SLAB OF BLOCK AB SHOULD BE READ IN CONJUNCTION WITH ALL
300mm THK. RC WALL OTHER DRAWINGS, SPECIFICATIONS AND
WATER PROOFING
RETAINING WALL OF BLOCK AB ASSOCIATED CONTRACT DOCUMENTS WITH DUE
2000
250mm THK. RC WALL ALLOWANCE FOR THE DESIGN STATUS.
250mm THK. RC SLAB TRENCH FROM BLOCK AB
550mm THK. RC SLAB
250
OSR
6. THIS DRAWING PROVIDES INFORMATION
TOP OF CUTOUT IN RETAINING WALL +98.440 m TRENCH BOTTOM SLAB LVL +95.890 m INTENDED TO IDENTIFY THE SCOPE, DESIGN
550
INTENT AND GENERAL INSTALLATION
REQUIRMENTS OF THE WORKS. THE CONTRACTOR
250mm THK. RC WALL 250 75
2000
75 SHALL BE RESPONSIBLE FOR THE FINAL
COORDINATION AND SHALL UNDERTAKE SITE
550mm THK. RC SLAB MEASUREMENTS AND/OR SURVEYS AS REQUIRED.
P.C.C (M15) 100 THK.
I TRENCH BOTTOM SLAB LVL +95.890 m I
550
7. GRADE OF CONCRETE SHALL BE AS FOLLOWS:
75 a. FOUNDATION: M40
TRENCH FROM BLOCK AB 2 SECTION b. COLUMNS & RC WALL: M40
c. BEAM, STAIRCASE & SLAB: M30
P.C.C (M15) 100 THK. - Scale 1 : 100
BLOCK AB
8. GRADE OF REINFORCEMENT SHALL BE Fe 500D.
2000
G 1550 G
BEAM AND RC TRENCH WALL
ROAD LVL +102.700 m
B5 WATER PROOFING TRENCH BOTTOM SLAB LVL +100.500 m TRENCH BOTTOM SLAB LVL +100.500 m
PILE CAP TOP LVL +100.400 m
200
1370 25mm GAP BETWEEN THE RC 75
75 75 75
BEAM AND RC TRENCH WALL PILE CAP OF
UTILITY BLOCK P.C.C (M15) 100 THK.
300mm THK. RC WALL 200mm THK. RC SLAB 00 FOR COORDINATION 20/08/21 JGG RR KJ
WATER PROOFING
300mm THK. RC WALL P.C.C (M15) 100 THK. REV DESCRIPTION DATE DRWN CHKD APPD
250mm THK. RC SLAB 250 3000 200mm THK. RC SLAB
F F
250mm THK. RC WALL
2000
4 SECTION 5 SECTION
TRENCH BOTTOM SLAB LVL +95.890 m - Scale 1 : 100 - Scale 1 : 100 ARCHITECT
550
200
MANHOLE TOP SLAB LVL +102.700 m MANHOLE TOP SLAB LVL +102.700 m Andheri (East) Mumbai- 400093, India
B5 B5 Tel +91 22 7153 8000 Fax +91 22 7153 80001
www.arup.com
1100
200 750
200mm THK. RC WALL MANHOLE BOTTOM SLAB LVL +101.550 m
C-X01 200mm THK. RC WALL MANHOLE BOTTOM SLAB LVL +101.200 m
MAIN CONTRACTOR
200
C C
75 RETAINING WALL BLOCK AB MEP CONSULTANT
PROJECT NAME
200 2870 200 200mm THK. RC SLAB DLF DOWNTOWN @ TARAMANI,CHENNAI
200mm THK. RC WALL
TRENCH TOP SLAB LVL +102.700 m Town Survey No 1/5 ,1/9 in Block No7 Tiruvanmiyur Village,
6 SECTION RETAINING WALL TOP LVL +102.100 m Mylapore-Triplicane Taluk, Chennai District
200 1800 200
B B
Survey No 300/2B , 300/2C & 301/3 in Kottivakkam Village,
- Scale 1 : 100 200mm THK. RC WALL Tamabaram taluk, Kanchipuram
TOP OF CUTOUT IN RETAINING WALL +101.400 m
STAGE :
500
16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1