Professional Documents
Culture Documents
21'
High End Studio Beam PC @
BEAM
4
700w
#1A ELEC
#4a ELEC
FOH PIPE
SET PIPE
#5 ELEC
#4 ELEC
#3 ELEC
#2 ELEC
#1 ELEC
20'
NOT DRAWN IN
TRUE POSITION
ADDED PIPE
PL
TOP
ETC Source-4 10° @ 750w 4
2003
TOP
Shelley
©Steve
#1 BOOM SL
19'
123
0 0
3
ETC Source-4 19° @ 750w 10
7
HOUSE
3
L1
18'
LTS
1
122
2
602
ETC Source 4 26° @ 750w 14
37
#1A ELEC ACTUAL POSITION
L1
500
213
3
17'
BEAM
45
CMY
121
1
1
L2
ETC Source-4 36° @ 575w 4
2003
Shelley
©Steve
37
362
L1
204
16'
x7
R55
1
1
HAZER
2003
Shelley
©Steve
BASE
142
802
L017
1
15'
FOH LEDGE
1
C
402
2003
Shelley
N/
©Steve
ETC Source-4 50° @ 750w 23
NOT DRAWN IN
TRUE POSITION
951
R55
1
2
HR BOX NEAR
PIPE DOWN 36"
14'
2003
Shelley
©Steve
141
157
HR BOX FAR
NOTE:
ETC Source-4 70° @ 750w 1
1 1
L202
361
401
2003
Shelley
1
©Steve
L202
13'
3
x7
813
2003
2
Shelley
©Steve
L202
12'
4
L202
814
32
156
ETC D40 @ 110w 28
L103
2
11'
1
8
R08
98
x7
LEDGE PIPE R
x7
USITT Practical Luminaire 1
1
34
NOT DRAWN IN
L201
TRUE POSITION
375
601
10'
2
N/C
702
1
78
Elation ELED @ 80w 4
155
3
BEAM
R08
CMY
1
9'
48 4
L2
374
03 L202
x7
STROBE @ 37w 2
©Steve
Shelley
2003
3
2 2
8'
353 354
R365 R365
L2
ETC VIVID R11 @ 100w 12
2
03
SHELLEYSHELLEY
154
35
33
7'
BEAM
L103
CMY
6
3
1
97
101
7
x7
R08 R08
L103
612
x7
6'
2
L103
4
11
C
43
93
©Steve
Shelley 2003
Shelley
L202
2003
©Steve
G
x7
5
5
153
5'
64
L201
351 352
3
47
5
©Steve
R365 R365
Shelley
L202
L201
2003
N/C
7
x7
2
3
4
77
81
x7
4'
L201
5
6
373
31
73
2003
Shelley
GENERAL NOTES
©Steve
3'
152
3 3
451
L202
R08 available at focus call.
7
L2
©Steve
9
Shelley
652
2003
372
03
2'
63
L103
N/C
3
8
- Please have top hats and barn doors onhand at
431
96
100
L2
6
46
1'
0
©Steve
Shelley
L201
L202
L103
2003
3
151
x7
4
7
8
- Instruments hung on 18" centers unless otherwise
L103
noted herein.
9
M
12
L
L
C
11
C
50
K
10
92
F
©Steve ©Steve 2003
42
Shelley Shelley Shelley
L202
L202
2003 2003 ©Steve
x7
x7
4
8
3
0
x7
L201
2
10
LEGEND
L103
L201
R53
x7
10
421 422 423
5
8
76
103
80
1'
62
L201
R = Rosco CLR
R08
N/C
11
9
6 G = GAM
102
LENSº
72
N
13
2003 2003
Shelley Shelley
©Steve ©Steve
A = Apollo
51
2'
©Steve
Shelley
L161
L202
L201
2003
x7
10
4
2
G
L201
GP = Ground Plan
4 4
7
83
2003
Shelley
TD = Tech. Direct.
©Steve
3'
LD = Lighting Dsgnr
11
441
CHANNEL #
22
49
©Steve
Shelley
L203
L202
L103
2003
11
12
5
4'
91
2003
Shelley
61
©Steve
5
99
45
©Steve
Shelley
L202
L103
2003
N/C
11
x7
12
8
6
L103
13
E
J
9
41
5'
95
©Steve
Shelley
L202
2003
371
12
x7
13
L203
L201
1
14
6
L201
N/C
U
x7
14
6'
9
71
1
2003
Shelley
©Steve
L503
P
79
651
14
BEAM
P
L201
CMY
12
x7
13
15
7
2
7'
75
24
D
R
611
N
333
5 5
44
8'
©Steve
Shelley
L202
L202
2003
12
12
14
10
LEDGE PIPE L
461
NOT DRAWN IN
http://www.mikewoodld.com
TRUE POSITION
R
mike@mikewoodld.com
9'
15
8
L103
10'
16
and all designs contained on this document and elsewhere throughout
25
23
94
rigging or construction takes place. All applicable local and national fire
and life safety codes must be follwed at all times.
11
x7
355
L503
R365
L201
REVISION HISTORY
11'
17
14
L201
16
15
74
411
HL BOX FAR
21
HL BOX NEAR
L202
L202 A02 Rough Draft V1 27 AUG 18 MW
12'
1
B01 Submittal V1 19 SEPT 18 MW
812
>B02< LOAD IN 26 SEPT 18 MW
FOH LEDGE
N/C
701
16
NOT DRAWN IN
L202
TRUE POSITION
13'
404
2
6 6
NOTE:
811
2003
Shelley
©Steve
L202
©Steve
Shelley
2003
14'
R02
17
3
403
2003
Shelley
©Steve
132
C
©Steve
N/
Shelley
15'
2003
THE BIRDS
1
#1A ELEC ACTUAL POSITION
801
R02
4
16'
x7
PRODUCTION STAFF
2003
Shelley
©Steve
131
1
201 2
R5
DIRECTOR . . . . . . . . . . . . . . . . . . ARADHANA TIWARI
45
1
L2
#1 BOOM SR
111
3
1
R5
TECHNICAL DIRECTOR . . . . . . . . . . . . . JIM ZERVAS
211
2
PROD. ELEC . . . . . .. . .. . . . . . . . . . DAVID CLENNEY
18'
112
#1A ELEC
#4a ELEC
FOH PIPE
- THE GARDEN THEATRE -
1
#5 ELEC
#4 ELEC
#3 ELEC
#2 ELEC
#1 ELEC
R5
7 7
NOT DRAWN IN
TRUE POSITION
3
19'
DWG NUMBER
113
PL
TOP
1
20'
LIGHTING PLOT
A B C D E F G H I J OVERHEAD