You are on page 1of 2

A B C D E F G H I J K L M N

NOTES:
PLANT NORTH
1. ALL DIMENSIONS ARE IN MILLIMETERS & ELEVATIONS ARE IN METERS,
TRUE NORTH
UNLESS OTHERWISE SPECIFIED.
2. THE CABLE ROUTING SHOWN IN THIS DRAWING IS INDICATIVE AND FOR
GUIDANCE PURPOSE ONLY.
11 11
3. THE CABLE TRENCH / TRAY LOCATIONS & SIZES SHOWN IN THIS
DRAWING ARE INDICATIVE AND FOR GUIDANCE PURPOSE ONLY AND
THE SAME SHALL BE REVALIDATED / MODIFIED BY CONTRACTOR
ACCORDING TO THE ACTUAL REQUIREMENT DURING DETAIL
ENGINEERING.
4. AT ROAD CROSSING, CULVERT SHALL BE CONSIDERED FOR
UNDERGROUND CABLES AND OVERHEAD CABLE BRIDGE SHALL BE
CONSIDERED FOR ABOVE GROUND CABLES.
5. CABLE INSTALLATION SHALL BE IN ACCORDANCE WITH JOB
SPECIFICATION FOR FIELD ELECTRICAL INSTALLATION DRG. NO.
077154C-000-JSD-1600-003 AND RESPECTIVE POWER INSTALLATION
BY EPCC-2 CONTRACTOR STANDARDS DWG. NO. 077154C-000-STD-1682-001.
6. NECESSARY CO-ORDINATION WITH OTHER CONTRACTORS SHALL BE IN
THE SCOPE OF PACKAGE CONTRACTOR, WHEREEVER OTHER
BATTERY LIMIT CONTRACTOR REQUIREMENTS AND TIE-INS ARE TO BE INCORPORATED,
FOR RFCCU / MS & UTILITY BEFORE ISSUING ANY CONSTRUCTION DRAWINGS.
BLOCK SUBSTATIONS) 7. FOR SCOPE SPLIT BETWEEN CONTRACTORs, REFER DOCUMENT
10 10
CABLE TRENCH & PULL PIT NO. 077154C-SOW-PACKAGE4-004
UNDER EPCC2 CONTRACTOR 8. THE C&R PANELS FOR PROPOSED 220kV BAYS & RTCC PANELS OF
BY LUPECH POWER PROPOSED TRANSFORMERS SHALL BE LOCATED IN 1ST FLOOR OF
SCOPE
DISTRIBUTION FACILITY EXISTING 220KV GIS BUILDING. THE INTERFACE / CONTROL CABLES

ROAD NO. 23

Gas Turbine Shed


DM PLANT 10455
PACKAGE CONTRACTOR BETWEEN "PROPOSED 220kV BAY EXTENSION AND RESPECTIVE C&R
PANELS, EXISTING ECS/SCADA SYSTEMS", "PROPOSED 220kV
TRANSFORMERS AND RESPECTIVE RTCC PANELS" SHALL BE ROUTED
CABLE TRAY DROPPER

WALL
IN EXISTING CABLE TRAYS INSIDE EXISTING 220kV GIS BUILDING.
FROM CABLE RACK TO PULL PIT

1760
CGP -1 LEGEND:

6000 BOUNDARY
5500
- CABLE LADDER
CABLE TRAY DROPPER

5539
ROAD NO. 28 FROM CABLE RACK TO PULL PIT
9 9
- CONCRETE TRENCH WITH TRAYS
10

EXISTING APPROACH ROAD


CABLE TRAY
10 PULL PIT UNDER EPCC6
CONTRACTOR SCOPE

6000
9681
- EXISTING SPARE FEEDER TO BE USED TO FEED
DRAIN THE PROPOSED LOAD
15782

1 NO. 600MM WIDE CABLE TRAY SHALL BE SUPPLIED & FROM THIS PROPOSED CABLE TRENCH, THE INTERFACE 9
IN THIS PORTION OF CABLE ROUTE, 1 NO. 600MM
INSTALLED BY "LUPECH POWER DISTRIBUTION FACILITY CABLES WITH EXISTING CGP-1 SUBSTATION (FROM
WIDE CABLE TRAY ALONG WITH SUPPORT SHALL BE - EXISTING EQUIPMENT TO BE MODIFIED TO FEED

20000
5828

8000
PIPE AREA SUPPLIED & INSTALLED BY LUPECH POWER PACKAGE CONTRACTOR" ON THE BOTTOM MOST LEVEL CGP-1 SS TO NEW GIS BUILDING) SHALL BE ROUTED THE PROPOSED LOAD
(HORIZONTAL SUPPORTS ALREADY AVAILABLE) OF EXISTING UPTO THE RESPECTIVE INTERFACE EQUIPMENT INSIDE
DISTRIBUTION FACILITY PACKAGE CONTRACTOR"
CABLE ROUTE SUPPORTED FROM CGP-1 SS WALL (SUPPLY & CGP-1 SS ACCORDING TO ACTUAL SITE CONDITIONS.

EXISTING TRENCH
UPTO THE MAIN CABLE TRAY RAISER LOCATION
PUMP HOUSE INSIDE CGP-1 SS.
INSTALLATION OF ECS INTERFACE CABLES BY OTHER (FOR DETAILS OF INTERFACE EQUIPMENT, REFER DWG 9 CULVERT AT ROAD
- EXISTING EQUIPMENT TO BE EXTENDED TO

5433
X 320.52 CONTRACTOR)
EXISTING APPROACH ROAD No. 077154C-1825-DW-1625-001)
EXISTING APPROACH ROAD 2000 6200 FEED THE PROPOSED LOADS

(FOR PPU/PRU/CT PACKAGE


CROSSING

6000
APPROACH ROAD (IN OTHER CONTRACTOR SCOPE)
6466

Y 1541.72
16 8
8 22 21 20 19 18 17 15 14 13 12 11 10 9 7 6 5 4 3 2 1 - EXISTING EQUIPMENT TO BE EXTENDED TO 8
FEED THE PROPOSED LOADS

UNIT SUBSTATIONS)
A

(IN PACKAGE4 CONTRACTOR SCOPE)

