NOTES:
PLANT NORTH
1. ALL DIMENSIONS ARE IN MILLIMETERS & ELEVATIONS ARE IN METERS,
TRUE NORTH
UNLESS OTHERWISE SPECIFIED.
2. THE CABLE ROUTING SHOWN IN THIS DRAWING IS INDICATIVE AND FOR
GUIDANCE PURPOSE ONLY.
11 11
3. THE CABLE TRENCH / TRAY LOCATIONS & SIZES SHOWN IN THIS
DRAWING ARE INDICATIVE AND FOR GUIDANCE PURPOSE ONLY AND
THE SAME SHALL BE REVALIDATED / MODIFIED BY CONTRACTOR
ACCORDING TO THE ACTUAL REQUIREMENT DURING DETAIL
ENGINEERING.
4. AT ROAD CROSSING, CULVERT SHALL BE CONSIDERED FOR
UNDERGROUND CABLES AND OVERHEAD CABLE BRIDGE SHALL BE
CONSIDERED FOR ABOVE GROUND CABLES.
5. CABLE INSTALLATION SHALL BE IN ACCORDANCE WITH JOB
SPECIFICATION FOR FIELD ELECTRICAL INSTALLATION DRG. NO.
077154C-000-JSD-1600-003 AND RESPECTIVE POWER INSTALLATION
BY EPCC-2 CONTRACTOR STANDARDS DWG. NO. 077154C-000-STD-1682-001.
6. NECESSARY CO-ORDINATION WITH OTHER CONTRACTORS SHALL BE IN
THE SCOPE OF PACKAGE CONTRACTOR, WHEREEVER OTHER
BATTERY LIMIT CONTRACTOR REQUIREMENTS AND TIE-INS ARE TO BE INCORPORATED,
FOR RFCCU / MS & UTILITY BEFORE ISSUING ANY CONSTRUCTION DRAWINGS.
BLOCK SUBSTATIONS) 7. FOR SCOPE SPLIT BETWEEN CONTRACTORs, REFER DOCUMENT
10 10
CABLE TRENCH & PULL PIT NO. 077154C-SOW-PACKAGE4-004
UNDER EPCC2 CONTRACTOR 8. THE C&R PANELS FOR PROPOSED 220kV BAYS & RTCC PANELS OF
BY LUPECH POWER PROPOSED TRANSFORMERS SHALL BE LOCATED IN 1ST FLOOR OF
SCOPE
DISTRIBUTION FACILITY EXISTING 220KV GIS BUILDING. THE INTERFACE / CONTROL CABLES
ROAD NO. 23
WALL
IN EXISTING CABLE TRAYS INSIDE EXISTING 220kV GIS BUILDING.
FROM CABLE RACK TO PULL PIT
1760
CGP -1 LEGEND:
6000 BOUNDARY
5500
- CABLE LADDER
CABLE TRAY DROPPER
5539
ROAD NO. 28 FROM CABLE RACK TO PULL PIT
9 9
- CONCRETE TRENCH WITH TRAYS
10
6000
9681
- EXISTING SPARE FEEDER TO BE USED TO FEED
DRAIN THE PROPOSED LOAD
15782
1 NO. 600MM WIDE CABLE TRAY SHALL BE SUPPLIED & FROM THIS PROPOSED CABLE TRENCH, THE INTERFACE 9
IN THIS PORTION OF CABLE ROUTE, 1 NO. 600MM
INSTALLED BY "LUPECH POWER DISTRIBUTION FACILITY CABLES WITH EXISTING CGP-1 SUBSTATION (FROM
WIDE CABLE TRAY ALONG WITH SUPPORT SHALL BE - EXISTING EQUIPMENT TO BE MODIFIED TO FEED
20000
5828
8000
PIPE AREA SUPPLIED & INSTALLED BY LUPECH POWER PACKAGE CONTRACTOR" ON THE BOTTOM MOST LEVEL CGP-1 SS TO NEW GIS BUILDING) SHALL BE ROUTED THE PROPOSED LOAD
(HORIZONTAL SUPPORTS ALREADY AVAILABLE) OF EXISTING UPTO THE RESPECTIVE INTERFACE EQUIPMENT INSIDE
DISTRIBUTION FACILITY PACKAGE CONTRACTOR"
CABLE ROUTE SUPPORTED FROM CGP-1 SS WALL (SUPPLY & CGP-1 SS ACCORDING TO ACTUAL SITE CONDITIONS.
EXISTING TRENCH
UPTO THE MAIN CABLE TRAY RAISER LOCATION
PUMP HOUSE INSIDE CGP-1 SS.
