4.

40
12.60
1.70 1.10 1.60 1.00
CONSTRUCTION NOTES: 1.20 10.10 1.20
LADDER
SEE DETAIL E
*VERIFY SPECIFICATION

a
A. GENERAL

1.20
1. CONSTRUCTION NOTES AND TYPICAL DETAILS APPLY TO ALL DRAWINGS UNLESS
OTHERWISE SHOWN OR NOTED, MODIFY TYPICAL DETAILS AS DIRECTED TO MEET SPECIAL

3.00
CONDITIONS.
2. SHOP DRAWINGS WITH ERECTION & PLACING DIAGRAMS OF ALL STRUCTURAL STEEL,

5.40

5.40
MISCELLANEOUS IRON, PRE-CAST CONCRETE ETC. SHALL BE SUBMITTED FOR ENGINEER'S

4.20
APPROVAL BEFORE FABRICATION.

4.40
3. CONTRACTOR SHALL VERIFY ALL DIMENSIONS BEFORE ALL WORK IS TO BEGIN, CHECK

5.40

2.40
WITH MECHANICAL OR ELECTRICAL CONTRACTORS FOR CONDUITS, PIPE SLEEVES, ETC, TO
BE EMBEDDED IN CONCRETE.
SHORING & BRACINGS OF THE STRUCTURE FOR ALL LOADS THAT MAYBE IMPOSED DURING
CONSTRACTION.

1.00
B. CONCRTE AND REINFORCEMENT
a
1. ALL MATERIALS & WORKMANSHIP SHALL CONFIRM WITH THE LATEST BUILDING CODE OF
CHLORINE REACTION TANK (CONCRETE)
AMERICAN CONCRETE INSTITUTE (ACI - 318)
CHLORINE REACTION TANK (CONCRETE)
SECTION AT A
S C A L E 1 : 1 0 0 M T S
2. ALL CONCRETE SHALL DEVELOP A MINIMUM COMPRESSIVE STRENGTH AT THE END OF
TWENTY EIGHT (28) DAYS WITH CORRESPONDING MAXIMUM SIZE AGGREGATE AND SLUMP
L A Y O U T
S C A L E 1 : 1 0 0 M T S

AS FOLLOWS:

LOCATION 28 DAYS STRENGTH MAX. SIZE AGGREGATE MAX SLUMP


CURBS & SLAB 2500 PSI 1 IN. (25MM) 4 IN. (100MM)
ON GRADE
EXCEPT FOUND. 12.60

FOUNDATION AND 3
3000 PSI IN. (19MM) 4 IN. (100MM)
RETAINING WALL 4
C1F1 C1F1 C1F1 C1F1 C1F1
ALL OTHERS
INCLUDING BEAMS, 3000 PSI 3
IN. (19MM) 4 IN. (100MM)
4
SUSPENDED SLABS &
COLUMNS
SLAB ON GRADE
3. ALL REINFORCING BARS SHALL CONFORM TO ASTM A615 GRADE 40 FOR DIA.20MM & 16mmØ- G40 TOP BAR SPACED AT

4.40
SMALLER BARS & GRADE 60 FOR DAI. 25MM & LARGER BARS. COLUMN HOOPS ARE ALL 200mm ON CENTER BOTHWAYS
GRADE 40 BARS. 20mmØ - G40 BOTTOM BAR SPACED AT
200mm ON CENTER BOTHWAYS 1.25
4. IN GENERAL, THE LATEST EDITION OF ACI - 315, MANUAL OF STANDARD PRACTICE C1F1 C1F1 C1F1 C1F1 C1F1
DETAILING REINFORCED CONCRETE STRUCTURES SHALL BE ADHERED TO UNLESS 0.25 1.00
OTHERWISE SHOWN OR NOTED.
12mm Ø REBAR SPACED
5. MAINTAIN MINIMUM CONCRTE COVER FOR REINFORCING STEEL AS FOLLOWS: AT 200mm ON CENTER

SUSPENDED SLABS......................................................3/4 IN. (19MM.)


