Annex 31
ACCEPTANCE & INSPECTION REPORT
SANGGUNAING BARANGAY OF BAYANAN SAN PASCUAL BATANGAS
LGU
Supplier EB OFFICE SUPPLIES AND EQUIPMENT TRADING CENTER
PO No.: 2024-09-0012 Date: September 18, 2024 Invoice No.: _______ Date: September 23, 2024
Requisitioning Office/Department SB OF BARANGAY BAYANAN
Item No. Unit Description Quantity
unit CORE i5-12400F 2.5Ghz 1
6Cores/12threads 18m Cache LGA 1700 Processor
Gigabyte GA-H610M-K-DDR4 LGA 1700 HDMI
MATX Mother Board
2pcs 8gb Adata DDR4-3200Mhz UDIMM Memory
1TB Kingston
Cougar ARCHONNV22Mesh
PCIE 4.0NVME
RGB MidM.2 SSDCase W/
Tower
TG ATX Black
Deepcool DE-600 V2 Power Supply
24.5” Acer KA252Q GOBI FHD IPS 120Hz Monitor
MSI GEFORCE 710 2GD3H LP Video Card
Keyboard, Mouse, Speaker, AVR
unit 1
Epson L3210 MFP Integrated InkTank Printer
ACCEPTANCE INSPECTION
Date Received: _________________ Date Inspected: __________________
Complete Inspected, verified and found OK
as to quantity and specifications
Partial
Prescila C. Alba JOSEPH EDISON DALISAY
Property Officer Inspection Officer/Committee
Annex 31
ACCEPTANCE & INSPECTION REPORT
SANGGUNAING BARANGAY OF BAYANAN SAN PASCUAL BATANGAS
LGU
Supplier J. GAINZAS FURNITURE CENTER
PO No.: 2024-09-0013 Date: November 4, 2024 Invoice No.:68415 Date: November 4, 2024
Requisitioning Office/Department SB OF BARANGAY BAYANAN
Item No. Unit Description Quantity
pc STEEL CABINET LATERAL 4 DRAWER 1
pc GANG CHAIR HEAVY DUTY 4 SEATER 1
ACCEPTANCE INSPECTION
Date Received: _________________ Date Inspected: __________________
Complete Inspected, verified and found OK
as to quantity and specifications
Partial
Prescila C. Alba JOSEPH EDISON DALISAY
Property Officer Inspection Officer/Committee
Annex 31
ACCEPTANCE & INSPECTION REPORT
SANGGUNAING BARANGAY OF BAYANAN SAN PASCUAL BATANGAS
LGU
Supplier EB OFFICE SUPPLIES AND EQUIPMENT TRADING CENTER
PO No.: 2024-11-0015 Date: November 25, 2024 Invoice No.:___________ Date: November 17, 2024
Requisitioning Office/Department SB OF BARANGAY BAYANAN
Item No. Unit Description Quantity
PCS FLASH LIGHT 28
PCS RAIN COAT 28
PCS RAIN BOOTS 28
ACCEPTANCE INSPECTION
Date Received: _________________ Date Inspected: __________________
Complete Inspected, verified and found OK
as to quantity and specifications
Partial
Prescila C. Alba JOSEPH EDISON DALISAY
Property Officer Inspection Officer/Committee