You are on page 1of 1

Test scenario no Step 1

test step Description check whether all the jobs on DS server 7.5 for target table Table_A run successfully from the interface A check whether Data from interface A with DS server 7.5 is loaded into target table Table_A as per business rules or not check whether all the jobs on DS server 7.5 for target table Table_A run successfully from the interface B check whether Data from interface B with DS server 7.5 is loaded into target table Table_A as per business rules or not Migrate the jobs of interface A from DS server 7.5 to 8.5. And check whether all the dependent jobs of Interface A for the target table Table_A run sucessfully or not check whether Data from interface A with DS server 8.5 is loaded into target table Table_A as per business rules or not

Expected results All the jobs should run successfully

Step 2 Step 3

data should be loaded as per mapping sheet All the jobs should run successfully

Step 4

data should be loaded as per mapping sheet

Step 5

All the jobs should run successfully

Step 6

data should be loaded as per mapping sheet

Step 7(validation point) Step 8 step 9(validation point) Step 10

Step 11

Data in the target table Table_A should be same for the Compare the results after step 2 with the results after step 6 interface A irrespective of data stage server.there are same or not? should not be any difference in the results repeat the step 3 and step 4 and load the target table Table_A All the jobs should run successfully and target table from Interface B with DS server 7.5 should be loaded from interface B Compare the results after step 4 with the results after step 8 the target data should be same ; there should not be are same or not? any difference . Repeat the step 5 and step 6 . And load the target table All the jobs should run successfully and target table Table_A with interface A on DS server 8.5 Table_A should be loaded from interface A Migrate the jobs of interface B from DS server 7.5 to 8.5. And check whether all the dependent jobs of Interface B for the target table Table_A run sucessfully or not All the jobs should run successfully check whether Data from interface B with DS server 8.5 is loaded into target table Table_A as per business rules or not compare the results after Step 4 ,step 8 and step12.And whether the results are same or not.

Step 12 Step 13(validation point)

data should be loaded as per mapping sheet All the results should be same ;there should not be any difference in the results

You might also like