Transforming Factory Planning Benjamin Huber
& Manufacturing Operations Head of Advanced Automation & Digitalization
UX Operations Industrial Engineering
NVIDIA GTC, March 20th, 2024
Supported by:
Business Area User Experience (UX)
Overview
KEY FACTS
› Advanced Display Solutions as our key product portfolio
› Our Customers – Major OEM
› 12 manufacturing locations
› More than 15.000 employees
› HQ: Babenhausen, Germany
O IE MPS © Continental AG Internal 27 March 2024 2
Public
Pressuring Market Situation
Reactive Manufacturing
PRESSURE POINTS
Increasing Shorter dev.
requirements & cycles & product
specifications lifetime
REQUIREMENTS
› Lean & effective workflows
› Data based decision taking
Change from Rapid changing › X-function collaboration
hardware to processes &
software focus technologies › Synergies through standards
› Intuitive access to new tools!
User Experience Operations (UX O) Benjamin Huber © Continental AG Public 3/27/2024 3
Public
Towards Digital Mega Plants
Predictive Manufacturing
ONE ECOSYSTEM
Digital
Factory Twin
X-platform data Accessible digital
exchange twin factories
(real-time)
Global Collaboration &
scalability & work progress
Single source of truth accessible standardization synchronized
from anywhere at anytime
User Experience Operations (UX O) Benjamin Huber © Continental AG Public 3/27/2024 4
Public
Architecture
Simplified Overview
DATA SOURCE
Factory ON-PREM / CLOUD WORKFLOWS
Game Simulation
Engines Tools
USD
IOT
Lines & Stations
UI Platform
Powered by
Extensions
Cloud Enterprise Nucleus Server
Data Industry
Lake Protocols
UX DataVerse USD
Edge
Products & Design Devices
USD Omniverse Omniverse
Composer Kit Code
Storage
User Experience Operations (UX O) Benjamin Huber © Continental AG Public 3/27/2024 5
Public
ContiVerse
ONE Ecosystem
X-platform data
exchange
...
Virtual Commissioning
...
...
Layout planning &
simulations
...
Virtual
Improvement
Workshops
Legend Gemba on
… Digital Twins
Engineering Applications
...
Business Applications
User Experience Operations (UX O) Benjamin Huber © Continental AG Public 3/27/2024 6
Internal
ContiVerse
Estimated Impact & Benefits
Impact Area ContiVerse Value Story Potential
Invest Use equipment that are proven in series production Reduces – ~5%
Time-to-market X-discipline workflow & version control Reduces – 13%
X-platform
data exchange Man Hours Efficient workflow and reduction of the review loops Reduces – ~5%
Impact Area ContiVerse Value Story Potential
Shopfloor Space Quick & detailed analysis of shopfloor layout Reduces – ~0,5%
Layout Planning & Scrap Cost Live root-cause-analysis by experts worldwide Reduces – ~0.5%
Simulations
Man Hours Efficient workflow and reduction of the review loops Reduces – ~2%
Impact Area ContiVerse Value Story Potential
Virtual Shopfloor Space On-the-fly benchmarking of planned scenarios Reduces – ~0,5%
Improvement OEE Direct verification with connected tool 1:1 Increases – 1%
Workshops
Start-Up-Cost Virtual collaboration & action planning like in real Reduces – 1 %
Impact Area ContiVerse Value Story Potential
Cost & Hour Remote support possible and less traveling Reduces - ~5%
Gemba on OEE Direct validation of parameter changes & behaviour Increases – 1%
Digital Twins
Start-Up-Cost Easy X-function collaboration for best-practice Reduces – 1.5 %
User Experience Operations (UX O) Benjamin Huber © Continental AG Public 3/27/2024 7
Internal
…and get
Any
Questions?
User Experience Operations (UX O)
Public