GENERAL NOTES: SECTION

10MMØ RB TIES 8-20MMØ VERT.


@0.20M.O.C. BARS (SEE SCH.
1.20
A. GENERAL (VERIFY-SEE SCH. OF COL. & FTG.)
OF COL. & FTG)
1. CONSTRUCTION NOTES AND TYPICAL DETAILS SHALL APPLY TO ALL UNLESS SCHEDULE OF BEAM 0.35
NGL

OTHERWISE SHOWN OR NOTED. MODIFY TYPICAL DETAILS AS DIRECTED TO


MEET SPECIAL CONDITIONS. IT SHALL BE IN STRICT ACCORDANCE WITH THE SUPPORT MIDSPAN AT POINT OF LOAD REMARKS
PLANS AND SPECIFICATIONS AND IN CONFORMITY WITH ALL APPLICABLE BEAM # WIDTH DEPTH
TOP BARS BOTT. BARS TOP BARS BOTT. BARS TOP BARS BOTT. BARS
NATIONAL LAWS, LOCAL ORDINANCES, BUILDING RULES AND REGULATIONS. RB-1
RB-1 200 300 4-16MMØ RB 4-16MMØ RB 4-16MMØ RB 4-16MMØ RB BACKFILL
2. SHOP DRAWINGS WITH ERECTION AND PLACING DIAGRAMS OF ALL STRUCTURAL 0.30M. THK.

1.50
B-1 200 450 4-16MMØ RB 3-16MM∅ RB 3-16MM∅ RB 4-16MMØ RB
STEEL, MISCELLANEOUS IRON, PRE-CAST CONCRETE ETC. SHALL BE SUBMITTED REINF. FTG. SLAB
FTB-1 250 400 4-16MMØ RB 2-16MM∅ RB 2-16MM∅ RB 4-16MMØ RB
(SEE SCH. OF
FOR ENGINEER'S APPROVAL BEFORE FABRICATION. COL. & FTG.)

3. CONTRACTOR SHALL BE VERIFY ALL DIMENSIONS BEFORE ALL WORK IS TO BE


SCHEDULE OF COLUMN 0.30M. THK
FTG. SLAB
DONE. COORDINATE WITH ELECTRICAL AND PLUMBING CONTRACTORS AND PVC (SEE SCH. OF

0.40
1.20
PIPES SLEEVES, ETC. TO BE EMBEDDED IN CONCRETE. COL. # WIDTH DEPTH VERT. BARS TIE BARS REMARKS C-1 6-20MMØ REINF. COL. & FTG)
BARS B.W.
6-20MMØ REINF.

0.30
4. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO PROVIDE ADEQUATE (REFER TO SCH.
10MMØ RB 3@100,4@150 & OF COL. & FTG.) BARS B.W.
SHORING AND BRACING OF THE STRUCTURE FOR ALL LOADS THAT MAYBE C-1 250 400 8-20MMØ RB (REFER TO SCH.
REST @200MM.O.C.
IMPOSED DURING CONSTRUCTION. OF COL. & FTG.)

5. PROVIDE 3 INCHES THICK, GRAVEL BEDDING TO ALL FOOTING AND FOOTING TIE SCHEDULE OF FOOTING
BEAMS.
FTG T W L REINF. BARS REMARKS 1.20
6. MAINTAIN MINIMUM CONCRETE COVER FOR ALL REINFORCING STEEL AS
FOLLOWS: F-1 300 MM THK 1200 1200 9-16MMØ RB
PLAN F-1
SECTION
SUSPENDED SLABS
SLAB ON GRADE
SCHEDULE OF SLAB 0.25
WALLS ABOVE GRADE
BEAM STIRRUPS AND COLUMN TIES
SLAB # T TEMPERATURE BARS MAIN BARS REMARKS 1 COLUMN FOOYING DET.
WHERE CONCRETE IS EXPOSED TO EARTH BUT POURED AGAINST FORM S-1 100 MM THK 10MMØ RB @300MM.O.C. 10MMØ RB @200MM.O.C. 6 SCALE 1:20M. 8-20MMØ VERT.
BARS & 10MMØ
WHERE CONCRETE IS DEPOSITED DIRECTLY AGAINST EARTH

0.40
TIES @0.20M.O.C.
(SEE SCH. OF
7. SPLICES SHALL BE SECURELY WIRED TOGETHER AND SHALL LAP OR EXTEND IN COL. & FTG.)
ACCORDANCE WITH THE ACI CODE PROVISION FOR LAP SPLICES AND
ANCHORAGE LENGTH UNLESS OTHERWISE SHOWN ON DRAWINGS, SPLICING
SHALL BE STAGGERED WHENEVER POSSIBLE.
C-1
8. ALL ANCHOR BOLTS, DOWELS AND OTHER INSERTS SHALL BE PROPERLY
POSITIONED AND SECURED IN PLACE PRIOR TO PLACING OF CONCRETE.
2 COLUMN DETAILS
0.20 0.20 0.20 0.20 0.25 0.20 6 SCALE 1:20M.

