0% found this document useful (0 votes)
43 views3 pages

Acceptance & Inspection Report for Barangay Bayanan

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
43 views3 pages

Acceptance & Inspection Report for Barangay Bayanan

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd

Annex 31

ACCEPTANCE & INSPECTION REPORT


SANGGUNAING BARANGAY OF BAYANAN SAN PASCUAL BATANGAS
LGU

Supplier EB OFFICE SUPPLIES AND EQUIPMENT TRADING CENTER


PO No.: 2024-09-0012 Date: September 18, 2024 Invoice No.: _______ Date: September 23, 2024

Requisitioning Office/Department SB OF BARANGAY BAYANAN

Item No. Unit Description Quantity


unit CORE i5-12400F 2.5Ghz 1

6Cores/12threads 18m Cache LGA 1700 Processor


Gigabyte GA-H610M-K-DDR4 LGA 1700 HDMI
MATX Mother Board

2pcs 8gb Adata DDR4-3200Mhz UDIMM Memory

1TB Kingston
Cougar ARCHONNV22Mesh
PCIE 4.0NVME
RGB MidM.2 SSDCase W/
Tower
TG ATX Black
Deepcool DE-600 V2 Power Supply

24.5” Acer KA252Q GOBI FHD IPS 120Hz Monitor

MSI GEFORCE 710 2GD3H LP Video Card


Keyboard, Mouse, Speaker, AVR

unit 1
Epson L3210 MFP Integrated InkTank Printer

ACCEPTANCE INSPECTION

Date Received: _________________ Date Inspected: __________________

Complete Inspected, verified and found OK


as to quantity and specifications
Partial

Prescila C. Alba JOSEPH EDISON DALISAY


Property Officer Inspection Officer/Committee
Annex 31

ACCEPTANCE & INSPECTION REPORT


SANGGUNAING BARANGAY OF BAYANAN SAN PASCUAL BATANGAS
LGU

Supplier J. GAINZAS FURNITURE CENTER


PO No.: 2024-09-0013 Date: November 4, 2024 Invoice No.:68415 Date: November 4, 2024

Requisitioning Office/Department SB OF BARANGAY BAYANAN

Item No. Unit Description Quantity

pc STEEL CABINET LATERAL 4 DRAWER 1


pc GANG CHAIR HEAVY DUTY 4 SEATER 1

ACCEPTANCE INSPECTION

Date Received: _________________ Date Inspected: __________________

Complete Inspected, verified and found OK


as to quantity and specifications
Partial

Prescila C. Alba JOSEPH EDISON DALISAY


Property Officer Inspection Officer/Committee
Annex 31

ACCEPTANCE & INSPECTION REPORT


SANGGUNAING BARANGAY OF BAYANAN SAN PASCUAL BATANGAS
LGU

Supplier EB OFFICE SUPPLIES AND EQUIPMENT TRADING CENTER


PO No.: 2024-11-0015 Date: November 25, 2024 Invoice No.:___________ Date: November 17, 2024

Requisitioning Office/Department SB OF BARANGAY BAYANAN

Item No. Unit Description Quantity

PCS FLASH LIGHT 28


PCS RAIN COAT 28
PCS RAIN BOOTS 28

ACCEPTANCE INSPECTION

Date Received: _________________ Date Inspected: __________________

Complete Inspected, verified and found OK


as to quantity and specifications
Partial

Prescila C. Alba JOSEPH EDISON DALISAY


Property Officer Inspection Officer/Committee

You might also like