NOTES:
1. ALL DIMENSIONS ARE IN MILLIMETRES AND ALL ELEVATIONS ARE IN METERS UNLESS OTHERWISE INDICATED.

A 2. FOR CONCRETE WORKS GENERAL NOTES SEE DWG 00250600BADB12010. A


3. FOR GENERAL STEEL CONSTRUCTION NOTES SEE DWG 00250600BADQ12031.
4. + 0.000 LEVEL CORRESPONDS TO HPP 100.000 m.
5. ALL DIMENSIONS AND ELEVATION ARE INDICATIVE ONLY AND SHALL BE UPDATED ACCORDING TO STRUCTURAL
CALCULATIONS AND DETAILED DESIGN.
6. DOORS AND WINDOWS SIZES SHOWN ON DRAWING ARE PRELIMINARY AND SHALL BE FINALISED DURING DETAILED DESIGN.
7. FINAL ORIENTATION OF BUILDINGS TO BE DEFINED DURING THE DETAILED ENGINEERING.
B 8. WALL AND SLAB OPENINGS SHALL BE PROVIDED FOR CABLE PENETRATION AND THEY WILL BE DEFINED
B

9. PAINTING COLORS TO BE DEFINED DURING DETAILED DESIGN.


10. INTERNAL DISTRUBUTION WILL BE FINALIZED DURING DETAILED ENGINEERING.
11. PIT POSITION AND DIMENSIONS WILL BE FINALIZED DURING DETAILED ENGINEERING.
1 2 3 4 5 6 7 12. DOORS AND WINDOWS IN FIRE-RATED WALL ASSEMBLIES SHALL HAVE THE SAME FIRE RATING OF WALLS.
MOROVER, FIRE WALLS SHALL BE CLOSED UP TO ROOF.
13. APPROPRIATE CAULKING TO BE PROVIDED TO SEAL THE OPENING AT ALL WALL.
14. MAIN ACCESS TO BUILDING SHALL BE DEFINED DURING DETAIL DESIGN.

C 30000 15. FINAL ORIENTATION OF TOILETS TO BE VERIFIED DURING DETAIL DESIGN ACCORDING TO MAKKA DIRECTION. C
16. ALL BUILDINGS SHALL BE DESIGNED BY EPC CONTRACTOR TO BE BLAST PROOF CONSIDERING THE MINIMUM STRUCTURAL
AND ARCHITECTURAL REQUIREMENT DETAILED IN SPECIFICATION 00251034BASG10017 AND 00251034BFRZ85232.
5000 5000 5000 5000 5000 5000 17. EPC CONTRACTOR SHALL CONFIRM THAT THE HVAC SYSTEMS AND ANY BUILDING ELEMENT (SUCH AS ROOF, DOORS,
03 WINDOWS, ETC.) WHICH MAY BE IMPACTED BY THE BLAST PROOF CONDITION SHALL BE DESIGNED TAKING INTO ACCOUNT
THE MANDATORY PROJECT REQUIREMENT THAT EVERY BUILDING HAS TO BE BLAST RESISTANT.

D D

E E

+0.100 +0.100 0.000


REFERENCE DOCUMENT
CLIENT DOC. N. CONTRACTOR DOC. N. TITLE

00251000BTDG62511 022026-2510-GB-A-62511 ZUBAIR MISHRIF DGS - PLOT PLAN NEW DGS

ELEVATION "A" 00251010BADM12143 022026-2510-CC-B-12143 GROUND FLOOR PLAN

F 00251010BADM12145 022026-2510-CC-B-12145 FURNITURE LAYOUT F


00251010BADM12146 022026-2510-CC-B-12146 DOORS & WINDOWS DETAILS - FINISH SCHEDULE

00251010BADM12415 022026-2510-CC-B-12415 ROOF PLAN

00250600BADQ12023 022026-2506-CC-A-12023 WALL SECTION DETAILS

00250600BAST10017 022026-2506-CA-E-10017 SPECIFICATION FOR BUILDING WORKS, MATERIALS FOR FINISHING

00250600BAST10005 022026-2506-CA-E-10005 BASIC SPECIFICATION FOR DESIGN & ENGINEERING OF HVAC SYSTEM

G 7 6 5 4 3 2 1 G

30000

5000 5000 5000 5000 5000 5000

H H

J J

+0.100 +0.200 +0.100 0.000

CD-FE 03 17/06/2021 ISSUED FOR ORDER S. SMITH N. THARAKAN J. GARDINER


K CD-FE 02 21/03/2011 MODIFIED FOR ADDENDUM V.BARBUTO L.PALAZZO N.FERRARO R.CHIORRINI
K
CD-FE 01 07/02/2011 ISSUE FOR TENDER V.BARBUTO L.PALAZZO N.FERRARO R.CHIORRINI

ELEVATION "B" CD-FE


Validity
00
Rev.
25/01/2011
Date
FINAL ISSUE
Description
V.BARBUTO
Prepared by
L.PALAZZO
Checked by
N.FERRARO
Approved by
R.CHIORRINI

Contractor Company
Status number Approval Approval
Revision index
Company logo and business name Project name Company identification
ZUBAIR OIL FIELD 00251010BADM12144
DEVELOPMENT PROJECT Job. N
Contractor logo and business name Contractor identification
L L
022026-2510-CC-B-12144
Contract N
0 5m Vendor logo and business name
Vendor identification

SCALE 1:100 Order N


Facility Name
ZUBAIR FIELD Location Scale Sheet of Sheets

ZUBAIR MISHRIF UNIT ONSHORE 1:100 2 of 2


DRAWING SCALE
Document Title Supersedes N.
M ZUBAIR MISHRIF DGS - SECURITY BUILDING Superseded by N. M
ELEVATIONS AND SECTION Plant Area Plant Unit