To stabilize social economic status of these communities, Ministry of water and livestock developmenthasdecidedtowithdrawwaterfromanearbyriver34kmfromtheTownship.Youhave beenconsultedasanEnvironmentalEngineertodesignthewatersupplyinfrastructureofthescheme. Preliminarysurveyshowsthattheschemewillrequireastoragetankatacentralizedpositionontopof ahillwithamainwatersupplypipestoeachvillageandtotownship(i.e.4mainoutletpipes) ThePopulationoftheTownshipandnearbyruralvillageswascollectedfromrecordsWardofficersand villageofficersandareasbelow.Theregionalgrowthratewas3.8%perannum.SinceTownshipplans have not been prepared i.e. Other water demands cannot be established exactly. Design period=20 years,thedateofcommissioningofproject2014. Table1:Populationdata: Areaofsupply TOWNNSHIP TOWNSHIPWARDS(MTAA) WardA WardB WardC DATA2008 5350 3148 4252 12750 853 878 776 2507 15257
TOTAL RURALAREA VILLAGEAREA VillageA VillageB VillageC TOTAL Otherinformationavailable: Table2a:Typesofotherconsumption TypesofConsumption NormalRange(lit/capita/day) 1 2 3 4 5 6 7 DomesticConsumption IndustrialandCommercialDemand PublicUsesincludingFireDemand LossesandWaste Livestockinruralareas Ruralpopulation Firefighting
Average %
Table2a:TypesofdomesticDemandcategory ULTIMATELONGTERMPLAN Demandcategory PublicTapPT %gedistribution Consumption (l/c/d) 25 LowclassLC 35 MCMediumclass HCHighclass 25 15
25
70
130
200
Table3.Peakfactors(MOW.2007)
10
11
12
0.40
0.43
0.44
0.45
0.60
0.80
1.00
1.50
1.70
1.65
1.25 1.15
1.10
1.10
1.38
1.45
1.50
1.40
1.19
1.10
0.80
0.70
0.50
0.43
0.40