You are on page 1of 1

N

2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23

GENERAL NOTES:
A

10.075%
1. ALL DIMENSIONS & SPOT ELEVATIONS ARE IN MM.
2. DIMENSIONS ARE NOT TO BE MEASURED FROM THIS DRAWING.
ELECTRICAL ROOM 3. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH THE RELEVANT

10.000%
GF-SV-09 STRUCTURAL, MECHANICAL, AND ELECTRICAL DRAWINGS.
4. ALL DIMENSIONS ARE TO BE VERIFIED ON-SITE BEFORE EXECUTING THE
WORKS.
B LPG ROOM 5. THE SIZES & LOCATIONS OF ALL OPENINGS ARE COORDINATED WITH
GF-SV-11 MEP MECHANICAL & ELECTRICAL SHOP DRAWING.
GF-SV-08
KITCHEN GARBAGE ROOM
GF-017 GF-SV-07
C MALE WC
GF-MT-07
ENTRANCE LOBBY STAFF ROOM
GF-CF-01 GF-SV-10
FEMALE WC
GF-FT-08
D

F&B
GF-018
E
MECHANICAL ROOM ELECTRICAL ROOM CONCESSIONAIRE STAFF ROOM
GF-SV-01 GF-SV-02 GF-002 GF-003

F
JANITOR
GF-CL-01

FEMALE SHOWERS/TOILETS
G GF-FT-01
SECURITY ROOM
GF-015

FOR CONTINUITY REFER TO

FOR CONTINUITY REFER TO


RECREATION ROOM
GF-004
REFERENCES:
H

1/ GF-SDW-AR-10006

1/ GF-SDW-AR-10008
FEMALE BASIN WASH TYPE SHEET NUMBER Rev.
GF-FT-02
ICT/BMS SERVER DWG R03-C07B01-IKP-01-GF-DWG-AR-10001 03
GF-VS-04 DWG R03-C07B01-IKP-01-ZZ-DWG-FL-10001 01
PDF R03-C07B01-IKP-01-GF-SDW-FP-10101 C2
PDF R03-C07B01-IKP-01-GF-SDW-ME-10101 C1
PDF R03-C07B01-IKP-01-GF-SDW-ME-10201 C1
I PDF R03-C07B01-IKP-01-GF-SDW-PL-10201 C2
FEMALE CHANGE / LOCKERS
GF-FT-03
FOR CONTINUITY REFER TO
CLUB OFFICE STORE
1/ GF-SDW-AR-10006 GF-019 GF-006
DISABLED TOILET
J GF-AT-01 C2 07/07/2022 SHOP DRAWINGS
FOR CONTINUITY REFER TO C1 03/06/2022 SHOP DRAWINGS
1/ GF-SDW-AR-10007 MALE CHANGE/LOCKERS REV DATE DISCRIPTION APPR'D
GF-MT-01
Current Issue Signatures
Original
A1
FOR CONTINUITY REFER TO
K
Size Drawn By:

MALE BASIN WASH


STUDIO 1/ GF-SDW-AR-10007 Datum WGS 84 Designed By:
GF-007
GF-MT-02
JANITOR JANITOR
L GF-CL-02 GF-CL-03 Grid UTM ZONE 37N Approved By:
Client:

MALE SHOWERS/TOILETS
M STORE
GF-SV-05
GF-MT-03

Lead Consultant:

GYM STORE P.O. BOX 231597, DUBAI, UAE


GF-008 [P] +971 4 2425535
[E] info@a2z-architectural.com
N Office 1203, 12th floor, Empire Heights
Building, Tower B, Business Bay

POOL STORE
GF-SV-06

THIS DRAWING IS THE PROPERTY OF A2Z ARCHITECTURAL ENGINEERING CONSULTANCIES.


COPYRIGHT RESERVED BY A2Z ARCHITECTURAL CONSULTANCIES AND THIS DRAWING IS ISSUED ON
O THE CONDITION THAT IT IS NOT COPIED REPRODUCED, RETAINED OR DISCLOSED TO ANY
UNAUTHORISED PERSON EITHER WHOLLY OR IN PART WITHOUT THE CONSENT IN WRITING OF A2Z
ARCHITECTURAL ENGINEERING CONSULTANCIES.

BIM Consultant:
VIA MONFERRATO,2
Milano, 20144
TEL: 02.43917210
P FAX.02.87383834
e-mail: info@spazio3.com
GYM/FITNESS CENTRE
Master Planning:
GF-010

Contractor:

Address: P.O. Box 5338, Jeddah 21422 KSA


R Email: corpcomm.kcg@ikkgroup.com

Phone: +966 12 627 8444

Project Name:
S
Red Sea Coastal Village
Beach Club House
T Drawing Title

BUILDERWORK GENERAL
ARRANGEMENT PLAN - GROUND
FLOOR
DRAWINGS HAS BEEN REVIEWED AND VERIFIED, COORDINATED AND INTEGRATED AND COMPLIED WITH
General Comment THE CONTRACT REQUIREMENTS
ARCHITECTURAL STRUCTURAL MECHANICAL ELECTRICAL PLUMBING ID ICT
1. Prior to site execution, all opening sizes and locations should
be consulted with Mechanical and Electrical disceplines. APPROVED APPROVED APPROVED APPROVED APPROVED APPROVED APPROVED
2. Ensure that all works on site are organized properly
BUILDERWORK GENERAL ARRANGEMENT PLAN according to priority.
MR
Scale
HB
Drawn By:
AE WA
Suitability Code
AE
Project Stage
MR WA

1 1 : 150 3. The contractor is responsible for ensuring that all materials 1 : 150 S2 CONSTRUCTION
are installed correctly and that quality standard are met.
Drawing No. Rev.
4. For execution, a copy of the approved shop drawings should
be provided on site. R03-C07B01-IKP-01-GF-SDW-AR-10005 C2

You might also like