Confined Space Rescue Plan Guide

The document outlines a Rescue Plan for high-risk activities at the Fairmount Tower project in Riyadh, focusing on safety measures for working in confined spaces and at heights. It details the responsibilities of the rescue team, required equipment, emergency contact information, and precautions to ensure safety during operations. The plan emphasizes the importance of communication and proper training for all team members involved in rescue operations.

Uploaded by

ebinbernar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

Topics covered

  • Emergency Contacts,
  • Communication Equipment,
  • Emergency Procedures,
  • Gas Line Work,
  • Environmental Hazards,
  • Emergency Numbers,
  • Working at Heights,
  • Rescue Operations,
  • Rope Access,
  • Site Inspection
0% found this document useful (0 votes)
17 views8 pages

Confined Space Rescue Plan Guide

The document outlines a Rescue Plan for high-risk activities at the Fairmount Tower project in Riyadh, focusing on safety measures for working in confined spaces and at heights. It details the responsibilities of the rescue team, required equipment, emergency contact information, and precautions to ensure safety during operations. The plan emphasizes the importance of communication and proper training for all team members involved in rescue operations.

Uploaded by

ebinbernar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

Topics covered

  • Emergency Contacts,
  • Communication Equipment,
  • Emergency Procedures,
  • Gas Line Work,
  • Environmental Hazards,
  • Emergency Numbers,
  • Working at Heights,
  • Rescue Operations,
  • Rope Access,
  • Site Inspection

RESCUE PLAN Axis For Operation & Maintenance

RESCUE PLAN
‫خطة االنقاذ‬
CONFINED SPACE ‫العمل داخل االماكن مغلقة‬ WORKING AT HEIGHTS .‫العمل على االرتفاعات‬

PROJECT: Fairmount tower( gladding work)


LOCATION: Riyadh
PLANNED HIGH RISK ACTIVITY: ‫مخطط انشطة االعمال الخطرة‬
Excavation Entry Explosives Use Confined Space Entry Hazardous Substance Use Work at Heights
‫العمل داخل حفرة‬ ‫استخدامات ادوات قابلة لالنفجار‬ ‫العمل داخل اماكن مغلقة‬ ‫استخدام مواد خطرة‬ ‫العمل على ارتفاعات‬
Roof Work Tilt-Up/Precast Use Structural alterations Mobile plant movement Work in/over water
‫العمل على االسطح‬ ‫اعادة هيكلة‬ ‫نقل‬ ‫ فوق اسطح المياة‬/‫العمل داخل‬
Road work Gas/chemical/fuel line work Energised electrical Temperature extreme Flammable/ contaminated
‫اعمال طرق‬ ‫العمل على خطوط غاز اومواد كيميائية او وقود‬ work. ‫العمل فى درجة حرارة عالية‬ atmosphere
‫العمل في اماكن نشطة كهربيا‬ ‫استخدام مواد قابلة لالشتعال او ملوثة للبيئة‬
Demolition Work Asbestos Removal
‫اعمال هدم‬ ) ‫(ازالة االسبست‬
DEVELOPED BY: REVIEWED BY:
No Name Signature Position Date No Name Signature Position Date
1 MOHAMMAD ROPE ASCESS 1
MANEGER
GAMAL

APPROVAL BY:
MOHAMMAD GAMAL Signature: Position:
ROPE ASCESS MANEGER

Form # RARP07-01-01 Rev.:00 – Date: .11.02.2020 Page 1 of 8


RESCUE PLAN Axis For Operation & Maintenance

REVIEW: (NOTE: Work SHALL NOT proceed until the Rescue Plan is signed and dated by the HSE Manager or nominee)
Name: Signature: Position: Date:
Name: Signature: Position: Date:
The team surveyed the Position: M Signature: Date:
job: BAKTHA SUPERVIS
OR

P.P.E / EMERGENCY and COMMUNICATION PLANT, EQUIPMENT, TOOLS FOR JOB&PERMITS Rescue Equipment Air System And Other
REQUIREMENTS&TAGGING & SIGNS & INSTRUCTION “Check ” Equipment
“Check ” “Check ” “Check ”
Persons Working
Safety Harness ‫حزام‬ MSDS Rope access Cascade Rack
Above Ladder ‫سلم‬
‫امان‬ ‫النشرة الفنية لسالمة المواد‬ Harness \ ‫حزام احبال‬ ‫اسطوانات هواء‬
‫اشخاص تعمل باألعلى‬
Gloves – Cat5min
/Rigging/ PVC Leather Barrier Tape Hand Tools
Fans ‫مراوح‬ Steel Karabiner Regulator ‫منظم‬
Riggers ‫شريط حاجز‬ ‫ادوات يدوية‬
‫قفازات‬
Tinted/Clear Safety High Pressure Low- & high-
Flagging Shovel
Glasses Testing ‫اختبار ضغط‬ Pulley ‫بكارة‬ pressure hoses
‫نظارات شفافة‬
‫عالمات ارشادية‬ ‫مجرفة‬
‫عالى‬ ‫مرتفع‬/‫خراطيم ضغط منخفض‬
Air Purifying
Personal Locks Welding Machine Floor/Roof
Respirator I.D Airline ‫خط هواء‬
‫اقفال شخصية‬ ‫ماكينة لحام‬ Opening
‫فلتر تنقية هواء‬
Personal
Goggles Danger/Information Compactor Hot Work Rope protects. Isolation Valve
‫نظارات‬ Tag ‫مكـبس‬ ‫اعمال ساخنة‬ ‫واقى حبال‬ ‫صمام عزل‬
‫عالمات تحذيرية للمخاطر‬
Face Shield UHF Radio Drill Isolation
Soft Sling Manifold ‫موزع‬
‫واقى للوجه‬ ‫السلكى‬ ‫حفار‬ ‫العزل‬
Fire Blanket Fire Extinguisher Grinder Excavation SCBA 15 min
ASAP
‫بطانية حريق‬ ‫مكافحة حريق‬ ‫ حجار‬/ ‫تحجير‬ ‫الحفر‬ ‫ دقيقة‬15‫اسطوانة هروب‬

Form # AXIS -01-01 Rev.:00 – Date: .11.02.2020 Page 2 of 8


RESCUE PLAN Axis For Operation & Maintenance

High Pressure /
Hearing Protection Mobile Phone Pre-Scaffold SCBA 30 min
Abrasive Blasting Steel Sling
‫وقاية سمعية‬ ‫هاتف محمول‬ ‫انشاء سقالة‬ ‫ دقيقة‬30‫اسطوانة هروب‬
‫العمل فى اماكن ضغط عالى‬
Power Source Crane (where
Static Line/ Rope
‫مصدر طاقة‬ possible) ‫ونش ان امكن‬

HAZARDS ASSOCIATED WITH LOCATION


‫المخاطر المرتبطة بمكان العمل‬

Within a building ‫داخل المبنى‬ Accessible by many open hatches ‫ الخروج من اكثر من فتحة‬/‫الدخول‬
Operational equipment in surrounding area ‫المعدات المحيطة بمكان العمل‬ Only accessible by Ladder.
Other. Specify: High Pressure Breathing Airlines Rigged On-Ground ‫ الخروج الوحيدة عن طريق سلم فقط‬/ ‫طريقة الدخول‬
Outside the Confined Space ‫ مثل خطوط تنفس خارج االماكن المغلقة‬:‫أخرى‬
…………………………………………….

RESCUE PLAN ‫خطة االنقاذ‬


 Ensure area has been inspected and it is suitable for the task.
Rescue Precautions .‫التأكد من فحص مكان العمل وأنه مناسب للعمل‬
‫إحتياطات األنقاذ‬  Familiarise yourself with the controls and the work area (Overhead hazards and Working at Heights)
.)‫ واحتياطات االمن ( المخاطر فوق مستوى الرأس – العمل علي ارتفاعات‬،‫كن واعيا ً بمكان العمل‬
 Familiarise yourself with the rescue plan and ensure you agree with it.
.‫كن واعيا ً بخطة اإلنقاذ والتأكد من انك متوافق معها‬
 Ensure there is a communication system in place.
.‫التأكد من أن هناك نظام إتصال فى المكان‬
Emergency contact details Project Emergency Number Mobile Ph.
‫تفاصيل اتصاالت الطوارئ‬ ‫رقم الطوارئ للمشروع‬ Digital Emergency Channel #
AXIS OPERATION &MAINTENANCE

