NOTES & LEGENDS:

1. Dimensions must not be scaled from this drawing.


2. All dimensions to be checked on site and discrepancies are to
CCMI be referred to this office for decision.
RS Malbar & gold 3. All work specified in this drawing to be carried out in strict
02/03/2023 accordance with relevant Codes of Practice and Statutory
Authority Requirements.
4. All materials to be in full compliance with Codes of Practice
Statutory Authority Requirements
5. In carrying out works relating to this drawing, the contractor.is
to be responsible for complying with the full requirements of
all related legislation including Local Statutory Authority
Services Regulations and all Safety Acts (Latest Edition).
6.This drawing should be read in conjunction with other relevant,
Architectural, Structural, Mechanical and Electrical drawings
and all relevant sections of the specifications.
7. All dimensions are in millimeters unless otherwise indicated.

1) Approval is subject to incorporation of comments in Final Design Submission Package. This


includes all necessary details as requested (aside from the standard), as noted in the previous
drawings & Final Design Checklist of Drawings satisfactorily complied with.

2) All Samples must be submitted for approvals, including working samples of both lighting
(with an attached lux level calculation) and signage (same as the proposal)

3) Tenants must submit a Green Star Compliance Layout, as mentioned in the email. This must
be met with a min. of 3-star Rating, as required from the Lease.

4) Any changes made after this issued Approval must be highlighted and resubmitted for
approvals.

5) Final Approved MAF Stamped Drawings to be displayed at site at all times, A3, installed in No. Revision details.
the hoarding, or made available electronically. All comments made from the Concept - Final
REVISION STATUS
Design is subject to comments herein AND previously noted unless stated otherwise.

6) All dimensions to be checked on site by tenant contractor. Tenant finishes must be inside
the leaseline.

7) Final Approved Reflected Ceiling Plan (Architectural) to be followed. Ensure this is the same
in the MEP Approved Drawings.

8) All comments herein and previously noted are considered unless otherwise stated.

ENSURE GREEN STAR COMMENTS ARE INCORPORATED IN RESUBMISSION. MUST BE A


MINIMUM OF 3 STARS. GREEN STAR LAYOUT MUST BE SUBMITTED FOR ASSESSMENT Project :

ARCHITECTURAL SUBMISSION DRAWINGS MIRDIF CITY CENTRE

MGD STORE- MIRDIF CITY CENTRE, Drawing title :

UNIT NUMBER - D015 COVER PAGE

AREA- 843.5 SQ.FT

Project number.

Drawing number.

Revision Suffix.

Scale. Date. Drawn. Designed &


Checked:
1:50 24.02.2023 MGD PROJECTS
MGD PROJECTS
NOTES & LEGENDS:
A B
1. Dimensions must not be scaled from this drawing.
2. All dimensions to be checked on site and discrepancies are to
CCMI be referred to this office for decision.
RS Malbar & gold ADJOINING TENANCY 3. All work specified in this drawing to be carried out in strict
accordance with relevant Codes of Practice and Statutory
Authority Requirements.
4. All materials to be in full compliance with Codes of Practice
Statutory Authority Requirements

CABINET
STORAGE
RACK CABINET
CCTV/ SERVER
5. In carrying out works relating to this drawing, the contractor.is
to be responsible for complying with the full requirements of
MINE NICHE DISPLAY-26 NOS

1174

1174
all related legislation including Local Statutory Authority

800
Services Regulations and all Safety Acts (Latest Edition).
622 620 6.This drawing should be read in conjunction with other relevant,
Architectural, Structural, Mechanical and Electrical drawings
POS/ and all relevant sections of the specifications.

PREMIUM GOLD DISPLAY


CASH MINE DISPLAY MINE DISPLAY MINE DISPLAY 7. All dimensions are in millimeters unless otherwise indicated.

