Professional Documents
Culture Documents
1.50
B-1 200 450 4-16MMØ RB 3-16MM∅ RB 3-16MM∅ RB 4-16MMØ RB
STEEL, MISCELLANEOUS IRON, PRE-CAST CONCRETE ETC. SHALL BE SUBMITTED REINF. FTG. SLAB
FTB-1 250 400 4-16MMØ RB 2-16MM∅ RB 2-16MM∅ RB 4-16MMØ RB
(SEE SCH. OF
FOR ENGINEER'S APPROVAL BEFORE FABRICATION. COL. & FTG.)
0.40
1.20
PIPES SLEEVES, ETC. TO BE EMBEDDED IN CONCRETE. COL. # WIDTH DEPTH VERT. BARS TIE BARS REMARKS C-1 6-20MMØ REINF. COL. & FTG)
BARS B.W.
6-20MMØ REINF.
0.30
4. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO PROVIDE ADEQUATE (REFER TO SCH.
10MMØ RB 3@100,4@150 & OF COL. & FTG.) BARS B.W.
SHORING AND BRACING OF THE STRUCTURE FOR ALL LOADS THAT MAYBE C-1 250 400 8-20MMØ RB (REFER TO SCH.
REST @200MM.O.C.
IMPOSED DURING CONSTRUCTION. OF COL. & FTG.)
5. PROVIDE 3 INCHES THICK, GRAVEL BEDDING TO ALL FOOTING AND FOOTING TIE SCHEDULE OF FOOTING
BEAMS.
FTG T W L REINF. BARS REMARKS 1.20
6. MAINTAIN MINIMUM CONCRETE COVER FOR ALL REINFORCING STEEL AS
FOLLOWS: F-1 300 MM THK 1200 1200 9-16MMØ RB
PLAN F-1
SECTION
SUSPENDED SLABS
SLAB ON GRADE
SCHEDULE OF SLAB 0.25
WALLS ABOVE GRADE
BEAM STIRRUPS AND COLUMN TIES
SLAB # T TEMPERATURE BARS MAIN BARS REMARKS 1 COLUMN FOOYING DET.
WHERE CONCRETE IS EXPOSED TO EARTH BUT POURED AGAINST FORM S-1 100 MM THK 10MMØ RB @300MM.O.C. 10MMØ RB @200MM.O.C. 6 SCALE 1:20M. 8-20MMØ VERT.
BARS & 10MMØ
WHERE CONCRETE IS DEPOSITED DIRECTLY AGAINST EARTH
0.40
TIES @0.20M.O.C.
(SEE SCH. OF
7. SPLICES SHALL BE SECURELY WIRED TOGETHER AND SHALL LAP OR EXTEND IN COL. & FTG.)
ACCORDANCE WITH THE ACI CODE PROVISION FOR LAP SPLICES AND
ANCHORAGE LENGTH UNLESS OTHERWISE SHOWN ON DRAWINGS, SPLICING
SHALL BE STAGGERED WHENEVER POSSIBLE.
C-1
8. ALL ANCHOR BOLTS, DOWELS AND OTHER INSERTS SHALL BE PROPERLY
POSITIONED AND SECURED IN PLACE PRIOR TO PLACING OF CONCRETE.
2 COLUMN DETAILS
0.20 0.20 0.20 0.20 0.25 0.20 6 SCALE 1:20M.
0.30
0.30
10MMØ
L1/4 TOP BARS 0.30L1/L2 0.30L1/L2
0.40
0.40
TOP BARS
0.45
0.45
@0.20M.O.C. GREATER
10. STRIPPING OF FORMS AND SHORES: 2-16MMØ 4-16MMØ @0.20M.O.C. GREATER
4-16MMØ
3-16MMØ 4-16MMØ
FOUNDATION @SUPPORT @MIDSPAN
0.15
SUSPENDED SLAB EXCEPT WHEN ADDITIONAL LOAD ARE ;IMPOSED @SUPPORT @MIDSPAN
WALL RB-1 @SUPPORT @MIDSPAN
BEAM FTB-1 10MMØ TEMP
11. USE ONLY PORTLAND CEMENT THROUGH THE ENTIRE CONSTRUCTION. L1/CLEAR SPAN
0.35
0.35
6. COMMENCE SOIL POISONING WORK WHEN GRAVEL BED HAVE BEEN PREPARED
0.40
0.40
0.40
PRIOR TO POURING OF FOOTING AND FOOTING TIE BEAMS AND WHEN THE AREA BACKFILL BACKFILL BACKFILL
IS SUBSTANTIALLY DRY. BOTT. BARS BOTT. BARS STIRRUPS BOTT. BARS
@SUPPORT @MIDSPAN 4@0.05,3@0.10, @SUPPORT FTG. FTG. FTG.
(SEE SCH. (SEE SCH. 2@0.15, & REST (SEE SCH. @SUPPORT @MIDSPAN SLAB SLAB SLAB
C. CONCRETE AND REINFORCEMENT
0.20
0.20
0.20
OF BEAMS) OF BEAMS) @0.20M.O.C. OF BEAMS)
PLAN
3-10MMØ 3-10MMØ 3-10MMØ
1. ALL MATERIALS AND WORKMANSHIP SHALL CONFORM WITH THE LATEST BUILDING
CODE AMERICAN CONCRETE INSTITUTE (ACI0318).
SECTION CONT. BARS CONT. BARS CONT. BARS
0.40 0.40 0.40
2. ALL CONCRETE SHALL DEVELOP A MINIMUM COMPRESSIVE STRENGTH AT THE 5 TYP. BEAM DET. WF1 WF2 WF3
END OF TWENTY EIGHT (28) DAYS WITH CORRESPONDING MAXIMUM SIZE 6 SCALE 1:20M.
AGGREGATES A.ND SLUMP AS FOLLOWS:
LOCATION
SLAB ON GRADE
FOUNDATION
6 TYP. WALL FOOTING DET.
6 SCALE 1:20M.
COLUMNS AND BEAMS
ARCHITECT/ENGINEER PROJECT TITLE PROJECT OWNER SHEET CONTENTS REVISIONS SHEET NO.
DESIGN:
AS SHOWN
ASBUILT PLAN OF CAD: S-2
TWO2)-STOREY RESIDENCE ROSALIA G. YU/TO HENRY J. YU
PRC NO.: PTR NO.:
CHECKED:
2 9
REG. NO.: TIN NO.: PROJECT LOCATION: LOT 37 BLOCK 5 MOSS STREET, METROGREEN ADDRESS:
DATE:
ISSUED ON: ISSUED AT: SUBD,. BRGY. SAN BARTOLOME, QUEZON CITY PROJ. NO.: