERE POSSIBLE.

MVE + PARTNERS, INC. ALL RIGHTS RESERVED, © COPYRIGHT 2018.


17. PROVIDE CAMBER TO SLABS AS SHOWN ON PLAN AND AS NOTED IN THE
CONCRETE SLAB SECTION OF THE GENERAL NOTES.

18. ALL SLABS TO BE MONITORED DURING CONSTRUCTION FOR FLATNESS AND


LEVELNESS AS NOTED IN THE SLAB SURVEY CONTROL SECTION OF THE

1/8" = 1'-0"
GENERAL NOTES. SUBMIT SURVEY DATA TO BMZ STRUCTURAL ENGINEERS
FOR REVIEW.

19. FOR STUDRAIL REINFORCING REFER TO STUD RAIL SCHEDULE ON PLAN.

08/03/2020 - ISSUED FOR 100% DD PROGRESS SET


20. CONFIRM ALL SLAB ELEVATIONS, STEPS, SLOPES, AND OPENINGS WITH
ARCHITECTURAL DRAWINGS.

21. FOR BUILTUP STRUCTURES SHOWN ON PLAN REFER TO DETAILS 2 / S1.06


& 3 / S1.06

22. FOR ALL DRAINAGE AND WATER PROOFING REQUIREMENTS REFER TO THE

SHEET TITLE
ARCHITECT.

23. SEE ARCHITECTURAL DRAWINGS FOR SIZE AND LOCATION OF ALL

Scale
ARCHITECTURAL CURBS, UPSTANDS AND ARCHITECTURAL FEATURES.

24. CONFIRM ALL MECHANICAL AND ELECTRICAL OPENINGS AND SLEEVES WITH
CONSULTANTS DRAWINGS. CONFIRM ALL OPENINGS AND ELEMENTS NOT
CONCRETE COLUMN REFERENCE NOTE: SHOWN ON THE STRUCTURAL DRAWINGS WITH BMZ STRUCTURAL SHEET NUMBER
ENGINEERS PRIOR TO CONSTRUCTION.
1. COLUMN WITH SYMBOL 50 DENOTES TOWER
CONCRETE COLUMN. TYPE VARIES
25. REFER TO MECHANICAL DRAWINGS FOR LOCATIONS OF IN-SLAB DUCTS.
REFER TO DETAIL 5 / S1.04 FOR CLEARANCE REQUIREMENTS TO DUCTS AND
S2.14.1
INSIDE CIRCLE EXTRA REINFORCING REQUIRED AT IN-SLAB DUCTS.
2. SEE DRAWINGS S4.01, S4.02 AND S4.03 FOR ALL THE
26. FOR SHEARWALL REINFORCING DETAILS AND ELEVATIONS SEE DRAWING
TOWER CONCRETE COLUMNS, U.N.O. SERIES S3.00 UNLESS NOTED OTHERWISE ON PLAN. PROJECT NUMBER
30925-01
27. FOR COLUMN REINFORCING AND DETAILS SEE DRAWING SERIES S4.00
UNLESS NOTED OTHERWISE ON PLAN.

28. PROVIDE SHORING AND RESHORING PROCEDURES TO ENSURE


CONSTRUCTION LOADS DO NOT EXCEED THE SPECIFIED DESIGN LIVE LOAD.
REFER TO THE FORMWORK AND RESHORING SECTION OF THE GENERAL
NOTES FOR FURTHER REQUIREMENTS.

29. REFER TO GENERAL NOTES FOR FURTHER REQUIREMENTS.


BRYSON MARKULIN ZICKMANTEL
30. THE TWO-WAY FLAT SLAB SHOWN ON THIS PLAN IS CONSIDERED PART OF STRUCTURAL ENGINEERS
THE PRIMARY STRUCTURAL FRAME AND HAS BEEN REINFORCED FOR 3hr
FIRE RESISTANCE RATING IN ACCORDANCE WITH CBC 2016 CHAPTER 722. #501 - 510 BURRARD STREET, VANCOUVER, B.C. V6C 3A8
(604) 685-9533 WWW.BMZSE.COM CONTACT@BMZSE.COM

31. FOR EMBED PLATE, SEE 5 / S1.11


7
6
5
4
3
2
1

13'-0" 25'-6" 28'-0" 28'-0" 25'-6" 28'-6"


A

21'-10"
B

12 12 12 12
" " x " x " x
x 24 24 24
24
" " " "
30'-6"

12
" x
12
" x
24
"
24
"
C

12
" x
24"

24"

39
" 20"
26"
UP

DN.
21'-4"

UP
DN.

24"
D

12
24"

24"

20 " x
" x
24
24 "
"
29'-11"

24
" Ø

24 24 24
" " " Ø
Ø Ø
E

19'-11"

SYMBOL " ".


F

COLLECTOR REINF. REFERENCE NOTE:


1. SEE DET. 26 / S1.05 FOR ALL REINFORCING WITH THE

TRUE NORTH
NORTH
PROJECT

(604) 685-9533

SHEET TITLE PROJECT NAME STAMP


A

Project Number
NO.

30925-01
LEVEL 21-ROOF - DIAPHRAGM
ISSUES:

Date APRIL 10TH, 2020


DATE

1233 South Grand PROGRESS


30925-01

REINFORCING PLAN Drawn By


WWW.BMZSE.COM

ML THESE DRAWINGS ARE NOT TO BE USED FOR


SET

Checked By TENDER, CONTRACT, OR CONSTRUCTION


S2.14.2

JD
SHEET NUMBER

Scale 2020-09-04 5:18:25 PM


PROJECT NUMBER

STRUCTURAL ENGINEERS

1/8" = 1'-0"
THIS DOCUMENT CONTAINS INFORMATION PROPRIETARY TO MVE + PARTNERS, INC. AND IS FURNISHED IN CONFIDENCE FOR
#501 - 510 BURRARD STREET, VANCOUVER, B.C. V6C 3A8

THE LIMITED PURPOSE OF EVALUATION, BIDDING OR REVIEW. THIS DOCUMENT OR ITS CONTENTS MAY NOT BE USED FOR ANY
OTHER PURPOSE AND MAY NOT BE REPRODUCED OR DISCLOSED TO OTHERS WITHOUT THE PRIOR WRITTEN CONSENT OF
ADDRESS, AVE, SUITE
DESCRIPTION

MVE + PARTNERS, INC. ALL RIGHTS RESERVED, © COPYRIGHT 2018. CITY, STATE, ZIP
BRYSON MARKULIN ZICKMANTEL
2020-08-03 100% DD PROGRESS

CONTACT@BMZSE.COM

08/03/2020 - ISSUED FOR 100% DD PROGRESS SET


A B B.2 C D E F
PROJECT
NORTH

TRUE NORTH

STAMP
A B C D E F A B C D E F
ISSUES:
NO. DATE DESCRIPTION
A 2020-04-23 ISSUED AS 100% SD
B 2020-06-16 50% DD PROGRESS
SET
C 2020-08-03 100% DD PROGRESS
21'-10" 30'-6" 21'-4" 29'-11" 19'-11"
21'-10" 30'-6" 21'-4" 29'-11" 19'-11" SET

1 11

28'-6"

28'-6"
2 22

THESE DRAWINGS ARE NOT TO BE USED FOR


TENDER, CONTRACT, OR CONSTRUCTION
25'-6"

25'-6"

2020-09-04 5:18:27 PM
PROGRESS
3 33 2 2

1"
S1.05 S1.05

8"
8"
3.3

8"
8"
5" 8"

5" DN. DN.


28'-0"

28'-0"
8"

8"

8"
8"

8"
8"
12"

12"
12" 12"
4 12" 44 12"

"
24
x
12"

12"

"
12
16
8"
2
S1.05
10" SLAB 10" SLAB

4.5
2
28'-0"

28'-0"
S1.05
12"

12"
8"

12" 12" 12" 12"

30925-01
Date APRIL 10TH, 2020

JD
ML
4.7

12"

8"
8"
8"

5 55

Project Number
2

Checked By
S1.05

8"

Drawn By
8" 8" 8"

AT FLOOR LEVEL AND


T.O. PARAPET LEVEL
DN. DN.

HSS6x6x0.375
8"
2
OPEN OPEN
8"

8"
S1.05
25'-6"

25'-6"

8"
10" SLAB
2
2 S1.05

1233 South Grand


S1.05 2
S1.05

6 66

"
24
HSS6x6x0.375

x"
12
AT FLOOR LEVEL AND 12

8"
T.O. PARAPET LEVEL 13

"
13'-0"

13'-0"

24
x
2

"
POST-TENSIONED SLAB NOTES:

12
S1.05
1. SEE PLAN FOR SLAB THICKNESS

2. CLEAR COVER TO REINFORCING:


7 77 1" CLEAR COVER TOP – TO UPPER MOST TOP REINF.
1" CLEAR COVER BOTTOM – TO LOWERMOST BOTTOM REINF.
1 1/2" CLEAR COVER BOTTOM TO P/T
DROP BARS FOR CHAIRING PURPOSES ARE TO BE CONSIDERED
ACCESSORIES SUPPLIED BY THE CONTRACTOR. REFER TO BAR PLACING
ORDER FOR FURTHER REQUIREMENTS.

3. DIMENSIONS FOR P/T PROFILE SHOWN ON PLAN ARE CHAIR HEIGHTS


SHOWN IN INCHES. CHAIR HEIGHTS SPECIFIED ARE TO UNDERSIDE OF
TENDON SHEATHING.

4. PROVIDE 0.5" DIA LOW RELAXATION OR SUBSTITUTE 0.6" DIA LOW


AUX - ROOF PLAN - REINFORCING AUX - ROOF

ADDRESS, AVE, SUITE


RELAXATION STRAND AND MAKE ADJUSTMENTS TO CHAIR HEIGHTS.

5. WHERE P/T STRAND QUANTITIES ARE SHOWN ON PLAN, THE ASSUMED

CITY, STATE, ZIP


PROJECT NAME
STRAND NET EFFECTIVE FORCE IS 27 KIPS.

6. MAINTAIN SMOOTH PROFILES OF ALL STRANDS.

7. WHERE STRANDS ARE CURVED IN PLAN, SPREAD TENDONS 1" CLEAR


BETWEEN THROUGHOUT CURVE.

8. RUN STRANDS STRAIGHT PAST OPENINGS.

9. DEVIATE STRANDS 1:6 MAXIMUM UNLESS NOTED.

THE LIMITED PURPOSE OF EVALUATION, BIDDING OR REVIEW. THIS DOCUMENT OR ITS CONTENTS MAY NOT BE USED FOR ANY
THIS DOCUMENT CONTAINS INFORMATION PROPRIETARY TO MVE + PARTNERS, INC. AND IS FURNISHED IN CONFIDENCE FOR
10. TWO TENDONS MINIMUM TO BE PLACED OVER ALL WALLS AND COLUMNS –

OTHER PURPOSE AND MAY NOT BE REPRODUCED OR DISCLOSED TO OTHERS WITHOUT THE PRIOR WRITTEN CONSENT OF
SEE TYPICAL INTEGRITY REINF. DETAIL – EXCEPT AS NOTED ON PLAN.

ALL ANCHORS TO BE PLACED MID-HEIGHT OF SLAB, BANDED ANCHORS

LEVEL HIGH ROOF PLAN - CONCRETE


11.
HAVE PRIORITY OVER DISTRIBUTED ANCHORS AT CORNERS OF SLAB.

12. PLACE DISTRIBUTED STRANDS ABOVE BANDED STRANDS WHERE THEY

OUTLINE AND REINFORCING PLAN


CONFLICT AT MID-HEIGHT OF SLAB.

13. SEE SHOP DRAWINGS FOR SYSTEM SPECIFIC REQUIREMENTS INCLUDING


BURSTING STEEL, CORROSION PREVENTION, ETC.

14. PROVIDE FULLY ENCAPSULATED POST-TENSION SYSTEM. ALTERNATE NON-


ENCAPSULATED SYSTEMS WILL BE REJECTED.

15. STORE POST-TENSION CABLES IN A DRY ENVIRONMENT.

16. STRANDS OVER 130 FT IN LENGTH TO BE STRESSED TWO ENDS. SHORTER


STRANDS ALTERNATE STRESSING EACH END WHERE POSSIBLE.

MVE + PARTNERS, INC. ALL RIGHTS RESERVED, © COPYRIGHT 2018.


17. PROVIDE CAMBER TO SLABS AS SHOWN ON PLAN AND AS NOTED IN THE
CONCRETE SLAB SECTION OF THE GENERAL NOTES.

18. ALL SLABS TO BE MONITORED DURING CONSTRUCTION FOR FLATNESS AND


LEVELNESS AS NOTED IN THE SLAB SURVEY CONTROL SECTION OF THE

1/8" = 1'-0"
GENERAL NOTES. SUBMIT SURVEY DATA TO BMZ STRUCTURAL ENGINEERS
FOR REVIEW.

19. FOR STUDRAIL REINFORCING REFER TO STUD RAIL SCHEDULE ON PLAN.

08/03/2020 - ISSUED FOR 100% DD PROGRESS SET


20. CONFIRM ALL SLAB ELEVATIONS, STEPS, SLOPES, AND OPENINGS WITH
ARCHITECTURAL DRAWINGS.

21. FOR BUILTUP STRUCTURES SHOWN ON PLAN REFER TO DETAILS 2 / S1.06


& 3 / S1.06

22. FOR ALL DRAINAGE AND WATER PROOFING REQUIREMENTS REFER TO THE

SHEET TITLE
ARCHITECT.

23. SEE ARCHITECTURAL DRAWINGS FOR SIZE AND LOCATION OF ALL

Scale
ARCHITECTURAL CURBS, UPSTANDS AND ARCHITECTURAL FEATURES.

24. CONFIRM ALL MECHANICAL AND ELECTRICAL OPENINGS AND SLEEVES WITH
CONSULTANTS DRAWINGS. CONFIRM ALL OPENINGS AND ELEMENTS NOT
CONCRETE COLUMN REFERENCE NOTE: SHOWN ON THE STRUCTURAL DRAWINGS WITH BMZ STRUCTURAL
ENGINEERS PRIOR TO CONSTRUCTION.
SHEET NUMBER

1. COLUMN WITH SYMBOL 50 DENOTES TOWER


CONCRETE COLUMN. TYPE VARIES
25. REFER TO MECHANICAL DRAWINGS FOR LOCATIONS OF IN-SLAB DUCTS.
REFER TO DETAIL 5 / S1.04 FOR CLEARANCE REQUIREMENTS TO DUCTS AND
S2.15.1
INSIDE CIRCLE EXTRA REINFORCING REQUIRED AT IN-SLAB DUCTS.

2. SEE DRAWINGS S4.01, S4.02 AND S4.03 FOR ALL THE 26. FOR SHEARWALL REINFORCING DETAILS AND ELEVATIONS SEE DRAWING
TOWER CONCRETE COLUMNS, U.N.O. SERIES S3.00 UNLESS NOTED OTHERWISE ON PLAN. PROJECT NUMBER
30925-01
27. FOR COLUMN REINFORCING AND DETAILS SEE DRAWING SERIES S4.00
UNLESS NOTED OTHERWISE ON PLAN.

28. PROVIDE SHORING AND RESHORING PROCEDURES TO ENSURE


CONSTRUCTION LOADS DO NOT EXCEED THE SPECIFIED DESIGN LIVE LOAD.
REFER TO THE FORMWORK AND RESHORING SECTION OF THE GENERAL
NOTES FOR FURTHER REQUIREMENTS.

29. REFER TO GENERAL NOTES FOR FURTHER REQUIREMENTS.


BRYSON MARKULIN ZICKMANTEL
30. THE TWO-WAY FLAT SLAB SHOWN ON THIS PLAN IS CONSIDERED PART OF STRUCTURAL ENGINEERS
THE PRIMARY STRUCTURAL FRAME AND HAS BEEN REINFORCED FOR 3hr
FIRE RESISTANCE RATING IN ACCORDANCE WITH CBC 2016 CHAPTER 722. #501 - 510 BURRARD STREET, VANCOUVER, B.C. V6C 3A8
(604) 685-9533 WWW.BMZSE.COM CONTACT@BMZSE.COM

31. FOR EMBED PLATE, SEE 5 / S1.11


7
6
5
4
3
2
1

13'-0" 25'-6" 28'-0" 28'-0" 25'-6" 28'-6"


A

21'-10"
B

30'-6"

OPEN
8"

8"
C

12
8"

" x
12"

24
12"

" 8"
8"
8"

8" 12" 12" 12"


DN.
DN.

12"
12"

8"
21'-4"

8"

8"
12"

8"
8"
D

12
" x
8"

12 24
" x "
24
"
29'-11"
E

19'-11"

SYMBOL " ".


F

COLLECTOR REINF. REFERENCE NOTE:

TRUE NORTH
1. SEE DET. 26 / S1.05 FOR ALL REINFORCING WITH THE
NORTH
PROJECT

(604) 685-9533

SHEET TITLE PROJECT NAME STAMP


A

Project Number
NO.

30925-01
LEVEL HIGH ROOF - DIAPHRAGM
ISSUES:

Date APRIL 10TH, 2020


DATE

1233 South Grand PROGRESS


30925-01

REINFORCING PLAN Drawn By


WWW.BMZSE.COM

ML THESE DRAWINGS ARE NOT TO BE USED FOR


SET

Checked By TENDER, CONTRACT, OR CONSTRUCTION


S2.15.2

JD
SHEET NUMBER

Scale 2020-09-04 5:18:29 PM


PROJECT NUMBER

STRUCTURAL ENGINEERS

1/8" = 1'-0"
THIS DOCUMENT CONTAINS INFORMATION PROPRIETARY TO MVE + PARTNERS, INC. AND IS FURNISHED IN CONFIDENCE FOR
#501 - 510 BURRARD STREET, VANCOUVER, B.C. V6C 3A8

THE LIMITED PURPOSE OF EVALUATION, BIDDING OR REVIEW. THIS DOCUMENT OR ITS CONTENTS MAY NOT BE USED FOR ANY
OTHER PURPOSE AND MAY NOT BE REPRODUCED OR DISCLOSED TO OTHERS WITHOUT THE PRIOR WRITTEN CONSENT OF
ADDRESS, AVE, SUITE
DESCRIPTION

MVE + PARTNERS, INC. ALL RIGHTS RESERVED, © COPYRIGHT 2018. CITY, STATE, ZIP
BRYSON MARKULIN ZICKMANTEL
2020-08-03 100% DD PROGRESS

CONTACT@BMZSE.COM

08/03/2020 - ISSUED FOR 100% DD PROGRESS SET


7
6
5
4
3
2
1
13'-0" 25'-6" 28'-0" 28'-0" 25'-6" 28'-6"
A

21'-10"
B

30'-6"
C

21'-4"
D

T.O. UPPER ROOF PLAN - REINFORCING


29'-11"
E

19'-11"
F

7
6
5
4
3
2
1

13'-0" 25'-6" 28'-0" 28'-0" 25'-6" 28'-6"


A

21'-10"
B

30'-6"

2
S1.05

12
C

8"

12 HSS8x8x0.375
" x
24
"

8" 8"
21'-4"

OPEN
8" SLAB

HSS8x8x0.375

T.O. UPPER ROOF


D

8"

12 HSS8x8x0.375
" x
13

24
"
2
S1.05
29'-11"
E

19'-11"

CONCRETE COLUMN.
F

TOWER CONCRETE COLUMNS, U.N.O.


TYPE VARIES
INSIDE CIRCLE
1. COLUMN WITH SYMBOL 50 DENOTES TOWER
CONCRETE COLUMN REFERENCE NOTE:

2. SEE DRAWINGS S4.01, S4.02 AND S4.03 FOR ALL THE

TRUE NORTH
NORTH
PROJECT

(604) 685-9533

SHEET TITLE PROJECT NAME STAMP


B
A

Project Number
NO.

30925-01
T.O. UPPER ROOF CONCRETE OUTLINE
ISSUES:

Date APRIL 10TH, 2020


DATE

1233 South Grand PROGRESS


30925-01

AND REINFORCING PLAN Drawn By


WWW.BMZSE.COM

SA THESE DRAWINGS ARE NOT TO BE USED FOR


SET
SET

Checked By TENDER, CONTRACT, OR CONSTRUCTION


S2.16.1

JD
SHEET NUMBER

Scale 2020-09-04 5:18:31 PM


PROJECT NUMBER

STRUCTURAL ENGINEERS

1/8" = 1'-0"
THIS DOCUMENT CONTAINS INFORMATION PROPRIETARY TO MVE + PARTNERS, INC. AND IS FURNISHED IN CONFIDENCE FOR
#501 - 510 BURRARD STREET, VANCOUVER, B.C. V6C 3A8

THE LIMITED PURPOSE OF EVALUATION, BIDDING OR REVIEW. THIS DOCUMENT OR ITS CONTENTS MAY NOT BE USED FOR ANY
OTHER PURPOSE AND MAY NOT BE REPRODUCED OR DISCLOSED TO OTHERS WITHOUT THE PRIOR WRITTEN CONSENT OF
ADDRESS, AVE, SUITE
DESCRIPTION

MVE + PARTNERS, INC. ALL RIGHTS RESERVED, © COPYRIGHT 2018. CITY, STATE, ZIP
2020-06-16 50% DD PROGRESS
2020-04-23 ISSUED AS 100% SD

BRYSON MARKULIN ZICKMANTEL


2020-08-03 100% DD PROGRESS

CONTACT@BMZSE.COM

08/03/2020 - ISSUED FOR 100% DD PROGRESS SET


A B C D E F
PROJECT
NORTH

BW3
1

TRUE NORTH
Z16

STAMP
BW1A
ISSUES:

W12
NO. DATE DESCRIPTION
A 2020-06-16 50% DD PROGRESS
SET
B 2020-08-03 100% DD PROGRESS
14" 14" SET

14"

24"
8" CMU W10
INFILL WALL Z14 Z15
3 1
S3.11
1

22"
W7 S3.12

4
Z1 Z2

RAMP UP TO
S3.11 8" CMU
DN. INFILL WALL
SHEARWALL REINFORCING NOTES:
LEVEL 3
W1 24" W4
24" 1. THESE REQUIREMENTS ARE IN ADDITION TO THOSE SHOWN ON THE 13. HOOK ALL VERTICAL WALL AND ZONE REINFORCING TO TOP OF SLAB OR
UP GENERAL NOTES. BEAM AT UPPER MOST LEVEL.
14" Z3 Z4
14. ALL SHEARWALL REINFORCING INCLUDING ZONES, TIES, HEADERS AND
2. REFER TO THE SHEARWALL SCHEDULE FOR ALL SHEARWALL, BOUNDARY WALL REINFORCING TO COMPLY WITH ASTM A706 GRADE 60 U.N.O.
ZONE, AND HEADER BEAM REINFORCING. ALTERNATIVELY, ASTM A615, GRADE 60 MAY BE USED PROVIDED THE
H1 H3 FOLLOWING PROPERTIES ARE SATISFIED.
ACTUAL YIELD STRENGTH OF BARS IS NOT TO EXCEED 78 KSI
3. REFER TO S3.02 FOR TYPICAL SHEARWALL DETAILS. ACTUAL TENSILE STRENGTH MUST EQUAL OR EXCEED 1.25 x
W9 ACTUAL YIELD STRENGTH
4. ZONE TIES TO BE THE SIZE AND SPACING INDICATED IN SHEARWALL MINIMUM ELONGATION IN 8 INCHES MUST BE AT LEAST 14% FOR #3

24"
Z5 H5 Z6 SCHEDULE AND DETAILS. ENDS OF TIES TO HAVE 135 DEGREE BENDS PLUS THROUGH #6 BARS, 12% FOR #7 THROUGH #11 BARS AND 10% FOR

VARIES

20"
6 x DIAMETER OR 4" MIN. EXTENSIONS, OR AS SHOWN IN DETAILS. #14 THROUGH #18 BARS.
3 Z13 8" CMU

STEP
INFILL WALL
S3.11 5. PLACE LARGER VERTICAL BARS IN CORNER OF BOUNDARY ZONES IF 15. AT CHANGES IN WALL THICKNESS, LOCATE THE VERTICAL REINFORCING IN
4 APPLICABLE. THE LOWER LIFT TO FIT INTO THE REDUCED THICKNESS OF THE UPPER
LIFT – PROVIDE DOWELS AS NECESSARY. ALL ZONE VERTS AND ZONE
BW1

BW5

W2 W5 6. PROVIDE SPLICES FOR ALL REINFORCING IN SHEARWALLS AS NOTED IN THE DOWELS ARE TO BE TIED. PROVIDE ADDITIONAL TIES AT ALL CHANGES IN
SHEARWALL & ZONE LAP SPLICE TABLE 1/S3.02. WALL THICKNESS AS REQUIRED.
Z7 Z8
7. ZONE REINFORCING SHALL BE PLACED WITH NO OFFSET BENDS. 16. ALL ZONE TIES TO BE DETAILED AS HOOP TIES.

8. SPLICE 100% OF ZONE REINFORCING AT ALTERNATE FLOOR LEVELS EXCEPT 17. ZONE TIES TO BE CONTINUOUS THROUGH FLOOR SYSTEMS INCLUDING
H2 AS SHOWN IN THE SHEARWALL & ZONE SCHEDULE. PROVIDE TIES AT 4" HEADER BEAMS.
H4 MAX O.C. OVER REGION OF ZONE SPLICE.

THESE DRAWINGS ARE NOT TO BE USED FOR


TENDER, CONTRACT, OR CONSTRUCTION
9. ZONE DOWELS SHALL BE PROVIDED TO MATCH ZONE VERTICAL BARS AND
RAMP DN. TO LEVEL 1

SHALL PROJECT WITH 100% LAPS AT THE TOP OF THE FOOTINGS. EXTEND
14" Z9 Z10 100% OF ZONE DOWELS TO THE BOTTOM OF THE FOOTING AND HOOK. ZONE
TIES SHALL EXTEND A MINIMUM OF 12” INTO THE FOOTING. FOR ZONES
24" 24" ADJACENT TO ELEVATOR PITS, EDGES OF FOOTING, OR OTHER OPENINGS,
EXTEND ZONE TIES TO BOTTOM OF FOOTING.

2020-08-26 4:47:24 PM
PROGRESS
W3 W6 8" CMU
INFILL WALL 10. ALL SHEARWALL REINFORCING TO BE EMBEDDED A VERTICAL SPLICE
DEPTH INTO FOUNDATIONS UNLESS DETAILED OTHERWISE.

26"
Z11 Z12 11. ROUGHEN SLAB-TO-WALL INTERFACE TO 1/2" MINIMUM AMPLITUDE AT ALL
CONSTRUCTION JOINTS, INCLUDING TOP OF WALLS AND TOP OF SLAB
SURFACES.
5 W8 2

24"
S3.11 S3.12 W11 12. PLACE VERTICAL WALL REINFORCING ON OUTSIDE FACE OF WALL. PLACE
HORIZONTAL WALL REINFORCING ON INSIDE FACE OF WALL AND EXTEND TO
Z17
5 2 Z18
END OF WALL WITH 180 DEGREE HOOK. SEE DETAILS.

8" CMU S3.11


INFILL WALL

14"

BW02
Z19

14" OPEN
6
DN.
21'-0"

UP
BW1B

OPEN

12"
12"
SHEARWALL SCHEDULE
7 ZONES
BW4
ELEMENT ELEMENT CONCRETE
Z19 Z18 Z17 Z16 Z15 Z14 Z13 Z12 Z11 Z10 Z9 Z8 Z7 Z6 Z5 Z4 Z3 Z2 Z1 STRENGTH
FLOOR FLOOR
ROOF ROOF

AUX. ROOF AUX. ROOF

30925-01
Date APRIL 10TH, 2020

JD
ML
KEY PLAN - SHEAR WALLS - LEVEL 2

LEVEL 21 LEVEL 21

Project Number
LEVEL 20 LEVEL 20

Checked By
Drawn By
LEVEL 19 LEVEL 19

LEVEL 18 LEVEL 18

LEVEL 17 LEVEL 17

1233 South Grand


LEVEL 16 LEVEL 16

LEVEL 15 LEVEL 15

LEVEL 14 LEVEL 14

LEVEL 13 LEVEL 13

f'c = 8 ksi
LEVEL 12 LEVEL 12

LEVEL 11 LEVEL 11

ADDRESS, AVE, SUITE


CITY, STATE, ZIP
PROJECT NAME
LEVEL 10 LEVEL 10

LEVEL 9 LEVEL 9

THE LIMITED PURPOSE OF EVALUATION, BIDDING OR REVIEW. THIS DOCUMENT OR ITS CONTENTS MAY NOT BE USED FOR ANY
THIS DOCUMENT CONTAINS INFORMATION PROPRIETARY TO MVE + PARTNERS, INC. AND IS FURNISHED IN CONFIDENCE FOR

OTHER PURPOSE AND MAY NOT BE REPRODUCED OR DISCLOSED TO OTHERS WITHOUT THE PRIOR WRITTEN CONSENT OF
LEVEL 8 LEVEL 8

LEVEL 7 LEVEL 7

LEVEL 6 LEVEL 6

SHEAR WALL SCHEDULE


LEVEL 5 LEVEL 5

MVE + PARTNERS, INC. ALL RIGHTS RESERVED, © COPYRIGHT 2018.


LEVEL 4 LEVEL 4

1/8" = 1'-0"
LEVEL 3 LEVEL 3

08/03/2020 - ISSUED FOR 100% DD PROGRESS SET


LEVEL 2 LEVEL 2

SHEET TITLE
LEVEL 1 MEZZ. LEVEL 1 MEZZ.

Scale
LEVEL 1 LEVEL 1 SHEET NUMBER

S3.01
LEVEL P1 LEVEL P1

PROJECT NUMBER
30925-01

LEVEL P2 LEVEL P2
ELEMENT ELEMENT CONCRETE
FLOOR Z19 Z18 Z17 Z16 Z15 Z14 Z13 Z12 Z11 Z10 Z9 Z8 Z7 Z6 Z5 Z4 Z3 Z2 Z1 FLOOR STRENGTH

BRYSON MARKULIN ZICKMANTEL


STRUCTURAL ENGINEERS

#501 - 510 BURRARD STREET, VANCOUVER, B.C. V6C 3A8


(604) 685-9533 WWW.BMZSE.COM CONTACT@BMZSE.COM
STAMP
ISSUES:
NO. DATE DESCRIPTION

SHEARWALL SCHEDULE
HEADERS WALLS
ELEMENT ELEMENT CONCRETE
H5 H4 H3 H2 H1 BW5 BW4 BW3 BW2 BW1B BW1A BW1 W12 W11 W10 W9 W8 W7 W6 W5 W4 W3 W2 W1 STRENGTH
FLOOR FLOOR
ROOF ROOF

AUX. ROOF AUX. ROOF

LEVEL 21 LEVEL 21

LEVEL 20 LEVEL 20

LEVEL 19 LEVEL 19

LEVEL 18 LEVEL 18

LEVEL 17 LEVEL 17

LEVEL 16 LEVEL 16

THESE DRAWINGS ARE NOT TO BE USED FOR


TENDER, CONTRACT, OR CONSTRUCTION
LEVEL 15 LEVEL 15

2020-08-26 4:47:26 PM
PROGRESS
LEVEL 14 LEVEL 14

LEVEL 13 LEVEL 13

f'c = 8 ksi
LEVEL 12 LEVEL 12

LEVEL 11 LEVEL 11

LEVEL 10 LEVEL 10

LEVEL 9 LEVEL 9

LEVEL 8 LEVEL 8

LEVEL 7 LEVEL 7

LEVEL 6 LEVEL 6

LEVEL 5 LEVEL 5

30925-01
Date APRIL 10TH, 2020

SA
JD
LEVEL 4 LEVEL 4

LEVEL 3 LEVEL 3

Project Number

Checked By
Drawn By
LEVEL 2 LEVEL 2

LEVEL 1 MEZZ. LEVEL 1 MEZZ.

LEVEL 1 LEVEL 1

1233 South Grand


LEVEL P1 LEVEL P1

LEVEL P2 LEVEL P2
ELEMENT ELEMENT CONCRETE
FLOOR H5 H4 H3 H2 H1 BW5 BW4 BW3 BW2 BW1B BW1A BW1 W12 W11 W10 W9 W8 W7 W6 W5 W4 W3 W2 W1 FLOOR STRENGTH

ADDRESS, AVE, SUITE


CITY, STATE, ZIP
PROJECT NAME

THE LIMITED PURPOSE OF EVALUATION, BIDDING OR REVIEW. THIS DOCUMENT OR ITS CONTENTS MAY NOT BE USED FOR ANY
THIS DOCUMENT CONTAINS INFORMATION PROPRIETARY TO MVE + PARTNERS, INC. AND IS FURNISHED IN CONFIDENCE FOR

OTHER PURPOSE AND MAY NOT BE REPRODUCED OR DISCLOSED TO OTHERS WITHOUT THE PRIOR WRITTEN CONSENT OF
SHEARWALL REINFORCING NOTES:
1. THESE REQUIREMENTS ARE IN ADDITION TO THOSE SHOWN ON THE 13. HOOK ALL VERTICAL WALL AND ZONE REINFORCING TO TOP OF SLAB OR
GENERAL NOTES. BEAM AT UPPER MOST LEVEL.

14. ALL SHEARWALL REINFORCING INCLUDING ZONES, TIES, HEADERS AND


2. REFER TO THE SHEARWALL SCHEDULE FOR ALL SHEARWALL, BOUNDARY WALL REINFORCING TO COMPLY WITH ASTM A706 GRADE 60 U.N.O.
ZONE, AND HEADER BEAM REINFORCING. ALTERNATIVELY, ASTM A615, GRADE 60 MAY BE USED PROVIDED THE
FOLLOWING PROPERTIES ARE SATISFIED.
ACTUAL YIELD STRENGTH OF BARS IS NOT TO EXCEED 78 KSI
3. REFER TO S3.02 FOR TYPICAL SHEARWALL DETAILS. ACTUAL TENSILE STRENGTH MUST EQUAL OR EXCEED 1.25 x

SHEAR WALL SCHEDULE


ACTUAL YIELD STRENGTH
4. ZONE TIES TO BE THE SIZE AND SPACING INDICATED IN SHEARWALL MINIMUM ELONGATION IN 8 INCHES MUST BE AT LEAST 14% FOR #3
SCHEDULE AND DETAILS. ENDS OF TIES TO HAVE 135 DEGREE BENDS PLUS THROUGH #6 BARS, 12% FOR #7 THROUGH #11 BARS AND 10% FOR
6 x DIAMETER OR 4" MIN. EXTENSIONS, OR AS SHOWN IN DETAILS. #14 THROUGH #18 BARS.

MVE + PARTNERS, INC. ALL RIGHTS RESERVED, © COPYRIGHT 2018.


5. PLACE LARGER VERTICAL BARS IN CORNER OF BOUNDARY ZONES IF 15. AT CHANGES IN WALL THICKNESS, LOCATE THE VERTICAL REINFORCING IN
APPLICABLE. THE LOWER LIFT TO FIT INTO THE REDUCED THICKNESS OF THE UPPER
LIFT – PROVIDE DOWELS AS NECESSARY. ALL ZONE VERTS AND ZONE
6. PROVIDE SPLICES FOR ALL REINFORCING IN SHEARWALLS AS NOTED IN THE DOWELS ARE TO BE TIED. PROVIDE ADDITIONAL TIES AT ALL CHANGES IN

1/8" = 1'-0"
SHEARWALL & ZONE LAP SPLICE TABLE 1/S3.02. WALL THICKNESS AS REQUIRED.

7. ZONE REINFORCING SHALL BE PLACED WITH NO OFFSET BENDS. 16. ALL ZONE TIES TO BE DETAILED AS HOOP TIES.

08/03/2020 - ISSUED FOR 100% DD PROGRESS SET


8. SPLICE 100% OF ZONE REINFORCING AT ALTERNATE FLOOR LEVELS EXCEPT 17. ZONE TIES TO BE CONTINUOUS THROUGH FLOOR SYSTEMS INCLUDING
AS SHOWN IN THE SHEARWALL & ZONE SCHEDULE. PROVIDE TIES AT 4" HEADER BEAMS.
MAX O.C. OVER REGION OF ZONE SPLICE.

9. ZONE DOWELS SHALL BE PROVIDED TO MATCH ZONE VERTICAL BARS AND


SHALL PROJECT WITH 100% LAPS AT THE TOP OF THE FOOTINGS. EXTEND
100% OF ZONE DOWELS TO THE BOTTOM OF THE FOOTING AND HOOK. ZONE

SHEET TITLE
TIES SHALL EXTEND A MINIMUM OF 12” INTO THE FOOTING. FOR ZONES
ADJACENT TO ELEVATOR PITS, EDGES OF FOOTING, OR OTHER OPENINGS,
EXTEND ZONE TIES TO BOTTOM OF FOOTING.

Scale
10. ALL SHEARWALL REINFORCING TO BE EMBEDDED A VERTICAL SPLICE
DEPTH INTO FOUNDATIONS UNLESS DETAILED OTHERWISE.

11. ROUGHEN SLAB-TO-WALL INTERFACE TO 1/2" MINIMUM AMPLITUDE AT ALL


CONSTRUCTION JOINTS, INCLUDING TOP OF WALLS AND TOP OF SLAB SHEET NUMBER
SURFACES.

12. PLACE VERTICAL WALL REINFORCING ON OUTSIDE FACE OF WALL. PLACE


HORIZONTAL WALL REINFORCING ON INSIDE FACE OF WALL AND EXTEND TO
S3.02
END OF WALL WITH 180 DEGREE HOOK. SEE DETAILS.

PROJECT NUMBER
30925-01

BRYSON MARKULIN ZICKMANTEL


STRUCTURAL ENGINEERS

#501 - 510 BURRARD STREET, VANCOUVER, B.C. V6C 3A8


(604) 685-9533 WWW.BMZSE.COM CONTACT@BMZSE.COM
STAMP
EMB
EDM ISSUES:

RS
SEE ENT
VER SHEAR WALL & ZONE SPLICES

RNE
LC OF . AT 4 ACED
TIC LEN NO. DATE DESCRIPTION
GTH
LAP AL SH ' L' WHERE EMBEDMENT LENGTH 'L'

CO
SPL EAR IS NOT AVAILABLE PROVIDE A 2020-06-16 50% DD PROGRESS

-BR
.C.
ICE WA VERTICAL REINFORCING SET
LL MECHANICAL TERMINATORS

5" O

5" C ER RE ROSS
DEVELOPING FULL TENSILE B 2020-08-03 100% DD PROGRESS

S
BAR
#4 TIES @ 4" o.c. STRENGTH OF DIAGONAL BARS f'c BAR SET

INF
EMBEDMENT LENGTH 'L' MADE WITH #4 U- #4 #5 #6 #7 #8 #9 #10 #11

OC
PER DETAIL 3 / S3.03 (psi)
SEE TABLE ON DET. 2 / S3.03 2-#5 TOP BARS LAPPED FULL
NOTE:

HEA LR. T
& BOTTOM WIDTH OF HEADER. END PLATES OR MECHANICAL 3000 36" 45" 53" 78" 89" 100" 111" 122"
WHERE DIMENSION

L TO
#4 STIRRUPS TERMINATORS IF REQUIRED.

D
TOP & BOTTOM REINF.

1" C
IS LESS THAN 'L', 4000 31" 39" 46" 67" 77" 87" 96" 106"
SEE SCHEDULE BUT HOOK TOP + BOTTOM
4-#6 TOP & BOT. MIN. BARS AS SHOWN. 5000 28" 34" 41" 60" 69" 78" 86" 95"

HEADER DEPTH VARIES


#5 TOP & BOTTOM 6000 25" 31" 38" 55" 63" 71" 79" 87"

~
PROJECT 3'-0" BEYOND 6" 6"
CROSS-BRACED HEADER EDGE OF OPENING, 7000 23" 29" 35" 51" 58" 66" 73" 80"
#4 @ 4" HOOK ENDS IF AVAILABLE
SEE SCHEDULE BUT REINFORCING WITH #4 EACH FACE
TIES @ 4" O.C. EMBEDMENT IS LESS THAN 3'-0" 8000 22" 27" 33" 48" 55" 61" 68" 75"
CARRY HORIZONTAL WALL #3 @ 4" MIN. HORIZONTAL #4 @ 4"
HORIZONTAL WALL

5"O.C. 5"O.C. 5"O.C. 5"O.C.


REINFORCING THROUGH EACH FACE. 9000 21" 26" 31" 45" 51" 58" 64" 71"
STEEL TO EXTEND

~
12-BARS
HEADER FULL DEPTH OF ZONE.
DO NOT CARRY HORIZONTAL REINFORCING
ZONE VERT'S. AND TIES, 10-BARS THROUGH HEADER.
EACH SIDE. TIES TO BE f'c BAR #4 #5 #6 #7 #8 #9 #10 #11
MAINTAINED OF HEADER #4 (psi)
LOCATIONS 8-BARS STIRRUPS
@12" 3000 37" 46" 56" 81" 93" 104" 116" 127"
ZONE VERTS. AND TIES #4 @ 4" o.c. 2A
IN BACKGROUND TIES OVER DOOR MECHANICAL
6-BARS S3.03 TERMINATORS IF REQUIRED. 4000 32" 40" 48" 70" 80" 90" 100" 110"

5000 29" 36" 43" 63" 72" 81" 90" 99"


12" MIN. FOR 24" WALLS 6000 26" 33" 39" 57" 65" 74" 82" 90"
18" MIN. FOR 32", 36" WALLS
4 CONVENTIONAL HEADER DETAIL 24" MIN. FOR 48" WALLS
CROSS-BRACED HEADER
ZONE REINF. AND ZONE TIES EA. 7000 24" 30" 36" 53" 61" 68" 76" 83"
REINF. EACH WAY. SEE
N.T.S. SIDE. TIES TO BE MAINTAINED AT
S3.03 SCHEDULE, C/W #4 TIES HEADER LOCATIONS. 8000 23" 28" 34" 50" 57" 64" 71" 78"
REINFORCING TO INTERLOCK @ 4" o.c. FOR EXTENT SHOWN
HEADERS WITH LARGER AND 9000 21" 27" 32" 47" 53" 60" 67" 73"
SMALLER CAGES AS SHOWN
2A HEADER SECTION NOTE: HORIZONTAL REINFORCEMENT SHALL NOT BE SPLICED
N.T.S. WITHIN TIED BOUNDARY ZONES
S3.03 VARIES, SEE CORE PLANS SEE CORE PLANS

THESE DRAWINGS ARE NOT TO BE USED FOR


DIAGONAL CROSSBRACED HEADER DETAIL SHEARWALL & ZONE LAP SPLICE

TENDER, CONTRACT, OR CONSTRUCTION


2 1
S3.03 N.T.S. S3.03
HRC 555 T-HEADED MECHANICAL
REBAR TERMINATOR ESR-2935

2020-08-26 4:47:30 PM
PROGRESS
TYPICAL FOR ALL DIAGONAL
BARS TERMINATING IN ZONE
DIAGONAL REBAR

FACE OF ZONE
6" CLEAR
MIN.

3 END PLATE DETAIL

TENSION SPLICE
LENGTH, TYP.
S3.03 N.T.S.
ADD 1/2 THE TOTAL NUMBER
OF VERTICAL BARS (E.F.) CUT
AT OPENING, TO EACH SIDE
OF OPENING (MIN. 2 PER SIDE)
MATCH BAR SIZE.

EMB
EDM

RS
SEE ENT
VER

RNE
LC OF . AT 4 ACED
TIC LEN
A GTH
LAP L SH ' L' WHERE EMBEDMENT LENGTH 'L'
HORIZONTAL BARS EACH FACE SPL EAR

CO
WA IS NOT AVAILABLE PROVIDE

-BR
ICE

.C.
INTERRUPTED BY OPENING. LL MECHANICAL TERMINATORS

5" O

5" C ER RE ROSS

S
DEVELOPING FULL TENSILE

BAR

HEADER DEPTH
STRENGTH OF DIAGONAL BARS

INF
SLAB STEEL #5 BARS IN EACH

OC
OR END PLATES AS DETAIL 3 / S3.03
TENSION SPLICE CARRIES THRU STIRRUP/CROSS TIE
ADD 1/2 THE TOTAL NUMBER

HEA LR. T
LENGTH, TYP. HEADER HAUNCH TYPICAL END PLATES OR MECHANICAL
OF HORIZONTAL BARS (E.F.) CUT

L TO
AT OPENING, TO EACH SIDE TERMINATORS IF REQUIRED.

D
1" C
OF OPENING (MIN. 2 PER SIDE) 4" MAX. SPACING
VERTICAL BARS EACH FACE MATCH BAR SIZE.
INTERRUPTED BY OPENING.

