You are on page 1of 1

A B C D E F G H I J KEY TO INSTRUMENTATION

21'
High End Studio Beam PC @

BEAM
4
700w

#1A ELEC
#4a ELEC

FOH PIPE
SET PIPE
#5 ELEC

#4 ELEC

#3 ELEC

#2 ELEC

#1 ELEC

20'
NOT DRAWN IN
TRUE POSITION

ADDED PIPE

PL

TOP
ETC Source-4 10° @ 750w 4
2003

TOP
Shelley
©Steve

#1 BOOM SL

19'

123
0 0

3
ETC Source-4 19° @ 750w 10

7
HOUSE

3
L1
18'
LTS
1

122
2
602
ETC Source 4 26° @ 750w 14

37
#1A ELEC ACTUAL POSITION

L1
500

213
3
17'
BEAM

45
CMY

121
1
1

L2
ETC Source-4 36° @ 575w 4
2003
Shelley
©Steve

37
362

L1
204
16'

x7

R55
1

1
HAZER

ETC Source-4 36° @ 750w 26


2003
Shelley
©Steve

2003
Shelley
©Steve
BASE

142
802
L017

1
15'

FOH LEDGE
1

C
402
2003
Shelley

N/
©Steve
ETC Source-4 50° @ 750w 23

NOT DRAWN IN
TRUE POSITION
951

R55
1

2
HR BOX NEAR
PIPE DOWN 36"

14'
2003
Shelley
©Steve

141
157

HR BOX FAR
NOTE:
ETC Source-4 70° @ 750w 1
1 1
L202

361

401
2003
Shelley
1

©Steve

L202
13'

3
x7

813
2003

2
Shelley
©Steve

L017 ETC S4-PAR (WFL) @ 750w 17

L202
12'

4
L202

814
32
156
ETC D40 @ 110w 28

L103
2

11'

1
8
R08

98
x7

LEDGE PIPE R
x7
USITT Practical Luminaire 1

1
34

NOT DRAWN IN
L201

TRUE POSITION
375
601

10'

2
N/C

702
1

78
Elation ELED @ 80w 4

155
3
BEAM

R08
CMY
1

9'
48 4

L2
374

03 L202
x7
STROBE @ 37w 2
©Steve
Shelley
2003

3
2 2

8'
353 354

R365 R365

L2
ETC VIVID R11 @ 100w 12
2

03

SHELLEYSHELLEY
154
35

33

7'

BEAM
L103

CMY
6
3

1
97
101
7
x7
R08 R08

L103

612
x7

6'
2

L103

4
11

C
43

93
©Steve
Shelley 2003
Shelley

L202
2003
©Steve

G
x7
5

5
153

5'
64

L201
351 352

3
47

5
©Steve
R365 R365

Shelley

L202

L201
2003
N/C
7

x7
2

3
4

77
81
x7

4'

L201
5

6
373

31

73
2003
Shelley

GENERAL NOTES
©Steve

3'
152

- Please have ample R119, R132, and blackwrap


8

3 3
451

L202
R08 available at focus call.

7
L2

©Steve
9

Shelley

652
2003
372

03

- Please have all color, templates, and accessories


6

framed and loaded prior to focus. See Channel


x7

2'
63

Hookup and Instrument Schedule for details.


10

L103
N/C
3

8
- Please have top hats and barn doors onhand at
431

96
100
L2

focus call - all sizes.

6
46

1'
0

©Steve
Shelley
L201

L202

L103
2003
3
151

x7
4
7

8
- Instruments hung on 18" centers unless otherwise

L103
noted herein.

