Comment:

1. The contractor is responsible for any change and additional materials


required on site as per client's requirements.
2. Coordinate any electrical power and lighting supply with the electrical
department. As per the design, the vertical
3. Provide response sheet. square steel frame at the wall
4. Contractor should comply the SC's comments. does not reach to the ceiling.

Comply the as per design


drawings commented by RSG,
reference dwg. no: GF-DWG-
Please remove any lines
ID-50101_Rev. 01, (WF-000623).
that are not included in
this drawing.

missing the wall


finishing materials

provide spot detail Must have a laminated


for fixation of metal finish on one side
skirting. facing elevation.
Dimension (backing support)

FFL.

Provide additional Coordinate to the electrical


support. works for the installation.