Form # AXIS -01-01 Rev.:00 – Date: .11.02.2020 Page 3 of 8


RESCUE PLAN Axis For Operation & Maintenance

RESCUE PLAN ‫خطة االنقاذ‬


RAT Responsibilities Rescue Team Responsibilities:
‫مسئوليات فريق العمل لالنقاذ‬ ‫مسئوليات فريق العمل فى الطوارئ‬

1. Team Leader (level 3 supervisor)


‫قائد الفريق‬
- The person in charge for selecting anchorage point, hanging ropes, and managing the team.
.‫الشخص المسئول عن عمليات اإلنقاذ‬
- Is responsible for the safety of rescue operation
.‫مسئول عن أمان عمليات اإلنقاذ‬

2. Level 2 and Level 1 rope access team members


.‫أعضاء فريق الطوارئ‬
- Is responsible for causality care
.‫مسئول عن اإلهتمام بالمصاب‬
- Is responsible for causality retrieval
.‫مسئول عن إخراج المصاب‬

Form # AXIS -01-01 Rev.:00 – Date: .11.02.2020 Page 4 of 8


RESCUE PLAN Axis For Operation & Maintenance

Weather Conditions:
‫حالة الطقس‬

- Observing the weather forecast on daily basis.


.‫متابعة توقعات الطقس اليومية‬
- Mind the slippery surfaces.
.‫مالحظة األسطح الزالقة‬

Potential Hazards:
‫األخطار المحيطة‬

- Injury while working at height.


- .‫اإلصابة فى االماكن المرتفعه‬
1-Work precaution
- Wind speed not to be more than 20 knot per second.

Anchor points:
‫اماكن التعليق‬

- Selected carefully and must be unquestionable and use sharing load systems for more secure.

Form # AXIS -01-01 Rev.:00 – Date: .11.02.2020 Page 5 of 8


RESCUE PLAN Axis For Operation & Maintenance

 Rope access technicians will work with separately sets of ropes hanged on unquestioned anchor points min strength 15
KN.

 In case of any rescue needed, intervention rescue technique will apply by one technician to another as trained under
supervision of level 3 supervisor or the level 3 himself will do the rescue whichever faster, easier, and efficient
deployment.

 Level 3 rope access called the performing authority to make announce for ambulance.

 L3 maintain ropes to the ground and take the casualty connected by two points to the ID karabiner on the rope, a
friction karabiner will put to the ID tail rope to minimize and control descending with the casualty then go down to the
ground.

 rescue team members will be responsible to secure the casualty to the stretcher to prevent any further damage or
1. Rescue from Possible severe injury using first aid kit under the supervision of level 3.
exhaust or Injury for
working at height.  casualty then will be assessed manually and in case of any first aid requirements done by level 3 supervisor. Team
leader would call site medical crew if further care needed.

‫اإلنقاذ في حالة االجهاد او االصابه‬


‫فى االماكن المرتفعه‬

Form # AXIS -01-01 Rev.:00 – Date: .11.02.2020 Page 6 of 8


RESCUE PLAN Axis For Operation & Maintenance

WORK GROUP MEMBERS(Members of the team carrying out of the work)


I have read and understand this rescue plan
NO POSITION NAME SIGNATURE NO POSITION NAME SIGNATURE
1 Eng/Rope access Mohammed Gamal 10 SPIDER/L1 TIRTHA MAN
Manager TAMANG

2 Eng/ Safety manager EBIN BERNARD 11 SPIDER/L1 RAJU DHAKAL

3 SPIDER/L3 BHAKT GURUNG 12 SPIDER/L1


RIKI GURUNG
4 SPIDER/L2 LAXMI GURUNG 13 HELPER Guru Yadav

5 SPIDER/L1 UMESH 14 HELPER SAIF ULLAH

6 SPIDER/L1 BARUN RAI 15 HELPER MD ASHIK

7 SPIDER/L1 SABER ALI 16 HELPER JAVITH


JANBASHA
8 SPIDER/L1 HEM BAHADUR 17

9 SPIDER/L1 BISHWOKARMA 18

Form # AXIS -01-01 Rev.:00 – Date: .11.02.2020 Page 7 of 8


RESCUE PLAN Axis For Operation & Maintenance

Form # AXIS -01-01 Rev.:00 – Date: .11.02.2020 Page 8 of 8