1. The contractor is responsible for any change and additional materials
required on site as per client's requirements. 2. Coordinate any electrical power and lighting supply with the electrical department. As per the design, the vertical 3. Provide response sheet. square steel frame at the wall 4. Contractor should comply the SC's comments. does not reach to the ceiling.
Comply the as per design
drawings commented by RSG, reference dwg. no: GF-DWG- Please remove any lines ID-50101_Rev. 01, (WF-000623). that are not included in this drawing.
missing the wall
finishing materials
provide spot detail Must have a laminated
for fixation of metal finish on one side skirting. facing elevation. Dimension (backing support)