SEE PLAN
HEADER DEPTH VARIES

SLAB
#5 TOP & BOTTOM
PROJECT 3'-0" BEYOND 6" 6"
DIAGONAL BARS EDGE OF OPENING.
NOTE: CONFIRM ALL OPENINGS THRU SHEARWALLS WITH PER SCHEDULE HOOK ENDS IF AVAILABLE
BMZ STRUCTURAL ENGINEERS IF NOT SHOWN ON DRAWINGS. EMBEDMENT IS LESS THAN 3'-0"
#5 BARS IN
#5 STIRS. 8" MAX. o.c. SPACING EACH CROSS

~
TYPICAL CONSISTING OF FOR #5 CROSS TIES. TIE.
TYPICAL REINFORCING AT SMALL MECHANICAL OUTER HOOP AND ACTUAL NUMBER OF HORIZONTAL WALL
INNER CROSS-TIES CROSS TIES WILL VARY STEEL TO EXTEND
7 OPENINGS IN SHEARWALLS ACCORDING TO HEADER FULL DEPTH OF
DIAGONAL BARS DEPTH ZONE. DO NOT CARRY

30925-01
Date APRIL 10TH, 2020

JD
ML
S3.03 N.T.S. PER SCHEDULE
THROUGH HEADER. MECHANICAL SLEEVES MAY
PLACE FIRST STIRRUP SET
BE PLACED AS INDICATED.
8" o.c. MAX. SPACING MAX. 2" FROM OPENING
SLEEVES MUST NOT INTERFERE
WIDER HEADERS MAY EDGE, TYPICAL WITH DIAGONAL OR VERTICAL
6A END PLATES OR MECHANICAL
REQUIRE ADDITIONAL TERMINATORS IF REQUIRED. ZONE REINFORCING.
BARS TO MAINTAIN ZONE VERTS. AND TIES S3.03 PROVIDE MINIMUM 1" CLEAR
8" MAX. SPACING IN BACKGROUND COVER TO ALL REINFORCING.

SPLICE TYPICAL
FIRST SEE SCHEDULES
TYPICAL HEADER SLEEVE LOCATIONS

Project Number
ZONE REINF. AND ZONE TIES
EACH SIDE. TIES TO BE MAINTAINED
5
SUSPENDED

Checked By
SLAB EXTEND ZONE AT HEADER LOCATIONS. S3.03 N.T.S.
CROSS-BRACED HEADER

Drawn By
TIES TO BOTTOM OF REINF. EACH WAY.
FOOTING WHEN 6A ALTERNATIVE HEADER SECTION SEE SCHEDULE
ZONES ARE
ADJACENT TO S3.03 N.T.S.
ELEVATOR PIT OR
ARE LESS THAN 1/2 VARIES, SEE CORE PLANS SEE CORE PLANS
FOOTING DEPTH TO
MIN
12"

EDGE OF FOOTING
SHEARWALL
FOOTING

6 ALTERNATIVE DIAGONAL CROSSBRACED HEADER DETAIL


S3.03 N.T.S.

1233 South Grand


ELEVATOR PIT
HOOK 90° AS REQ'D. FOR MIN.
EMBEDMENT, TYPICAL _
<1/2 SHEARWALL
OPTION: HRC-120 T-HEADED FOOTING DEPTH
REINFORCING BARS OR
PRE-APPROVED EQUIVALENT
INSTEAD OF 90° HOOK

DISTRIBUTED WALL REINF.


12 TYPICAL ZONE DOWELS RUN HORIZ. REINF. THROUGH
INSIDE OF ZONES TO
S3.03 N.T.S. BACK FACE OF ZONE AS
SHOWN. (NOTE: DISTRIBUTED
12" FOR 4-BAR ZONE REINF. MAY BE ONE CURTAIN ONLY)

4-BAR ZONE
WALL VERTICAL REINFORCING
TIE LEG TO EXTEND 6 x
OUTSIDE LAYER
BAR DIA OR 4" MIN WITH
SEE WALL SCHEDULE SPACE
135° HOOK AND
STANDARD RADIUS BEND
FROM LAST ZONE BAR
THINNER WALL 6-BAR ZONE
CONCRETE WALL TENSION HOOK DOWELS TO
FOR COVER, SEE OUTLINE OFFSET LAP MATCH WALL VERTS.
S1.00 SERIES DWG'S.

ADDRESS, AVE, SUITE


TENSION
LAP
FOR WALLS OVER
8-BAR ZONE

CITY, STATE, ZIP


16" WIDE PROVIDE

PROJECT NAME
EXTRA BAR & TIE
UNLESS SHOWN
ON SCHEDULE
CROSS TIES 12-BAR ZONE
TO HAVE TENSION HOOK WALL VERTS
PROVIDE HOOK BARS AT TOP OF SLAB
FOR ALL HORIZ. WALL 135° HOOKS LAP
REINFORCING PROVIDE DOWELS TO
MATCH WALL VERT.
AT CHANGES IN WALL THICKNESS,
16-BAR ZONE REINF. ABOVE

THE LIMITED PURPOSE OF EVALUATION, BIDDING OR REVIEW. THIS DOCUMENT OR ITS CONTENTS MAY NOT BE USED FOR ANY
THIS DOCUMENT CONTAINS INFORMATION PROPRIETARY TO MVE + PARTNERS, INC. AND IS FURNISHED IN CONFIDENCE FOR
EQ SPACE AS SHOWN 4'-0" CLEAR MIN. LAP SPLICE POSITION ALL DIAGONAL REINF. TO
THICKER WALL

OTHER PURPOSE AND MAY NOT BE REPRODUCED OR DISCLOSED TO OTHERS WITHOUT THE PRIOR WRITTEN CONSENT OF
FIT IN THINNER WALL
ON ZONE DETAIL OR LOCATED IN WALL VERT. REINF.
PLACE ZONE AT END OF WALL VERT. REINF.
6" MAX UNO MIDDLE 1/3 OF
WALL U.N.O. LENGTH OF
SEE S1.00 SERIES DWG'S. WALL ONLY
FOR COVER NOTES 24-BAR ZONE
- LAP ZONE BARS ONLY AS SHOWN ON SCHEDULE
- PROVIDE SHEARWALL & ZONE SPLICES TO ALL REINFORCING
- EXTEND HORIZ. WALL REINFORCING TO END OF ZONE WALL SPACE ZONE VERTS. AT 6" o/c ( U.N.O. ON ZONE DETAILS )
- LAP HORIZ. WALL REINFORCING ONLY IN MIDDLE 1/3 OF WALL
PROVIDE LAP SPLICES EXTEND NO CLOSER THAN EXCEPT 12" o/c FOR 4-BAR ZONE
4'-0" CLEAR MIN. OF BOUNDARY ZONES
TYPICAL WALL AND ZONE VERT REINFORING DETAIL TYPICAL WALL AND ZONE VERT REINFORING DETAIL
13 TYPICAL ZONE U.N.O. 11 HEADER AT CHANGES IN WALL THICKNESS 10 TYPICAL ZONE REINF. ARRANGEMENT 9 WHERE WALL THICKNESS CHANGES 8 WHERE WALL THICKNESS CHANGES
S3.03 N.T.S. S3.03 N.T.S. S3.03 N.T.S. S3.03 N.T.S. S3.03 N.T.S.

MVE + PARTNERS, INC. ALL RIGHTS RESERVED, © COPYRIGHT 2018.


SHEARWALL DETAILS

As indicated

08/03/2020 - ISSUED FOR 100% DD PROGRESS SET


SHEET TITLE

Scale
SHEET NUMBER

S3.03
PROJECT NUMBER
30925-01

BRYSON MARKULIN ZICKMANTEL


STRUCTURAL ENGINEERS

#501 - 510 BURRARD STREET, VANCOUVER, B.C. V6C 3A8


(604) 685-9533 WWW.BMZSE.COM CONTACT@BMZSE.COM
C D T.O. UPPER
C D T.O. UPPER
C D T.O. UPPER
4 T.O. UPPER 4 5 T.O. UPPER
ROOF ROOF ROOF ROOF ROOF

STAMP
AUX - ROOF AUX - ROOF AUX - ROOF AUX - ROOF AUX - ROOF

ISSUES:
NO. DATE DESCRIPTION
A 2020-06-16 50% DD PROGRESS
SET
B 2020-08-03 100% DD PROGRESS
SET

LEVEL 21 - LEVEL 21 - LEVEL 21 - LEVEL 21 - LEVEL 21 -


ROOF ROOF ROOF ROOF ROOF

LEVEL 20 - PH LEVEL 20 - PH LEVEL 20 - PH LEVEL 20 - PH LEVEL 20 - PH

LEVEL 19 LEVEL 19 LEVEL 19 LEVEL 19 LEVEL 19

LEVEL 18 LEVEL 18 LEVEL 18 LEVEL 18 LEVEL 18

THESE DRAWINGS ARE NOT TO BE USED FOR


TENDER, CONTRACT, OR CONSTRUCTION
LEVEL 17 LEVEL 17 LEVEL 17 LEVEL 17 LEVEL 17

2020-08-26 4:47:34 PM
PROGRESS
LEVEL 16 LEVEL 16 LEVEL 16 LEVEL 16 LEVEL 16

LEVEL 15 LEVEL 15 LEVEL 15 LEVEL 15 LEVEL 15

LEVEL 14 LEVEL 14 LEVEL 14 LEVEL 14 LEVEL 14

LEVEL 13 LEVEL 13 LEVEL 13 LEVEL 13 LEVEL 13

LEVEL 12 LEVEL 12 LEVEL 12 LEVEL 12 LEVEL 12

30925-01
Date APRIL 10TH, 2020

JD
ML
LEVEL 11 LEVEL 11 LEVEL 11 LEVEL 11 LEVEL 11

Project Number

Checked By
Drawn By
LEVEL 10 LEVEL 10 LEVEL 10 LEVEL 10 LEVEL 10

LEVEL 9 LEVEL 9 LEVEL 9 LEVEL 9 LEVEL 9

1233 South Grand


LEVEL 8 LEVEL 8 LEVEL 8 LEVEL 8 LEVEL 8

LEVEL 7 LEVEL 7 LEVEL 7 LEVEL 7 LEVEL 7

LEVEL 6 LEVEL 6 LEVEL 6 LEVEL 6 LEVEL 6


EL.296' - 7" EL.296' - 7" EL.296' - 7" EL.296' - 7" EL.296' - 7"

ADDRESS, AVE, SUITE


CITY, STATE, ZIP
PROJECT NAME
LEVEL 5 LEVEL 5 LEVEL 5 LEVEL 5 LEVEL 5
EL.284' - 4" EL.284' - 4" EL.284' - 4" EL.284' - 4" EL.284' - 4"

THE LIMITED PURPOSE OF EVALUATION, BIDDING OR REVIEW. THIS DOCUMENT OR ITS CONTENTS MAY NOT BE USED FOR ANY
THIS DOCUMENT CONTAINS INFORMATION PROPRIETARY TO MVE + PARTNERS, INC. AND IS FURNISHED IN CONFIDENCE FOR

OTHER PURPOSE AND MAY NOT BE REPRODUCED OR DISCLOSED TO OTHERS WITHOUT THE PRIOR WRITTEN CONSENT OF
LEVEL 4 LEVEL 4 LEVEL 4 LEVEL 4 LEVEL 4
EL.275' - 4" EL.275' - 4" EL.275' - 4" EL.275' - 4" EL.275' - 4"

LEVEL 3 LEVEL 3 LEVEL 3 LEVEL 3 LEVEL 3


EL.266' - 4" EL.266' - 4" EL.266' - 4" EL.266' - 4" EL.266' - 4"

SHEAR WALL ELEVATIONS


6'-6"

LEVEL 2 LEVEL 2 LEVEL 2 LEVEL 2 LEVEL 2


EL.257' - 4" EL.257' - 4" EL.257' - 4" EL.257' - 4" EL.257' - 4"

MVE + PARTNERS, INC. ALL RIGHTS RESERVED, © COPYRIGHT 2018.


