School of Building Science & Technology Quantity Surveying & Specifications RATE ANALYSIS

Name of the Project: Vrajnandan Bunglows Item Student Name: Japan Shah Code No: 2404 Item Description Unit No. 11.01 Providing and applying 3 coats of white wash on newly plastered internal surface including Sq.m finishing etc. complete at Ground Floor level. Quantity Rate Amount Remarks

For 100 Sqm [A] Materials Slaked lime Glue Ultramarine blue Sodium chloride Cement Brush etc @ 10% Total material rate [B] Labours Skilled Unskilled Total labour rate [C] Water + electric @ 2% of A+B [D] Tools, Equipments & plants @ 2% A+B [E] Scaffolding @ 2% A+B [F] Profit & overhead @ 15% of A+B+C+D+E Total cost ----------------2.7 1.14 150 90 405 102.6 507.60 0.00 22.56 22.56 175.94 1348.85 Rs Kg Kg Kg Kg kg 30.8 0.08 0.09 4.01 33.77 5 150 70 5 11 154.00 12.00 6.30 20.05 371.47 56.38 620.20

Unit Rate

13 Rs / Sqm

Checked by: Date:

Page No.

School of Building Science & Technology Quantity Surveying & Specifications CALCULATIONS FOR RATE ANALYSIS
Name of the Project: Vrajnandan Bunglows Student Name: Japan Shah Code No: 2404

Calculations for rate analysis of 100 Sqm [A] Materials 1. Slaked lime For first coat =12 Kg For second coat = 8 Kg For Third coat = 8 Kg Total weight=28 Kg + wastage Total qty = 30.8 Kg 2. Glue For first coat =0.03 Kg For second coat = 0.02 Kg For Third coat = 0.02 Kg

Total weight=0.07 Kg + 10% wastage Total qty = 0.077 Kg 3. Ultramarin blue For first coat =0.04 Kg For second coat = 0.02 Kg For Third coat = 0.02 Kg Total weight=0.08 Kg + 10% wastage Total qty = 0.088 Kg 4. Sodium Chloride For first coat =1.55 Kg For second coat = 1.05 Kg For Third coat = 1.05 Kg Total weight=3.65 Kg + 10% wastage Total qty = 4.01 Kg 5. Cement For first coat =10.7 Kg For second coat = 10 Kg For Third coat = 10 Kg Total weight=30.7 Kg + 10% wastage Total qty = 33.77 Kg

Checked by: Date:

Page No.

School of Building Science & Technology Quantity Surveying & Specifications RATE ANALYSIS
Name of the Project: Vrajnandan Bunglows Item Student Name: Japan Shah Code No: 2404 Item Description Unit No. 11.02 Providing and applying 2 coats of semi-acrylic paint on newly plastered external surface including finishing etc. complete at Ground Floor Sq.m level. Quantity Rate Amount Remarks

For 100 Sqm [A] Materials Cement Paint Brush sand etc. @ 10% Total material rate [B] Labours Skilled Unskilled Total labour rate [C] Water + electric @ 2% of A+B [D] Tools, Equipments & plants @ 2% A+B [E] Scaffolding @ 2% A+B [F] Profit & overhead @ 15% of A+B+C+D+E Total cost -----------------

Kg

42

25

1050.00 105.00 1155.00

5.5 4

150 90

825 360 1185.00 0.00 46.80 46.80 365.04 2798.64 Rs

Unit Rate

28 Rs / Sqm

Checked by: Date:

Page No.