You are on page 1of 3

ADHI - CNTIC - LAPI JO

DOCUMENT NO :

DATE

TEST REPORT

PERFORMANCE TEST REPORT


Purchaser Project Job No. Item No. Type Capacity Span Lifting Date Location : : : : : : : : : : CNTIC Mongango Mini Hydro Power Plan (2x600Kw)

I. Deflection of main girder (100% of SWL) Span =_________________


Test load Before load During load After load Deflection Allow Deflection Result

Allowed Deflection

(1/750 of span) /

(1:800 of span) /

(1/..of span)

II. Over load test (max 125% of SWL) Test load % of SWL Result Over load protector (cuts at 110% of SWL)

Result

Type of test

Static test /

Dynamic test

CRANE SPEED TEST REPORT


Purchaser : CNTIC Inspected / Witnessed by From : Date : Inspected / Witnessed by From : Date : Witnessed / Approved by From : Date : Prepared / Inspected by From : Date :

Name & Signature

Name & Signature

Name & Signature

Name & Signature

ADHI - CNTIC - LAPI JO


DOCUMENT NO :

DATE

TEST REPORT
Project : Mongango Mini Hydro Power Plan (2x600Kw) Job No. : Item No. : Type : Capacity : Span : Lifting : Date : Location : 1. Hoisting Motion Distance No. Item description Speed Spec. (m/min) Time (m) 1 UPPER Low speed Fast speed 2 LOWER Low speed Fast speed 1. Travelling Motion Distance No. Item description Speed Spec. (m/min) Time (m) 1 LEFT Low speed Fast speed 2 RIGHT Low speed Fast speed 1. Travelling Distance No. Item description Speed Spec. (m/min) Time (m) 1 FORWARD Low speed Fast speed 2 BACKWARD Prepared / Inspected by From : Date : Inspected / Witnessed by From : Date :

Speed ave. (m/min)

Result

Remarks

Speed ave. (m/min)

Result

Remarks

Speed ave. (m/min)

Result

Remarks

Inspected / Witnessed by From : Date :

Witnessed / Approved by From : Date :

Name & Signature

Name & Signature

Name & Signature

Name & Signature

ADHI - CNTIC - LAPI JO


DOCUMENT NO :

DATE

TEST REPORT
Low speed Fast speed Load during testing : Of SWL = KG

Allowed Tolerance : Voltage : +/- 10% (line /measured) Current : max +/- 10% (rated / measured)

Prepared / Inspected by From : Date :

Inspected / Witnessed by From : Date :

Inspected / Witnessed by From : Date :

Witnessed / Approved by From : Date :

Name & Signature

Name & Signature

Name & Signature

Name & Signature