10mm Ø REBAR SPACED
SLAB ON GRADE.........................................................1 1/2 IN. (38MM.) AT 200mm ON CENTER

WALLS ABOVE GRADE.....................................................1 IN. (25MM.) CHLORINE REACTION TANK (CONCRETE)

BEAM STIRRUPS AND COLUMN TIES.......................1 1/2 IN. (38MM.)


FOUNDATION PLAN
S C A L E 1 : 1 0 0 M T S
WHERE CONCRETE IS EXPOSED
12mm Ø REBAR SPACED
TO EARTH BUT POURED AGAINST FORMS...................2 IN. (50MM.) AT 200mm ON CENTER

0.45
WHERE CONCRETE IS DEPOSITED
DIRECTLY AGAINST EARTH.............................................2 IN. (50MM.)

6. SPLICES SHALL BE SECURELY WIRED TOGETHER & SHALL LAP OR EXTEND IN


ACCORDANCE WITH TABLE 1 (TABLE OF LAP SLICE & ANCHORAGE LENGTH) UNLESS 12.70 10mm Ø REBAR SPACED

1.00
AT 200mm ON CENTER
OTHERWISE SHOWN ON DRAWINGS, SPLICES SHALL BE STAGGERED WHENEVER POSSIBLE. HORIZONTAL BAR
3.00 3.00 3.00 3.30 16mmØ - G40 REBAR SPACED
AT 200mm ON CENTER

D. FOUNDATION
VERTICAL BAR
20mmØ - G40 REBAR SPACED
1. FOUNDATION IS DESIGNED FOR ASSUMED ALLOWABLE SOIL BEARING CAPACITY OF : AT 200mm ON CENTER
BU - 5,000 PSI; BA - 2,000 PSI B2 B2 B2 B2
2. FOUNDATION SHALL REST ON NATURAL SOIL. UNLESS OTHERWISE NOTED BY THE
ENGINEER, NO PART OF THE FOUNDATION SHALL REST ON FILL.
3.THE CONTRACTOR SHALL NOTIFY THE ENGINEER AFTER FOOTING EXCAVATION HAVE
4.40

B2 S1 B2 S1 B2 S1 B2 S1
BEEN COMPLETED & PRIOR TO CONCRETING TO CONFIRM THE DESIGN SOIL BEARING 0.20
CAPACITY. B2 DETAIL- E
S C A L E 1 : 1 5 M T S

B2 B2 B2 B2

CHLORINE REACTION TANK (CONCRETE)


BEAM FRMG. PLAN
CHLORINE REACTION TANK (CONCRETE) S C A L E 1 : 1 0 0 M T S

CONTRACTOR: DESIGNER: CHECKED AND APPROVED BY: PROJECT TITLE : PHASE: SHEET CONTENTS: SHEET NO.:

CONSTRUCTION OF THE MWCD WATER SOURCE -


METRO CARIGARA WATER DISTRICT SITE DEVELOPMENT PLAN
ARCHITECT DEVELOPMENT AND WATER QUALITY
P.T.R. NO. - P.R.C. NO. -

ENGR. GEORGE A. AGBAYANI ISSUED ON - ISSUED AT -


Checked by: Approved by:

ATTY. REGIDOR V. CABALLES


IMPROVEMENT PROJECT MARK REV. NO. DESCRIPTION: DRAFTED BY: JAJ ARCHITECTURAL
PRESIDENT DATE
T.I.N. - IAPOA NO. -
DATE GENERAL MANAGER DATE
PROJECT LOCATION : BARANGAY MACALPI, CARIGARA, LEYTE DATE: 31JULY2020 DWG NO: 20MPB01
L

L/4 L/2 L/4 LENGTH OF SLAB

EXTRA TOP BAR @ SUPPORTS


TOP BARS
16mmØ - G40 REBAR SPACED AT
200mm ON CENTER BOTHWAYS
NOTE:
SLAB :
PROVIDE SPACER EVERY 1.00 MTRS; BOTHWAYS

0.25
WALLS:
PROVIDE HOOK EVERY 1.00 METERS; BOTHWAYS

EXTRA BOTTOM BAR @ MIDSPAN


GRAVEL BED

L/5 3L/5 L/5 BOTTOM BARS


20mmØ - G40 REBAR SPACED AT
200mm ON CENTER BOTHWAYS 1.30

TYPICAL BEAM DETAIL MEMBRANE TANK (CONCRETE)


