Professional Documents
Culture Documents
F.C.L.
Finishing materials
It is important for all drawings to
missing from the
include materials leveling.
wall must be
shown and
specified.
F.F.L.
F.F.L.
F.F.L.
Comment:
1. The contractor is responsible for any change and additional
materials required on site as per client's requirements.
2. Coordinate any electrical power and lighting supply with the
electrical department.
3. Provide response sheet.
4. Contractor should comply the SC's comments.