Professional Documents
Culture Documents
Date: 20-Feb-2023
Request no. RFI-CSCEC-12-D01-ME-M1-0973-00
Project No. & Title: E18066-0200S - The Central Business District of the New Administrative Capital of Egypt
We request your attendance to inspect the following works : Duct work installation and test of corridor for M1 floor
M1 floor corridor
5. Purpose of Inspection :
1. Electrical 2. Mechanical
raceways and boxs for electrical system Light fittings Mechanical installations
Furniture elect. culvert Sub-stations Pumping stations
MV cables Civil works & finishings Sleeves installations
Street lighting cables
Street lighting poles
Telephone duct Bank
TV cables
MIR-CSCEC-12-D01-ME-HD-0268-00
MIR-CSCEC-12-D01-ME-HD-0570-00
MIR-CSCEC-12-D01-ME-HD-0571-00
MIR-CSCEC-12-D01-ME-HD-0572-00
MIR-CSCEC-12-D01-ME-HD-0573-00
Others (specify) MIR-CSCEC-12-D01-ME-HD-0574-00
Duct work installation and test of corridor for M1 floor
Particular Details
ITS
Date/time of inspection :
S-PRC-SS-02(F31) Rev 2
'
#
3#
0
+. +1 23
!"#$%& '( !)*(
&( *
*
)
)
)
)
+ ,(&
7 #-3 8#$ 9:&:+$+;77&$: '9<=>?/)>+@
$ :++=++ ?*+A*+
! " 7 #-3 8#$ $1& :'(&/0,
+! -%
$
# $
" % %"
&&'( $ )*+*+
$,&- ,
$ #" .# . $ %
.( (
/*0 '
1." #%2
% 3 3 2
4 . 3# 2
* ##2
The contractor is requested stick with the requirement of delivering and storage as mentioned method of statement and specification.
-All galvanization coating shall be G90 Z275 negative tolerance shall not accepted.
-Contractor is responsible for any damage for during storage or installation and it is required to change the damage piece if requested by engineer.
&5 -Final approval based on the quality of collecting duct and installation and leak test
A. Adel- Reda .Elsayed 11/10/2022
$ %
Hassanein Ali 11-10-2022
3 . 3 . .6 5 ". .
"4 . .
$1& $$+97?@&3
Project No. P2&P6 Date 10/9/2022
Computed by Checked by
Results
Weight Area
Strait Duct 373 43
Elbow 13 2
Reducer 7 1
Take Off 31 4
Plenum 0
Ring 0 0
End Cap 0 0
'
#
3#
0
+. +1 23/
!"#$%& '( !)*(
&( *
*
)
)
)
)
+ ,(&
7 #-3 8#$ 97+$+:;7-&-<=$,69<>?@/@?+A
$ =++:++ B*+@*+
! " 7 #-3 8#$ $1& ='(&/0,
+! -%
$
# $
" % %"
&&'( $ )*+*+
$,&- ,
$ #" .# . $ %
.( (
/*0 '
1." #%2
% 3 3 2
4 . 3# 2
* ##2
The contractor is requested stick with the requirement of delivering and storage as mentioned method of statement and specification.
&5 -All galvanization coating shall be G90 Z275 negative tolerance shall not accepted.
-Contractor is responsible for any damage for during storage or installation and it is required to change the damage piece if requested by engineer.
-Final approval based on the quality of collecting duct and installation and leak test
A. Adel- Reda .Elsayed 11/10/2022
$1& $$+97BA&3
Project No. P2&P6 Date 10/9/2022
Computed by Checked by
Results
Weight Area
Strait Duct 28 4
Elbow 7 1
Reducer 0 0
Take Off 0 0
Plenum 0
Ring 0 0
End Cap 0 0
'
#
3#
0
+. +1 234
!"#$%& '( !)*(
&(
( *
* )
)
)
)
+ ,(&
7 #-3 8#$ 97+$+:7;' <0=<$'9=>?@/+?AB
$ <++>++ @*+A*+
! " 7 #-3 8#$ $1& <'(&/0,
+! -%
$
# $
" % %"
&&'( $ )*+*+
$,&- ,
$ #" .# . $ %
.( (
/*0 '
1." #%2
% 3 3 2
4 . 3# 2
* ##2
The contractor is requested stick with the requirement of delivering and storage as mentioned method of statement and specification.
-All galvanization coating shall be G90 Z275 negative tolerance shall not accepted.
-Contractor is responsible for any damage for during storage or installation and it is required to change the damage piece if requested by engineer.
&5 -Final approval based on the quality of collecting duct and installation and leak test
A. Adel- Reda .Elsayed 11/10/2022
$1& $$+97@B&3
Project No. P2&P6 Date 10/9/2022
Computed by Checked by
Results
Weight Area
Strait Duct 255 29
Elbow 21 3
Reducer 0 0
Take Off 3 1
Plenum 0
Ring 0 0
End Cap 0 0
'
#
3#
0
+. +1 23
!"#$%& '( !)*(
&( *
*
)
)
)
)
+ ,(&
7 #-3 8#$ 9:&:+$+;7,'<:$'9<=>?/+>@A
$ :++=++ B*+@*+
! " 7 #-3 8#$ $1& :'(&/0,
+! -%
$
# $
" % %"
&&'( $ )*+*+
$,&- ,
$ #" .# . $ %
.( (
/*0 '
1." #%2
% 3 3 2
4 . 3# 2
* ##2
The contractor is requested stick with the requirement of delivering and storage as mentioned method of statement and specification.
-All galvanization coating shall be G90 Z275 negative tolerance shall not accepted.
&5 -Contractor is responsible for any damage for during storage or installation and it is required to change the damage piece if requested by engineer.
-Final approval based on the quality of collecting duct and installation and leak test
A. Adel- Reda .Elsayed 11/10/2022
$1& $$+97BA&3
Project No. P2&P6 Date 10/9/2022
Computed by Checked by
Results
Weight Area
Strait Duct 463 52
Elbow 48 5
Reducer 7 1
Take Off 12 2
Plenum 0
Ring 0 0
End Cap 0 0
01235678
9331131 3233
! """""""""""#$%&#%'&'#
012345679 9 647.# #
41547455924 216 0(4417
!6217 "
7#$%4641&
'7'14'(6(&41'0!)*+!97, -)0(7, -
89:;9<=>?
@:A9BCDEC<F9CGH:IJHCKLM?
@:N OCP;Q >CP;Q RCP;Q S:DE<
T UVWXXT? YWYYY? TWTZ[?
[ U\WXZT? YWYYY? TWTZ[?
Z U\WXZT? YWYYY? TW\Z]?
\ UVWZYX? YWYYY? YW]^[?
V UVWZYX? YWYYY? TWTZ[?
X U\W_VX? YWYYY? YW]^[?
] U\W_VX? YWYYY? TWTZ[?
`J=BM?
@:N @:A9B `J=BCB<Daa9E9ACDE `J=CB9b<D:E c9EG<FC
de df de df P;Q
Tg?hijklmnop [?qrs? Z?qrs? tuu tuu \Tv\Tv[WV? YWZYV?
[g?hijklmnop \?qrs? V?qrs? tuu tuu w^ YWZVY?
Zg?hijklmnop T?qrs? V?qrs? tuu tuu \TvX[v[WV? YWZVV?
\g?hijklmnop \?qrs? X?qrs? tuu tuu \Tv[TvTWV? YWZVY?
Vg?hijklmnop X?qrs? ]?qrs? tuu tuu w^ YWZVY?
Xg?hijklmnop V?qrs? ]?qrs? tuu tuu \TvX[v[WV? YWZVY?
]g?hijklmnop ]?qrs? [?qrs? tuu tuu \TvX[v[WV? YWZ[V?
Lxyy:=<BCJEACBxyy:=<CB9<<H9;9E<BCDEC<F9CGH:IJHCb::=ADEJ<9CB>B<9;?
@:N =O => =R zO > R |{H O
JB<DbD<D9BCP|@};Q
|> |R
{HJB<DbD<D9BCP|@}=JAQ
aO a> aR
e ~? ~? ~? ~? ~? ~?
~? ~? ~? ~? ~?
c:JACG=:xyBM?