SLAB DETAIL
S C A L E 1 : 1 5 M T S

BEAM DESIGN
SUPPORT MIDSPAN
BEAM NO. NUMBER OF TIES

0.25
REINFORCEMENTS REINFORCEMENTS

B2 3 - 20MMØ 2 - 20MMØ

1.30
USE 10MM Ø STIRRUPS SPACED 1 @ 0.025M., 5 @ 0.05M.,
2 - 20MMØ 3 - 20MMØ 5 @ 0.10M., REST AT 0.15M., ON CENTER
0.25 X 0.45
1 = SPAN
S
2 1
2 2
1

C:\Users\rachelS'leyson\Desktop\Baring.jpg
= SPAN'
E = WIDTH OF ROOF EAVES

2 P= HT. FROM TOP OF BEAM - ROOF RIDGE


P2

D= HT. FROM FFL


L= NGL- -TOP
FFL OF BEAM

LENGTH LENGTH 0.25 0.40


L/4 L/4 L/4 L/4

0.25 16mm Ø - G40 REBARS SPACED AT 16mm Ø - G40 REBARS SPACED AT


0.15m ON CENTER, BOTHWAYS 0.15m ON CENTER, BOTHWAYS

LATERAL TIES
5- 10mm Ø AT 0.05M ON CENTER
5- 10mm Ø AT 0.10M ON CENTER
REST AT 0.15M ON CENTER

0.20 0.20 0.20

HEIGHT IN METERS
0.20
COLUMN REBARS
8 - 20mm Ø REBARS
TOP SLAB DETAIL
S C A L E 1 : 2 0 M T S

HORIZONTAL BAR
16mmØ - G40 REBAR SPACED
AT 200mm ON CENTER

VERTICAL BAR
20mmØ - G40 REBAR SPACED NGL

COLUMN DESIGN AT 200mm ON CENTER

COLUMN NO. NUMBER OF TIES


MAIN BARS
5mm THICK GRAVEL BED

0.90
C1 USE 10MM Ø TIES (2 SETS) SPACED 5 @ 0.05M.,
8 - 20MMØ

1.20
5 @ 0.10M., REST AT 0.15M., ON CENTER
0.25 X 0.40

0.25
COLUMN FOOTING DESIGN

0.30
MIDSPAN
BEAM NO. REINFORCEMENTS NUMBER OF TIES

SHORT DIRECTION : USE 6 - 20MMØ BARS


F1C1 1.30M X 1.30M X 0.30M
LONG DIRECTION : USE 6 - 20MMØ BARS
G R A V E L B E D D I N G

WALL DETAIL
CHLORINE REACTION TANK (CONCRETE)
S C A L E 1 : 2 0 M T S
MEMBRANE TANK (CONCRETE)
COLUMN-FOOTING DETAIL
S C A L E 1 : 2 0 M T S

CONTRACTOR: DESIGNER: CHECKED AND APPROVED BY: PROJECT TITLE : PHASE: SHEET CONTENTS: SHEET NO.:

CONSTRUCTION OF THE MWCD WATER SOURCE -


METRO CARIGARA WATER DISTRICT SITE DEVELOPMENT PLAN
ARCHITECT DEVELOPMENT AND WATER QUALITY
P.T.R. NO. - P.R.C. NO. -

ENGR. GEORGE A. AGBAYANI ISSUED ON - ISSUED AT -


Checked by: Approved by:

ATTY. REGIDOR V. CABALLES


IMPROVEMENT PROJECT MARK REV. NO. DESCRIPTION: DRAFTED BY: JAJ ARCHITECTURAL
PRESIDENT DATE
T.I.N. - IAPOA NO. -
DATE GENERAL MANAGER DATE
PROJECT LOCATION : BARANGAY MACALPI, CARIGARA, LEYTE DATE: 31JULY2020 DWG NO: 20MPB01