9. ALL CONCRETE SHALL BE KEPT MOIST FOR A MINIMUM OF SEVEN CONSECUTIVE


DAYS IMMEDIATELY AFTER PORING BY THE USE OF WET BURLAP SPRAYING,
4-16MMØ 2-16MMØ 4-16MMØ 3-16MMØ 4-16MMØ
CURING COMPOUNDS OR OTHER APPROVED METHODS. 10MMØ

0.30

0.30
10MMØ
L1/4 TOP BARS 0.30L1/L2 0.30L1/L2

0.40

0.40
TOP BARS

0.45

0.45
@0.20M.O.C. GREATER
10. STRIPPING OF FORMS AND SHORES: 2-16MMØ 4-16MMØ @0.20M.O.C. GREATER
4-16MMØ
3-16MMØ 4-16MMØ
FOUNDATION @SUPPORT @MIDSPAN

0.15
SUSPENDED SLAB EXCEPT WHEN ADDITIONAL LOAD ARE ;IMPOSED @SUPPORT @MIDSPAN
WALL RB-1 @SUPPORT @MIDSPAN
BEAM FTB-1 10MMØ TEMP

B-1 BARS @0.30M.O.C.

11. USE ONLY PORTLAND CEMENT THROUGH THE ENTIRE CONSTRUCTION. L1/CLEAR SPAN

B. FOUNDATION 3 BEAM DETAILS


1. FOUNDATION IS DESIGNED FOR ASSUMED SOIL BEARING CAPACITY OF 143.70 KPa.
6 SCALE 1:20M. 4 TYP. TWO-WAY SLAB DET.
6 SCALE 1:20M.
2. FOUNDATION SHALL REST ON NATURAL SOIL UNLESS OTHERWISE PERMITTED BY
THE ENGINEER. NO PART OF FOUNDATION SHALL REST ON FILL.

3. THE CONTRACTOR SHALL NOTIFY THE ENGINEER AFTER FOOTING EXCAVATION


HAVE BEEN COMPLETED AND PRIOR TO CONCRETING.
SPAN
150MM CHB THK 150MM CHB THK 150MM CHB THK
4. THE CONTRACTOR SHALL PROVIDE FOR DESIGN AND INSTALLATION OF ALL L1/3 L1/3
w/ 10MMØ RB w/ 10MMØ RB w/ 10MMØ RB
CRIBBING, SHEATHING AND SHORING NECESSARY TO SAFELY RETAIN @0.60M.O.C. @0.60M.O.C. @0.60M.O.C.
TOP BARS TOP BARS TOP BARS
EXCAVATION AND EARTH BANKS. 0.20 0.20
@SUPPORT @MIDSPAN @SUPPORT
(SEE SCH. (SEE SCH. (SEE SCH.
5. ALL ON-SITE WORKS SHALL BE AS PER RECOMMENDATION OF THE PROJECT SOIL OF BEAMS) OF BEAMS) OF BEAMS) NGL NGL NGL
ENGINEER.

0.35

0.35
6. COMMENCE SOIL POISONING WORK WHEN GRAVEL BED HAVE BEEN PREPARED

0.40

0.40

0.40
PRIOR TO POURING OF FOOTING AND FOOTING TIE BEAMS AND WHEN THE AREA BACKFILL BACKFILL BACKFILL
IS SUBSTANTIALLY DRY. BOTT. BARS BOTT. BARS STIRRUPS BOTT. BARS
@SUPPORT @MIDSPAN 4@0.05,3@0.10, @SUPPORT FTG. FTG. FTG.
(SEE SCH. (SEE SCH. 2@0.15, & REST (SEE SCH. @SUPPORT @MIDSPAN SLAB SLAB SLAB
C. CONCRETE AND REINFORCEMENT

0.20

0.20

0.20
OF BEAMS) OF BEAMS) @0.20M.O.C. OF BEAMS)
PLAN
3-10MMØ 3-10MMØ 3-10MMØ
1. ALL MATERIALS AND WORKMANSHIP SHALL CONFORM WITH THE LATEST BUILDING
CODE AMERICAN CONCRETE INSTITUTE (ACI0318).
SECTION CONT. BARS CONT. BARS CONT. BARS
0.40 0.40 0.40

2. ALL CONCRETE SHALL DEVELOP A MINIMUM COMPRESSIVE STRENGTH AT THE 5 TYP. BEAM DET. WF1 WF2 WF3
END OF TWENTY EIGHT (28) DAYS WITH CORRESPONDING MAXIMUM SIZE 6 SCALE 1:20M.
AGGREGATES A.ND SLUMP AS FOLLOWS:

LOCATION
SLAB ON GRADE
FOUNDATION
6 TYP. WALL FOOTING DET.
6 SCALE 1:20M.
COLUMNS AND BEAMS

3. ALL REINFORCING BARS ,SHALL CONFORM TO ASTM A615 GRADE 33 FOR


DIAMETER 12MM AND SMALLER BARS AND GRADE 40 FOR DIAMETER 16MM AND
LARGER BARS.

ARCHITECT/ENGINEER PROJECT TITLE PROJECT OWNER SHEET CONTENTS REVISIONS SHEET NO.
DESIGN:

AS SHOWN
ASBUILT PLAN OF CAD: S-2
TWO2)-STOREY RESIDENCE ROSALIA G. YU/TO HENRY J. YU
PRC NO.: PTR NO.:
CHECKED:
2 9
REG. NO.: TIN NO.: PROJECT LOCATION: LOT 37 BLOCK 5 MOSS STREET, METROGREEN ADDRESS:
DATE:
ISSUED ON: ISSUED AT: SUBD,. BRGY. SAN BARTOLOME, QUEZON CITY PROJ. NO.: