You are on page 1of 1

As per the design, the vertical

square steel frame at the wall


does not reach to the ceiling.

F.C.L.

Finishing materials
It is important for all drawings to
missing from the
include materials leveling.
wall must be
shown and
specified.

F.F.L.

Please remove any lines


that are not included in
It is important for all drawings to this drawing.
include materials leveling.

F.F.L.
F.F.L.

Comment:
1. The contractor is responsible for any change and additional
materials required on site as per client's requirements.
2. Coordinate any electrical power and lighting supply with the
electrical department.
3. Provide response sheet.
4. Contractor should comply the SC's comments.

You might also like