6000
GT-1 DCDB GT-2 DCDB

EXISTING TRENCH
BOP-1 MCC BATTERY CHARGER

BY EPCC-6 CONTRACTOR
7223

BATTERY LIMIT
HRSG-3 MCC
CGP-1 MCC

PACKAGE CONTRACTOR
28 27 26 25 24A 24 23A 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6A 6 5 5A 4 3 2 1 CHARGER
PIPE AREA TR - 156 REACTOR REACTOR
BATTERY BATTERY CHARGER

DISTRIBUTION FACILITY
4-Z6 4-Z4
OUT IN
CHARGER
BATTERY
BATTERY LIMIT FOR ECS GT-3 MCC 11 KV HT SWGR. F HT SWBD. 2 ( ZONE 2,4,6)
HRSG-1 MCC HRSG-2 MCC
110V DCDB
- CULVERT AT ROAD CROSSING
EXISITING CGP-1 SUBSTATION
LV PANEL
INTERFACE CABLES DCDB

BY LUPECH POWER
GT-1 MCC GT-2 MCC
FIRE WATER LINE

BOP-2 MCC LDB-2

6000
110V DCDB
F HT SWBD. 1 ( ZONE 1,3,5)
ELDB

16175 GT-3 PMCC X 306.62 30 29 28 27 27A 26 25 24 23 22 21 20 19 18 17 16 15 14 14A 13 12 11 10 9 8 7 6 5 4A 4 3 2 1

PMCC-153 & 154 (GHP POWER PLANT PCC)


ELDB-1
TR - 155 REACTOR
3-Z5
REACTOR
3-Z3 LDB-1

EXISTING CABLE TRAY RAISER Y 1555.80 OUT IN

DRIVE
- CABLE LADDER/TRAY RAISER
4252
LOCATION BETWEEN CABLE VAULT 1 NO 600MM WIDE TRAY RAISER & THE SAME TO BE CONNECTED
DRAIN

ZONE-2 SWBD-251
SWBD-252
DB-2
T-3
EL
11
C
L KV HT SWGR.
DCDBDB
PMCC

11 KV HT SWGR. ZONE-1

2B
D
C
E
2
1 ACDB

2B
D
C
E
1
2

26-TC-00-00-1C
26-TC-00-00-1B
S/S-CGP1
FENCING
REACTOR-3
REACTOR-4
SWITCH
MANDIR
REACTOR-
EARTH
ENTRY
Fire
TR-1
TR-2
IC-1
IC-2
TR.
G e30
r- 152
155
156
153
154
151 water
e1000
10 YARD
MVA
MVA
TR.
1600
2n
1 etanks
BTR.
KVA ltArea
Electrical Annexe. Bldg.

2B
A'
D
B
E
A
2
1

2B
A'
C
A
B
2
CABLE MOUND
TRENCH

DCDB-1
C
B
A

09.05.2019AS MARKED
REVISED
HRS
SAK
TB
TERRACE
CGP-1
D
E Bldg.

EMTS
1:150
G
C
B
A
E
F
0
D'
C
A
B
IndianOil
(1)-G71770-AD001-L160-001-H

CONSTRUCTION
ENGINEERING
PRELIMINARY
GUJARAT,
Released
220/33kV
GUJARAT
LOCATION
21.03.2018
04.05.2018
10.05.2018
06.06.2018
05.07.2018
31.10.2018
06.02.2019
14.03.2018
VOLTAGE
GUJARAT
OVERALL
REVISED
POWER
220/33kV
LAYOUT
INDIAN
FIRST
HRS
SUB
SAK
GIS
for
AN
AS
TB
1EN
-H OIL
& CORPORATION
SYSTEM
DIMENSION
REFINERY
APPROVAL
REFINERY
UTILITIES
MARKED
GENERAL
TYPE
SUBMISSION
SUBSTATION
GIS
TRAFO
STATION
FOR
4.03.2018
PER AS PER
220
LEVEL CLIENT
DIM. &MEASURMENT
LIMITED
COMMENTS
kV ARRANGEMENT
GIS
& BUILDING
PLOT CRP PANEL CHANGES
AT SITE
01 of 02

3500
AIR B

6000
TO 1ST FLOOR OF CGP-1 SUBSTATION TO THE BOTTOM MOST LEVEL OF EXISTING CABLE TRAY ROUTE

XX
X
XX
RECEIVER -1

X
REACTOR- 2

XX
X
X

XX
X
R9501

XX
(SPARE SPACE) SUPPORTED FROM EXISTING CGP-1 SS WALL.

X
15

XX
X
20000 X 306.50

X
2B 2 EXISTING CABLE DUCT 1

X
4687
C
36400 (FOR ROUTING OF ECS INTERFACE
Y 1643.54 CABLES X 306.50
FROM VARIOUS - CABLE LADDER/TRAY DROPPER
26-TC-00-00-1B

X
11 KV SWBD-3

X
Y 1643.54
COMPRESSOR

AIR NEW SUBSTATIONS TO EXISTING CENTRAL ECS)

TRENCH
TRENCH
E
X X X X

X
RECEIVER -2
15

6000
NIFPS
TRENCH
14 14
LINE
M20x30 DEEP

21
130

60

25
2xM10x15 DEEP

EARTH

77
X
1250(W) X 2500 (D)

X
X
7 L.V.SIDE

8650 7

X
46881
36350

D 000-TR-101A

X
HOUSE

X
EARTH

77
2xM10x15 DEEP

AIR

25

60
220kV GIS

130
21

M20x30 DEEP

W1 V1 U1
LINE
FIRE WATER LINE

EXISTING

X
D H.V.SIDE REACTOR- 1
RECEIVER -3
8 8 REFERENCE DRAWINGS/DOCUMENTS
X

X
X
TR EMR

6000
EXISTING 220kV / 33kV
1600

ACDB
IN THIS PORTION OF CABLE ROUTE, PROPOSED 220KV 1600 KVA

X
LINE
M20x30 DEEP

21

130

60
X

25
2xM10x15 DEEP

EARTH

77
REACTOR-3

TRANSFORMERS
X

CABLES & ASSOCIATED CONTROL CABLES SHALL BE G71770-AD001-L160-001-Z OVERALL GENERAL ARRANGEMENT LAYOUT

X
1250(W) X 1500 (D)
TR. - 155
C

7600
11 KV SWBD-2

E
AIR (EXISTING) FOR 220KV GIS BUILDING
X

TRENCH

X
ROUTED ON EXISTING
RECEIVER -4CABLE TRENCH (SEE NOTE-8)
LINE
M20x30 DEEP

21
130

Fire water tanks


60

25
2xM10x15 DEEP

EARTH

77
5601

77
EARTH

2xM10x15 DEEP

25

60
130
21

M20x30 DEEP
LINE

3000
1W 1V 1U
X

CABLE TRAY DROPPER

X
220/33kV TRANSFORMER TR. - 154 1000 KVA
16 16 ELECTRICAL DESIGN BASIS

X
077154C-000-JSD-1600-001
X

X
IN THIS PORTION OF ABOVE GROUND CABLE ROUTE, THE TRENCH
SEE NOTE-3

X
X
LINE
M20x30 DEEP

21

130

60
25
2xM10x15 DEEP

EARTH

77
B REACTOR-4
1250(W) X 2500 (D)

1W
PROPOSED CABLES SHALL BE ROUTED WITH THE EXISTING

L.V.SIDE

H.V.SIDE

EXISTING DRAIN
1V

6000
F
077154C-000-DW-0051-001 OVERALL PLOT PLAN

1U
(TYP)

X
12323
SUPPORTS TO THE POSSIBLE EXTENT (OR) WITH NEW CABLE

X
000-TR-101B

EXISTING TRENCH
X
EXISTING ROAD
12500

38000

TRAYS WHICH SHALL BE ROUTED TO SUIT SITE CONDITIONS TR. - 156


MANDIR POWER INSTALLATION STANDARDS FOR

3.75M WIDE

X
077154C-000-STD-1682-001

FENCING
TR. - 153 1000 KVA DESIGN

WALL
A
1W 1V 1U

X
2443
6
CABLE TRENCH
EXISTING 220kV

BY ISBL
11KV SWBD-1

6000
FENCE
G

1W
1500(W) X 1500 (D)

L.V.SIDE

H.V.SIDE
A'

1V
077154C-000-DW-1652-002 KEY SINGLE LINE DIAGRAM

1U
11077

X
X
TRENCH
R9560
6317

BY ISBL
BATTERY LIMIT FOR OTHER

FENCE

BOUNDARY
TRENCH

X
6 26-TC-00-00-1C

X
CONTRACTOR CABLES SINGLE LINE DIAGRAM - LUPECH POWER
17 17
1
220/33kV TRANSFORMER

55000
2B 2

X
077154C-1825-DW-1652-001
DISTRIBUTION FACILITY

1000 KVA
L.V.SIDE L.V.SIDE

1000 KVA

TR 152
TRENCH

TRENCH
TR 151
X X X X

6000
IC-1 30 MVA TR. IC-2 30 MVA TR. H

GATE
PROPOSED 220kV W1 V1 U1

X
W1 V1 U1

13 13 SWITCH YARD
EXISTING 220kV

14642 H.V.SIDE

H.V.SIDE

TRENCH
CABLE TRENCH ENTRY
CABLE MOUND

3.75M WIDE
GIS BUILDING

X
13366

PROPOSED ROAD
18

X
TRENCH
PT
400(W) X 500 (D)

X
2 NOS. OF 300MM WIDE TRAYS FROM

6000
KEY PLAN

X
CABLE RACK TO UPS ROOM
FENCE IN
18 BY OSBL
LINE LINE
M20x30 DEEP M20x30 DEEP
21

21

130 130

60 60
25

25

2xM10x15 DEEP 2xM10x15 DEEP

EARTH EARTH
77 77

LEVEL-2 THROUGH CABLE VAULT IN PLANT NORTH

EXISTING APPROACH ROAD


12205 12647 TRENCH
PACKAGE CONTRACTOR SCOPE FOR TRUE NORTH
BATTERY LIMIT WASTE 7 7 ROU TO DUMAD

33kV GIS BUILDING


PROPOSED CABLE TRENCH UPTO
33kV TRENCH

6000
X 2957.55

ROUTING OTHER CONTRACTOR


Y 2796.72

FIR OIL PIT


EW DUCT BANK FOR NEW CABLE TRENCH 4135
EXISTING CABLE RACK

220KV LINE NO.2


PROPOSED
7902

ATE CABLES
X 2792.17
Y 2497.65

IV
RIL A r e a

R LI 1000
18821

11 11
PIPE RACK

X 2690.61
Y 2831.12 X 2685.81
Y 2876.31

NE

R.U.B.
ESS-041
22000
WT-8 Gate

Gate
N.R
X 2646.13
Y 2489.52

. 09 PH
No CISF DUTY
POST
ad
Ro

Oily
Oily Gujarat Electricity

4300
Sludge

a
Sludge
Lagoon Board X 2558.35

re
Lagoon Oily Y 2904.11

Sludge

Y 2775.00
A

rack
Lagoon

Y 2691.00

Y 2720.00
d pipe

Y 2541.00
RIL

Duma
X 2525.73
Y 2562.27
WT-9

07A
17800

PROP.U/G GI PIPE 600mmØ FOR PROP.U/G GI PIPE 600mmØ FOR


X 2478.74
ELECTRCAL CABLING(BY MECH.) ELECTRCAL CABLING(BY MECH.)
Y 2786.77
X 2478.60

No.
Y 2593.21 WT-10
S/S-39 CR.

2
Road
O&m 7M WIDE ROAD

Marketing Division
Room PROP.CISF 14M WIDE ROAD
9.50 MORCHA

20
7M WIDE ROAD EXIT
DRAIN

X 2440.00 X=2448.90
Y=2543.02
X=2448.90
Y=2692.46
ELECTRIC
PANEL ROOM
4x6 m
3.75 M

WIDE ROAD

6.45
GARDEN

PROP.

X=2446.08 HARD PAVEMENT


MARKETING BUILDING
15.250 x 14.250

X=2438.90 Y=2664.88
PARKING
SHED
3.5x9m

CONSTRUCTION
Y=2533.02
SUB-STATION Bitumen Truck
CWTP TO BE DISMANTLED
Parking
CT 14M WIDE ROAD
ENTRY

PROP.LAB

IOCL
7M WIDE ROAD

7M WIDE ROAD

SHED

OUR
TOILET

CHEMICAL STORE CONTROL ROOM/


OPERATOR ROOM CHLORINE DIOXIDE ROOM
CISF
CABIN
X 2398.555
ELE.Cable Trench Y 2571.150

Road
X 2379.00

Cable Trench

45
TRENCH

6000

BOUNDARY WALL
TT Crewrest

LT

LT
Well

ET

ET
Room

MODIFICATION
14014,99
X 2352.59
Y 2133.03

IV FCC

LT

LT
ET

ET
F

70
WT-7 PH
GASOLINE Tank 5 Tank 1

BOU
Open store

24866,01

63649,4
PROP.HARD PAVEMENT

Area
DRAIN
TRUCK FOR W/O & B/O
DESULPHURIZATION Tank 6 Tank 2
(126 x 75)
X 2290.49
Y 2420.26

Belt X 2289.40
or Y 2485.41

16414,99
vey Calico Area Tank 7 Tank 3
RIL A r e a Cok
e Con X 2262.50 X 2272
Y 2691

X 2252.5
Y 2607

Tank 8 Tank 4

TOILET AT

VERANDAH
FIRST FL.
NDA 3100

BATTERY ROOM

TRANSFORMER
DISTRIBUTION
SPACE FOR OTHER

DISTRIBUTION
TRANSFORMER
RIL A r e a

TRANSFORMER
DISTRIBUTION
12
RIL A r e a

TRANSFORMER
DISTRIBUTION
T.L.F. Pump

SS
House

HGU

TRANSFORMER
DISTRIBUTION
5 5

TRANSFORMER
DISTRIBUTION
TRANSFORMER
DISTRIBUTION
Road No. 09
12
Weigh Bridge

ROACH ROAD
X 2187.65

DISTRIBUTION
Y 2118.85

7000

7000
No-19A

POWER TRANSFORMER
CABLE CELLAR
X 2171.66
F
TR

WT-4 WT-5

No-19
Y 434.13 WT-6

POWER TRANSFORMER

Tank Lorry Filling Shed


IV Coke Conveyor Belt

DISTRIBUTION
TRANSFORMER
X 2164.54

TRANSFORMER
DISTRIBUTION
Y 404.25
Open store Railway Tracks Railway Track X 2158.33

Road
X 2154.80

POWER TRANSFORMER
Road
Y 1908.43

RY
Area Platform Bitumen drum filling Platform Road No. 10
Y 2138.02

POWER TRANSFORMER
Road No. 10 K.A.P.L.

COKE YARD

VERANDAH
X 2127.11

COKE YARD
X 2119.75 X 2120.76 X 2121.01 Y 1711.66
X 2117.50

EXISTING APP
Y 1417.16 X 2128.72
Y 852.88 Y 1540.81 X 2128.60
Y 1653.90
Tank
Y 1572.24 Top Level Of Dyke 39.37

X 2122.09
Y 486.18
X 2119.40

Conveyor Belt
X 2102.93 X 2102.63 Y 1381.04
Top Level Of Dyke 39.44 Top Level Of Dyke 39.3
CRMB
Y 553.99 Y 625.27
741
Top Level Of Dyke 40.15
CBD
38.19
DHDT SWS PIT
Top Level Of Dyke 39.69
37.8
38.22
39.04 Vessel F
E

1505 518 519 520


(147x100)

CONTRACTOR
711 712 715 716 738 727 728 723 724 731 732
37.67 O.N.G.C.

Road No. 05A


WA
PMP PLANT

Road No. 11A


DCU feed 742
38.43 Parking

Road No. 01
H.S.D. CRUDE
XXVIII
NC

Top Level Of Dyke 39.34 SMPL SURGE TANK

Road No. 03
F.O.

Road No. 05
1510 1511 XXIX 743 SKO L.D.O. X 2041.16
TCF
38.32 517 XXV Y 1866.30

13454,49
X 2016.74 X 2017.53
Y 449.58
713 714 717 718 739 729 730 725 726 733 734 Y 1539.53
X 2021.67
744 37.8 Y 1873.01
S/S-18A B.T.T.L. PH 1508

LL
775 522 1517
Gate 38.22
745 NAPHTHA KERO X 1978.52 X 1976.51 Top Level Of Dyke 40.16
6
X 1978.25 Y 1416.85
X 1991.06 X 1991.86 Y 1116.15 37.61
Y 438.70 Y 479.34 1512 1513 X 1977.17
Y 625.19 Bitumen
Y 1077.17 Top Level Of Dyke 39.25 777
914
AIR LOCK LOBBY PASSAGE

TCF
TCF U.P.S. ROOM

A.H.U. ROOM

Filling 746 Top Level Of Dyke 39.33


X 1974.81
1509
5 (2450 SQM) BATTERY ROOM
ENGR. ROOM

(1700 SQM) TRUCK

BARCADDING(TEMPORARY)
521
CLEAN AGENT ROOM

X 1956.49 1516
CONSOLE ROOM A/C PLANT RM.

Station Y 1532.64
HEAVY DUTY FLOORING

PIPE RACK Top Level Of Dyke 40.52


100.950
F.F.L
H

PARKING
S.M.P.L.
OFFICE AREA

Y 612.27 PH CR 38.87 CAP


PIPE RACK
XXVII
AIR LOCK LOBBY AIR LOCK LOBBY

ENTRANCE LOBBY

27
XXVI
ELECT ROOM. MAINT. TOOL ROOM. OPERATOR ROOM PANTRY LADIES TOILET GENTS TOILET

SB-07 S/S-17 X 2377.21

Weigh Bridge
NOS.
X 1939.74 DCU PH CCH On-grade Piping corridor On-grade Piping corridor X 1954.22 X 1940.88 Top Level Of Dyke 37.13 X 1939.73 X 1939.36 Y 1945.70 (Area
S/S-18 747 748 Y 1654.40 Y 1719.72 Y 1900.57 5537

CONSTRUCTION

EQUIPMENTS
Y 546.70 Y 2101.40
M

HARD
Sqm)

DRAIN
Gate No.2 12 PIPE RACK PIPE RACK NEW ROAD (9M WIDE)

ISOM NHT CCR

8547
ENTRY BS VI Road No. 8
Road No. 8 Road No.8 UNIT LIMIT

KHDS (120Mx59M)

KHDS TANKS
X 1903.93

NEW ROAD (9M WIDE)


X 1901 X 1901.99
Y 524.45 X 1898.53 X 1898.39
Y 947 X 1869.24
PIPE RACK PIPE RACK Y 872.65 Y 1548.76
Y 1658.87
Y 1737.42

CABLE TRAY DROPPER


Top Level Of Dyke 38.78 FCC MEROX X 1901 X 1901.0
X 1896.60
X 1900
Top Level Of Dyke 39.74 R45
2093-T01 557

G.B. Tanks
Y 991 Y 1121.6 38.54
MS BLOCK
Y 1168
Y 658.44 37.22 Top Level Of Dyke 38.63 X 1879.5
VGO-HDT S/S-33

PH
36.68 X 1873.5
515 516
Y 922.0 Y 954.0 511
UNIT (223Mx185M)

Road No.3A
SABIC 783
RIL NAPHTHA
Benzene 59 83 76

Road No. 01

ROAD
WIDE
ATF MEROX

On-grade Piping corridor

On-grade Piping corridor


DUMAD

On-grade Piping corridor

mtr
7.5
2093-T02 73 75 60
X 1852.5 558 514 513 512
TCF

Road No.3
PH

GR Compound Wall
772 701 702
Y 922.0

X 1829.01
Y 2127.83
Coke

Road No.15
CCH XXII X 1852.06
Y 1411.31 PH (1300 SQM)

Road No.17
ATF M.S
NAPHTHA
Pit X 1840

X 1811.18
Y 2154.80
Y 1345

Road No.08A
64 65 66 70 71
74 77 61
Shed Shed
X 1816.00

PIPE RACK
XXIII

6000
X 1802.30
82 84 78

PIPE RACK
Y 921.60 67 68 69 72

NEW ROAD (9M WIDE)


782

Track No. 02
Track No. 03
38.25

Track No. 04
Track No. 05
X 1801.51

CRUDE CRUDE Coker LPG North block North Block Y 1370.33


X 1788.31
NHT

UNIT LIMIT
Control Room S/S-37 X 1786.79 Top Level Of Dyke 40.98 X 1786.08

UNIT LIMIT
Merox X 1762.86
Y 1202.85 Y 1442.55 Y 1657.45 III X 1784.00
Y 1952.65
Y 2040.40
101 PENEX CCR

Road No.13A
TB On-grade Piping corridor
108
X 1770.30
II

Road No.13
On-grade Piping corridor X 1757.11 X 1756.86

6280
Y 963.60
DCU X 1762.96 Y 1272.85 Y 1649.55 Y 1957.73
39.0
Road No.08B

FROM CABLE RACK TO PULL PIT

Road No.07A

NEW ROAD (9M WIDE)


Road N0-11
771

DM PLANT
703 704 109 102
37.23

On-grade Piping corridor


TCF FOR EPCM

(55x155)
On-grade Piping corridor
RIL A r e a 781 205 207 Top Level Of Dyke 40.18

On-grade Piping corridor


UNIT LIMIT

201 203 85 87 89 91

Cable Trench
On-grade Piping corridor
(EPCM STORAGE YARD X 1725.05

R30
Y 2101.30

Road No.3
X 1698.42
Top Level Of Dyke 38.48
XXI
Y 697.24 X 1698.00
Y 921.60 & WAREHOUSE) ATF ATF S.K. S.K.

Road No.07
FIRE WATER LINE
ROAD TO
CR
38.49
HEADWORKS
XXIV (30000 SQM) R45 DG
Road No.14 202 204 206 86 88 90 92 (160Mx42M)
X 1662.31 208 (30Mx25M)
X

Y 103.14
X 1663.99
X 1670.03
NOTE 3 (MS BLOCK + KHDS + UTILITIES BLOCK)

Y 858.03 Top Level Of Dyke 40.22


Y 1057.55
911 2117-TK-01A 39.89

Top Level Of Dyke 38.73


Vacuum Residue 37.17 X 1642.53
761 766 X 1653.06 Top Level Of Dyke 39.89
PH Y 1215.12

PH
Y 1437.38 On-grade Piping corridor X 1648.71
Y 1733.50 On-grade Piping corridor
37.06
Top Level Of Dyke 38.83 708 709 710 774 735
764 765
Chlorination
Building North Block CT M

Road No. 01
770

PIPE RACK
X 1627.48
762
XX Road No. 6

GANTRY 1

GANTRY 2
S/S
X 1623.83 Y 1139.24
X 1605.50

S/S-23
Y 453.59 GR Compound Wall WT
Top Level Of Dyke 38.89 X 1607.52
Y 551.67
XIX X 1595.75
Y 1167.68
Y 1195.88

Top Level Of Dyke 40.23


X 1595.69
X 1590.92
R30 ESS-045 (180Mx36M)
763 Y 1656.63

Y 2485.00
705 773 WT

PH
706 707 Y 1733.88 Top Level Of Dyke 40.13 (MS BLOCK + KHDS + UTILITIES BLOCK)
736 Mist

Y 2506.5
Cooling 38.24
X 1565.50 Abandoned H S D

Road No. 05
On-grade Piping corridor
36.67 Y 695.47 tower Office
38.75
Top Level Of Dyke 38.23 F.C.O. 38.23

On-grade Piping corridor


X 1574.48 GR-GRE

Track No. 02
Track No. 03
On-grade Piping corridor

Track No. 04

No-19
Y 1132.03 OWS SUMP Abandoned

Track No. 05
X 1550.83 X 1565.01

1826-T-003
X 1563.50 Project Office
62 219 218 103
CPU
X 1550.54
WT-3 Y 655.52 PIPE RACK Y 916.24 R30

PH
Y 454.47 Y 1209.28
905 906 907
Road No. 12 Road No. 12 (85Mx25M)
X

Road
NHT & MTO TANKS

DM TANKS
SB 05

CP TANKS
Chlorination
Fire water tanks
Building PH

X 1501.07
Office S/S-16A 06 05

Y 937.29
X 1523.21
(90Mx105M)

GR PH
Cryogenic

X 1492.84
Y 2141.31

X 1492.78
Y 2168.36
Y 625.48
CCH 101A 63 220 101 102

BOILER-1
(30Mx55M)

BOILER-2
(30Mx55M)

BOILER-3
(30Mx55M)
101B

1826-T-002
X 1501.07
X 1490.40
FCC CT Nitrogen X 1499.58 X 1500.57
Y 980.44
4 PH

1826-T-001
Y 656.850 Y 1117.33 Y 1435.93 F.O.
Plant CH Stock F.O. PH
F.O.
X 1068.54
Road No. 4A

GRE CR
RAW WATER PUMPS S/S-16 Y 1498.91 GRE CT X 1483.40
(999-P-01A/B) GR Fire Water PH Y 1955.58
X 1486.82 V

PIPE RACK

CSB
Merox X 1481.92 PH

Road No.
901 902 N2
Y 864.00 TB PH (Drinking water) CCH X 1468.26
VI
OFFICE Y 1185.70
RIL A r e a

Cable Trench
STORAGE
PH X 1463.66 Y 1735.44 Top Level Of Dyke 39.93

S/S-19A
FCC Unit Y 1655.85 X 1459.16

Road No.15
S/S-19 X 1465.34 X 1465.63 X 1440.97 Y 2102.49
CR

On-grade Piping corridor


Y 957.88 Y 1015.88 Y 2038.74 NEW ROAD (9M WIDE)

S/S-13
SB-03 Naphtha H S D H S D 38.23

BS VI PIPERACK
56

X 1441.12
XVII Y 1033.15
3

On-grade Piping corridor


XVIII XVI Road No. 4A
56

93 95 99

Road N0-11
97

5140
DM PLANT

OM & S
S/S No.14
F.C.C.

Top Level Of Dyke 40.01


CRUDE

Office
X 1429.23 X 1429.23 X 1429.20

Unit
Y 951.08 Y 1015.68 Y 1073.87 908 909 910 TK-108A
ZLD

No. 01
X 1419.64 X 1420.0
L.D.O.

EXISTING 220kV CABLE TRENCH


Y 744.56 Y 1379.0 L.D.O.

FABRICATION YARD
H.S.D.
(180Mx60M)

PIPE RACK
SURAKSHA NAGAR
4500 TK-108B
X

Track
94 96 98 100 SB-01
903 904 BBU &

PH
AU-4 CCH.
66

F.P.U. -1 VDU VBU


MSQ Unit 38.29 CCH. NEW ROAD (9M WIDE)

X 1367.34
Y 1435.38
Top Level Of Dyke 40.32
PBM
X 1366.93
Y 2051.75 Gate No. 10
36.07 X 1345.00 X 1345.0 X 1345.0 X 1359.15
X 1342.51 X 1342.51 X 1342.51 On-grade Piping corridor
X 1345.02 Y 788.22 Y 1141.4 Y 1371.0 RL. 37.96 m. On-grade Piping corridor Y 1957.19
Top Level Of Dyke 37.72 Y 697.29
Y 908.78 Y 973.38 Y 1031.58
X 1404, Y 1716 EXISTING PIPE RACK BRIDGE
KARACHIYA

C
WT
X 1339.20 On-grade Piping corridor On-grade Piping corridor
Weigh Bridge
On-grade Piping corridor SLEEPER TRENCH
PIPE RACK
Y 460.71
VILLAGE
6965
138

Road No. 4 Road No. 4 Road No. 4


PIPE RACK PIPE RACK On-grade Piping corridor
AIR DRYER B.O.T.T.L.
PH On-grade Piping corridor On-grade Piping corridor
Top Level Of Dyke38.62 X 1309.87
Y 659.73 X 1285.79 XIV On-grade Piping corridor
Cable Trench X 1296.32
X 1300.71 X 1219.26
1105 1106

Road No. 01
X 1280.84 Y 1804.47 Y 1833.61
PH Y 710.24 Top Level Of Dyke 38.49 Top Level Of Dyke 38.53 Y 1494.17
36.93
XV X 1286.68 Gap Naphtha X 1287.67
Y 1352.35
Y 1418.79
Air Comp. Central UNIT-1820 N2
X 1282.0 Y 1235.52 X 1280
CGP-2 124 125
IA PLANT PLANT

GR Compound Wall
823 37.53 Y 1067.0
555 556
X 1266.86
Y 1392.95
Quality control X 2266.10
Y 1660 House 126 Store Area
X

Laboratory Y 1494.14
X 1260.47
(INCL. S/S (40Mx70M)

EXISTING ROAD
PH

S/S-CGP2
FOAM SHED
Y 869.29
PH 37.44
5000 SQM)

Cable Trench
R.C.O. V.G.O. X 1249.45 LAB

Road No.15
X 21246.49
Y 955.69

(500 SQM)
X 1243.16
822 821 Reformate S/S-36 Y 1502.64
AU-2

Road No.11
Y 709.66

PIPE RACK

S/S-1O
211 212
AU-3

6000
LAB 551 552 Air Comp. GT hrsg-4 & 5 GT hrsg-6 X

150
AUX. FIRE STATION

S/S-2
32 35 38 House S/S

Weighbridge
803 804
210 213 Unit X 1219.10
Y 1388.82
VIII X 1219.26
Y 1979.94
ESS-043 (30M x 19M)

824 801 802 Naphtha Reformate 33 36 39

220KV LINE NO.1

work shop
Electrical
209 214
553 IX X
LPG CR. X 1199.15

BOU
37.02 554 1199.39

EXCHANGER CLEANING
Y Y 2539.76

Central store
34 X 1192

Road No. 05
37 100
X 1199.64
1991.68
Top Level Of Dyke 38.63 Y 1541 X 1186.87 S/S-12 X 1198.36

C
Switch Gear Bldg. PROP. MECHNICAL

CCTV
Y 1798.42 Y 1895.40 Y 2459.67
X 1189.45 B X 1190.97 X 1189.09 LAB CT MAINTENANCE

00
X 1183.75 Y 689.61 Y 886.29 Y 913.72 X
X 1183.39
Y 459.62 Unit Y 1434.69
X 1169.29
Y 1499.48 X 1165
1173.00
Y

PROPYLENE
Road No. 16 TPS CT 2029.37 SB-06

(105Mx65M)
X 1161.19

MOUNDED
Y 1582 X 1157.88 CT X
1159.88
PROP. MEAL CANTEEN
SB-04

VESSELS

Road No. 09
Y 1874.62
WT-2 Y 1802.70 Y
X 1140.9
XII
2007.56X 1163.00
Top Level Of Dyke 38.18 X 1159.89 X 1159.32 X 1150.53
CCH X 1152 X 1163.00
36.40 X 1158.10 Y 775.32 Y 800 55 57 Y 2029.37
WT-13
Y 558.49 FCC Y 735.10 815 813 Control Y 1060 X
Y 2072.37

Road No.3
X 1141.11 Y 665.82
METHANOL 817 811 X 1140
X 1150 T.P.S. 1142.30 S/S-6

PH
Y 71.65 GASOLINE Y 870 Room PH Y

CCH
TANKS 1991.04 X 1145.94
Y 1660

YARD
X
1503 1504 1507 X 1128.71 UDEX X 1130.76 1146.19 Y 2066.06 Weigh Bridge
EFFLUENT 818 812 X 1139.85

S/S-11
816
56 58 S/S-TPS Y 1881.42 Y
X

805 806 814


Flare Knock Y 968.48 S-1 CCH Y 1754.26 PROP. INSTRUMENT 2007.38

LAB
3105-T-01
X 1120
CHANNEL 36.37 X 1124.03 FCC GASOLINE X 1131.07

DCS CR.
Out Drum S-3
1103 1104 BUILDING Mechanical

Retubing
FEED TANK Y 860 Y 1796.42
508 506
VII

section
Top Level Of Dyke 38.18
510 S-2 X 1111.54

BEING DISMANTLED
Unit

PENTANE BULLETS
X 1099.99 X
Workshop

S/S-22
3500 43000
BEING DISMANTLED

NDA

S/S-01
Y 1742.37

CL OF DISH.
MCC 1108.89
1601 CRU

S/S-35
PIPE RACK
Open Channel Y 434.81
ROOM X 1115 X 1116
AU-1 DM Plant (3
Y

1506 X 1092.43 Y 868 Y 990 1991.04


LPG Mounded Bullets X 1109.21
Green

PIPE RACK
X 1093.67 X 1107.78 CR
Flare Knock

PH
Y 405.55 Y 577.92 Y 694.95 509 Streams) Y 2417.52
AMINE & SWS
BEING X 1090.56
X 1106.54 X 1107.63 DISMANTLED B ANTI OXIDANT Out Drum X 1100.85 Old PWI Office
P.H X 1085.57 CCH DOSING SKID 507 505 X 1097.80 Y 2023.56
Y 83.70 X 1098.48 DHDT PUMP Y 754.26 Y 1280.17
Belt

C
Y 464.33 36.30 X 1091.75 Y 1720.50 X X

TANKS
Y 136.85 X 1091.10 LPG Bullets
(2115-P-101D) 1078.76 1078.76

COO
Y 825.00 Y 1074.30 3201 X 1740.48 GAS - WATER TANK Y Y 07 & 09
C FCC GHDS PUMPS Reformate 1974.59 2004.59 Pumps

W
W

W
100-L-01A X 1068.60 X 1080.50
(70Mx70M)
Y 1085.01 PROP. P & U
10A 10B A B X 1067.22
Area

DN
V

3105-P-01A/B & 3105-P-02A/B C

UP TOFLOOR
FIRST

No-19
Top Level Of Dyke 38.34 Y 665.71 Y 881.50 PH

W
W

X 1112.3 X 1060.95 Y 2353.21


100-L-01B 02A
Top Level Of Dyke 37.89 PDF & TELEPHONE EXCH.BUILDING

W
W

36.14 DHDT Feed DHDT Feed XIII 504 503 502 501 Y 2281.37
Spent Y 763.35 No.4

W
No.1
W

02B 2110-T-01
Unit
BEING
F.G.H 37.61 X 1052.50

W
W

W
X 1129.16 LPG Mounded

ENTRY
DISMANTLED
02C
PORCH

Open Drain
10C 10D Caustic X 1059.05 X 1059.05 Y 1545.50 Sump

C
3202
Y 1050.12
PH 36.03 Y 701.00 Y 792.00 Unit X 1053.47 D.M.W. Tanks X Bullets

Road
Top Level Of Dyke 37.40 X 1051.78
Oxidation 1501 1502 X 1034.95 Y 1365.85 1056.29
LPG PH.

7087
X 1045.19 X 1049.89 Y 1720.62
No.3 BULK CAUSTIC
BULK Y X 1035.26 LPG PH.

Op
X 1030.50 X 1030.65 No.2 A
Y 141.57 Unit MTBE Y 825.00 B A B ACID 1984.19 Y 2235.29

Sp
Y 88.90 T No.1
Butene-1 Y 841.50 X 1037.33 Top Level Of Dyke 39.42 Y 1310.70 X 1025.60
TANK TANK

en
en
Tre nt
Unit Unit X 1019.82 Y 911.71 Y 1575.30
Top Level Of Dyke 39.28 Drain
01B

RY
01A

t Ca en

Ch
Pla
X 1027.11 100-L-02A

atm
36.26 Y 808.38
Road No. 02 Road No.2

an
Y 80.30
Lagoon X 1008.05 X 1008.05

ust
100-L-02B Top Level Of Dyke 38.35 X 1008.43

ne
Y 666.48 Y 741.00 Y 756.00 S/S-31

ic
t

l
Lagoon X 1008.63 LPG Mounded
X 1010.97
Y 552.59 X 1006.20
8 Y 2379.67

18 -00
X

Y 845.91 X 1003.85 Maintenance SB-09 Bullets


7
X 983.88
Road No. 02 Road No. 02

01 1A
N = 1000.000
36.14 Y 1006.80 X 983.59 E = 1728.000

On-grade Piping corridor


Y 103.69
Flocclation Building LPG PH.

-VV
TCF FOR AVU
Y 1057.09

LING
Top Level Of Dyke 38.18 TANK-B Road No- 2 A (1500 SQM)
OPEN STORAGE X 973.70

Culvert
YARD (TCF) Y 2296.11

Culvert
X 978.91
Open Channel

Y 1133.18

No-9A
X 989.27 CETP CR C Road No- 2 A (4100 SQM)

X 976.32
Y 1615.79 X 973.99

PIPE RACK
DAF DAF Chlorination
Control
Y 151.00
S/S-30
Road No- 2 A PIPE RACK X 960.07
11 Building Dust Bin
XXXII Room NOTE 3
Y 2260.89

WA
X 957.47

SUMP
Y 98.69
Y 920.42
Control AU-5 Amar
SB-08

Road
Jyoti
FGRS skid Control R15 X 948.78

No.32
X 946.06 X 947
Room Y 2368.22

CT - 1
Y 1490
Y 111.55 X 935.36 PH X 940.80
Room South
X 940.50 TB X 927.20

CWPH
X 843.31
Y 237.79 LAB
X 931.64
FLARE STACK
Y 761.50
Block X 917.11
Y 1114.20
Y 1305
XXXI
X 934.62
Y 1569.28
X 915.80
Y 1700.96 AVU Abandoned
LPG Mounded
Y 2579.47

AU-5 CT
Y 383.15 Sludge Shed

Road No. 09
PENEX Y 1079.55

Road
Flare Stack of Bullets
Aeration Tank-C
Lagoon TB
PH (47905 SQM)