9
M
12
L

L
C

11

C
50

K
10

92
F
©Steve ©Steve 2003

42
Shelley Shelley Shelley
L202

L202
2003 2003 ©Steve
x7

x7
4

8
3

0
x7

L201
2

10
LEGEND
L103

L201
R53

x7

10
421 422 423

5
8

76
103

80

1'
62

ABBREVIATIONS: FOCUS FOC


COLOR
L103

L201
R = Rosco CLR
R08

N/C

11
9

6 G = GAM
102
LENSº

72
N
13

2003 2003
Shelley Shelley
©Steve ©Steve

A = Apollo
51

2'
©Steve
Shelley
L161

L202

L201

2003

LS = Line Set TEMPLATE


10

x7

10
4
2

G
L201

GP = Ground Plan
4 4
7
83

L503 LX = Electric UNIT # U#


82

2003
Shelley

TD = Tech. Direct.
©Steve

3'
LD = Lighting Dsgnr

11
441

CHANNEL #
22
49

©Steve
Shelley
L203

L202

L103
2003
11

12
5

4'

91
2003
Shelley
61

©Steve
5

99
45

©Steve
Shelley
L202

L103

2003
N/C

11

x7

12
8
6

L103

13
E
J
9

41

5'

95
©Steve
Shelley
L202
2003
371

12

x7

13
L203

L201
1

14
6

L201
N/C
U

x7

14

6'
9

71
1

2003
Shelley
©Steve

L503
P

79
651
14

BEAM
P

L201

CMY
12

x7

13

15
7

2
7'

75
24

D
R

611
N
333

5 5
44

8'
©Steve
Shelley
L202

L202

2003

12
12

14

10

LEDGE PIPE L
461

NOT DRAWN IN
http://www.mikewoodld.com

TRUE POSITION
R
mike@mikewoodld.com
9'

813-716-1909 Cell / 646-694-8656 Studio


L503 L503
13325

3161 Broadway #2C - New York, NY 10027


This drawing contains a visual concept and construction suggestions.
The lighting designer and design assistants/associates are not qualified
to determine or guarantee the structural integrity or appropriateness of
x7

15
8

any construction or rigging methods, and assume no liability or

L103
10'

responsibility for the improper engineering, construction, or use of any


D

16
and all designs contained on this document and elsewhere throughout
25

23

the production. Always consult a licensed structural engineer before any

94
rigging or construction takes place. All applicable local and national fire
and life safety codes must be follwed at all times.
11

x7
355

L503
R365

L201
REVISION HISTORY
11'

17
14

L201

16

15

74
411

NO. REVISION DATE BY

HL BOX FAR
21

A01 Document Prep 17 AUG 18 MW

HL BOX NEAR

L202
L202 A02 Rough Draft V1 27 AUG 18 MW
12'

1
B01 Submittal V1 19 SEPT 18 MW

812
>B02< LOAD IN 26 SEPT 18 MW

FOH LEDGE
N/C

701

16

PIPE DOWN 36"


3

NOT DRAWN IN

L202
TRUE POSITION
13'
404

2
6 6
NOTE:

811
2003
Shelley
©Steve

L202
©Steve
Shelley
2003

14'

R02
17

3
403

2003
Shelley
©Steve

132
C
©Steve

N/
Shelley

15'
2003

THE BIRDS
1
#1A ELEC ACTUAL POSITION

801

R02

4
16'

x7

PRODUCTION STAFF
2003
Shelley
©Steve

131
1
201 2

R5
DIRECTOR . . . . . . . . . . . . . . . . . . ARADHANA TIWARI
45

1
L2
#1 BOOM SR

LIGHTING DESIGNER . . . . . . . . . . . . . . MIKE WOOD


17'

111
3

SCENIC DESIGNER . . . . . . . . . . . . . . VANDY WOOD

1
R5
TECHNICAL DIRECTOR . . . . . . . . . . . . . JIM ZERVAS
211

2
PROD. ELEC . . . . . .. . .. . . . . . . . . . DAVID CLENNEY
18'

112
#1A ELEC
#4a ELEC

FOH PIPE
- THE GARDEN THEATRE -

1
#5 ELEC

#4 ELEC

#3 ELEC

#2 ELEC

#1 ELEC

R5
7 7
NOT DRAWN IN
TRUE POSITION

WINTER GARDEN, FL 2018

3
19'

DWG NUMBER

113
PL

SCALE 1/2" = 1'


TOP

TOP
1
20'

PG SIZE 36" x 24"


21'

LIGHTING PLOT
A B C D E F G H I J OVERHEAD

You might also like