MASS GOLD DISPLAY


WM

800 1350 1191 1350

500
AD
MASS GOLD
800

DISPLAY

PREMIUM
1476

ADJOINING TENANCY
2800

2800
GOLD
976
ADJOINING TENANCY

MASS GOLD

PREMIUM
DISPLAY

GOLD
1350

1350
C C
500

500
PREMIUM GOLD DISPLAY
PREMIUM GOLD DISPLAY
No. Revision details.
MASS GOLD DISPLAY

MASS GOLD DISPLAY


REVISION STATUS
D D
2800

2800
2750

2750

52
Project :
1420 1420
LOW HEIGHT PARTITION LOW HEIGHT PARTITION 860
860 MIRDIF CITY CENTRE
WALL NICHE WALL NICHE

POWER WALL
WALL PANEL

1200 1200
GLASS FACADE

GLASS FACADE
1200

1200
Drawing title :
500

500
FREE STAND DISPLAY FREE STAND DISPLAY

GLASS FACADE

2950 2000
GLASS FACADE

2950
FURNITURE LAYOUT
DEMISE PIER FINISHED 50 50 50 LEASE LINE 50 DEMISE PIER FINISHED
3050 3050
BY LANDLORD 50X100MM S.S FRAME IN 15MM THICK CRYSTAL 50X100MM S.S FRAME IN BY LANDLORD
BRASS FINISH(MT 01) CLEAR TOUGHENED BRASS FINISH(MT 01)
GLASS DOOR
15MM THICK CRYSTAL
A B 15MM THICK CRYSTAL
CLEAR TOUGHENED
GLASS
CLEAR TOUGHENED AREA- 843.5 SQ.FT
GLASS
50X100MM S.S FRAME IN
BRASS FINISH(MT 01)
Project number.
50X100MM S.S FRAME IN 50X100MM S.S FRAME IN
BRASS FINISH(MT 01) BRASS FINISH(MT 01) Drawing number.
Q
R

MALL LEVEL Revision Suffix.

+20.500 FFL
+20.425 SSL Scale. Date. Drawn. Designed &
Checked:
1:50 24.02.2023 MGD PROJECTS
MGD PROJECTS
NOTES & LEGENDS:
A B 1. Dimensions must not be scaled from this drawing.
2. All dimensions to be checked on site and discrepancies are to
CCMI be referred to this office for decision.
RS Malbar & gold
ADJOINING TENANCY 3. All work specified in this drawing to be carried out in strict
accordance with relevant Codes of Practice and Statutory
Authority Requirements.
4. All materials to be in full compliance with Codes of Practice
Statutory Authority Requirements

CCTV/ SERVER
RACK CABINET

STORAGE
CABINET
6811 5. In carrying out works relating to this drawing, the contractor.is
to be responsible for complying with the full requirements of

1173
1174
all related legislation including Local Statutory Authority

1232

1232
BLUE WPC WITH FR BLUE WPC WITH FR Services Regulations and all Safety Acts (Latest Edition).
6.This drawing should be read in conjunction with other relevant,
MDF BACKING MDF BACKING
622 BLUE WPC WITH FR 620 Architectural, Structural, Mechanical and Electrical drawings
and all relevant sections of the specifications.
MDF BACKING FR GYPSUM 400
385 7. All dimensions are in millimeters unless otherwise indicated.
CLADDING
U PROFILE IN MT 01 U PROFILE IN MT 01
248
FINISH FINISH

FR GYPSUM FR GYPSUM
CLADDING CLADDING

ADJOINING TENANCY
ADJOINING TENANCY

C C

6101
6101

FR GYPSUM FR GYPSUM
CLADDING CLADDING No. Revision details.

REVISION STATUS
D D

FR GYPSUM FR GYPSUM
CLADDING CLADDING

52
400
61

400

61
S.S PROFILE IN S.S PROFILE IN Project :
BRASS FINISH(MT 01) BRASS FINISH(MT 01)
133

LEATHER PANEL 133 8


LEATHER PANEL 59

47
MIRDIF CITY CENTRE
47

860
237 WALL NICHE 2000 WALL NICHE
237
GLASS FACADE

GLASS FACADE
1200

1200
Drawing title :
1000
850

850
LEATHER FINISH
LEATHER FINISH

47
PARTITION LAYOUT
47

GLASS FACADE GLASS FACADE

2950 2000 2950


DEMISE PIER FINISHED 50 50 50 LEASE LINE DEMISE PIER FINISHED
3050 3050
BY LANDLORD 50X100MM S.S FRAME IN 15MM THICK CRYSTAL 50X100MM S.S FRAME IN BY LANDLORD
BRASS FINISH(MT 01) CLEAR TOUGHENED BRASS FINISH(MT 01)
GLASS DOOR
15MM THICK CRYSTAL
CLEAR TOUGHENED A B 15MM THICK CRYSTAL
AREA- 843.5 SQ.FT
CLEAR TOUGHENED
GLASS GLASS
50X100MM S.S FRAME IN
BRASS FINISH(MT 01)
Project number.

50X100MM S.S FRAME IN 50X100MM S.S FRAME IN


BRASS FINISH(MT 01) BRASS FINISH(MT 01) Drawing number.
Q
R

MALL LEVEL Revision Suffix.

