Professional Documents
Culture Documents
Type DE (Direct-fired Chiller/ Heaters) Type NE (Steam-fired Chillers) Type LE (Hot w ater-fired Chillers)
On the installation
*Read the installation manual carefully before carried-in and installing the unit. *Carried-in and works of installation, foundation, wiring, piping, interlocks and thermal insulation are involved. Please contact your agency with any questions relating to these issues. In case such works are inadequate, it may cause overturn, electric shock, water and fuel leakage, scalding, fire and so forth. *Please consult your agency when the work of flue, exhaust and in-take air duct, and chimneys are required. In case such works are inadequate, it may cause scalding, fire and oxygen deficiency. *Waterproof work of the foundation for installing the unit and drainage ditch are required in order to prevent wetting surrounding equipment. *Adequate space surrounding the unit is needed for maintenance work. Such space is indispensable for safe work and avoiding injuries.
For m aintenance
*Periodical maintenance, in addition to daily inspection, is required. If it is improper in maintenance, it may cause fire, electric shock and scalding. *Please consult the service agency to obtain professional guidance.
SA N Y O Elect ric A ir Condit ioning Co.,Lt d. Int ernat ional Business D ivision Overseas Sales & M ark et ing D ept . 1 Otsuki-Cho, Ashikaga-City, Tochigi 326-8534, Japan Telephone : +81-284-44-3222 Facsimile : +81-284-44-3138 http://kuchosys.sanyo.co.jp/eng/ SA N Y O Elect ric Trading Co.,Lt d. 1-10 Ueno 1-chome,Taito-ku, Tokyo 110-8534 Japan Telephone : +81-3-3837-6266 Facsimile : +81-3-3837-6389 2000SANYO Printed in Japan 00 7 IM0.5
SAE-2002