8=:xyCEJ;9 @:N c:JAC<>y9 KFJ=Jb<9= ;DE ;JO {EJIH9A
liti T liti liti TWYY? TWYY?
rkmmko?oj [ liti liti TWYY? TWYY?
c:JABM?
"/ /"/ %$!19! &206912&$3$02
354&40217*1414!9&6153$3$963 7
012345679 9 647.# #
41547455924 216 0(4417.
!6217 "
7#$%4641&
'7'14'(6(&41'0!)*+!97, -)0(7, -
89:;<=>?@A@?B9:CD><:DE?FDG
H<EE?=I?BD;9J<DE?I=J?:=BH<>9@?8KLL=J;
<MNO BPQNR @NSTUVWMVPX YMZ KXVM
[, ,/[, " 61694%\[#\#$,/61&
# 9,,/%% 21694%\%\#$,/61& %
# 9,,%# 21694%\#\$,/61& /,
/ 9[[,]] % 616464^*45_ # 05^&_
% 9[[,]]#` ` 4(1449245621a*45_ 05^&_
[ [ `]/bc 4 b\bc12(26!521 % 05^&_
. 9//]#% *4\(226#\% % 05^&_
] 9]]] # 61646# d 05^&_
` 9//## '64&41# % 05^&_
9[[,]] ] e 44&41] d 05^&_
9]]] ] 61646] f 05^&_
# 9// ] 144"2]
/ 9// ] *4\(26] g 05^&_
% 9[[,]] e 44&41 h 05^&_
, 9]]] 61646 h 05^&_
[ 9// 144"2 %
. 9// *4\(26 i 05^&_
] "#, #, "41 216&416 # 05^&_
` 9%%%] e269 )#j # 05^&_
# 9##,klmb 94&*(41%j 05^&_
# 9.. /, 12419 j 05^&_
## 9#, [/klmc 34 69 ^[/[[_ 05^&_
#/ nopggiqqrsft utvwxyz{t|x}wz~tosft s 05^&_
#d giggrdst 9 &%\% s 05^&_
#i giggrfst 9 &%\f # 05^&_
ZW[X
@;A:BCDEC=F:CGH;IJHCKLM
@;N OCP<Q ?CP<Q RCP<Q S;DE=
T UVWXVY ZWZZZ ZWZTX
[ U\W]^_ ZWZZZ ZWZTX
Y U\W^]Y ZWZZZ UZW\T^
\ U\W^]Y ZWZZZ ZWZTX
V UVWY[Y ZWZZZ UZW\T^
X UVWY[Y ZWZZZ ZWZTX
_ UVWXVY ZWZZZ ZWY[T
] U\W]^_ ZWZZZ ZWY[T
`J>BM
@;N @;A:B `J>BCB=Daa:E:ACDE `J>CB:b=D;E c:EG=F
de df de df P<Q
Tghijklmnopq \hrst Yhrst uvv uvv wxlpuqpqhlmqhyTZ ZW\YV
[ghijklmnopq \hrst [hrst uvv uvv \Tz\Tz[WVh{|sh}uo~qsln ZWZ]X
Yghijklmnopq Yhrst Vhrst uvv uvv \Tz[TzTWVh{|sh}uo~qsln ZWY\Z
\ghijklmnopq Vhrst Xhrst uvv uvv wxlpuqpqhlmqhyTZ ZW\YV
Vghijklmnopq Thrst Xhrst uvv uvv \Tz\Tz[WVh{|sh}uo~qsln ZWYYZ
Xghijklmnopq Xhrst \hrst uvv uvv \Tz\Tz[WVh{|sh}uo~qsln ZWY\Z
_ghijklmnopq Thrst _hrst uvv uvv wxlpuqpqhlmqhyTZ ZWYZV
]ghijklmnopq [hrst ]hrst uvv uvv wxlpuqpqhlmqhyTZ ZWYZV
L;>=BCJEACB;>=CB:==H:<:E=BCDEC=F:CGH;IJHCb;;>ADEJ=:CB?B=:<
@;N >O >? >R O ? R H O
JB=DbD=D:BCP@<Q
? R
HJB=DbD=D:BCP@>JAQ
aO a? aR
01 101 $! 19 22693"!3!02
454422175!.614-2'!.!74#8
abcd
012345679 4562 647$"" "
41547455924216 0'4417/
6217 !
