Professional Documents
Culture Documents
Design Spread Footing
Design Spread Footing
1.Input Data width (B) length (L) depth (D) col. width (b) col. depth (h) covering allowable bearing stresses steel grade fc' fy bar size (DB) soil density depth of soil cave Es Ec concrete factor 2.Loadind Data Dead Load Soil Dead Load Column Load Mx My Total Axial Load 3.Parameters fc fs n k j R
-2
= = = = = = = = = = = = = = = = = = = = = = = = = = = =
Footing Number :
3 3 0.6 0.6 0.6 7 8,000 SD-30 173 3,000 16 1,700 1.00 2,040,000 198,873 0.45 12,960 15,300 25,000 12,000 4,000 53,260 78 1,500 10 0.342 0.886 11.82 m m m m m cm kg/m2 ksc ksc mm kg/m3 m ksc ksc kg kg kg kg-m kg-m kg ksc ksc ksc
4.Checking Bearing Stresses ex (L dir.) ey (B dir.) cx cy Ix Iy B,b 4 3 L,h Quadrant 1 2 3 4 P/A 5,918 5,918 5,918 5,918 Case
5.Checking Stresses at each Locatio Major or "X" Direction use effective depth Location 1) x = 0 (min.stresses) 2) x = L/2 3) x = face of col. 4) x = d/2 from face of col. 5) x = d from face of col.
Project :
-2
Footing Number :
50 50
cm cm
L / 2
6) x = L (max. stresses) V V1 Punching shear stresses All. shear stresses (0.53sqrt(fc') Beam Shear V Beam shear stresses All. shear stresses (0.29sqrt(fc')
L / 2
B / 2 B / 2
b+2 /d 2/
h+ /d 2
2 3
4 5 6
L / 2
L / 2 C / 2
1 Msee = i. t s s n rs 2 acnr =t et e 3 afcocl =t aef o . 4 ad =t / 2 5 ad =t 6 Mse e = a. t s s xrs CiaStoaec PnfrCcl toS aad oet rtcl eint ah ot o au inh r nM n i c i l a e m
Minor or "Y" Direction use effective depth Location 1) x = 0 (min.stresses) 2) x = B/2 3) x = face of col. 4) x = d/2 from face of col. 5) x = d from face of col. 6) x = L (max. stresses)
7.Reinforcement forBending in X d h/2 (L/2) - (h/2) M1 (rectangular) M2 (triangular) M at face of col. As As-min As-temp for SD-30 V for bonding u Req. perimeter Use number of bars As Perimeter
8.Checking Shear Stresses in Y dir Punching Shear d/2 2(b+d) + 2(h+d) half of critical section B/2
Project :
d/2 = bo = 2(b+d) + 2(h+d) = half of critical section = L/2 = Beam Shear V = Beam shear stresses = All. shear stresses (0.29sqrt(fc') = 9.Reinforcement forBending in Y direction b/2 = (B/2) - (b/2) = M1 (rectangular) = M2 (triangular) = M at face of col. = As = As-min = As-temp for SD-30 = V for bonding = u = Req. perimeter = Use number of bars = As = Perimeter =
-2
Footing Number :
26.5 452 226.0 1.50
13,475 0.86 3.81 0.3 1.2 13,166 1,024 14,190 20.53 27.52 36.00 23,224 26.55 18.98 16 32.15 80.38
>
O.K.
< >
36.00 18.98
10.Bond Length of Dowels This is the bond length of dowels for only major direction due to moment Number of col. Bars on tension sides 24 sizes of col. bars = 20 mm As of col. bars = 3.14 cm2 As - total = 75.36 cm2 Mx = 1,200,000 kg-cm fs = M/(As*j*d) = 339 ksc
Project :
u ld effective depth Hooks of dowels Extension Length 1.Input Data width (B) length (L) depth (D) col. width (b) col. depth (h) covering allowable bearing stresses steel grade fc' fy bar size (DB) soil density depth of soil cave Es Ec concrete factor 2.Loadind Data Dead Load Soil Dead Load Column Load Mx My Total Axial Load 3.Parameters fc
-2
= = = = = = = = = = = = = = = = = = = = = = = = = = = =
Footing Number :
21.24 8 53 90 24 >
ksc cm 8 degrees cm m m m m m cm kg/m2 ksc ksc mm kg/m3 m ksc ksc kg kg kg kg-m kg-m kg ksc
3 3 0.6 0.6 0.6 7 8,000 SD-30 173 3,000 16 1,700 1 2,040,000 198,873 0.45 12,960 15,300 25,000 12,000 4,000 53,260 78
5.Checking Stresses at each Locatio Major or "X" Direction use effective depth Location 1) x = 0 (min.stresses) 2) x = L/2 3) x = face of col. 4) x = d/2 from face of col. 5) x = d from face of col. 6) x = L (max. stresses) Minor or "Y" Direction use effective depth
Project :
fs = n = k = j = R = kern boundary = B/6 = kern boundary = L/6 = 6.Checking Shear Stresses in X direction Punching Shear d/2 = bo = 2(b+d) + 2(h+d) = half of critical section = L/2 = V = V1 = Punching shear stresses = All. shear stresses (0.53sqrt(fc') = Beam Shear V = Beam shear stresses = All. shear stresses (0.29sqrt(fc') = 7.Reinforcement forBending in X direction h/2 = (L/2) - (h/2) = M1 (rectangular) = M2 (triangular) = M at face of col. = As = As-min = As-temp for SD-30 = V for bonding = u =
-2
Footing Number :
1,500 10 0.34 0.89 11.82 50 50
ksc ksc cm cm cm cm cm m kg kg ksc 2.38 kg ksc 1.01 m m kg-m kg-m kg-m cm2 cm2 cm2 kg ksc
26.5 452 226 1.5 32,630 4,099 2.38 6.97 16,058 1.01 3.81 0.3 1.2 13,934 3,072 17,006 24.14 32.35 36 27,064 26.55
> >
O.K. O.K.
Location 1) x = 0 (min.stresses) 2) x = B/2 3) x = face of col. 4) x = d/2 from face of col. 5) x = d from face of col. 6) x = L (max. stresses) half of critical section B/2 V V1 Punching shear stresses All. shear stresses (0.53sqrt(fc') Beam Shear V Beam shear stresses All. shear stresses (0.29sqrt(fc')
9.Reinforcement forBending in Y d b/2 (B/2) - (b/2) M1 (rectangular) M2 (triangular) M at face of col. As As-min As-temp for SD-30 V for bonding u Req. perimeter Use number of bars As Perimeter
Project :
-2
Footing Number :
21.71 16 32.15 80.38 26 452 < >
cm 36.00 21.71 cm cm
10.Bond Length of Dowels Try Again Number of col. Bars on tension side O.K. As of col. bars Mx fs = M/(As*j*d) u ld effective depth
Project :
-2
Footing Number :
g
= = = = = = = = My 52.2 50.6 22.5 7.5 1.50 1.50 6.75 6.75 T,T T,C
Date :
cm cm 50 50 m m m4 m4 My O.K. O.K.
Bearing Stresses
< <
2 1
Mx
C,T C,C
Mx
Net Stresses on each Quadrant (kg/m2) Mc/I-Y Net stress Status Only Mx Only My 889 9,473 Try Again 8,584 6,807 889 7,696 O.K. 8,584 5,029 889 4,140 O.K. 3,251 6,807 889 2,362 O.K. 3,251 5,029 53.00 Length 0.000 1.500 0.300 0.565 0.830 cm Stress at each Location 3,251 5,918 6,451 6,922 7,393
Stresses at each Location " Direction se effective depth = Location Distance n.stresses) 0.000 1.500 of col. 1.800 om face of col. 2.065 m face of col. 2.330
g
3.000 0.670 32,630 4,099 2.38 6.97 16,058 1.01 3.81 0.3 1.20 13,934 3,072 17,006 24.14 32.35 36.00 27,064 26.55 21.71 16 32.15 80.38 26 452 226.0 1.5
ax. stresses)
Date :
8,584 kg kg ksc 2.38 kg ksc 1.01 m m kg-m kg-m kg-m cm2 cm2 cm2 kg ksc cm
> >
O.K. O.K.
ent forBending in X direction = L/2) - (h/2) = M1 (rectangular) = M2 (triangular) = M at face of col. = = = s-temp for SD-30 = for bonding = = eq. perimeter = umber of bars = = = = = = =
< >
36.00 21.71 cm cm cm m
g
28,630 3,816 2.11 6.97
Date :
>
kg kg ksc 2.11
O.K.
Date :
Bearing Stresses
< <
50 50 m m m4 m4
O.K. O.K.
Net Stresses on each Quadrant (kg/m2) Net stress Status Only Mx Only My 9,473 Try Again 8,584 6,807 7,696 O.K. 8,584 5,029 4,140 O.K. 3,251 6,807 2,362 O.K. 3,251 5,029 53 Length 0.00 1.50 0.30 0.57 0.83 0.67 52 cm Stress at each Location 3,251 5,918 6,451 6,922 7,393 8,584 cm
Stresses at each Location " Direction se effective depth = Location Distance n.stresses) 0.00 1.50 1.80 om face of col. 2.07 m face of col. 2.33 ax. stresses) 3.00 =
g
Length 0.00 1.50 0.30 0.56 0.82 0.68 226 1.5 28,630 3,816 2.11 6.97 13,475 0.86 3.81 0.3 1.2 13,166 1,024 14,190 20.53 27.52 36 23,224 26.55 18.98 16 32.15 80.38
Distance 0.00 1.50 1.80 om face of col. 2.06 m face of col. 2.32 ax. stresses) 3.00 critical section = = = = g shear stresses = resses (0.53sqrt(fc') =
Location n.stresses)
Date :
Stress at each Location 5,029 5,918 6,096 6,250 6,404 6,807 cm m kg kg ksc > 2.11 O.K. > kg ksc 0.86 m m kg-m kg-m kg-m cm2 cm2 cm2 kg ksc cm < > 36.00 18.98 Try Again O.K. O.K.
ent forBending in Y direction = B/2) - (b/2) = M1 (rectangular) = M2 (triangular) = M at face of col. = = = s-temp for SD-30 = for bonding = = eq. perimeter = se number of bars = = =
Date :
24 3.14 1,200,000 339 21 8 53 cm2 kg-cm ksc ksc cm 8
gth of Dowels ol. Bars on tension sides s of col. bars = = = M/(As*j*d) = = = fective depth =
>
O.K.
Date :