Construction Bill Summary for Bharta Sevashram

The document provides a detailed status report of billing for Ashirbad Intcon Pvt. Ltd. related to the Bharta Sevashram Sangh School project as of January 15, 2025. It includes quantities, rates, and amounts for various construction items such as steel reinforcement, centering, and concrete work, totaling a work done amount of Rs 1,262,580.00 after discounts and extra works are accounted for, with a significant supply of steel at the site amounting to Rs 2,486,503.69.

Uploaded by

nishukaushik827
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
39 views1 page

Construction Bill Summary for Bharta Sevashram

The document provides a detailed status report of billing for Ashirbad Intcon Pvt. Ltd. related to the Bharta Sevashram Sangh School project as of January 15, 2025. It includes quantities, rates, and amounts for various construction items such as steel reinforcement, centering, and concrete work, totaling a work done amount of Rs 1,262,580.00 after discounts and extra works are accounted for, with a significant supply of steel at the site amounting to Rs 2,486,503.69.

Uploaded by

nishukaushik827
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

ASHIRBAD INTCON PVT.

LTD
CLIENT- BHARTA SEVASHRAM SANGH SCHOOL.
STATUS OF BILL UPTO 15TH JAN 2025
Abstract-RA1st.
Item BOQ Per.of Prv. Bill This bill Commulati Pri.Bill This bill Commulative Bill
Description Unit
No. Rate(Rs) Rate(%) Qty. Qty. ve Bill Qty. Amount(Rs) Amount(Rs) Amount (Rs)
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in
position and binding all complete above plinth level. Kg 100 90 6982.04 628,383.69 628,383.69
6
5.22A.6 Thermo-Mechanically Treated bars of grade Fe-500D or more.
Centering and shuttering including strutting, propping etc. and
removal of form work for : Sqm 910 819 228.552 187,184.09 187,184.09
7
5.9.20 Columns, piers, abutments, pillars, posts and struts

10 (B) 5.33.2.3 (a) Concrete of M35 grade with minimum cement content of 370 kg /cum Cum 9265 8338.5 43.173 359,998.06 359,998.06
Total Amount (Rs) 1,175,565.84 1,175,565.84
Less: Discount @1% on basic Amount( Rs) -11,755.66 11,755.66
1,163,810.18
EXTRA WORKS 98,769.82
Total Work done Amount (Rs) 1,262,580.00
70% Amount of Supply steel at site. Kg 53.10 66,899.78 2,486,503.69 2,486,503.69
Total Amount . 3,749,084 2,486,503.69