Professional Documents
Culture Documents
D
D C B A
NON- SKID CERAMIC TILES FLOOR
FINISH
D
150 150
300
A' A B C D A' A B C D
300
RISER
REINFORCED CONCRETE STAIR
7000
SLAB ON-FILL
(0.40mm THK) 7
A-4
SPOT DETAIL
(R.C. STAIR)
1200
(0.50mm THK)
1200 1200
SCALE 1: 20 M.
C D 300
50 50
2500 1200
5 NON- SKID METAL NOSING STRIP
A-5 (SUBMIT SAMPLE)
(0.40mm THK)
PRE-PAINTED LONGSPAN
150
CORR. G.I. ROOFING SHEET
A' A B C D (SEE SCHED. OF FINISH)
1926 7000
400
(0.40mm THK)
1200 3500 3500 2500 1200 PRE-PAINTED LONGSPAN CORR. TOP LINE OF REINFORCED CONCRETE STAIR
150
SLAB ON FILL
TOP OF PARAPET
G.I. ROOFING SHEET (SEE
ROOF BEAM 100mm THK. CHB PARAPET WALL
1000
SCHED. OF FINISH)
300
1000 400
TOP LINE OF ROOF BEAM SEE STRUCTURAL 100mm THK. CHB PARAPET CEILING LINE
1000
PLASTER(PAINT FINISH)
CEILING LINE
CORRIDOR
3000
150mm THK. CHB WALL WITH 150mm THK. CHB WALL WITH
PLAIN CEMENT PLASTER(PAINT
1500
CORRIDOR
FINISH GRADE LINE FLOOR LINE FLOOR LINE
50mmØ B.I. VERT. & HOR. PIPE CORRIDOR
HANDRAIL(PAINT FINISH) FLOOR LINE (NON- SKID
5 CROSS SECTION FINISH GRADE
8 SPOT DETAIL METAL NOSING STRIP)
A-4 SCALE 1:100 M A-4 SCALE 1:5 M.
LINE
50mmØ B.I. VERT. & HOR. PIPE
HANDRAIL (PAINT FINISH
D
150 150
RISER
45000
300
9000 9000 9000 9000 9000 (0.40mm THK)
PRE-PAINTED LONGSPAN REINFORCED CONCRETE STAIR
4500 4500 4500 4500 4500 4500 4500 4500 4500 4500 CORR. G.I. ROOFING SHEET SLAB ON-FILL
TOP OF PARAPET (SEE SCHED. OF FINISH)
300
300 300
8
600
TOP LINE OF ROOF BEAM
THREAD
A-4
5419
SCALE 1: 20 M.
CLASSROOM CLASS ROOM
D-2 D-2
CLASS ROOM CLASS ROOM
D-2 D-2
CLASS ROOM CLASS ROOM
D-2
A-4
FINISH FLOOR LINE W-1 1 W-3 W-3 2 W-1 W-1 3 W-3 W-3 4 W-1 W-1 5 W-3
800
319
GROUP HANDWASHING
COUNTER SINK (SEE
4 LONGITUDINAL SECTION DETAIL)
SCALE 1:100 M
A-4
A' A B C D D C B A
(0.40mm THK)
300
300
APEX LINE OF TRUSS APEX LINE OF TRUSS 50
APEX LINE OF TRUSS
1800
1800
400
400
200 400
200 200
TOP LINE OF ROOF BEAM SEE STRUCTURAL
1000
1000
1000
1000
1000
TOP LINE OF ROOF BEAM R.C. PARAPET WALL TOP LINE OF ROOF BEAM
1000
200
200mmX150mm PRECAST
±5419
200
5419
MOULDING WITH PAINTED MOULDING WITH PAINTED MOULDING WITH PAINTED
FINISH FINISH FINISH
3000
3000
3000
CLASS ROOM CORRIDOR
2650
2600
2600
2600
2600
150mm THK. CHB WALL WITH 150mm THK. CHB WALL WITH 150mm THK. CHB WALL WITH
2
CLASSROOM FINISH W-3 PLAIN CEMENT PLASTER CLASSROOM FINISH PLAIN CEMENT PLASTER(PAINT CLASSROOM PLAIN CEMENT PLASTER (PAINT
900
900
800
700
700
850
1000
PAINTED FINISH FINISH) FINISH FLOOR LINE
381
319
319
300
300
300
CORRIDOR FLR. LINE
FINISH GRADE LINE FINISH GRADE LINE 50mmØ STAINLESS STEEL PIPE FINISH GRADE LINE
950 50mmØ STAINLESS STEEL PIPE 950 50mmØ STAINLESS STEEL PIPE
GROUP HANDWASHING VERT. & HOR. HANDRAILS GROUP HANDWASHING
VERT. & HOR. HANDRAILS VERT. & HOR. HANDRAILS
COUNTER SINK COUNTER SINK (SEE DETAIL)
DESIGN CONCEPT:
REPUBLIC OF THE PHILIPPINES PROJECT AND LOCATION: SHEET CONTENTS: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: APPROVED: SET NO. SHEET NO.
ARCHITECTURAL SECTION
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS LEFT SIDE ELEVATION
MODFIEIDSTANDARDDPWHD
-EPE
-D CADD BY: SIGNED
RIGHT SIDE ELEVATION APPROVED WITH SIGNATURE APPROVED WITH SIGNATURE APPROVED WITH SIGNATURE APPROVED WITH SIGNATURE
BUREAU OF DESIGN ONE(1)STOREY,FIVE(5)CLASSROOM
SCHOOLBUILDING
CROSS SECTIONS IRMA BINAG-BERNARDO
ARCHITECT III
BOD
A-4
LONGITUDINAL SECTION JOSEPHINE P. ISTURIS LEA N. DELFINADO RAUL C. ASIS LEONOR M. BRIONES
ARCHITECTURAL SECTION W/TOILET@EACHCLASSROOM DETAIL BAY SECTIONS CHECKED: SIGNED B 7 20
BONIFACIO DRIVE PORT AREA, MANILA O
( PTO
I N1) SPOT DETAILS MARYLENE CRUZ-SISON CHIEF, BUILDINGS DIVISION OFFICER-IN-CHARGE UNDERSECRETARY SECRETARY, DEPED
ARCHITECT IV