7"#$4641
%&7%14%'6'41(%0 (61)04* +,-. 97* +,0'7
* +
hijkefgklminjopkqrkesc
RSTU:VWXSYSX>STZ[W:T[\
]:\\XV^X>[US_:[\XTV>]:WSBXRK``V_U
:;<= >?@<A B<CDEFG;F?H I;J KHF;
9**$$ 21694$L$L"#*061 M*
" 9**$" 21694$L"L#*061 $
* N0 5 64126521 " 05
N 9NN*MM M O4541M efg $ 05
/ 9MMM M 66164(6M efg " 05
M 900 M P144!2M efg Q
Q 900"M %6541M efg " 05
900M -4L'2(6M efg N 05
9MMM 66164(6 05
" 9NN*MM O4541 0 05
0 900 P144!2
$ 900" %6541 $ 05
* 900 -4L'2(6 / 05
N !6"*"* !412166416 " 05
/ 9$$$M O269 " 05
M 9"*N0 0 4469N0NN 05
F.F.L+328.25
C.L. +328.15 OPEN TO BELOW
D01 D01
Y08 Y08 Main Consultant:
FCU-D01-08 FCU-D01-08
M5x25
M5x25
D D
F.F.L+330.75 F.F.L+330.75
C.L. +330.65 C.L. +330.65
FCU-D01-04 FCU-D01-04
F.F.L+330.75
C.L. +330.65
Shop drawing-Consultant:
3B-D01-M-A3
D01 D01
Y09 Y09
FCU-D01-01
FCU-D01-01
ѣᔰޡቶㅢӂᔰ䇴ᴿ䲆ޢਮ
THE SECOND CONSTRUCTION LIMITED COMPANY OF CHINA
CONSTRUCTION EIGHTH ENGINEERING DIVISION
FCU-D01-01 FCU-D01-01
Model No. : 00000 Model No. : 00000
A. Flow : 171 L/S A. Flow : 171 L/S
B.O.U 2685 B.O.U 2685 Contractor:
General Comments - Ductwork CODE-B
D01 D01 1- Drawings of General standard installations details shall be submitted separately for review and approval. Details provided with building plans are indicative only.
Y10 Y10
3B-D01-M-A3
F.F.L+330.75
C.L. +330.65
2- Show the fire rated walls on the drawings and provide sectional detail for pipe sleeves penetration for walls and slab clarifying: material, size, invert level, sealant, escutcheon plates…etc.; noting that the
FCU-D01-01
FCU-D01-01
sealant and Sleeve/box out penetrating fire rated wall, shaft, slab or mechanical room shall have the same rating of the wall / slab.
FCU-D01-01 F.F.L+330.75 FCU-D01-01
F.F.L+330.75
C.L. +330.65 3- Provide fire damper on all ducts penetrating fire rated wall, shaft, slab or mechanical room.
Model No. : 00000 C.L. +330.65 Model No. : 00000
A. Flow : 171 L/S A. Flow : 171 L/S
B.O.U 2720 B.O.U 2720 4- Contractor to ensure that equipment installed are fit and/or accommodate the available space.
5- Provide installation benchmark/mockups for all items on site prior commencement of installation for final approval. Project Name:
6- Duct elbows should be provided with turning vanes as per SMACNA standards.
7- Volume dampers to be added wherever necessary for proper air test & balancing. Central Business District
8- Riser diagram shall be provided.
9- Coordinated shaft details drawings (including longitudinal sections from basement to roof) showing, supporting details and branches at each floor to be provided to ensure that shafts will accommodate all
Of the
services inside. New Administrative Capital
D01 FCU-D01-03 FCU-D01-03 D01 10- All FCU, IU, VD, FD, MD, valves, VAV, fans, filters, controllers…etc. shall be accessible. Provisions shall be provided for easy accessibility of MEP services and all access doors shall be as per
Y11 Model No. : 00000 Model No. : 00000 Y11
FCU-D01-03 FCU-D01-03
A. Flow : 290 L/S A. Flow : 290 L/S CBD EAST - PHASE 1
B.O.U 2767 B.O.U 2770
approved RCP plans.