Road No.11A
X 897.80 X 897
6000

6000
GHP XXXIV

4 4
Y 879.50
AU - V

S/S-28
Y 1540

Road No. 01
Paved Area Access For Heavy Crane X 892.10
X 897 Y 2219.98 X 884.50

X X CETP X 901.07 X 891.80


DHDS
Y 1570

LL
Y 2298.86
Y 613.16 X 887.66 R15

3
Y 761.50
XXXIII

X X X X X X
Y 926.74 TCF FOR AVU

X X
Unit

X X X X X X X
Unit

WA X X X X
(1900 SQM)

X X X
BID
XXXV

X X X X
NSU/NHT

X
South Block

X X X
Tower (B) X 860.33 HGU-2 NOTE 3

Y 1114.20
X 855.30

X 843.31
Y 246.45
Y 879.50
S/S-38 X 854.72
Y 1061.52 X 864.19 X 850.50 Road No. 22
S/S-29 Y 1212.41 36.60 Y 1460
X 840.79
TCF FOR FABRICATION OF Abandoned LPG X 839.42
1801-C-001 / 1801-C-007
Y 168.76 Sludge
Thickener CCH Cable Trench 36.60
X 837
Y 1560 36.60
X 837
Y 1650
S/S 140M x 50M (7000 SQM) Office Y 2396.46
BID X 843.31 ESS - 041 (1595 SQM)
Back Wash CONTROL ROOM S/S-20
Tower (A) Final Clarifier (B) Biological Final Clarifier (A)
Sump Clarifier PIPE RACK
Y 1114.20
Road No. 32 NOTE 3 FOR AVU / SR LPG
CISF DUTYPOST

90000
Road No- 2B Gate X 828.68

EXISTING FENCING
(64M x 26M) (1664 SQM)
ST Sump PIPE RACK Y 2340.14 Private land
New Sludge
Thickener NOTE 2 Road No. 22 WT-14
X 801.53 S.R
Gate

TERDROPPER
Car Parking
1803-PR-02
Y 2099.96
X 804.77
WT-1 WT-1 Road No. 22 Y 1824.74 Gate

1803-TS-01
Road No. 22
1803-TS-05

Road No. 22 Road No.22


X2 PLOT

1803-TS-02
C Main Fire

150
X 770.87

1803-TS-05
Y 894.09 X 776.35 X 776.58 X 776.48 DMC
X 760.26 Station

Culvert

No. 5
X 771.80 Y 1589.17 Y 1620.35 Y 1644.47
Y 919.40 Y 1113.81

INDMAX FCC
Paved Area
X 750.05 S/S-27 Access For Heavy Crane X 760.02 X 760.02 X 761.53 X 761.32
Y 835.88 36.20 Y 1819.23 Y 1914.92
Y 1384.60 Y 1523.48

Warehouse
Warehouse
SWS of DHDS

Warehouse
ARU of DHDS
SWS Of AU-V
P.C.O. V.G.O.

Road
DG

No. 12
1803-PR-01

1803-PR-01
CR

RO

No.10
HGU III

No. 13
CABLE TRAY
(19Mx25M)
SRU XXXVIII XXXVII

AD

Covered. drain
00
XL
X 728.98
XXXIX 41-TC-00- 41-TC-00-

1803-TS-03
Y 865.51
X 708.09 004A 005A S/S

Road No. 23A


X 706.30
Y 814.90

LINE

Road No. 21
Y 1074.40
X 707.78 1803-PR-03
X 712
Y 880
FPU-II X 694.98 X 695.00 X 695.02 (CT 1 & CT 2)

1803-TS-04
Paved Area

1803-PR-04
Y 329.48
KOY Y 1568.15 Y 1599.87 Y 1623.79

Road No. 23
CCR Access For Heavy Crane 50 Ton
ALI
SRU
8765

weighbridge
VILL HCU

AD

IGHD )
AGE

S)
Amine SWS

70M
CR-LPG TREATER UNIT

0
S/S

Walk Way
RO
(1803-X-205)
Unit (G.H.P.)

R6
X 675.91

1803-SH-01
X 673.30 X 660.02 Y 2450.52

FCC+
Mx
Y 1066.70 41-TC-00- 41-TC-00- Y 1523.48

(39

Stores
004B 005B

AX
DHDT Warehouse

(INDM
RO

No. 5
PH Warehouse No.9
AD X 632.0
SB No. 8 Ghc/project YARD

Road No.11
KARACHIYA
Y 840.0 P.C.O. V.G.O.
36.34

R60
X 619.78 X 630.43 02 stores office

TP
(75Mx125M)

Road
Y 1313.22
Y 1525.11
NOTE 3 NOTE 7
X 622
R30
Green Belt Area

CW
Top Level Of Dyke 38.11
SRR

Hydrocraker Complex
Y 880

IGHDS

PRU (130Mx64M)
X 602.30 Car parking

0
(35Mx30M)
9

R3
Y 919.90

Weigh Bridge
NOTE 3 SRU

Maintenance office
HCU CR
E
(INDMAX FCC) IOC Road No. 24 Culvert

LAG
( DHDS )

FROM CABLE RACK TO PULL PIT


GR L

S/S-26
NOTE 4 EEN RE
Paved Area

CT

I VIL
Access For Heavy Crane
FIN

Inspection
BEL ER

Road No. 01
-2

YAL
NOTE 6 NOTE 4
ARU SWS

Weigh Bridge
T AR Y
VIL KO EA
X 568 X 571.30 X 571.30 SRU

KO
LAGYAL Y 847 Y 920.60 Y 1060.60 (3800 SQM) (3800 SQM) X 546.35
110MX84M
Y 1493.22 SUM
E I
(9240 SQM)

SIT
P
ARU-III / SWSU-VI,VII CW
E
NOTE 4
X 532.5 PH

25M)
Y 862.0 Civil

DG
(19Mx
TEM
(70 S/S HGU-I N2 XXXVI
Mx PLE TB

0
SRR
PHU 35M
(SUL

R3
Paved Area Access For Heavy Crane GHP
AIR MON
Plant

R30
(15Mx31M) X 500.02 X 500.02 Canteen
CR
STN
R BLO ) (SULPHUR BLOCK) Y 1384.60 Y 1464.60

ARU
7000

AIR MON S/S-25


CK) (100Mx35M) STN X 500.02