Level 1.5 Level 1.5 Level 1.5 Level 1.5 Level 1.5
EL.253' - 0" EL.253' - 0" EL.253' - 0" EL.253' - 0" EL.253' - 0"

1/8" = 1'-0"

08/03/2020 - ISSUED FOR 100% DD PROGRESS SET


LEVEL 1 LEVEL 1 LEVEL 1 LEVEL 1 LEVEL 1
EL.241' - 0" EL.241' - 0" EL.241' - 0" EL.241' - 0" EL.241' - 0"

SHEET TITLE

Scale
LEVEL P1 LEVEL P1 LEVEL P1 LEVEL P1 LEVEL P1 SHEET NUMBER
EL.229' - 6" EL.229' - 6" EL.229' - 6" EL.229' - 6" EL.229' - 6"
S3.11
PROJECT NUMBER
NOTE 1: 30925-01
LEVEL P2 LEVEL P2 LEVEL P2 LEVEL P2 LEVEL P2

TENSION
EL.219' - 4" EL.219' - 4" EL.219' - 4" EL.219' - 4" EL.219' - 4"

SPLICE
TENSION LAP WALL VERTICAL REINFORCING
WITH MATCHING U-BARS AT FACE OF OPENING.

BRYSON MARKULIN ZICKMANTEL


STRUCTURAL ENGINEERS
5 SHEAR WALL ELEVATION 4 SHEAR WALL ELEVATION 3 SHEAR WALL ELEVATION - SOUTH 2 SHEAR WALL ELEVATION - EAST 1 SHEAR WALL ELEVATION - WEST #501 - 510 BURRARD STREET, VANCOUVER, B.C. V6C 3A8
(604) 685-9533 WWW.BMZSE.COM CONTACT@BMZSE.COM
1/8" = 1'-0" 1/8" = 1'-0" 1/8" = 1'-0" 1/8" = 1'-0" 1/8" = 1'-0"
S3.11 S3.11 S3.11 S3.11 S3.11
STAMP
ISSUES:
NO. DATE DESCRIPTION
A 2020-08-03 100% DD PROGRESS
SET

THESE DRAWINGS ARE NOT TO BE USED FOR


TENDER, CONTRACT, OR CONSTRUCTION
2020-08-26 4:47:36 PM
PROGRESS
F E
E F

LEVEL 7 LEVEL 7

LEVEL 6 LEVEL 6
EL.296' - 7" EL.296' - 7"

JM
ML / MM
30925-01
Date APRIL 10TH, 2020
LEVEL 5 LEVEL 5
EL.284' - 4" EL.284' - 4"

Project Number

Checked By
LEVEL 4 LEVEL 4

Drawn By
EL.275' - 4" EL.275' - 4"

LEVEL 3 LEVEL 3
EL.266' - 4" EL.266' - 4"

1233 South Grand


LEVEL 2 LEVEL 2
EL.257' - 4" EL.257' - 4"

Level 1.5 Level 1.5


EL.253' - 0" EL.253' - 0"

LEVEL 1 LEVEL 1
EL.241' - 0" EL.241' - 0"

LEVEL P1 LEVEL P1
EL.229' - 6" EL.229' - 6"

ADDRESS, AVE, SUITE


CITY, STATE, ZIP
PROJECT NAME
LEVEL P2 LEVEL P2
EL.219' - 4" EL.219' - 4"

THE LIMITED PURPOSE OF EVALUATION, BIDDING OR REVIEW. THIS DOCUMENT OR ITS CONTENTS MAY NOT BE USED FOR ANY
THIS DOCUMENT CONTAINS INFORMATION PROPRIETARY TO MVE + PARTNERS, INC. AND IS FURNISHED IN CONFIDENCE FOR

OTHER PURPOSE AND MAY NOT BE REPRODUCED OR DISCLOSED TO OTHERS WITHOUT THE PRIOR WRITTEN CONSENT OF
2 SHEAR WALL ELEVATION AT GRID '5' 1 SHEAR WALL ELEVATION AT GRID '3'
1/8" = 1'-0" 1/8" = 1'-0"
S3.12 S3.12

SHEAR WALL ELEVATIONS

MVE + PARTNERS, INC. ALL RIGHTS RESERVED, © COPYRIGHT 2018.


1/8" = 1'-0"

08/03/2020 - ISSUED FOR 100% DD PROGRESS SET


SHEET TITLE

Scale
SHEET NUMBER

NOTE 1: S3.12

TENSION
SPLICE
TENSION LAP WALL VERTICAL REINFORCING
PROJECT NUMBER
WITH MATCHING U-BARS AT FACE OF OPENING.
30925-01

BRYSON MARKULIN ZICKMANTEL


STRUCTURAL ENGINEERS

#501 - 510 BURRARD STREET, VANCOUVER, B.C. V6C 3A8


(604) 685-9533 WWW.BMZSE.COM CONTACT@BMZSE.COM
PROJECT
NORTH

COLUMN SCHEDULE

TRUE NORTH
B C D E

STAMP
ELEMENT ELEMENT CONCRETE
FLOOR 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 FLOOR STRENGTH

UPPER ROOF. UPPER ROOF.


ISSUES:
ROOF ROOF NO. DATE DESCRIPTION
12" x 24" 12" x 24" A 2020-06-16 50% DD PROGRESS
12#8 VERTS 12#8 VERTS SET
B 2020-08-03 100% DD PROGRESS
LEVEL 22 LEVEL 22 SET
12" x 24" 12" x 24" 12" x 24" 12" x 39" 20" x 24" 24" Ø 12" x 24"
12#8 VERTS 12#8 VERTS 12#8 VERTS 12#8 VERTS 12#8 VERTS 10#8 VERTS 12#8 VERTS
LEVEL 21 LEVEL 21

6 ksi
LEVEL 20 LEVEL 20 2 3
1 4
2
LEVEL 19 LEVEL 19

LEVEL 18 LEVEL 18

LEVEL 17 LEVEL 17

LEVEL 16 LEVEL 16

12" x 48" 12" x 48" 12" x 48" 12" x 48" 12" x 48" 6
12#8 VERTS 12#8 VERTS 12#8 VERTS 12#8 VERTS 12#8 VERTS
3
LEVEL 15 LEVEL 15

LEVEL 14 LEVEL 14

LEVEL 13 LEVEL 13

THESE DRAWINGS ARE NOT TO BE USED FOR


LEVEL 12 LEVEL 12

TENDER, CONTRACT, OR CONSTRUCTION


8
LEVEL 11 LEVEL 11
4

7 ksi
10" x 72" 10" x 72" 10" x 84" 10" x 84"

2020-08-26 4:47:40 PM
PROGRESS
12#8 VERTS 12#8 VERTS 12#8 VERTS 12#8 VERTS
LEVEL 10 LEVEL 10
7
14" x 48" 14" x 48" 14" x 48"
12#8 VERTS 12#8 VERTS 12#8 VERTS
LEVEL 09 LEVEL 09

12" x 48" 14" x 48"


12#8 VERTS 12#8 VERTS
LEVEL 08 LEVEL 08 9
24" Ø 16" x 48" 16" x 48" 16" x 48" 24" Ø
10#8 VERTS 12#8 VERTS 12#8 VERTS 12#8 VERTS 10#8 VERTS
LEVEL 07 LEVEL 07 10
36" Ø 12" x 72" 12" x 72" 24" Ø 14" x 48" 24" x 48" 18" x 48" 24" x 30" 18" x 48" 24" x 48" 36" Ø 12" x 84" 12" x 84" 24" Ø
12#8 VERTS 12#8 VERTS 12#8 VERTS 10#8 VERTS 12#8 VERTS 12#8 VERTS 12#8 VERTS 12#8 VERTS 12#8 VERTS 12#8 VERTS 12#8 VERTS 12#8 VERTS 12#8 VERTS 10#8 VERTS 5
LEVEL 06 LEVEL 06

24" x 48"
12#8 VERTS
LEVEL 05 LEVEL 05

29" x 72"
12#8 VERTS 6#8
DOWELS
LEVEL 04 EXTRA LEVEL 04

16" x 114" 16" x 114" 32" x 88"


12#8 VERTS 12#8 VERTS 12#8 VERTS
LEVEL 03 LEVEL 03
11 12 13 14

8 ksi
16" x 72"
12#8 VERTS 6
LEVEL 02 LEVEL 02

24" x 56"
12#8 VERTS
LEVEL 1.5 LEVEL 1.5

16" x 114"
16#9 VERTS 7
LEVEL 01 LEVEL 01

6#8

30925-01
Date APRIL 10TH, 2020

JD
ML
DOWELS
LEVEL P1 EXTRA LEVEL P1 KEY PLAN - TOWER COLUMNS
16" x 72" 16" x 72" 30" x 42" 24" x 30" 24" x 30" 24" x 30" 24" x 30" 16" x 72" 16" x 72" 16" x 96" 24" x 114"
12#8 VERTS 12#8 VERTS 12#8 VERTS 12#8 VERTS 12#8 VERTS 12#8 VERTS 12#8 VERTS 12#8 VERTS 12#8 VERTS 18#9 VERTS 12#8 VERTS
LEVEL P2 LEVEL P2

DOWELS TO
MATCH VERTS
TYP. U.N.O.

Project Number
FOOTINGS FOOTINGS

Checked By
FLOOR FLOOR CONCRETE
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

Drawn By
ELEMENT ELEMENT STRENGTH
COLUMN NOTES:
1. FOR GENERAL NOTES, SEE S1.00 SERIES DRAWINGS.

2. COLUMN TIES TO BE MINIMUM #4.


MAXIMUM TIE SPACING TO BE:
@ 4" O/C FOR #6 VERTICAL COLUMN BARS
@ 5" O/C FOR #7 VERTICAL COLUMN BARS
@ 6" O/C FOR #8 OR LARGER VERTICAL COLUMN BARS
COLUMN SPLICE
OR AS SHOWN IN COLUMN SCHEDULE
UNLESS NOTED. FULL SPACE COLUMN ADJACENT TO PITS OR EDGE OF FOOTINGS
TO HAVE TIES TO THE BOTTOM OF FOOTING.
START 1/2 SPACE
3. FOOTING DOWELS TO MATCH COLUMN VERTS.
PROVIDE STANDARD HOOK AT BOTTOM OF FOOTINGS.