INSTALLATION OF ECS INTERFACE CABLES BY OTHER (FOR DETAILS OF INTERFACE EQUIPMENT, REFER DWG 9 CULVERT AT ROAD
- EXISTING EQUIPMENT TO BE EXTENDED TO
5433
X 320.52 CONTRACTOR)
EXISTING APPROACH ROAD No. 077154C-1825-DW-1625-001)
EXISTING APPROACH ROAD 2000 6200 FEED THE PROPOSED LOADS
6000
APPROACH ROAD (IN OTHER CONTRACTOR SCOPE)
6466
Y 1541.72
16 8
8 22 21 20 19 18 17 15 14 13 12 11 10 9 7 6 5 4 3 2 1 - EXISTING EQUIPMENT TO BE EXTENDED TO 8
FEED THE PROPOSED LOADS
UNIT SUBSTATIONS)
A
6000
GT-1 DCDB GT-2 DCDB
EXISTING TRENCH
BOP-1 MCC BATTERY CHARGER
BY EPCC-6 CONTRACTOR
7223
BATTERY LIMIT
HRSG-3 MCC
CGP-1 MCC
PACKAGE CONTRACTOR
28 27 26 25 24A 24 23A 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6A 6 5 5A 4 3 2 1 CHARGER
PIPE AREA TR - 156 REACTOR REACTOR
BATTERY BATTERY CHARGER
DISTRIBUTION FACILITY
4-Z6 4-Z4
OUT IN
CHARGER
BATTERY
BATTERY LIMIT FOR ECS GT-3 MCC 11 KV HT SWGR. F HT SWBD. 2 ( ZONE 2,4,6)
HRSG-1 MCC HRSG-2 MCC
110V DCDB
- CULVERT AT ROAD CROSSING
EXISITING CGP-1 SUBSTATION
LV PANEL
INTERFACE CABLES DCDB
BY LUPECH POWER
GT-1 MCC GT-2 MCC
FIRE WATER LINE
6000
110V DCDB
F HT SWBD. 1 ( ZONE 1,3,5)
ELDB
DRIVE
- CABLE LADDER/TRAY RAISER
4252
LOCATION BETWEEN CABLE VAULT 1 NO 600MM WIDE TRAY RAISER & THE SAME TO BE CONNECTED
DRAIN
ZONE-2 SWBD-251
SWBD-252
DB-2
T-3
EL
11
C
L KV HT SWGR.
DCDBDB
PMCC
11 KV HT SWGR. ZONE-1
2B
D
C
E
2
1 ACDB
2B
D
C
E
1
2
26-TC-00-00-1C
26-TC-00-00-1B
S/S-CGP1
FENCING
REACTOR-3
REACTOR-4
SWITCH
MANDIR
REACTOR-
EARTH
ENTRY
Fire
TR-1
TR-2
IC-1
IC-2
TR.
G e30
r- 152
155
156
153
154
151 water
e1000
10 YARD
MVA
MVA
TR.
1600
2n
1 etanks
BTR.
KVA ltArea
Electrical Annexe. Bldg.
2B
A'
D
B
E
A
2
1
2B
A'
C
A
B
2
CABLE MOUND
TRENCH
DCDB-1
C
B
A
09.05.2019AS MARKED
REVISED
HRS
SAK
TB
TERRACE
CGP-1
D
E Bldg.
EMTS
1:150
G
C
B
A
E
F
0
D'
C
A
B
IndianOil
(1)-G71770-AD001-L160-001-H
CONSTRUCTION
ENGINEERING
PRELIMINARY
GUJARAT,
Released
220/33kV
GUJARAT
LOCATION
21.03.2018
04.05.2018
10.05.2018
06.06.2018
05.07.2018
31.10.2018
06.02.2019
14.03.2018
VOLTAGE
GUJARAT
OVERALL
REVISED
POWER
220/33kV
LAYOUT
INDIAN
FIRST
HRS
SUB
SAK
GIS
for
AN
AS
TB
1EN
-H OIL
& CORPORATION
SYSTEM
DIMENSION
REFINERY
APPROVAL
REFINERY
UTILITIES
MARKED
GENERAL
TYPE
SUBMISSION
SUBSTATION
GIS
TRAFO
STATION
FOR
4.03.2018
PER AS PER
220
LEVEL CLIENT
DIM. &MEASURMENT
LIMITED
COMMENTS
kV ARRANGEMENT
GIS
& BUILDING
PLOT CRP PANEL CHANGES
AT SITE
01 of 02
3500
AIR B
6000
TO 1ST FLOOR OF CGP-1 SUBSTATION TO THE BOTTOM MOST LEVEL OF EXISTING CABLE TRAY ROUTE
XX
X
XX
RECEIVER -1
X
REACTOR- 2
XX
X
X
XX
X
R9501
XX
(SPARE SPACE) SUPPORTED FROM EXISTING CGP-1 SS WALL.
X
15
XX
X
20000 X 306.50
X
2B 2 EXISTING CABLE DUCT 1
X
4687
C
36400 (FOR ROUTING OF ECS INTERFACE
Y 1643.54 CABLES X 306.50
FROM VARIOUS - CABLE LADDER/TRAY DROPPER
26-TC-00-00-1B
X
11 KV SWBD-3
X
Y 1643.54
COMPRESSOR
TRENCH
TRENCH
E
X X X X
X
RECEIVER -2
15
6000
NIFPS
TRENCH
14 14
LINE
M20x30 DEEP
21
130
60
25
2xM10x15 DEEP
EARTH
77
X
1250(W) X 2500 (D)
X
X
7 L.V.SIDE
8650 7
X
46881
36350
D 000-TR-101A
X
HOUSE
X
EARTH
77
2xM10x15 DEEP
AIR
25
60
220kV GIS
130
21
M20x30 DEEP
W1 V1 U1
LINE
FIRE WATER LINE
EXISTING
X
D H.V.SIDE REACTOR- 1
RECEIVER -3
8 8 REFERENCE DRAWINGS/DOCUMENTS
X
X
X
TR EMR
6000
EXISTING 220kV / 33kV
1600
ACDB
IN THIS PORTION OF CABLE ROUTE, PROPOSED 220KV 1600 KVA
X
LINE
M20x30 DEEP
21
130
60
X
25
2xM10x15 DEEP
EARTH
77
REACTOR-3
TRANSFORMERS
X
CABLES & ASSOCIATED CONTROL CABLES SHALL BE G71770-AD001-L160-001-Z OVERALL GENERAL ARRANGEMENT LAYOUT
X
1250(W) X 1500 (D)
TR. - 155
C
7600
11 KV SWBD-2
E
AIR (EXISTING) FOR 220KV GIS BUILDING
X
TRENCH
X
ROUTED ON EXISTING
RECEIVER -4CABLE TRENCH (SEE NOTE-8)
LINE
M20x30 DEEP
21
130
25
2xM10x15 DEEP
EARTH
77
5601
77
EARTH
2xM10x15 DEEP
25
60
130
21
M20x30 DEEP
LINE
3000
1W 1V 1U
X
X
220/33kV TRANSFORMER TR. - 154 1000 KVA
16 16 ELECTRICAL DESIGN BASIS
X
077154C-000-JSD-1600-001
X
X
IN THIS PORTION OF ABOVE GROUND CABLE ROUTE, THE TRENCH
SEE NOTE-3
X
X
LINE
M20x30 DEEP
21
130
60
25
2xM10x15 DEEP
EARTH
77
B REACTOR-4
1250(W) X 2500 (D)
1W
PROPOSED CABLES SHALL BE ROUTED WITH THE EXISTING
L.V.SIDE
H.V.SIDE
EXISTING DRAIN
1V
6000
F
077154C-000-DW-0051-001 OVERALL PLOT PLAN
1U
(TYP)
X
12323
SUPPORTS TO THE POSSIBLE EXTENT (OR) WITH NEW CABLE
X
000-TR-101B
EXISTING TRENCH
X
EXISTING ROAD
12500
38000
3.75M WIDE
X
077154C-000-STD-1682-001
FENCING
TR. - 153 1000 KVA DESIGN
WALL
A
1W 1V 1U
X
2443
6
CABLE TRENCH
EXISTING 220kV
BY ISBL
11KV SWBD-1
6000
FENCE
G
1W
1500(W) X 1500 (D)
L.V.SIDE
H.V.SIDE
A'
1V
077154C-000-DW-1652-002 KEY SINGLE LINE DIAGRAM
1U
11077
X
X
TRENCH
R9560
6317
BY ISBL
BATTERY LIMIT FOR OTHER
FENCE
BOUNDARY
TRENCH
X
6 26-TC-00-00-1C
X
CONTRACTOR CABLES SINGLE LINE DIAGRAM - LUPECH POWER
17 17
1
220/33kV TRANSFORMER
55000
2B 2
X
077154C-1825-DW-1652-001
DISTRIBUTION FACILITY
1000 KVA
L.V.SIDE L.V.SIDE
1000 KVA
TR 152
TRENCH
TRENCH
TR 151
X X X X
6000
IC-1 30 MVA TR. IC-2 30 MVA TR. H
GATE
PROPOSED 220kV W1 V1 U1
X
W1 V1 U1
13 13 SWITCH YARD
EXISTING 220kV
14642 H.V.SIDE
H.V.SIDE
TRENCH
CABLE TRENCH ENTRY
CABLE MOUND
3.75M WIDE
GIS BUILDING
X
13366
PROPOSED ROAD
18
X
TRENCH
PT
400(W) X 500 (D)
X
2 NOS. OF 300MM WIDE TRAYS FROM
6000
KEY PLAN
X
CABLE RACK TO UPS ROOM
FENCE IN
18 BY OSBL
LINE LINE
M20x30 DEEP M20x30 DEEP
21
21
130 130
60 60
25
25
EARTH EARTH
77 77
6000
X 2957.55
ATE CABLES
X 2792.17
Y 2497.65
IV
RIL A r e a
R LI 1000
18821
11 11
PIPE RACK
X 2690.61
Y 2831.12 X 2685.81
Y 2876.31
NE
R.U.B.
ESS-041
22000
WT-8 Gate
Gate
N.R
X 2646.13
Y 2489.52
. 09 PH
No CISF DUTY
POST
ad
Ro
Oily
Oily Gujarat Electricity
4300
Sludge
a
Sludge
Lagoon Board X 2558.35
re
Lagoon Oily Y 2904.11
Sludge
Y 2775.00
A
rack
Lagoon
Y 2691.00
Y 2720.00
d pipe
Y 2541.00
RIL
Duma
X 2525.73
Y 2562.27
WT-9
07A
17800
No.
Y 2593.21 WT-10
S/S-39 CR.
2
Road
O&m 7M WIDE ROAD
Marketing Division
Room PROP.CISF 14M WIDE ROAD
9.50 MORCHA
20
7M WIDE ROAD EXIT
DRAIN
X 2440.00 X=2448.90
Y=2543.02
X=2448.90
Y=2692.46
ELECTRIC
PANEL ROOM
4x6 m
3.75 M
WIDE ROAD
6.45
GARDEN
PROP.
X=2438.90 Y=2664.88
PARKING
SHED
3.5x9m
CONSTRUCTION
Y=2533.02
SUB-STATION Bitumen Truck
CWTP TO BE DISMANTLED
Parking
CT 14M WIDE ROAD
ENTRY
PROP.LAB
IOCL
7M WIDE ROAD
7M WIDE ROAD
SHED
OUR
TOILET
Road
X 2379.00
Cable Trench
45
TRENCH
6000
BOUNDARY WALL
TT Crewrest
LT
LT
Well
ET
ET
Room
MODIFICATION
14014,99
X 2352.59
Y 2133.03
IV FCC
LT
LT
ET
ET
F
70
WT-7 PH
GASOLINE Tank 5 Tank 1
BOU
Open store
24866,01
63649,4
PROP.HARD PAVEMENT
Area
DRAIN
TRUCK FOR W/O & B/O
DESULPHURIZATION Tank 6 Tank 2
(126 x 75)
X 2290.49
Y 2420.26
Belt X 2289.40
or Y 2485.41
16414,99
vey Calico Area Tank 7 Tank 3
RIL A r e a Cok
e Con X 2262.50 X 2272
Y 2691
X 2252.5
Y 2607
Tank 8 Tank 4
TOILET AT
VERANDAH
FIRST FL.
NDA 3100
BATTERY ROOM
TRANSFORMER
DISTRIBUTION
SPACE FOR OTHER
DISTRIBUTION
TRANSFORMER
RIL A r e a
TRANSFORMER
DISTRIBUTION
12
RIL A r e a
TRANSFORMER
DISTRIBUTION
T.L.F. Pump
SS
House
HGU
TRANSFORMER
DISTRIBUTION
5 5
TRANSFORMER
DISTRIBUTION
TRANSFORMER
DISTRIBUTION
Road No. 09
12
Weigh Bridge
ROACH ROAD
X 2187.65
DISTRIBUTION
Y 2118.85
7000
7000
No-19A
POWER TRANSFORMER
CABLE CELLAR
X 2171.66
F
TR
WT-4 WT-5
No-19
Y 434.13 WT-6
POWER TRANSFORMER
DISTRIBUTION
TRANSFORMER
X 2164.54
TRANSFORMER
DISTRIBUTION
Y 404.25
Open store Railway Tracks Railway Track X 2158.33
Road
X 2154.80
POWER TRANSFORMER
Road
Y 1908.43
RY
Area Platform Bitumen drum filling Platform Road No. 10
Y 2138.02
POWER TRANSFORMER
Road No. 10 K.A.P.L.
COKE YARD
VERANDAH
X 2127.11
COKE YARD
X 2119.75 X 2120.76 X 2121.01 Y 1711.66
X 2117.50
EXISTING APP
Y 1417.16 X 2128.72
Y 852.88 Y 1540.81 X 2128.60
Y 1653.90
Tank
Y 1572.24 Top Level Of Dyke 39.37
X 2122.09
Y 486.18
X 2119.40
Conveyor Belt
X 2102.93 X 2102.63 Y 1381.04
Top Level Of Dyke 39.44 Top Level Of Dyke 39.3
CRMB
Y 553.99 Y 625.27
741
Top Level Of Dyke 40.15
CBD
38.19
DHDT SWS PIT
Top Level Of Dyke 39.69
37.8
38.22
39.04 Vessel F
E
CONTRACTOR
711 712 715 716 738 727 728 723 724 731 732
37.67 O.N.G.C.
Road No. 01
H.S.D. CRUDE
XXVIII
NC
Road No. 03
F.O.
Road No. 05
1510 1511 XXIX 743 SKO L.D.O. X 2041.16
TCF
38.32 517 XXV Y 1866.30
13454,49
X 2016.74 X 2017.53
Y 449.58
713 714 717 718 739 729 730 725 726 733 734 Y 1539.53
X 2021.67
744 37.8 Y 1873.01
S/S-18A B.T.T.L. PH 1508
LL
775 522 1517
Gate 38.22
745 NAPHTHA KERO X 1978.52 X 1976.51 Top Level Of Dyke 40.16
6
X 1978.25 Y 1416.85
X 1991.06 X 1991.86 Y 1116.15 37.61
Y 438.70 Y 479.34 1512 1513 X 1977.17
Y 625.19 Bitumen
Y 1077.17 Top Level Of Dyke 39.25 777
914
AIR LOCK LOBBY PASSAGE
TCF
TCF U.P.S. ROOM
A.H.U. ROOM
BARCADDING(TEMPORARY)
521
CLEAN AGENT ROOM
X 1956.49 1516
CONSOLE ROOM A/C PLANT RM.
Station Y 1532.64
HEAVY DUTY FLOORING
PARKING
S.M.P.L.
OFFICE AREA
ENTRANCE LOBBY
27
XXVI
ELECT ROOM. MAINT. TOOL ROOM. OPERATOR ROOM PANTRY LADIES TOILET GENTS TOILET
Weigh Bridge
NOS.
X 1939.74 DCU PH CCH On-grade Piping corridor On-grade Piping corridor X 1954.22 X 1940.88 Top Level Of Dyke 37.13 X 1939.73 X 1939.36 Y 1945.70 (Area
S/S-18 747 748 Y 1654.40 Y 1719.72 Y 1900.57 5537
CONSTRUCTION
EQUIPMENTS
Y 546.70 Y 2101.40
M
HARD
Sqm)
DRAIN
Gate No.2 12 PIPE RACK PIPE RACK NEW ROAD (9M WIDE)
8547
ENTRY BS VI Road No. 8
Road No. 8 Road No.8 UNIT LIMIT
KHDS (120Mx59M)
KHDS TANKS
X 1903.93
G.B. Tanks
Y 991 Y 1121.6 38.54
MS BLOCK
Y 1168
Y 658.44 37.22 Top Level Of Dyke 38.63 X 1879.5
VGO-HDT S/S-33
PH
36.68 X 1873.5
515 516
Y 922.0 Y 954.0 511
UNIT (223Mx185M)
Road No.3A
SABIC 783
RIL NAPHTHA
Benzene 59 83 76
Road No. 01
ROAD
WIDE
ATF MEROX
mtr
7.5
2093-T02 73 75 60
X 1852.5 558 514 513 512
TCF
Road No.3
PH
GR Compound Wall
772 701 702
Y 922.0
X 1829.01
Y 2127.83
Coke
Road No.15
CCH XXII X 1852.06
Y 1411.31 PH (1300 SQM)
Road No.17
ATF M.S
NAPHTHA
Pit X 1840
X 1811.18
Y 2154.80
Y 1345
Road No.08A
64 65 66 70 71
74 77 61
Shed Shed
X 1816.00
PIPE RACK
XXIII
6000
X 1802.30
82 84 78
PIPE RACK
Y 921.60 67 68 69 72
Track No. 02
Track No. 03
38.25
Track No. 04
Track No. 05
X 1801.51
UNIT LIMIT
Control Room S/S-37 X 1786.79 Top Level Of Dyke 40.98 X 1786.08
UNIT LIMIT
Merox X 1762.86
Y 1202.85 Y 1442.55 Y 1657.45 III X 1784.00
Y 1952.65
Y 2040.40
101 PENEX CCR
Road No.13A
TB On-grade Piping corridor
108
X 1770.30
II
Road No.13
On-grade Piping corridor X 1757.11 X 1756.86
6280
Y 963.60
DCU X 1762.96 Y 1272.85 Y 1649.55 Y 1957.73
39.0
Road No.08B
Road No.07A
DM PLANT
703 704 109 102
37.23
(55x155)
On-grade Piping corridor
RIL A r e a 781 205 207 Top Level Of Dyke 40.18
201 203 85 87 89 91
Cable Trench
On-grade Piping corridor
(EPCM STORAGE YARD X 1725.05
R30
Y 2101.30
Road No.3
X 1698.42
Top Level Of Dyke 38.48
XXI
Y 697.24 X 1698.00
Y 921.60 & WAREHOUSE) ATF ATF S.K. S.K.
Road No.07
FIRE WATER LINE
ROAD TO
CR
38.49
HEADWORKS
XXIV (30000 SQM) R45 DG
Road No.14 202 204 206 86 88 90 92 (160Mx42M)
X 1662.31 208 (30Mx25M)
X
Y 103.14
X 1663.99
X 1670.03
NOTE 3 (MS BLOCK + KHDS + UTILITIES BLOCK)
PH
Y 1437.38 On-grade Piping corridor X 1648.71
Y 1733.50 On-grade Piping corridor
37.06
Top Level Of Dyke 38.83 708 709 710 774 735
764 765
Chlorination
Building North Block CT M
Road No. 01
770
PIPE RACK
X 1627.48
762
XX Road No. 6
GANTRY 1
GANTRY 2
S/S
X 1623.83 Y 1139.24
X 1605.50
S/S-23
Y 453.59 GR Compound Wall WT
Top Level Of Dyke 38.89 X 1607.52
Y 551.67
XIX X 1595.75
Y 1167.68
Y 1195.88
Y 2485.00
705 773 WT
PH
706 707 Y 1733.88 Top Level Of Dyke 40.13 (MS BLOCK + KHDS + UTILITIES BLOCK)
736 Mist
Y 2506.5
Cooling 38.24
X 1565.50 Abandoned H S D
Road No. 05
On-grade Piping corridor
36.67 Y 695.47 tower Office
38.75
Top Level Of Dyke 38.23 F.C.O. 38.23
Track No. 02
Track No. 03
On-grade Piping corridor
Track No. 04
No-19
Y 1132.03 OWS SUMP Abandoned
Track No. 05
X 1550.83 X 1565.01
1826-T-003
X 1563.50 Project Office
62 219 218 103
CPU
X 1550.54
WT-3 Y 655.52 PIPE RACK Y 916.24 R30
PH
Y 454.47 Y 1209.28
905 906 907
Road No. 12 Road No. 12 (85Mx25M)
X
Road
NHT & MTO TANKS
DM TANKS
SB 05
CP TANKS
Chlorination
Fire water tanks
Building PH
X 1501.07
Office S/S-16A 06 05
Y 937.29
X 1523.21
(90Mx105M)
GR PH
Cryogenic
X 1492.84
Y 2141.31
X 1492.78
Y 2168.36
Y 625.48
CCH 101A 63 220 101 102
BOILER-1
(30Mx55M)
BOILER-2
(30Mx55M)
BOILER-3
(30Mx55M)
101B
1826-T-002
X 1501.07
X 1490.40
FCC CT Nitrogen X 1499.58 X 1500.57
Y 980.44
4 PH
1826-T-001
Y 656.850 Y 1117.33 Y 1435.93 F.O.
Plant CH Stock F.O. PH
F.O.
X 1068.54
Road No. 4A
GRE CR
RAW WATER PUMPS S/S-16 Y 1498.91 GRE CT X 1483.40
(999-P-01A/B) GR Fire Water PH Y 1955.58
X 1486.82 V
PIPE RACK
CSB
Merox X 1481.92 PH
Road No.
901 902 N2
Y 864.00 TB PH (Drinking water) CCH X 1468.26
VI
OFFICE Y 1185.70
RIL A r e a
Cable Trench
STORAGE
PH X 1463.66 Y 1735.44 Top Level Of Dyke 39.93
S/S-19A
FCC Unit Y 1655.85 X 1459.16
Road No.15
S/S-19 X 1465.34 X 1465.63 X 1440.97 Y 2102.49
CR
S/S-13
SB-03 Naphtha H S D H S D 38.23
BS VI PIPERACK
56
X 1441.12
XVII Y 1033.15
3
93 95 99
Road N0-11
97
5140
DM PLANT
OM & S
S/S No.14
F.C.C.
Office
X 1429.23 X 1429.23 X 1429.20
Unit
Y 951.08 Y 1015.68 Y 1073.87 908 909 910 TK-108A
ZLD
No. 01
X 1419.64 X 1420.0
L.D.O.
FABRICATION YARD
H.S.D.
(180Mx60M)
PIPE RACK
SURAKSHA NAGAR
4500 TK-108B
X
Track
94 96 98 100 SB-01
903 904 BBU &
PH
AU-4 CCH.
66
X 1367.34
Y 1435.38
Top Level Of Dyke 40.32
PBM
X 1366.93
Y 2051.75 Gate No. 10
36.07 X 1345.00 X 1345.0 X 1345.0 X 1359.15
X 1342.51 X 1342.51 X 1342.51 On-grade Piping corridor
X 1345.02 Y 788.22 Y 1141.4 Y 1371.0 RL. 37.96 m. On-grade Piping corridor Y 1957.19
Top Level Of Dyke 37.72 Y 697.29
Y 908.78 Y 973.38 Y 1031.58
X 1404, Y 1716 EXISTING PIPE RACK BRIDGE
KARACHIYA
C
WT
X 1339.20 On-grade Piping corridor On-grade Piping corridor
Weigh Bridge
On-grade Piping corridor SLEEPER TRENCH
PIPE RACK
Y 460.71
VILLAGE
6965
138
Road No. 01
X 1280.84 Y 1804.47 Y 1833.61
PH Y 710.24 Top Level Of Dyke 38.49 Top Level Of Dyke 38.53 Y 1494.17
36.93
XV X 1286.68 Gap Naphtha X 1287.67
Y 1352.35
Y 1418.79
Air Comp. Central UNIT-1820 N2
X 1282.0 Y 1235.52 X 1280
CGP-2 124 125
IA PLANT PLANT
GR Compound Wall
823 37.53 Y 1067.0
555 556
X 1266.86
Y 1392.95
Quality control X 2266.10
Y 1660 House 126 Store Area
X
Laboratory Y 1494.14
X 1260.47
(INCL. S/S (40Mx70M)
EXISTING ROAD
PH
S/S-CGP2
FOAM SHED
Y 869.29
PH 37.44
5000 SQM)
Cable Trench
R.C.O. V.G.O. X 1249.45 LAB
Road No.15
X 21246.49
Y 955.69
(500 SQM)
X 1243.16
822 821 Reformate S/S-36 Y 1502.64
AU-2
Road No.11
Y 709.66
PIPE RACK
S/S-1O
211 212
AU-3
6000
LAB 551 552 Air Comp. GT hrsg-4 & 5 GT hrsg-6 X
150
AUX. FIRE STATION
S/S-2
32 35 38 House S/S
Weighbridge
803 804
210 213 Unit X 1219.10
Y 1388.82
VIII X 1219.26
Y 1979.94
ESS-043 (30M x 19M)
work shop
Electrical
209 214
553 IX X
LPG CR. X 1199.15
BOU
37.02 554 1199.39
EXCHANGER CLEANING
Y Y 2539.76
Central store
34 X 1192
Road No. 05
37 100
X 1199.64
1991.68
Top Level Of Dyke 38.63 Y 1541 X 1186.87 S/S-12 X 1198.36
C
Switch Gear Bldg. PROP. MECHNICAL
CCTV
Y 1798.42 Y 1895.40 Y 2459.67
X 1189.45 B X 1190.97 X 1189.09 LAB CT MAINTENANCE
00
X 1183.75 Y 689.61 Y 886.29 Y 913.72 X
X 1183.39
Y 459.62 Unit Y 1434.69
X 1169.29
Y 1499.48 X 1165
1173.00
Y
PROPYLENE
Road No. 16 TPS CT 2029.37 SB-06
(105Mx65M)
X 1161.19
MOUNDED
Y 1582 X 1157.88 CT X
1159.88
PROP. MEAL CANTEEN
SB-04
VESSELS
Road No. 09
Y 1874.62
WT-2 Y 1802.70 Y
X 1140.9
XII
2007.56X 1163.00
Top Level Of Dyke 38.18 X 1159.89 X 1159.32 X 1150.53
CCH X 1152 X 1163.00
36.40 X 1158.10 Y 775.32 Y 800 55 57 Y 2029.37
WT-13
Y 558.49 FCC Y 735.10 815 813 Control Y 1060 X
Y 2072.37
Road No.3
X 1141.11 Y 665.82
METHANOL 817 811 X 1140
X 1150 T.P.S. 1142.30 S/S-6
PH
Y 71.65 GASOLINE Y 870 Room PH Y
CCH
TANKS 1991.04 X 1145.94
Y 1660
YARD
X
1503 1504 1507 X 1128.71 UDEX X 1130.76 1146.19 Y 2066.06 Weigh Bridge
EFFLUENT 818 812 X 1139.85
S/S-11
816
56 58 S/S-TPS Y 1881.42 Y
X
LAB
3105-T-01
X 1120
CHANNEL 36.37 X 1124.03 FCC GASOLINE X 1131.07
DCS CR.
Out Drum S-3
1103 1104 BUILDING Mechanical
Retubing
FEED TANK Y 860 Y 1796.42
508 506
VII
section
Top Level Of Dyke 38.18
510 S-2 X 1111.54
BEING DISMANTLED
Unit
PENTANE BULLETS
X 1099.99 X
Workshop
S/S-22
3500 43000
BEING DISMANTLED
NDA
S/S-01
Y 1742.37
CL OF DISH.