+20.500 FFL
Designed &
+20.425 SSL Scale. Date. Drawn.
Checked:
1:50 24.02.2023 MGD PROJECTS
MGD PROJECTS
All Floor
NOTES boxes must be flush mounted and
& LEGENDS:
placed under floor furniture
A B
1. Dimensions must not be scaled from this drawing.
Transition
2. All dimensions details between
to be checked on sitemall flooring and
and discrepancies are to
CCMI tenant flooring
be referred to be
to this office forsubmitted
decision.
RS Malbar & gold ADJOINING TENANCY 3. All work specified in this drawing to be carried out in strict
accordance with relevant Codes of Practice and Statutory
High quality
Authority hard surface flooring such as
Requirements.
natural wood,
4. All materials to bestone, porcelain
in full compliance tiles, ofmarble
with Codes Practice
and granite
Statutory to be
Authority used.
Requirements
Carpet,
5. In carryingVinyl,
out worksConcrete
relating to and epoxytheflooring
this drawing, contractor.is
to be
will notresponsible
be permittedfor complying with the full requirements of
all related legislation including Local Statutory Authority
Services Regulations and all Safety Acts (Latest Edition).
SS
6.Thistransition
drawing shouldstrip required
be read at junction
in conjunction with othertorelevant,
two
different flooring
Architectural, Structural,materials
Mechanical and Electrical drawings
and all relevant sections of the specifications.

3112
7. Allwires
All dimensions
andare in millimeters
cables to beunless
neatlyotherwise indicated.
concealed.

Tenant Floor to be flushed to the same level


as mall floor

ADJOINING TENANCY
2900 2400 2900 Mall flooring required at "POP IN" from lease

ADJOINING TENANCY
line to closure line

C C

3600
No. Revision details.

REVISION STATUS
D D

EXPANSION JOINT
PROFILE MATCHED
WITH FLOORING TILE

600

52
Project :

588
DETAIL- B

MIRDIF CITY CENTRE


600
500 1200 1200 1200

Drawing title :
subject to physical sample

DETAIL- A
FLOORING LAYOUT
DEMISE PIER FINISHED LEASE LINE DEMISE PIER FINISHED
BY LANDLORD BY LANDLORD
LEGENDS:

600x1200 BEIGE
PORCELAIN TILE A B AREA- 843.5 SQ.FT
600X1200 GREY Sample/mock up is 3mm BRASS TRANSITION
PORCELAIN TILE required
STRIP BETWEEN STORE AND Project number.
8MM BRASS STRIP
MALL FLOOR IN MT 01 FINISH
EXPANSION JOINT Drawing number.
PROFILE MATCHED WITH
FLOORING TILE Q
R

MALL LEVEL Revision Suffix.

BLACK ABSOLUTE TILE- +20.500 FFL


(MALL POP IN TILE) +20.425 SSL Scale. Date. Drawn. Designed &
Checked:
1:50 24.02.2023 MGD PROJECTS
MGD PROJECTS
No neon lights& or
NOTES exposed fluorescent lights
LEGENDS:
A B permitte
1. Dimensions must not be scaled from this drawing.
2. All dimensions to be checked on site and discrepancies are to
CCMI Shop front lighting must be separately
be referred to this office for decision.
RS Malbar & gold ADJOINING TENANCY switched3. All
toworka timer
specifiedand
in thisprogrammed
drawing to be carriedto
out suit
in strict
shopping accordance
mall trading hours
with relevant Codes of Practice and Statutory
Authority Requirements.
CL LEVEL +3850 4. All materials to be in full compliance with Codes of Practice
Shop lightingStatutorytoAuthority
be designed
Requirements by a
professional lighting
5. In carrying designer.
out works relating to this drawing, the contractor.is
6580 to be responsible for complying with the full requirements of
All light fixtures to be of high quality
DETAIL- B all related legislation including Local Statutory Authority
CL LEVEL +3700
commercial grade
Services Regulations and all Safety Acts (Latest Edition).
6.This drawing should be read in conjunction with other relevant,
Architectural, Structural, Mechanical and Electrical drawings
LEGENDS: Shop lighting
show windows
- LUXsections
and all relevant
andare900
7. All dimensions
levels ofspecifications.
of the 1000 -1200 at
-1000unless
in millimeters LUX inside
otherwise indicated.
the store.
Shop front must be a combination of warm
BOFC = +3700MM- GYPSUM+ and natural daylight
PAINT FINISH CL LEVEL +3850 CL LEVEL +3850

ADJOINING TENANCY
BOFC = +3850MM- GYPSUM+ Install automated lighting controls/occupancy
PAINT FINISH 2400 sensors which adjust the artificial light levels
ADJOINING TENANCY
BOFC = +4000MM- GYPSUM+ DETAIL A depending on occupant presence
WALLPAPER
Choice of light fittings must take into account
BOFC = +4500MM- GYPSUM+
anti glare features as a requisite