11- Ducts, pipes, equipment and false ceiling levels and air outlets locations, size, color, shape… etc. shall be as per RCP plans and ID approval.
12- Contractor is required to provide a table for ducts clarifies: duct material (black steel, galvanized, aluminum… etc.), duct construction, traverse and longitudinal joint, duct thickness, duct reinforcement, Key Plan:
hangers and supports span versus duct size, total weight, area of application (Supply, Return, Exhaust …..Etc.).
D01 D01 13- Contractor is requested to show/Indicate on duct routing air flowrate, velocity and pressure drop at each section.
Y12 Y12
14- Provide duct installation detail for flexible connection at building expansion joint.
NORTH
FCU-D01-02 15- Contractor is requested to provide coordinated sectional detail at all corridors clarifying: false ceiling level and all other trades invert levels.
Model No. : 00000
FCU-D01-02 A. Flow : 230 L/S
FCU-D01-07 B.O.U 2685
16- Contractor must submit shop drawings signed and sealed by a qualified professional engineer for multiple equipment supports and trapeze hangers. Include seismic calculations relevant to the life safety
Model No. : 00000
FCU-D01-07
A. Flow : 154 L/S FCU-D01-03
system and design calculations as per project specifications (Section 230548).
B.O.U 2815 Model No. : 00000
FCU-D01-03 17- Any deviation from original IFC drawing should be highlighted/clearly identified and addressed to engineer review and approval.
A. Flow : 290 L/S
B.O.U 2742
18- Coordination with other trades has not been checked, Contractor shall be held responsible for any corrective action if required without any extra time/cost.
19- All open-ended ducts on roof shall be provided with wire mesh screen & Goose Neck.
1B-D01-M-A
20- Show thermostats on the drawings.
FCU-D01-02
1B-D01-M-B
FCU-D01-02
Model No. : 00000
A. Flow : 230 L/S FCU-D01-03
B.O.U 2717 Model No. : 00000
A. Flow : 290 L/S
Sheet Cuts:
B.O.U 2745 Part-8 Part-7
F.F.L+330.75
C.L. +330.65
FCU-D01-03
D01 D01
Part-4 Part-3
Y14 Y14 -contractor to clarify the resons for shop drawing resubmission however is approved before
FCU-D01-02
-for any correction at REV 0 make all modified area clouded with rev 01
Model No. : 00000 FCU-D01-02
A. Flow : 230 L/S Model No. : 00000 - contractor to submit drawing for corridor and apartments separately Part-1 Part-2
B.O.U 2717 FCU-D01-02 A. Flow : 230 L/S **NOTE :- LEVELS INDICATED IN SECTION AND PLANS ARE
B.O.U 2685
SHAFT ARRANGMENT
MEASURED FROM + 330.75
1B-D01-M-A
FCU-D01-02
FCU-D01-03
Model No. : 00000
A. Flow : 290 L/S
B.O.U 2742
FCU-D01-03
FCU-D01-07
FCU-D01-02
FCU-D01-07
D01 Model No. : 00000 D01
Y15 FCU-D01-02 Y15 ahmed adel 14/03/2022
Model No. : 00000 A. Flow : 154 L/S
D01 D01
Y16 Y16
FCU-D01-02
