Quantity

No. DESCRIPTION OF ITEMS Unit


A

2. Supply of material, transport and erection of metal


railing.
Railing shall be mounted on vertical ballusters, fi 30
mm, which shall be connected to concrete base by
means of anchor plates, with the spacing in accordance
with the scheme. Horizontal pipes, fi 50 mm, shall be
welded to the main ballusters.

This item includes all connecting, bonding and sealing


material within metalworks and at the metalwork joints
with a structural member.

All welds and railing parts shall be finished and primer


and two coats of metal paint in the shade selected by
the designer shall be applied.

Payment shall be made per m1 of fully completed work


item. m1 36,30

3. Manufacture and installation of handrail made of steel


pipe, fi 50, anchoring in the wall by means of steel
bracket supports, in accordance with the relevant detail.

All metal shall be corrosion protected with two corrosion


protection coats and two coats of oil paint in the colour
and shade selected by the designer.
Payment shall be made per m1 of fully completed work
item. m1 16,70