You are on page 1of 1

Please remove any lines

that are not included in


this drawing.

F.C.L. F.C.L.

Finishing materials missing


from the wall must be It is important for all drawings to
shown and specified. include materials leveling.

F.F.L. F.F.L.

As per the design


As per the design, the vertical drawings, there is no Must have a laminated finish
square steel frame at the wall Please remove any lines gap in the center. on one side facing elevation.
does not reach to the ceiling. that are not included in (backing support)
(all clouded area) this drawing.

F.C.L. F.C.L. F.C.L.

Dim=?
It is important for all drawings to
include materials leveling.

Dim=?

Dim=?
F.F.L. F.F.L. F.F.L.

Comment: Comply the as per design


1. The contractor is responsible for any change and additional materials required on site drawings commented by RSG,
as per client's requirements. check & revise:reference dwg. no:
2. Coordinate any electrical power and lighting supply with the electrical department. GF-DWG-ID-50101_Rev. 01,
3. Provide response sheet. (WF-000623).
4. Contractor should comply the SC's comments.