7233
DETAIL- B
PAINT FINISH
C C

7233
LED STRIP LIGHTING (GOLD) Illuminated signage must be on a timer
DETAIL- A
switch and programmed to suit Shopping
LED STRIP LIGHTING
Mall trading hours

3600
(DIAMONDS) CL LEVEL +3700 CL LEVEL +4000 CL LEVEL +3700
Light No.
fixtures shall be of high quality
Revision details.
MT 01 BRASS CLADDING commercial grade
REVISION STATUS
D D
All lights to be warm white
DETAIL- B
DETAIL B
All lights to be warm white. Color
temperature between 3500 and 4000K
A

52
Project :

7800
Section A-A (bulkhead detail)
CL LEVEL +4500 A MIRDIF CITY CENTRE
EXPANSION JOINT TO BE to be rounded edge

1900
MAINTAINED AT CEILING
Drawing title :

8200

CEILING LAYOUT
DEMISE PIER FINISHED LEASE LINE DEMISE PIER FINISHED
BY LANDLORD BY LANDLORD

A B AREA- 843.5 SQ.FT

Project number.

Drawing number.
Q
R

MALL LEVEL Revision Suffix.

+20.500 FFL
+20.425 SSL Scale. Date. Drawn. Designed &
Checked:
1:50 24.02.2023 MGD PROJECTS
MGD PROJECTS
NOTES & LEGENDS:
A B
1. Dimensions must not be scaled from this drawing.
2. All dimensions to be checked on site and discrepancies are to
CCMI be referred to this office for decision.
RS Malbar & gold ADJOINING TENANCY 3. All work specified in this drawing to be carried out in strict
accordance with relevant Codes of Practice and Statutory
Authority Requirements.
CL LEVEL +3850
4. All materials to be in full compliance with Codes of Practice
Statutory Authority Requirements
5. In carrying out works relating to this drawing, the contractor.is
6579 to be responsible for complying with the full requirements of
all related legislation including Local Statutory Authority
CL LEVEL +3700
Services Regulations and all Safety Acts (Latest Edition).
507 507 507 507 507 507 507 507 507 NOTE: AS PER BRAND STANDARDS, WE USE 6500K 6.This drawing should be read in conjunction with other relevant,
COUNTERTOP LIGHTS FOR THE MINE(DIAMOND) Architectural, Structural, Mechanical and Electrical drawings
DISPLAY AREA GLOBALLY ON ALL OUR STORES TO and all relevant sections of the specifications.
ENHANCE AND HIGHLIGHT THE JEWELLERY 7. All dimensions are in millimeters unless otherwise indicated.

519

519
DISPLAY AND AS PER MARKETING REQUIREMENTS,
AND THIS CANNOT BE ALTERED.

519

519
CL LEVEL +3850
1530 1500 1530 CL LEVEL +3850

ADJOINING TENANCY
519

519
2400
ADJOINING TENANCY

450

450
519

519
CL LEVEL +4000

966
7233

7233
519

519
450 450
C C

1350
COUNTER TOP GOLD SECTION -3000K
519

519
COUNTER TOP DIAMOND SECTION-6500K

3700
519

519
CL LEVEL +3700 CL LEVEL +3700
CUSTOMER AREA -4000K
806 806 LED STRIP LIGHT (GOLD) -3000K
No. Revision details.
519

519
1350 REVISION STATUS
D D LED STRIP LIGHT (DIAMOND) -6500K
519

519
450 1500 CHANDELIER
965
SPEAKER
450

450
519

519
450
519

519
1530 1500 1530

52
300

300
Project :
300

CL LEVEL +4500

1008 1530 1500 1530 1011 MIRDIF CITY CENTRE


1200

1230 1500 1230 Drawing title :

LIGHTING LAYOUT
DEMISE PIER FINISHED LEASE LINE DEMISE PIER FINISHED
BY LANDLORD BY LANDLORD

A B AREA- 843.5 SQ.FT

Project number.

Drawing number.
Q
R

MALL LEVEL Revision Suffix.