Model No. : 00000
FCU-D01-02 A. Flow : 230 L/S
B.O.U 2685
ABBREVIATION
D01 D01 D01 D01 D01 D01 D01 D01 D01
X07 X08 X09 X10 X11 X12 X13 X14 X15
FCU-D01-04
2B-D01-M-B2
FCU-D01-04
Model No. : 00000
1B-D01-M-A
A. Flow : 421 L/S
B.O.U 2745
FCU-D01-03
Model No. : 00000
A. Flow : 290 L/S
B.O.U 2742
FCU-D01-03
LEGEND
FCU-D01-07
F.F.L+330.75
C.L. +330.65
FCU-D01-07
FCU-D01-07 FCU-D01-07
Model No. : 00000
Model No. : 00000
A. Flow : 154 L/S A. Flow : 154 L/S
D01 D01
Y17 Y17
FCU-D01-02
Model No. : 00000
A. Flow : 230 L/S
B.O.U 2720
FCU-D01-02
F.F.L+330.75
C.L. +330.65
B OPEN TO BELOW B
1B-D01-M-A2
CORRIDOR
D01M1 019 -
F.F.L+330.75
C.L. +330.65
FCU-D01-03
Model No. : 00000
A. Flow : 290 L/S
B.O.U 2740
FCU-D01-03
FCU-D01-07
FCU-D01-07
Model No. : 00000
OPEN TO BELOW 08
ELEVATOR LOBBY
D01M1 005 -
F.F.L+330.75 01 SCR-CSCEC-12-'0(*/ 00 03.08.2019
C.L. +330.65 FCU-D01-23
Documents 02 SCR-CSCEC-12-'0(*/ 00 02.09.2019
FCU-D01-01
Model No. : 00000
A. Flow : 171 L/S
FM-FTR
B.O.U 2785 D01 01 026 02
SHAFT ARRANGMENT
Coordination Table:
SHAFT ARRANGMENT
SEE DETAILS SHAFT No. ME-32
SEE DETAILS SHAFT No. ME-31
STORE MECH CLOSET FM-FTR
2B-D01-M-A6
D01M1 012 01 D01M1 011 01 D01M1 010 02 SP-FTR
FCU-D01-01 D01M1 007 02 ELEC. CLOSET
Discipline Signature Date
Architecture
OPEN TO BELOW
Structure C.
OPEN TO BELOW CORRIDOR
D01 01 027 - Structure S.
D01 D01
Y19 Y19
SHAFT ARRANGMENT Electrical
FCU-D01-02 SEE DETAILS SHAFT No. ME-14
BMS CLOSET MECH. CLOSET
Model No. : 00000 D01 01 047 01 D01 01 029 01
SHAFT ARRANGMENT Plumbing
A. Flow : 230 L/S SEE DETAILS SHAFT No. ME-37
CORRIDOR SHAFT ARRANGMENT
D01M1 019 - SEE DETAILS SHAFT No. ME-07
B.O.U 2740
F.F.L+330.75 HVAC
C.L. +330.65
GARBAGE ROOM
SHAFT ARRANGMENT
Other
D01 M1 018 06
SEE DETAILS SHAFT No. ME-04
FACILITY MANAGEMENT OPEN SPACE
020 01 020 -
FCU-D01-02
Total Air Gap LOBBY
FCU-D01-07 D01M1 015 04
Length: 5340 mm Revision Table:
FCU-D01-23
FCU-D01-07
Model No. : 00000
Model No. : 00000 STORE
SHAFT ARRANGMENT
FCU-D01-23
C.L. +330.65
STAIRS C.L. +330.65
OFFICE OFFICE
D01M1 008 10 SHAFT ARRANGMENT D01 01 018 - D01 01 019 -
SEE DETAILS SHAFT No. ME-03
REFER TO SCR-CSCEC-
12-D01-ME-GL-0049-00
SHAFT ARRANGMENT
SEE DETAILS SHAFT No. ME-12 OPEN TO BELOW
FCU-D01-02
ELECTRICAL ROOM
01 RESUBMIT AS PER CONSULTANT COMMENTS 2022-02-27 L.W.
D01 01 017 01
FCU-D01-08
A. Flow : 230 L/S
B.O.U 2720
SHAFT ARRANGMENT
SEE DETAILS SHAFT No. ME-40
FCU-D01-05
D01 FCU-D01-03 D01 RESIDENTIAL TOWER D01
Y20 Y20
F.F.L+330.75
C.L. +330.65 DUCT WORK LAYOUT
FIRST FLOOR MEZZANINE (M1)
OVERALL PLAN
FCU-D01-03
Model No. : 00000
A. Flow : 290 L/S
B.O.U 2830
FCU-D01-02 FCU-D01-05
Model No. : 00000 Model No. : 00000 A.S D.S. L.W.
A. Flow : 230 L/S A. Flow : 582 L/S
B.O.U 2730 B.O.U 2660
D01 D01
Y21 Y21 Drawn Date Scale