You are on page 1of 1

SAFE WORK PROCEDURE BOTTOM HOLE PRESSURE SURVEY OPERATION SEQUENCE. 1.

REVIEW SURVEY PROCEDURE WITH WIRELINE CREW 2. RECORD FTHP AND CHP ON WELL 3. SHUT IN WELL BY CLOSING VALVES AS FOLLOWS: CHOKE,WING VALVE,UPPER MASTER VALVE,AND LOWER MASTER VALVE.RECORD SITHP AND SICHP. 4. PREPARE DUMMY TOOL STRING WITH APPROPRIATE GUAGE CUTTER TO DRIFT HOLE 5. RIG UP WIRELINE LUBRICATOR ON WELL.ZERO WIRELINE DEPTH COUNTERS AT ZERO MASTER VALVES.TEST LUBRICATOR TO 500PSI ABOVE SITHP FOR 15MINUTES. OPEN MASTER VALVES CROWN VALVES.OPEN SCSSV BY PRESSURIZING CONTROL LINE WITH HYDRAULIC OIL WITH HYDRAULIC HAND PUMP (KEEP MINIMUM OF 400PSI ON LINE AT ALL TIMES)AND RIH 6. CONTINUE TO RUN IN HOLE WITH APPROPRIATE GUAGE CUTTER AND DRIFT WELL TO SURVEY DEPTH OF XXXXXFT MD WHILE OBSERVING DRAG AT EVERY500FT.IF DRAG EXCEEDS 500IBS WEIGHT, INFORM CLIENTS ENGINEERING SUPERVISOR, POOH.ENSURE AS ISWELLBORE SCHEMATICS IS ONSITE BEFORE RUN IN HOLE W/DUMMY. 7. CLOSE MASTER VALVES.LAY DOWN GUAGE CUTTER.MAKE UP ELECTRONIC GUAGES AND RIG UP ON WELL HEAD. 8. OPEN MASTER VALVE AND RUN IN HOLE;OBSERVE 10 MINUTES STAY IN LUBRICATOR TO ACCLIMATISE. THEN GO DOWN TO SURVEY DEPTH FT MD AND RECORD 30 MINUTES @SURVEY DEPTH-FT MD 9. RECORD THP AND CHP 10. POOH WITH ELECTRONIC GUAGES AND MAKING 10 MINUTES STATIC GRADIENT STOPS AT PRE DETERMINED DEPTH INTERVALS ###FT AND INTO THE LUBRICATOR 11. CLOSE MASTER VALVES,BLEED OFF LUBRICATOR,RETRIEVE THE ELECTRONIC GUAGE AND DOWNLOAD DATA.

You might also like