+20.500 FFL
+20.425 SSL Scale. Date. Drawn. Designed &
Checked:
1:50 24.02.2023 MGD PROJECTS
MGD PROJECTS
NOTES & LEGENDS:

1. Dimensions must not be scaled from this drawing.


2. All dimensions to be checked on site and discrepancies are to
CCMI be referred to this office for decision.
RS Malbar & gold 3. All work specified in this drawing to be carried out in strict
accordance with relevant Codes of Practice and Statutory
52 Authority Requirements.
4. All materials to be in full compliance with Codes of Practice
Statutory Authority Requirements
5. In carrying out works relating to this drawing, the contractor.is
to be responsible for complying with the full requirements of
all related legislation including Local Statutory Authority
Services Regulations and all Safety Acts (Latest Edition).
6.This drawing should be read in conjunction with other relevant,
GLASS SUPPORTED Architectural, Structural, Mechanical and Electrical drawings
S.S PROFILE IN BRASS
FROM CEILING and all relevant sections of the specifications.
FINISH (MT 01)
7. All dimensions are in millimeters unless otherwise indicated.

WPC BLUE FINISH


LEATHER FINISH AC GRILL
COVE EDGE FINISHED WITH S.S
FIRST FLOOR LVL. PROFILE IN BRASS FINISH ( MT 01)
+ 26.500 FFL WALL PANEL WALLPAPER LEATHERED PANELS
U- PROFILE IN BRASS
FINISH (MT 01)
+ 26.425 SSL

MALL CEILING LVL.


+ 4.500 AFFL
CL LVL +4500

UNDERSIDE OF BEAM
CL LVL +4000
CL LVL +3850
CL LVL +3700 S E R V I C E Z O N E CL LVL +3700

No. Revision details.

REVISION STATUS
15MM THICK CRYSTAL
CLEAR TOUGHENED GLASS

ADJOINING TENANCY
4500
LEASE LINE

ENTRANCE

Project :

200mm THK.
BLOCKWORK
GROUND FLOOR LVL. S.S FRAME IN BRASS
FINISH(MT 01)
TENANT UNIT MIRDIF CITY CENTRE
+ 20.500 FFL + 20.500 FFL
+ 20.425 SSL + 20.425 SSL
Drawing title :

LEATHER CLADDING
50MM SKIRTING- S.S PROFILE IN CONCEALED SHUTTER
SECTIONS
EXPANSION JOINT TO BE
ANTIQUE BRASS FINISH (MT 02)
50MM SKIRTING- S.S PROFILE MAINTAINED UPTO WALL LINING
IN BRASS FINISH (MT 01)
NICHE DISPLAY

AREA- 843.5 SQ.FT


SECTION A-A
Project number.

Drawing number.

Revision Suffix.

Scale. Date. Drawn. Designed &


Checked:
1:50 24.02.2023 MGD PROJECTS
MGD PROJECTS
NOTES & LEGENDS:

1. Dimensions must not be scaled from this drawing.


2. All dimensions to be checked on site and discrepancies are to
CCMI be referred to this office for decision.
RS Malbar & gold 3. All work specified in this drawing to be carried out in strict
accordance with relevant Codes of Practice and Statutory
Authority Requirements.

52 4. All materials to be in full compliance with Codes of Practice


Statutory Authority Requirements
5. In carrying out works relating to this drawing, the contractor.is
to be responsible for complying with the full requirements of
all related legislation including Local Statutory Authority
Services Regulations and all Safety Acts (Latest Edition).
6.This drawing should be read in conjunction with other relevant,
Architectural, Structural, Mechanical and Electrical drawings
GLASS SUPPORTED and all relevant sections of the specifications.
FROM CEILING 7. All dimensions are in millimeters unless otherwise indicated.
S.S PROFILE IN BRASS
FINISH (MT 01)

LEATHERED PANEL
LEATHER FINISH
FIRST FLOOR LVL.
WPC BLUE FINISH LEATHERED PANELS + 26.500 FFL
U- PROFILE IN BRASS FINISH (MT 01)
POWER WALL
+ 26.425 SSL

MALL CEILING LVL.


+ 4.500 AFFL
CL LVL +4500

UNDERSIDE OF BEAM
CL LVL +3850
S E R V I C E Z O N E CL LVL +3700

No. Revision details.


LEATHER FINISH
REVISION STATUS

15MM THICK CRYSTAL


CLEAR TOUGHENED GLASS
ADJOINING TENANCY

LEASE LINE

4500
4100
ENTRANCE
Project :
500 DIA M LOGO-
(BACK LIT)

200mm THK.
BLOCKWORK S.S FRAME IN BRASS MIRDIF CITY CENTRE
TENANT UNIT FINISH(MT 01)
GROUND FLOOR LVL.

1400
+ 20.500 FFL + 20.500 FFL
+ 20.425 SSL + 20.425 SSL Drawing title :

SECTIONS
50MM SKIRTING- S.S PROFILE IN CONCEALED CABINET SHUTTER EXPANSION JOINT TO BE 50MM SKIRTING- S.S PROFILE
ANTIQUE BRASS FINISH (MT 02) MAINTAINED UPTO WALL LINING IN BRASS FINISH (MT 01)

NICHE DISPLAY

AREA- 843.5 SQ.FT

SECTION B-B Project number.

