Reinforcement Plan for 1130 M³ Reservoir

The document contains detailed engineering drawings and specifications related to a construction project, including reinforcement details for columns, beams, and staircases. It outlines various dimensions, material specifications, and reinforcement patterns necessary for structural integrity. The drawings are accompanied by scales and notes for clarity in execution.

Uploaded by

manan.roy.007
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
122 views1 page

Reinforcement Plan for 1130 M³ Reservoir

The document contains detailed engineering drawings and specifications related to a construction project, including reinforcement details for columns, beams, and staircases. It outlines various dimensions, material specifications, and reinforcement patterns necessary for structural integrity. The drawings are accompanied by scales and notes for clarity in execution.

Uploaded by

manan.roy.007
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

2 nos.

12 tor 1
500
1200 2150 150 50
Lev. 21.000 2 nos. 10 tor
200 800 200
(EF) (circular)
200
Stps. @ 100 c/c
Confining Zone

2L 8 tor Stps.
200
1200

@ 125 c/c
2 nos. 10 tor

800
C.C. - 20 mm (4 x 2) nos.
200 200 (W) X 200 (D) 200 (W) X 200 (D)
(alround) 10 tor (EF) (2+2) nos. 8 tor
Landing beam [L2] Landing beam [L3]
(typ. at each face)
Stps. @ 200 c/c

Detail at - 'Z'
1000
General Zone

600

C.C. - 20 mm
Scale - 1:10 (alround)
1200

2 2
8 tor @ 200 c/c

300
450 (H) x 150 (V) Reinf. will be same as shown 25 tor spacer bar
200
450

Haunch (Typ.) in Bracing at Lev. 5.900


6 nos. 25 tor (Cont.)
Lev. 18.000 Details of extra Reinf. 800 100
Stps. @ 100 c/c
Confining Zone

8 tor @ 200 c/c around circular opening 50


1 Scale :- 1 : 30
1950

1050

Extra reinf. details around


4 nos. 20 tor (Cont.)
Reinf. Plan of Landing Slab at Lev. 20.750 800 X 800 Opening
Scale - 1:20
Scale - 1:20
450

450 (W) x 750 (D) 2L-10 tor stps.


Bracing (Typ.) @ 70 c/c (in pairs)
Stps. @ 200 c/c
General Zone

750

1000
1075

1200
5 5 1+1 nos. 12 tor (Cont.) 2 nos. 10 tor C.C. - 20 mm
2 nos. 10 tor C.C. - 20 mm 8 tor @ 200 c/c C.C. - 20 mm

100
8 tor @ 200 c/c (alround)
(bothways & bothfaces) Lev. 20.750 (alround) Lev. 20.750 (bothways & bothfaces) (Typ.)
Reinf. will be same as shown C.C. = 25 mm
(alround)
450

in Bracing at Lev. 5.900


Lev.
6 6 14.975
200

4 nos. 20 tor (Cont.) 200


Stps. @ 100 c/c
Confining Zone

6 nos. 8 tor (top)


50 50

100
50 2L-8 tor Stps. @ 125 c/c. 50
1950

1050

'Z'
100

2L-8 tor Stps. @ 125 c/c.


2 nos. 10 tor 2 nos. 10 tor
6 nos. 25 tor (Cont.) 100 100 800 100 100 1 no. 8 tor
100 100 600 100 100
25 tor spacer bar 8 tor @ 300 mm c/c (typ. at each step)
450
450

Distribution reinf.
Section at 3-3 Section at 2-2 (Typ.)
Scale - 1:10
Section at 1-1 6 nos. 8 tor
Stps. @ 200 c/c

Scale - 1:10 (typ. at each step)


General Zone

Scale - 1:10
1075

15 nos. 20 tor
6 nos. 8 tor
450 962 450 25 tor spacer bar (bottom) 250
6 nos. 25 tor (Cont.) (typ.)
Reinf. will be same as shown
150

(typ.)
450

150
in Bracing at Lev. 5.900 1200 2150
Lev.

0
10
11.950 2 nos. 10 tor C.C. - 20 mm
Stps. @ 100 c/c
Confining Zone

7 7 (alround)
375

4 nos. 20 tor (Cont.) Lev. 20.750


1950

Typ. R.C.C. details of Stair


375

1+1 nos. 12 tor (Ext.) Scale - 1:20

100
X 200 wide
Varies from 750 to 1050

50 50
450

2 nos. 10 tor
150

200

2L-10 tor stps. 3250


@ 70 c/c (in pairs) 2L-8 tor Stps. @ 125 c/c
Stps. @ 200 c/c
General Zone

1700
3350 350 350 200
4 nos. 12 tor
1075

C.C. = 40 mm
1+1 nos. 12 tor (Cont.) (corner)
(alround)
C.C. = 25 mm Longitudinal section showing Reinf. details of Landing beam mkd.- L3 C.C.-25 mm
(alround) 6 nos. 8 tor (alround)
(2 nos. off)

200
Reinf. will be same as shown
450

1127.6
in Bracing at Lev. 5.900 Scale - 1:20
1+1 nos. 12 tor (Ext.) 2L-8 tor stirrups
Lev. 8.925 @ 190 c/c
Stps. @ 100 c/c

450
Confining Zone

4 nos. 20 tor (Cont.)


1000
1950

1050

Section at 7-7
C.C. - 20 mm Scale - 1:10
2 nos. 10 tor
(alround) Lev. 20.750
6 nos. 25 tor (Cont.) 8 tor @ 300 c/c Column
450

X 200 wide
450 25 tor spacer bar
12 nos. 700 Dia. Columns 7.6

200

200

216.
Section at 4-4
Stps. @ 200 c/c

750
General Zone

6
Scale - 1:10
Bracing
1075

4 3 2 nos. 12 tor (Ext.)


each face
2 nos. 10 tor
2L-10 tor stps. 6 nos. 25 tor (Cont.) C.C. = 60 mm
15 nos. 20 tor 200 50 500 50 200 (alround)
@ 70 c/c (in pairs) 4 nos. 20 tor (Cont.)
450

2L-8 tor Stps. @ 125 c/c 2 nos. 20 tor


(vert.)
650 650
Lev. 5.900 2 nos. 16 tor
Longitudinal section showing Reinf. details of
Stps. @ 100 c/c
Confining Zone

Plan of Column Landing slab


Landing beam mkd.- L2 (2 nos. off)
24
at Lev. 18.000
1950

0 8 tor Rings Scale - 1:10


Scale - 1:20
@ 200 c/c
2L-10 tor Stps.
@ 150 c/c
4 nos. 20 tor (Cont.)
450

25 tor spacer bar C.C. = 25 mm 80


[4+4 nos. for a
700 Dia.

(alround)
single bracing] 4 nos. 20 tor
Stps. @ 200 c/c

6 nos. 25 tor (Cont.)


General Zone

G.L. (±) 0.000 300 (Circular)


1 no. 12 tor (Cont.) G.L. (±) 0.000
1075

Varies
4 3 each face 4+4 nos. 10 tor
(Side Face)
7 nos. 8 tor 7 nos. 8 tor
Reinf. will be same as shown 8 (Circular) (Circular)
450

600
in Bracing at Lev. 5.900
Lev. 2.875 C.C. = 40 mm 1450 100 350 350 100 1450
Stps. @ 100 c/c
Confining Zone

(alround) 4+4 nos. 10 tor C.C. = 30 mm


Lev. (-) 0.600

1200
(Side Face) (Top & Sides)
1950

1050

6 nos. 25 tor
2 nos. 20 tor Pile Cut-off Lev.
Section at 5-5 + 2 nos. 16 tor C.C. = 60 mm
2L-8 tor Stps. (-) 2.100
(General Zone) @ 150 c/c
(alround)
450

Scale - 1:10

600
C.C. = 60 mm 900

75
(alround) 4 nos. 20 tor
Stps. @ 200 c/c
General Zone

2175
15 nos. 20 tor Lev. (-) 1.200
(vert.) Lev. (-) 1.200
1075

2L-8 tor Stps.


@ 150 c/c
C.L. of Column
4 nos. 12 tor
8 tor Rings
(Circular) Section at 8-8
G.L. (±) 0.000 @ 100 c/c Scale - 1:20

900
4 nos. 10 tor

900
(Circular)
600

80

700 Dia.
600

Pile Cut-off Lev.


Pile Cut-off Lev. (-) 2.100
(-) 2.100
900
900

URBAN DEVELOPMENT DEPARTMENT

75
300 6 nos. 25 tor 4 nos. 20 tor
Client

75
Typ. 2L-10 tor Stps. + 4 nos. 20 tor 2L-10 tor Stps. (Circular) GOVERNMENT OF TRIPURA
75

Lev. (-) 2.100


@ 150 c/c @ 150 c/c
C.C. = 40 mm
(alround) C.L. of Column
C.L. of Toe Wall & Pile Cap Constructor
MECGALE
Elevation showing Reinf. details of Columns & Bracing Section at 6-6 Reinf. details of Circular Pile Cap & Toe Wall
(make to straight) (Confining Zone) Scale - 1:20 MAP PROJECT
Scale - 1:50 8
Scale - 1:10
Reinf. details of Radial Pile Cap SERVICES
Consultant
Scale - 1:20 PRIVATE Consulting Engineers, Architects, Planners
LIMITED 3/1, Janata Road, New Santoshpur, Kolkata - 700 075
NOTES:- LEGEND RELEASED FOR Date REVISIONS Drawn K. Das
Scheme Date Chkd. Purpose DESIGN SUPPLY AND CONSTRUCTION OF 5 NOS. OHSR WITH
1. All dimensions are in mm. and all levels are in m. G.L. =Ground Level rdly =Radially
Tender
Project Designed P. Laha
T.W.L. =Top Water Level eqly. =Equally PILE FOUNDATION AND OTHER ALLIED WORKS. - LOT - 2
2. This Drawing has been prepared based on the guidelines of the N.I.T. Construction
3. For all other notes refer our Drawing No. MAP / MCGL / ESR (RAM) / GAD - 01. Lev. =Level plcd. =Equally Fabrication Checked R. Chakraborty
4. For any discrepancy concerned, competent and relevant authority shall be consulted with. Typ. =Typical Circum. =Circumferentially Checking
Approval Approved M. K. Das
C.L. =Centre line stps. =Stirrups
Reinforcement Details of 1130 M 3 Capacity Overhead Reservoir
thk. =thick vert. =Vetical REFERENCE DRAWINGS Title Job No. J-017/007
at Rampur. (Sheet 2 of 3)
nos. =numbers ext. =Extra Drawing Nos. Date
M.S. =Mild steel cont. =Continuous Scale As noted
dia. =diametre cntly. =Centrally This drawing is a private and confidential communication Drawing No. Rev. 1
R.C.C. =Reinforcement cement concrete bott. =Bottom and the property of Map Project Services Private Limited .
It is subject to their recall and must not be copied, lent Date
C.I.D.F. =Cast iron dubble flange
or reproduced without the written consent of Map Project MAP / MCGL / ESR (RAM) / RD - 04
Conc. =Concrete Services Private Limited. 21.11.17

You might also like