0% found this document useful (0 votes)
28 views1 page

Comments Resolution Sheet (CRS) : C - Revise and Resubmit

Uploaded by

tonyfred445
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
28 views1 page

Comments Resolution Sheet (CRS) : C - Revise and Resubmit

Uploaded by

tonyfred445
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

COMMENTS RESOLUTION SHEET (CRS)

CONTRACT NUMBER: GTC-013-2019

CONTRACT TITLE: AL JAZEERA MUBASHER STUDIO-1 REFURBISHMENT

DOCUMENT TITLE: STRUCTURAL CALCULATION HVAC DUCT SHELTER ON STUDIO 5 ROOF AT AJMN

DOCUMENT NUMBER & REV & TITLE: PD100-AJMN-ADMS-WO-068-RPT-002 REV-01 Last Revision status: C - Revise and Resubmit
SR.
AJMN/HTCO COMMENTS CONTRACTOR'S RESPONSE REMARKS
NO

Noted and we comply. Please refer to pages 37 to 40, where the approved shop drawing is
1 Attach with submittal architectural approval concept design with material details. included in the calculation report. Additionally, pages 23 to 26 provide detailed information
regarding the materials.

Noted and we comply. Please refer to pages 37 to 40, where the approved shop drawing is
2 Attach with submittal structural approval concept design with material details. included in the calculation report. Additionally, pages 23 to 26 provide detailed information
regarding the materials.

Noted and we comply. Please refer to pages 37 to 40, where the approved shop drawing is
3 Attach with submittal mechanical approval.
included in the calculation report.

You might also like