Drawing number.

Revision Suffix.

Scale. Date. Drawn. Designed &


Checked:
1:50 24.02.2023 MGD PROJECTS
MGD PROJECTS
NOTES & LEGENDS:

1. Dimensions must not be scaled from this drawing.


2. All dimensions to be checked on site and discrepancies are to
CCMI be referred to this office for decision.
RS Malbar & gold 3. All work specified in this drawing to be carried out in strict
accordance with relevant Codes of Practice and Statutory
Authority Requirements.

R Q 4. All materials to be in full compliance with Codes of Practice


Statutory Authority Requirements
5. In carrying out works relating to this drawing, the contractor.is
to be responsible for complying with the full requirements of
all related legislation including Local Statutory Authority
Services Regulations and all Safety Acts (Latest Edition).
6.This drawing should be read in conjunction with other relevant,
Architectural, Structural, Mechanical and Electrical drawings
and all relevant sections of the specifications.
7. All dimensions are in millimeters unless otherwise indicated.

8400

COVE EDGE FINISHED WITH S.S


PROFILE IN BRASS FINISH ( MT 01)
FIRST FLOOR LVL.
+ 26.500 FFL
WALLPAPER LEATHER PANEL
LEATHER PANEL WPC BLUE FINISH AC GRILL MINE SIGNAGE
+ 26.425 SSL

UNDERSIDE OF BEAM
CL LVL +4000

S E R V I C E Z O N E
CL LVL +3850 CL LVL +3850
No. Revision details.
CL LVL +3700 CL LVL +3700
REVISION STATUS
ADJOINING TENANCY

ADJOINING TENANCY
Project :

MIRDIF CITY CENTRE


TENANT UNIT GROUND FLOOR LVL.
200mm THK.
+ 20.500 FFL BLOCKWORK + 20.500 FFL
+ 20.425 SSL + 20.425 SSL Drawing title :

50MM SKIRTING- S.S PROFILE IN 50MM SKIRTING- S.S PROFILE IN


SECTIONS
ANTIQUE BRASS FINISH (MT 02) ANTIQUE BRASS FINISH (MT 02)

SECTION C-C

AREA- 843.5 SQ.FT

Project number.

Drawing number.

Revision Suffix.

Scale. Date. Drawn. Designed &


Checked:
1:50 24.02.2023 MGD PROJECTS
MGD PROJECTS
NOTES & LEGENDS:

1. Dimensions must not be scaled from this drawing.


2. All dimensions to be checked on site and discrepancies are to
CCMI be referred to this office for decision.
RS Malbar & gold 3. All work specified in this drawing to be carried out in strict
accordance with relevant Codes of Practice and Statutory
Authority Requirements.

Q R 4. All materials to be in full compliance with Codes of Practice


Statutory Authority Requirements
5. In carrying out works relating to this drawing, the contractor.is
to be responsible for complying with the full requirements of
all related legislation including Local Statutory Authority
Services Regulations and all Safety Acts (Latest Edition).
8400 6.This drawing should be read in conjunction with other relevant,
Architectural, Structural, Mechanical and Electrical drawings
and all relevant sections of the specifications.
7. All dimensions are in millimeters unless otherwise indicated.

FIRST FLOOR LVL.


+ 26.500 FFL 15MM THICK CRYSTAL WALLPAPER 15MM THICK CRYSTAL CLEAR
+ 26.425 SSL CLEAR TOUGHENED GLASS TOUGHENED GLASS DOOR

UNDERSIDE OF BEAM
CL LVL +4000

S E R V I C E Z O N E
CL LVL +3850 CL LVL +3850
No. Revision details.
CL LVL +3700 CL LVL +3700

REVISION STATUS
ADJOINING TENANCY

ADJOINING TENANCY
Project :

MIRDIF CITY CENTRE


GROUND FLOOR LVL. TENANT UNIT
200mm THK.
+ 20.500 FFL BLOCKWORK
A + 20.500 FFL
+ 20.425 SSL + 20.425 SSL Drawing title :

Lease line
LOW HEIGHT PARTITION 15MM THICK CRYSTAL CLEAR 15MM THICK CRYSTAL CLEAR LOW HEIGHT PARTITION
SECTIONS
TOUGHENED GLASS A
TOUGHENED GLASS
Glass to be recessed
50 X100MM S.S FRAME IN
BRASS FINISH ( MT01)
15MM THICK CRYSTAL CLEAR
TOUGHENED GLASS DOOR

Max 50 mm
the frame to be rounded AREA- 843.5 SQ.FT
with no bulky corners- see
SECTION D-D visual comment
Project number.