1233 South Grand


EXTEND COLUMN TIES INTO FOOTING AT MIN. DEPTH OF 12".
(SEE DETAIL 1 / S4.01)
SLOPE 1 : 6
MAXIMUM 3" FOR COLUMN VERTICAL BAR SPLICES AND DOWELS SEE COLUMN
2 SPACES @ 3" 4.
START CRANK AT SPLICE SCHEDULE, THIS DWG. ALL COLUMN SPLICES TO BE
TOP OF SLAB.
TYPE 'A' UNLESS NOTED OTHERWISE.
FULL SPACE
5. HOOK VERTICAL REINFORCING TO TOP OF SLAB AT UPPERMOST LEVEL.
2 EXTRA TIES
AT OFFSET.
COLUMN VERTS.
6. WHERE VERTICAL BARS DO NOT MATCH THE LOCATION OF BARS FOR THE
COLUMN ABOVE, PROVIDE ADDITIONAL DOWELS FROM COLUMN BELOW
TO MATCH BARS ABOVE. REFER TO DET. 5 / S4.01 & 7 / S4.01

SPLICE AT INTERIOR - BEAMS 4 SIDES 7. ALL COLUMNS TO RECEIVE 2" CLEAR COVER TO VERTICAL REINFORCEMENT
BEAM WIDTHS COLUMN WIDTHS - OTHERWISE SEE GENERAL NOTES FOR FURTHER REQUIREMENTS.
AS PER EXTERIOR COLUMN
8. FOR ALL COLUMNS EXPOSED TO POTENTIAL DAMAGE FROM MOVING VEHICLES
ADDITIONAL CONCRETE COVER IS REQUIRED. REFER TO GENERAL NOTES.
8" MAX. COLUMN VERTS.
COLUMN WIDTH TIE EVERY BAR WITH
14"-20" PROVIDE 1 MIDDLE 9. SEE COLUMN SCHEDULE FOR SPECIAL COLUMN CONCRETE STRENGTHS.
CORNER OF HOOP OR COLUMN TIES
BAR OVER 20" @ 8" MAX. CROSS TIE
SEE PLAN
COLUMN

IN END OF COLUMN, UNLESS 10. COLUMNS TO BE POSITIONED FOR FULL BEARING UPON COLUMN
SPLICE

COLUMN SPLICE

EQ EQ EQ
UNLESS NOTED.
SHOWN OTHERWISE COLUMN DOWELS IN LEVEL BELOW UNLESS DETAILED OTHERWISE.
FULL SPACE COLUMN SPLICE
HOOK TO BOTTOM
UNLESS NOTED.
OF FOOTING
11. PROVIDE DOWELS AS REQUIRED TO MATCH REINFORCING OF COLUMN ABOVE.
START 1/2 SPACE

ADDRESS, AVE, SUITE


12. COLUMNS TRANSFERRING ONTO DISCONTINUOUS SUPPORTS
NOTE: SUCH AS TRANSFER BEAMS AND TRANSFER SLABS MUST EXTEND DOWELS AND
COLUMN

1/2 SPACE MAXIMUM TIES INTO SUPPORTA TO THE DEPTH OF THE MAXIMUM DEVELOPMENT LENGTH
SPLICE

COLUMN VERT BARS 12" MINIMUM

CITY, STATE, ZIP


OR ADD EXTRA TIES DOWELS TO MATCH
OF THE LONGITUDINAL REINFORCING.

PROJECT NAME
COLUMN TIES

12"
SLOPE 1 : 6 VERTS. ABOVE. MUST BE SYMMETRICAL
MAXIMUM 3" 2 SPACES @ 3" UNLESS OTHERWISE EQ SPACED VERT BARS SEE NOTE 2
EXTRA DOWELS WHERE
START CRANK AT
SHOWN 13. FOR COLUMN NOTED, PROVIDE COLUMN SPLICES AS SHOWN ON DET. 7 / S4.01
REQUIRED. SEE SCHEDULE

3" CL.
TOP OF SLAB. AND NOTE 6
FULL SPACE COVER TO VERT BAR :
14. REFER TO COLUMN SCHEDULE FOR COLUMN SIZE, REINFORCING AND
2 EXTRA TIES 2" (MIN) CONCRETE STRENGTH.
AT OFFSET.
COLUMN VERTS.

3" CL.

THE LIMITED PURPOSE OF EVALUATION, BIDDING OR REVIEW. THIS DOCUMENT OR ITS CONTENTS MAY NOT BE USED FOR ANY
APPROVED BEARING
TYPICAL OFFSET COLUMN SECTION TYPICAL COLUMN BAR & TIE ARRANGEMENT

THIS DOCUMENT CONTAINS INFORMATION PROPRIETARY TO MVE + PARTNERS, INC. AND IS FURNISHED IN CONFIDENCE FOR
5 2

COLUMN KEY PLAN, NOTES, SCHEDULE,


MATERIAL BY SOIL

OTHER PURPOSE AND MAY NOT BE REPRODUCED OR DISCLOSED TO OTHERS WITHOUT THE PRIOR WRITTEN CONSENT OF
SPLICE AT EXTERIOR COLUMNS ENGINEER. EXTEND TIES 12" INTO FOOTING
S4.01 N.T.S. S4.01 N.T.S.

PROVIDE GROUND SEAL


WHERE REQ’D BY
SITE CONDITIONS.
COLUMN SPLICES
COLUMN SPLICE
1 TYPICAL COLUMN FOOTING TYPE #4 #5 #6 #7 #8 #9 #10 #11

AND TYPICAL COLUMN DETAILS


UNLESS NOTED.
FULL SPACE EQ SP
SLAB, SLABBAND, 'W' S4.01 N.T.S. A 15" 19" 23" 27" 30" 34" 38" 42"
DROP PANEL FLOOR STRENGTH CONCRETE EXCEPT AS NOTED.
START 1/2 SPACE 8" MAX. 8" MAX.
FLOOR STRENGTH CONC.
FOR SPLICE AND EMBEDMENT LENGTHS, B 25" 31" 37" 53" 61" 69" 75" 85"
24" HATCHED AREA INDICATES
TIE EVERY BAR WITH TIE EVERY BAR WITH SEE TABLES ON STRUCTURAL DRAWINGS.
EXTENT OF COLUMN STRENGTH
CORNER OF HOOP OR CORNER OF HOOP OR
MIN.
1/2 SPACE MAXIMUM CONCRETE IN FLOOR. CROSS TIE CROSS TIE NOTES:
NOTE:
SLOPE 1 : 6 OR ADD EXTRA TIES SEE PLAN FOR LOCATION. SPLICE TYPE 'A' TYPICAL UNLESS NOTED
CONTRACTOR TO TIME POUR
MAXIMUM 3" SUCH THAT NO COLD JOINTS
2 SPACES @ 3"
START CRANK AT OCCUR IN FLOOR BETWEEN

MVE + PARTNERS, INC. ALL RIGHTS RESERVED, © COPYRIGHT 2018.


MIN.

TOP OF SLAB.
24"

FLOOR STRENGTH AND


FULL SPACE COLUMN STRENGTH CONCRETE.
THE INTERFACE BETWEEN THE
2 EXTRA TIES COLUMNS
DIFFERENT CONCRETES TO BE
AT OFFSET. COLUMN VERTS. THOROUGHLY VIBRATED TO
PLAN

As indicated
ENSURE CONTINUITY.
COVER TO VERT BAR MAINTAIN
2" (MIN)
SLAB AS PER PLAN COLUMN TIES
SEENOTE 2
SPLICE AT SLABS, SLABBANDS, DROP PANELS

08/03/2020 - ISSUED FOR 100% DD PROGRESS SET


DOWELS REQ’D IF COLUMN CONCRETE STRENGTH IN 3 TYPICAL SQUARE COLUMN TIE & BAR ARRANGEMENT
STEP IS GREATER 24" CROSS−HATCHED AREA TO BE
COLUMN
THAN 3" MIN. PLACED PRIOR TO FLOOR S4.01 N.T.S.
STRENGTH CONCRETE.
COLUMN SPLICE

SHEET TITLE
UNLESS NOTED.
FULL SPACE
SLAB, SLABBAND,
DROP PANEL

Scale
START 1/2 SPACE
TRANSMISSION OF HIGH STRENGTH COLUMNS
6 THRU FLOOR SYSTEMS 135° BEND AROUND VERT BAR
3" MAXIMUM 1/2 SPACE MAXIMUM STAGGER SIDE TO SIDE OF COLUMN
OR ADD EXTRA TIES S4.01 N.T.S. SHEET NUMBER
(USE WHEN COLUMN STRENGTHS ARE 8 ksi OR GREATER)
COLUMN SPLICE
UNLESS NOTED.
2 SPACES @ 3" VERT REINFORCING EQUALLY SPACED
AROUND PERIMETER
8 BARS MINIMUM
S4.01
FULL SPACE
2 EXTRA TIES
COLUMN TIES
AT OFFSET. COLUMN VERTS.
SEE NOTE 2 PROJECT NUMBER
30925-01

COVER TO VERT BAR-MAINTAIN :


2" (MIN)
COLUMN STEP AT SLAB, SLABBANDS,
DROP PANELS BEAMS SIMILAR

7 COLUMN SPLICE DETAILS - U.N.O. 4 TYPICAL ROUND COLUMN BRYSON MARKULIN ZICKMANTEL
STRUCTURAL ENGINEERS
S4.01 N.T.S. S4.01 N.T.S.
#501 - 510 BURRARD STREET, VANCOUVER, B.C. V6C 3A8
(604) 685-9533 WWW.BMZSE.COM CONTACT@BMZSE.COM
3
A B C D E S5.01 F

STAMP
4 2
7S5.01 6 5 4 3 2 S5.01 1
ISSUES:
NO. DATE DESCRIPTION
A 2020-06-16 50% DD PROGRESS
SET
1
B 2020-08-03 100% DD PROGRESS
S5.01 SET

LEVEL 6 LEVEL 6
EL.296' - 7" EL.296' - 7"

LEVEL 5 LEVEL 5
EL.284' - 4" EL.284' - 4"

LEVEL 4 LEVEL 4
EL.275' - 4" EL.275' - 4"

LEVEL 3 LEVEL 3
EL.266' - 4" EL.266' - 4"

LEVEL 2 LEVEL 2
EL.257' - 4" EL.257' - 4"

THESE DRAWINGS ARE NOT TO BE USED FOR


Level 1.5 Level 1.5

TENDER, CONTRACT, OR CONSTRUCTION


EL.253' - 0" EL.253' - 0"

2020-08-26 4:47:43 PM
PROGRESS
LEVEL 1 LEVEL 1
EL.241' - 0" EL.241' - 0"

LEVEL P1 LEVEL P1
EL.229' - 6" 1 EL.229' - 6"
2 S6.01
S6.01

LEVEL P2 LEVEL P2
EL.219' - 4" EL.219' - 4"

8'-0"

5'-0"

2 BASEMENT WALL ELEVATION - NORTH 1 BASEMENT WALL ELEVATION - WEST


1/8" = 1'-0" 1/8" = 1'-0"
S5.01 S5.01

30925-01
Date APRIL 10TH, 2020

JD
ML
1 2
1 2 3 S3.12 4 S3.12 5 6 7

Project Number

Checked By
Drawn By
3
F S5.01 E D C B A
2
S5.01

1 4
S5.01 S5.01

LEVEL 6 LEVEL 6
EL.296' - 7" EL.296' - 7"

1233 South Grand


LEVEL 5 LEVEL 5
EL.284' - 4" EL.284' - 4"

LEVEL 4 LEVEL 4
EL.275' - 4" EL.275' - 4"

LEVEL 3 LEVEL 3
EL.266' - 4" EL.266' - 4"

ADDRESS, AVE, SUITE


CITY, STATE, ZIP
PROJECT NAME
LEVEL 2 LEVEL 2
EL.257' - 4" EL.257' - 4"

Level 1.5 Level 1.5


EL.253' - 0" EL.253' - 0"

THE LIMITED PURPOSE OF EVALUATION, BIDDING OR REVIEW. THIS DOCUMENT OR ITS CONTENTS MAY NOT BE USED FOR ANY
THIS DOCUMENT CONTAINS INFORMATION PROPRIETARY TO MVE + PARTNERS, INC. AND IS FURNISHED IN CONFIDENCE FOR

OTHER PURPOSE AND MAY NOT BE REPRODUCED OR DISCLOSED TO OTHERS WITHOUT THE PRIOR WRITTEN CONSENT OF
LEVEL 1 LEVEL 1
EL.241' - 0" EL.241' - 0"

LEVEL P1 LEVEL P1
EL.229' - 6" 1 EL.229' - 6"

MVE + PARTNERS, INC. ALL RIGHTS RESERVED, © COPYRIGHT 2018.


