We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
Patient
Ertional Delay
Video
Fig 3.1.2(a). Block Diagram for Detecting Motor Deficit in ASD
3.1.3. System architecture diagram
mo
A system architecture diagram would be used to show the relationship between different
components. Usually, they are created for systems which include hardware and software and these
are represented in the diagram to show the i
issues.Tinger Taping
‘Aitention Deiat
Developmental Delay
Hyper Activity
Emotional Dey
Fig 3.1.3(a). System Architecture Diagram for Detecting Motor Deficit in ASD
3.1.4. Data Flow Diagram
‘Also known as DED, Data flow diagrams are used to graphically represent the flow of data in a
business information system. DED describes the processes that are involved in a system to transfer
data from the input to the file storage and reports generation. Data flow diagrams can be divided
into logical and physical. The logical data flow diagram describes flow of data through a system
to perform certain functionality of a business. The physical data flow diagram describes the
implementation of the logical data flow.
ests Datcinghetr | peformat cots
Seen =
Fig 3.1.4(@). Datan Approach
3.1.5. Software Des
was first proposed b3
The Rapid Apr
model is the use of powerful d
critical feature of this
project can be implemented using
can be assigned independently to separate te
velopment of each
wherein each module
be combined to form the final product. De
waterfall model ie communication, pl
stepsas inthe
as shown in the figure.
a
rim —
i '
i CONSTRUCTION
TEAM 1
‘CONSTRUCTION
Fig 3.1.5 Rapid Application Development Model
In rapid application the first step is communication in which developer and
pplication Development (RAD) Model yy IBM in the 1980s. The
levelopment tools and techniques. A software
this model ifthe project ean be broken down into small modules
‘ams. These modules can finally
module involves the various basic
fanning, modelling , construction , deployment
‘DEPLOYMENT
client discuss the
site. The next step
and to manage the
the project into
construction andFig 3.2 Time line chartFig 3.3 Gantt chart
3.4, Conclusion
Here we have selected Rapid Application Development (RAD) m the project. In Rapid
nce. Later it is divided
Application Development model planning and design are implement
in team which makes the work faster. It is very effective too.