Drawing number.
Shadow gap 20 mm
Revision Suffix.

Scale. Date. Drawn. Designed &


Checked:
1:50 24.02.2023 MGD PROJECTS
MGD PROJECTS
NOTES & LEGENDS:

1. Dimensions must not be scaled from this drawing.


2. All dimensions to be checked on site and discrepancies are to
CCMI be referred to this office for decision.
RS Malbar & gold 3. All work specified in this drawing to be carried out in strict
accordance with relevant Codes of Practice and Statutory

R Q Authority Requirements.
4. All materials to be in full compliance with Codes of Practice
Statutory Authority Requirements
5. In carrying out works relating to this drawing, the contractor.is
to be responsible for complying with the full requirements of
all related legislation including Local Statutory Authority
8400 Services Regulations and all Safety Acts (Latest Edition).
6.This drawing should be read in conjunction with other relevant,
Architectural, Structural, Mechanical and Electrical drawings
and all relevant sections of the specifications.
7. All dimensions are in millimeters unless otherwise indicated.

FIRST FLOOR LVL.


+ 26.500 FFL
+ 26.425 SSL

MALL CEILING LVL.


+ 4.500 AFFL

SIGNAGE - 500 DIA LOGO, 30MM SOLID No. Revision details.


ACRYLIC WITH SIDE RETURNS PAINTED MALL CEILING COVE REVISION STATUS
PANTONE 872C WITH FRONT LIT 6500K

SIGNAGE - 500 DIA LOGO, 30MM SOLID


ACRYLIC WITH SIDE RETURNS PAINTED
PANTONE 872C WITH FRONT LIT 6500K
ADJOINING TENANCY

ADJOINING TENANCY

4500
4100
DEMISE PIER FINISHED DEMISE PIER FINISHED
BY LANDLORD BY LANDLORD
3300

3300
Project :

GROUND FLOOR LVL.


MIRDIF CITY CENTRE
1400

1400
FLOOR FINISH BY
+ 20.500 FFL
1050

FREE STAND WINDOW LANDLORD


DISPLAY UNIT + 20.425 SSL Drawing title :

3050 2000 3050 SHOPFRONT ELEVATION


15MM THICK CRYSTAL 15MM THICK CRYSTAL 15MM THICK CRYSTAL FREE STAND WINDOW
CLEAR TOUGHENED GLASS CLEAR TOUGHENED CLEAR TOUGHENED DISPLAY UNIT
GLASS DOOR GLASS

50X100MM S.S FRAME IN 50X100MM S.S FRAME IN 50X100MM S.S FRAME IN


BRASS FINISH(MT 01) BRASS FINISH(MT 01) BRASS FINISH(MT 01)
AREA- 843.5 SQ.FT

Project number.

Drawing number.

Revision Suffix.

Scale. Date. Drawn. Designed &


Checked:
1:50 24.02.2023 MGD PROJECTS
MGD PROJECTS
NOTES & LEGENDS:

47
1. Dimensions must not be scaled from this drawing.
2. All dimensions to be checked on site and discrepancies are to be
referred to this office for decision.
LEATHERFINISH 3. All work specified in this drawing to be carried out in strict accordance with relevant
Codes of Practice and Statutory Authority Requirements.
4. All materials to be in full compliance with Codes of Practice Statutory Authority Requirements
CCMI 5. In carrying out works relating to this drawing, the contractor.is to be responsible for complying
RS Malbar & gold 1.5MM THICK BRASS

50
with the full requirements of all related legislation including Local Statutory
Authority Services Regulations and all Safety Acts (Latest Edition).
6.This drawing should be read in conjunction with other relevant, Architectural,
CAPPING (MT 01 FINISH) Structural, Mechanical and Electrical drawings and all relevant sections of the specifications.
7. All dimensions are in millimeters unless otherwise indicated.

WOODEN DESIGN PATTERN IN


PAINTED FINISH (RAL 4004)

1200
1.5MM THICK BRASS
CAPPING (MT 01 FINISH)

LED LIGHT

UV PRINTED GLASS

47 50
330

85

IN GOLD COLOR
R2

WOODEN DESIGN PLAN


PATTERN IN
PAINTED FINISH
(RAL 4004)
4500
3840

Project :

500 DIA M LOGO- MIRDIF CITY CENTRE


(BACK LIT)
Drawing title :

1.5MM THICK POWER WALL DETAIL


BRASS CAPPING
(MT 01 FINISH)
1600

AREA- 843.5 SQ.FT


LEATHER FINISH
330

50MM SKIRTING IN Project number.

MT-01 FINISH
Drawing number.
ELEVATION SECTION
Revision Suffix.

Scale. Date. Drawn. Design &Checked.


1:20 24.02.23 MGD PROJECTS MGD PROJECTS
NOTES & LEGENDS:
1. Dimensions must not be scaled from this drawing.
500 175 1330 1330 175 500 2. All dimensions to be checked on site and discrepancies are to be
referred to this office for decision.
3. All work specified in this drawing to be carried out in strict accordance with relevant
Codes of Practice and Statutory Authority Requirements.
CCMI 4. All materials to be in full compliance with Codes of Practice Statutory Authority Requirements
5. In carrying out works relating to this drawing, the contractor.is to be responsible for complying
RS Malbar & gold with the full requirements of all related legislation including Local Statutory
Authority Services Regulations and all Safety Acts (Latest Edition).
6.This drawing should be read in conjunction with other relevant, Architectural,
Structural, Mechanical and Electrical drawings and all relevant sections of the specifications.
7. All dimensions are in millimeters unless otherwise indicated.

8MM DIA CLEAR 8MM DIA CLEAR


TUBE FOR WIRING TUBE FOR WIRING

1330 175 500 500 175 1330

No. Date. Revision details.


8MM DIA CLEAR 8MM DIA CLEAR
TUBE FOR WIRING TUBE FOR WIRING REVISION STATUS

FRONT VIEW REAR VIEW

Project :

MIRDIF CITY CENTRE

Drawing title :

SIGNAGE REFERENCE

AREA- 843.5 SQ.FT


Project number.

Drawing number.

Revision Suffix.

Scale. Date. Drawn. Designed & Checked.


1:20 10.02.2023 MGD PROJECTS MGD PROJECTS
NOTES & LEGENDS:
1. Dimensions must not be scaled from this drawing.
2. All dimensions to be checked on site and discrepancies are to be
referred to this office for decision.
3. All work specified in this drawing to be carried out in strict accordance with relevant
Codes of Practice and Statutory Authority Requirements.
CCMI 4. All materials to be in full compliance with Codes of Practice Statutory Authority Requirements
5. In carrying out works relating to this drawing, the contractor.is to be responsible for complying
RS Malbar & gold with the full requirements of all related legislation including Local Statutory
Authority Services Regulations and all Safety Acts (Latest Edition).
6.This drawing should be read in conjunction with other relevant, Architectural,
Structural, Mechanical and Electrical drawings and all relevant sections of the specifications.
7. All dimensions are in millimeters unless otherwise indicated.

No. Date. Revision details.

REVISION STATUS

Project :

MIRDIF CITY CENTRE

Drawing title :

SIGNAGE REFERENCE

AREA- 843.5 SQ.FT


Project number.

Drawing number.

Revision Suffix.

Scale. Date. Drawn. Designed & Checked.


1:20 10.02.2023 MGD PROJECTS MGD PROJECTS
NOTES & LEGENDS:
1. Dimensions must not be scaled from this drawing.
2. All dimensions to be checked on site and discrepancies are to be
referred to this office for decision.
3. All work specified in this drawing to be carried out in strict accordance with relevant
Codes of Practice and Statutory Authority Requirements.
4. All materials to be in full compliance with Codes of Practice Statutory Authority Requirements
CCMI 5. In carrying out works relating to this drawing, the contractor.is to be responsible for complying
RS Malbar & gold with the full requirements of all related legislation including Local Statutory
Authority Services Regulations and all Safety Acts (Latest Edition).
6.This drawing should be read in conjunction with other relevant, Architectural,
Structural, Mechanical and Electrical drawings and all relevant sections of the specifications.
7. All dimensions are in millimeters unless otherwise indicated.

No. Date. Revision details.

REVISION STATUS

3D RENDERS

Project :

MIRDIF CITY CENTRE

Drawing title :

AREA- 843.5 SQ.FT

Project number.

Drawing number.

Revision Suffix.

Scale. Date. Drawn. Design &Checked.


1:50 24.02.2023 MGD PROJECTS MGD PROJECTS
Door design
CCMI
RS Malbar & gold
with handel

Sign baseline

Display height to folleow the same height of display behind

Lease line

Glass to be recessed

Max 50 mm

Max 50 mm
the frame to be rounded
with no bulky corners- see
visual comment

Avoid bulky corners


Shadow gap 20 mm
CCMI
RS Malbar & gold

recycled material
CCMI
RS Malbar & gold
CCMI
RS Malbar & gold

hexagon to be rounded as
proposed shape

this shape will match more


the design language
CCMI
RS Malbar & gold