2 S6.01
S6.01

WALL ELEVATIONS

1/8" = 1'-0"
LEVEL P2 LEVEL P2
EL.219' - 4" EL.219' - 4"

08/03/2020 - ISSUED FOR 100% DD PROGRESS SET


SHEET TITLE
5'-0"

Scale
SHEET NUMBER

BASEMENT WALL ELEVATION - SOUTH BASEMENT WALL ELEVATION - EAST


S5.01
4 3
1/8" = 1'-0" 1/8" = 1'-0"
S5.01 S5.01
PROJECT NUMBER
30925-01

BRYSON MARKULIN ZICKMANTEL


STRUCTURAL ENGINEERS

#501 - 510 BURRARD STREET, VANCOUVER, B.C. V6C 3A8


(604) 685-9533 WWW.BMZSE.COM CONTACT@BMZSE.COM
STAMP
6" S.O.G.
6'-0"
SEE PLAN
ISSUES:
LEVEL B5 NO. DATE DESCRIPTION
A 2020-06-16 50% DD PROGRESS
SET
B 2020-08-03 100% DD PROGRESS

8" S.O.G.
SET

SEE PLAN FOR


+ SLAB REINF.

H
SEE PLAN

FREE DRAINING
BACKFILL 1" CLR.

55H 75psf 11H


#5 @ 10" VERT.
#5 @ 10" HORIZ.
STATIC SEISMIC CONT.

DESIGN LOAD COMBINATIONS


LOAD COMBINATION 1 = 1.6 x STATIC C#5 @ 18"
LOAD COMBINATION 2 = 1.6 x STATIC + 1.0 SEISMIC DOWELS
4" 4"
B5 LOWER

DOWELS TO
MATCH WALL
4 BASEMENT DESIGN LOAD VERTS.

S5.02
FOR FOOTING AND
REINF. SEE PLAN

3"
3"

1 CONCRETE BASEMENT WALL DETAIL


1/2" = 1'-0"
S5.02

THESE DRAWINGS ARE NOT TO BE USED FOR


TENDER, CONTRACT, OR CONSTRUCTION
#3 PLACING BARS
EXTRA AS REQUIRED

2020-08-26 4:47:45 PM
PROGRESS
U.N.O. ON
ELEVATIONS
PARKING LEVEL
2'-0"

2"
SEE ELEV.

SEE ELEV.
SEE PLAN FOR SLAB AND
SLAB REINFORCING

TYP.
5"
#4 TIES @ 24" ALT.

2'-0"

SEE PLAN

WALL REINFORCING
SEE ELEVATION

2 SHEARWALL REINFORCING SECTION


1/2" = 1'-0"
S5.02

3'-0" TYP.

1" CLR
BOTH FACES
WALL BELOW GRADE
DESIGN TO BE
DRAINED WATER
PROOFING & DAMP
PROOFING, BY OTHERS

CJ CLEAN & ROUGHEN 2#5 TOP TYP.

30925-01
Date APRIL 10TH, 2020

JD
ML
2" CLR. 1" CLR.

VERTICAL REINF.
AS SHOWN ON WALL
DRAINAGE LAYER ELEVATIONS
WATERPROOFING AND
DAMP PROOFING BY

Project Number
OTHERS - SEE ARCH.

Checked By
HORIZ. REINF.

Drawn By
AS SHOWN ON WALL
ELEVATIONS

REFER TO SHEARWALL
SPLICE LENGTHS
2#5 BOT TYP. SEE DETAIL

1233 South Grand


CJ CLEAN & ROUGHEN

EXTRA BARS #5 HORIZ.


AS SHOWN ON WALL
ELEVATION 2#5 TOP TYP.
CENTERED AT SLAB
TYP. U.N.O.

SEE PLAN & WALL


ELEVATIONS

2" CLR. 1" CLR.

INSIDE FACE DOWELS


WALL DOWELS

TENSION SPLICE
SEE WALL

3'-6" TYP. U.N.O.


ELEVATION

ADDRESS, AVE, SUITE


S.O.G. PER PLAN

CITY, STATE, ZIP


PROJECT NAME
2#5 BOT TYP.

12"

12" MIN.
3" CLR.

THE LIMITED PURPOSE OF EVALUATION, BIDDING OR REVIEW. THIS DOCUMENT OR ITS CONTENTS MAY NOT BE USED FOR ANY
THIS DOCUMENT CONTAINS INFORMATION PROPRIETARY TO MVE + PARTNERS, INC. AND IS FURNISHED IN CONFIDENCE FOR
FIRM BEARING

OTHER PURPOSE AND MAY NOT BE REPRODUCED OR DISCLOSED TO OTHERS WITHOUT THE PRIOR WRITTEN CONSENT OF
TO SUIT 3" MAX.

3 TYPICAL BASEMENT WALL SECTION


S5.02 N.T.S.

MVE + PARTNERS, INC. ALL RIGHTS RESERVED, © COPYRIGHT 2018.


As indicated
WALL DETAILS

08/03/2020 - ISSUED FOR 100% DD PROGRESS SET


SHEET TITLE

Scale
SHEET NUMBER

S5.02
PROJECT NUMBER
30925-01

BRYSON MARKULIN ZICKMANTEL


STRUCTURAL ENGINEERS

#501 - 510 BURRARD STREET, VANCOUVER, B.C. V6C 3A8


(604) 685-9533 WWW.BMZSE.COM CONTACT@BMZSE.COM
STAMP
ISSUES:
NO. DATE DESCRIPTION
A 2020-08-03 100% DD PROGRESS
SET

4 1 5
1 2 3 S3.11 4 S6.01 S3.11 5 6 7
A B C D E F

2
S6.01

LEVEL P2
EL.219' - 4"
LEVEL P2
EL.219' - 4"

9'-0"
2 2
3 3
3 2
2 2 3
3 3 2
SEE DET. 3 / S6.01
3'-6" FOR SLOPE BTW'N. 4'-0" 2 3
SLAB THICKNESS TRANSITION 3

2 FOOTING SECTION
1/8" = 1'-0"
S6.01 1 FOUNDATION SECTION
1/8" = 1'-0"
S6.01

THESE DRAWINGS ARE NOT TO BE USED FOR


TENDER, CONTRACT, OR CONSTRUCTION
2020-08-26 4:47:48 PM
PROGRESS
REINF. TO BE CONTINUOUS

COVER TYP.
THROUGH CONSTRUCTION JOINT

1 1/2" CLR.
SEE PLAN FOR
PROVIDE CONTINUOUS KEYS REINFORCING
RAFT SLAB REINF. 1 1/2" FROM 2x6 OVER FULL DEPTH TENSION LAP TOP BARS
SEE PLAN SEE PLAN
OF CONSTRUCTION JOINT OR MAKE CONTINUOUS FOR REINF
LEVEL P2

SEE PLAN
TE
NS
ION TENSION LAP
SEE PLAN

LA
5 1/2"

P
5 1/2"

ON DWG S2.01.1
SEE NOTE 3
SEE PLAN FOR LAP LOWEST

SKIM COAT

COVER TYP.
2
REINFORCING 2 LAYERS U/N
SKIM COAT 3

3" CLR.
SEE NOTE 3 18"
ON DWG S2.01.1 WATERPROOF MEMBRANE BOTTOM REINF MAINTAIN POINT OF
WATERPROOF MEMBRANE BY OTHERS - SEE ARCH SEE PLAN LOWER END OF SLOPE #6 @ 12" O/C
BY OTHERS - SEE ARCH FOR SPECIFICATION
VERT. TYP.
FOR SPECIFICATION

NOTE:
EXACT LOCATION AND EXTENT OF CONSTRUCTION JOINT
TO BE CONFIRMED ON SITE BY THE CONTRACTOR.
LOCATION TO BE APPROVED BY ENGINEER #6@12" O/C HORIZ.
EXTEND 2'-0" PAST CORNER
EACH END, TYP.

CONSTRUCTION JOINT IN RAFT SLAB SLOPE BETWEEN SLAB THICKNESSES TYP. U.N.O.

30925-01
Date APRIL 10TH, 2020

JD
ML
5 4
S6.01 N.T.S. S6.01 N.T.S.
TE
NS
LA ION
P

Project Number
WALL REINF.

Checked By
SEE WALL
ELEVATIONS

Drawn By
24" SLAB MIN.
R/W #9 @ 9"
VERT. REINF. E/W TOP + BOT.

ON DWG S2.01.1
SEE WALL C/W #4 STIRRUPS
ELEVATIONS SEE PLAN @ 9"x9" O/C
TYP. U.N.O.

TENSION

SEE NOTE 3
FOR REINF

SKIM COAT
4'-6 1/4"

WATERPROOF MEMBRANE LAP


BY OTHERS - SEE ARCH
FOR SPECIFICATION
#6-5.10 @ 16", HOOK 16" 2

FOR FOOTING AND


2" CLR.

3
REINF. SEE PLAN

1233 South Grand


#6 @ 12" HORIZ. 3' - 6"
CUT BARS AT PIPE RUNS
TENSION LAP
ADD LAPPING REINFORCING

TY 6"
1
P.
TO MATCH

2" CLR.
TYP.
#5 @ 12" "U-BAR"
3 ELEVATOR PIT DETAIL IN CORE FOUNDATION
S6.01 N.T.S.
1
3" CLR.
MAX.

3" MIN.

24" 1
12"

#5 @ 16"
#5 @ 12"
CO

3" E R
V

SKIM COAT
SEE NOTE 3
ON DWG. S2.01.1

7 ALTERNATIVE SECTION AT MAT FOUNDATION 6 TYPICAL PIPES IN FOOTINGS


S6.01 N.T.S. S6.01 N.T.S.

ADDRESS, AVE, SUITE


CITY, STATE, ZIP
PROJECT NAME

THE LIMITED PURPOSE OF EVALUATION, BIDDING OR REVIEW. THIS DOCUMENT OR ITS CONTENTS MAY NOT BE USED FOR ANY
THIS DOCUMENT CONTAINS INFORMATION PROPRIETARY TO MVE + PARTNERS, INC. AND IS FURNISHED IN CONFIDENCE FOR

OTHER PURPOSE AND MAY NOT BE REPRODUCED OR DISCLOSED TO OTHERS WITHOUT THE PRIOR WRITTEN CONSENT OF
SECTIONS AND DETAILS

MVE + PARTNERS, INC. ALL RIGHTS RESERVED, © COPYRIGHT 2018.


As indicated

08/03/2020 - ISSUED FOR 100% DD PROGRESS SET


SHEET TITLE

Scale
SHEET NUMBER

S6.01
PROJECT NUMBER
30925-01

BRYSON MARKULIN ZICKMANTEL


STRUCTURAL ENGINEERS

#501 - 510 BURRARD STREET, VANCOUVER, B.C. V6C 3A8


(604) 685-9533 WWW.BMZSE.COM CONTACT@BMZSE.COM

You might also like