MCC 1108.89
1601 CRU
S/S-35
PIPE RACK
Open Channel Y 434.81
ROOM X 1115 X 1116
AU-1 DM Plant (3
Y
PIPE RACK
X 1093.67 X 1107.78 CR
Flare Knock
PH
Y 405.55 Y 577.92 Y 694.95 509 Streams) Y 2417.52
AMINE & SWS
BEING X 1090.56
X 1106.54 X 1107.63 DISMANTLED B ANTI OXIDANT Out Drum X 1100.85 Old PWI Office
P.H X 1085.57 CCH DOSING SKID 507 505 X 1097.80 Y 2023.56
Y 83.70 X 1098.48 DHDT PUMP Y 754.26 Y 1280.17
Belt
C
Y 464.33 36.30 X 1091.75 Y 1720.50 X X
TANKS
Y 136.85 X 1091.10 LPG Bullets
(2115-P-101D) 1078.76 1078.76
COO
Y 825.00 Y 1074.30 3201 X 1740.48 GAS - WATER TANK Y Y 07 & 09
C FCC GHDS PUMPS Reformate 1974.59 2004.59 Pumps
W
W
W
100-L-01A X 1068.60 X 1080.50
(70Mx70M)
Y 1085.01 PROP. P & U
10A 10B A B X 1067.22
Area
DN
V
UP TOFLOOR
FIRST
No-19
Top Level Of Dyke 38.34 Y 665.71 Y 881.50 PH
W
W
W
W
36.14 DHDT Feed DHDT Feed XIII 504 503 502 501 Y 2281.37
Spent Y 763.35 No.4
W
No.1
W
02B 2110-T-01
Unit
BEING
F.G.H 37.61 X 1052.50
W
W
W
X 1129.16 LPG Mounded
ENTRY
DISMANTLED
02C
PORCH
Open Drain
10C 10D Caustic X 1059.05 X 1059.05 Y 1545.50 Sump
C
3202
Y 1050.12
PH 36.03 Y 701.00 Y 792.00 Unit X 1053.47 D.M.W. Tanks X Bullets
Road
Top Level Of Dyke 37.40 X 1051.78
Oxidation 1501 1502 X 1034.95 Y 1365.85 1056.29
LPG PH.
7087
X 1045.19 X 1049.89 Y 1720.62
No.3 BULK CAUSTIC
BULK Y X 1035.26 LPG PH.
Op
X 1030.50 X 1030.65 No.2 A
Y 141.57 Unit MTBE Y 825.00 B A B ACID 1984.19 Y 2235.29
Sp
Y 88.90 T No.1
Butene-1 Y 841.50 X 1037.33 Top Level Of Dyke 39.42 Y 1310.70 X 1025.60
TANK TANK
en
en
Tre nt
Unit Unit X 1019.82 Y 911.71 Y 1575.30
Top Level Of Dyke 39.28 Drain
01B
RY
01A
t Ca en
Ch
Pla
X 1027.11 100-L-02A
atm
36.26 Y 808.38
Road No. 02 Road No.2
an
Y 80.30
Lagoon X 1008.05 X 1008.05
ust
100-L-02B Top Level Of Dyke 38.35 X 1008.43
ne
Y 666.48 Y 741.00 Y 756.00 S/S-31
ic
t
l
Lagoon X 1008.63 LPG Mounded
X 1010.97
Y 552.59 X 1006.20
8 Y 2379.67
18 -00
X
01 1A
N = 1000.000
36.14 Y 1006.80 X 983.59 E = 1728.000
-VV
TCF FOR AVU
Y 1057.09
LING
Top Level Of Dyke 38.18 TANK-B Road No- 2 A (1500 SQM)
OPEN STORAGE X 973.70
Culvert
YARD (TCF) Y 2296.11
Culvert
X 978.91
Open Channel
Y 1133.18
No-9A
X 989.27 CETP CR C Road No- 2 A (4100 SQM)
X 976.32
Y 1615.79 X 973.99
PIPE RACK
DAF DAF Chlorination
Control
Y 151.00
S/S-30
Road No- 2 A PIPE RACK X 960.07
11 Building Dust Bin
XXXII Room NOTE 3
Y 2260.89
WA
X 957.47
SUMP
Y 98.69
Y 920.42
Control AU-5 Amar
SB-08
Road
Jyoti
FGRS skid Control R15 X 948.78
No.32
X 946.06 X 947
Room Y 2368.22
CT - 1
Y 1490
Y 111.55 X 935.36 PH X 940.80
Room South
X 940.50 TB X 927.20
CWPH
X 843.31
Y 237.79 LAB
X 931.64
FLARE STACK
Y 761.50
Block X 917.11
Y 1114.20
Y 1305
XXXI
X 934.62
Y 1569.28
X 915.80
Y 1700.96 AVU Abandoned
LPG Mounded
Y 2579.47
AU-5 CT
Y 383.15 Sludge Shed
Road No. 09
PENEX Y 1079.55
Road
Flare Stack of Bullets
Aeration Tank-C
Lagoon TB
PH (47905 SQM)
Road No.11A
X 897.80 X 897
6000
6000
GHP XXXIV
4 4
Y 879.50
AU - V
S/S-28
Y 1540
Road No. 01
Paved Area Access For Heavy Crane X 892.10
X 897 Y 2219.98 X 884.50
LL
Y 2298.86
Y 613.16 X 887.66 R15
3
Y 761.50
XXXIII
X X X X X X
Y 926.74 TCF FOR AVU
X X
Unit
X X X X X X X
Unit
WA X X X X
(1900 SQM)
X X X
BID
XXXV
X X X X
NSU/NHT
X
South Block
X X X
Tower (B) X 860.33 HGU-2 NOTE 3
Y 1114.20
X 855.30
X 843.31
Y 246.45
Y 879.50
S/S-38 X 854.72
Y 1061.52 X 864.19 X 850.50 Road No. 22
S/S-29 Y 1212.41 36.60 Y 1460
X 840.79
TCF FOR FABRICATION OF Abandoned LPG X 839.42
1801-C-001 / 1801-C-007
Y 168.76 Sludge
Thickener CCH Cable Trench 36.60
X 837
Y 1560 36.60
X 837
Y 1650
S/S 140M x 50M (7000 SQM) Office Y 2396.46
BID X 843.31 ESS - 041 (1595 SQM)
Back Wash CONTROL ROOM S/S-20
Tower (A) Final Clarifier (B) Biological Final Clarifier (A)
Sump Clarifier PIPE RACK
Y 1114.20
Road No. 32 NOTE 3 FOR AVU / SR LPG
CISF DUTYPOST
90000
Road No- 2B Gate X 828.68
EXISTING FENCING
(64M x 26M) (1664 SQM)
ST Sump PIPE RACK Y 2340.14 Private land
New Sludge
Thickener NOTE 2 Road No. 22 WT-14
X 801.53 S.R
Gate
TERDROPPER
Car Parking
1803-PR-02
Y 2099.96
X 804.77
WT-1 WT-1 Road No. 22 Y 1824.74 Gate
1803-TS-01
Road No. 22
1803-TS-05
1803-TS-02
C Main Fire
150
X 770.87
1803-TS-05
Y 894.09 X 776.35 X 776.58 X 776.48 DMC
X 760.26 Station
Culvert
No. 5
X 771.80 Y 1589.17 Y 1620.35 Y 1644.47
Y 919.40 Y 1113.81
INDMAX FCC
Paved Area
X 750.05 S/S-27 Access For Heavy Crane X 760.02 X 760.02 X 761.53 X 761.32
Y 835.88 36.20 Y 1819.23 Y 1914.92
Y 1384.60 Y 1523.48
Warehouse
Warehouse
SWS of DHDS
Warehouse
ARU of DHDS
SWS Of AU-V
P.C.O. V.G.O.
Road
DG
No. 12
1803-PR-01
1803-PR-01
CR
RO
No.10
HGU III
No. 13
CABLE TRAY
(19Mx25M)
SRU XXXVIII XXXVII
AD
Covered. drain
00
XL
X 728.98
XXXIX 41-TC-00- 41-TC-00-
1803-TS-03
Y 865.51
X 708.09 004A 005A S/S
LINE
Road No. 21
Y 1074.40
X 707.78 1803-PR-03
X 712
Y 880
FPU-II X 694.98 X 695.00 X 695.02 (CT 1 & CT 2)
1803-TS-04
Paved Area
1803-PR-04
Y 329.48
KOY Y 1568.15 Y 1599.87 Y 1623.79
Road No. 23
CCR Access For Heavy Crane 50 Ton
ALI
SRU
8765
weighbridge
VILL HCU
AD
IGHD )
AGE
S)
Amine SWS
70M
CR-LPG TREATER UNIT
0
S/S
Walk Way
RO
(1803-X-205)
Unit (G.H.P.)
R6
X 675.91
1803-SH-01
X 673.30 X 660.02 Y 2450.52
FCC+
Mx
Y 1066.70 41-TC-00- 41-TC-00- Y 1523.48
(39
Stores
004B 005B
AX
DHDT Warehouse
(INDM
RO
No. 5
PH Warehouse No.9
AD X 632.0
SB No. 8 Ghc/project YARD
Road No.11
KARACHIYA
Y 840.0 P.C.O. V.G.O.
36.34
R60
X 619.78 X 630.43 02 stores office
TP
(75Mx125M)
Road
Y 1313.22
Y 1525.11
NOTE 3 NOTE 7
X 622
R30
Green Belt Area
CW
Top Level Of Dyke 38.11
SRR
Hydrocraker Complex
Y 880
IGHDS
PRU (130Mx64M)
X 602.30 Car parking
0
(35Mx30M)
9
R3
Y 919.90
Weigh Bridge
NOTE 3 SRU
Maintenance office
HCU CR
E
(INDMAX FCC) IOC Road No. 24 Culvert
LAG
( DHDS )
S/S-26
NOTE 4 EEN RE
Paved Area
CT
I VIL
Access For Heavy Crane
FIN
Inspection
BEL ER
Road No. 01
-2
YAL
NOTE 6 NOTE 4
ARU SWS
Weigh Bridge
T AR Y
VIL KO EA
X 568 X 571.30 X 571.30 SRU
KO
LAGYAL Y 847 Y 920.60 Y 1060.60 (3800 SQM) (3800 SQM) X 546.35
110MX84M
Y 1493.22 SUM
E I
(9240 SQM)
SIT
P
ARU-III / SWSU-VI,VII CW
E
NOTE 4
X 532.5 PH
25M)
Y 862.0 Civil
DG
(19Mx
TEM
(70 S/S HGU-I N2 XXXVI
Mx PLE TB
0
SRR
PHU 35M
(SUL
R3
Paved Area Access For Heavy Crane GHP
AIR MON
Plant
R30
(15Mx31M) X 500.02 X 500.02 Canteen
CR
STN
R BLO ) (SULPHUR BLOCK) Y 1384.60 Y 1464.60
ARU
7000