Professional Documents
Culture Documents
NOTES:
1. ALL DIMENSIONS ARE IN MILLIMETRES AND ALL ELEVATIONS ARE IN METERS UNLESS OTHERWISE INDICATED.
C 30000 15. FINAL ORIENTATION OF TOILETS TO BE VERIFIED DURING DETAIL DESIGN ACCORDING TO MAKKA DIRECTION. C
16. ALL BUILDINGS SHALL BE DESIGNED BY EPC CONTRACTOR TO BE BLAST PROOF CONSIDERING THE MINIMUM STRUCTURAL
AND ARCHITECTURAL REQUIREMENT DETAILED IN SPECIFICATION 00251034BASG10017 AND 00251034BFRZ85232.
5000 5000 5000 5000 5000 5000 17. EPC CONTRACTOR SHALL CONFIRM THAT THE HVAC SYSTEMS AND ANY BUILDING ELEMENT (SUCH AS ROOF, DOORS,
03 WINDOWS, ETC.) WHICH MAY BE IMPACTED BY THE BLAST PROOF CONDITION SHALL BE DESIGNED TAKING INTO ACCOUNT
THE MANDATORY PROJECT REQUIREMENT THAT EVERY BUILDING HAS TO BE BLAST RESISTANT.
D D
E E
00250600BAST10005 022026-2506-CA-E-10005 BASIC SPECIFICATION FOR DESIGN & ENGINEERING OF HVAC SYSTEM
G 7 6 5 4 3 2 1 G
30000
H H
J J
Contractor Company
Status number Approval Approval
Revision index
Company logo and business name Project name Company identification
ZUBAIR OIL FIELD 00251010BADM12144
DEVELOPMENT PROJECT Job. N
Contractor logo and business name Contractor identification
L L
022026-2510-CC-B-12144
Contract N
0 5m Vendor logo and business name
Vendor identification