Please remove any lines

that are not included in Supports for the ceiling frame


this drawing. shall be connected to the vertical
steel frame. (only circle area)

Finishing materials missing from


the wall must be shown and
specified.

Please specify what


It is impossible to read all text
kind of materials are
dimensions and text sizes should
used, if they are part of
be proportional.
this drawing.

Comply the as per design


drawings commented by RSG,
reference dwg. no: GF-DWG-
ID-50101_Rev. 01, (WF-000623).

Comment:
1. The contractor is responsible for any change and additional
materials required on site as per client's requirements.
2. Coordinate any electrical power and lighting supply with the
electrical department. IMPORTANT NOTE:
3. Provide response sheet.
IKK must review all drawings thoroughly before
4. Contractor should comply the SC's comments. submitting & uploading to Aconex, to avoid rejection.