The document is a shop drawing for the cable trunking layout of the Haryono Data Center in Jakarta, Indonesia. It includes specifications for galvanized cable trunking and details about various pumps and control panels. The drawing also outlines compliance with health and safety regulations and provides contact information for project consultants and contractors.

Uploaded by

dinduntobz
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
707 views1 page

Cable Trunking - Plan

The document is a shop drawing for the cable trunking layout of the Haryono Data Center in Jakarta, Indonesia. It includes specifications for galvanized cable trunking and details about various pumps and control panels. The drawing also outlines compliance with health and safety regulations and provides contact information for project consultants and contractors.

Uploaded by

dinduntobz
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

N

CINA
D C B

RA
BIDA
A A A

JL.

TA
R DINA
NDA
O ISKA
JL.

OTT
MT.
HAR
YON
O

JL.
CABLE TRUNKING & COVER
CABLE TRUNKING & COVER CABLE TRUNKING & COVER
GALVANIZED 100X100 mm
GALVANIZED 100X100 mm GALVANIZED 100X100 mm ELV +2770
ELV +2710 ELV +2750 NOTES:
1. ALL DIMENSIONS ARE IN "mm" & LEVELS ARE IN "m",
1630 100 100 1460 UNLESS OTHERWISE SPECIFIED.
2. THE INSTALLATION AND DESIGN SHALL COMPLY
WITH THEHEALTH AND SAFETY AT WORK ACT, AND
ALL REGULATIONS.
1
A

1
A

3. THIS DRAWING SHALL BE READ IN CONJUNCTION


DIESEL PUMP JOCKEY PUMP WITH ALL ASSOCIATED EQUIPMENT SCHEDULES AND
CONTROL PANEL CONTROL PANEL MECHANICAL,ELECTRICAL, STRUCTURAL AND

1580
ELECTRIC PUMP

1680
ARCHITECTURAL DRAWINGS.
CONTROL PANEL

2230
A
A

A
A

DIESEL FIRE PUMP ELECTRIC FIRE PUMP B1


JP

D
A

C
A

BA

REV. NO. REVISION DESCRIPTION BY DATE


PROJECT TITLE:

HARYONO DATA CENTER


M.T. HARYONO, JAKARTA TIMUR, INDONESIA.
CLIENT

Project Managers|QS Consultants

PT. TURNER & TOWNSEND


International Financial Centre, 26F Jl. Jend. Sudirman Kav 22-23, Jakarta
Selatan 12920 Tel: +62 21 252 3895 www.turnerandtownsend.com

M&E Consultant
3 ANSON ROAD #17-03 SPRINGLEAF
TOWER SINGAPORE 079909
t: +65 6226 3106 | www.red-eng.com

Architect

AWP PTE LTD


143 CECIL STREET, #12-00 GB BUILDING
SINGAPORE 069542
Tel: + 65 63376777, Fax:+ 6563396956
www.awparchitects.com
Proj. email:
awp220603c@awparchitects.com

C&S CONSULTANT:

GRAHA CHANTIA L3, JL BANGKA RAYA NO. 6 JAKARTA SELATAN 12720


TEL: +6221 719 0011 | ttw.com.au | ttw@ttwindonesia.com

SECURITY CONSULTANT:

16 COLLYER QUAY #22 01/02 INCOME @ RAFFLES SINGAPORE 049318


Tel: +65 6227 2038 | singapore@controlrisk.com

GENERAL CONTRACTOR:
A1 PT. Berca Buana Sakti
A1
PT. Berca Mandiri Perkasa
JOINT OPERATION
Jl. RC. Veteran No. 4 Bintaro,Jakarta
12330, Indonesia.
Tel. 021-7361979, Fax. 021-7362003

GC's DC CONSULTANT:
HEWLETT-PACKARD
ENTERPRISE
Data Center Technology Service

SHOP DRAWING
CABLE TRUNKING LAYOUT
7
7
CABLE TRUNKING LAYOUT FIRE PUMP ROOM
1 : 20
FIRE PUMP ROOM SCALE

DRAWN DWG
1 : 40
A1
A3
NANDO
SIGNATURE DATE

CHECKED ARC SUBHAN


CHECKED STR RIBUT S
CHECKED ME/P SINAR G
APPROVED EM JOEBEN
DRAWING NO. REV.NO.

HDC-BBS-PH1-01-DR-J-3001-0