0% found this document useful (0 votes)
1K views3 pages

BoQ Calculations Document

The document provides detailed calculations for various construction components including foundations, superstructure walls, flooring, roofing, doors, windows, and site works. It includes volumes for excavation, concrete, plastering, and materials needed such as bricks, cement, sand, and roofing materials. Additionally, it notes the consideration of standard wastage percentages and potential on-site adjustments.

Uploaded by

brookeorderszw
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
1K views3 pages

BoQ Calculations Document

The document provides detailed calculations for various construction components including foundations, superstructure walls, flooring, roofing, doors, windows, and site works. It includes volumes for excavation, concrete, plastering, and materials needed such as bricks, cement, sand, and roofing materials. Additionally, it notes the consideration of standard wastage percentages and potential on-site adjustments.

Uploaded by

brookeorderszw
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

# BoQ Calculations Document

## Foundation Calculations

1. **Excavation (Volume):**

- 230mm walls: 19.55 m³ = Length x Width x Depth

- 115mm walls: 2.34 m³ = Length x Width x Depth

2. **Concrete for Footings (Volume):**

- 230mm walls: 19.55 m³ = Length x Width x Depth

- 115mm walls: 2.34 m³ = Length x Width x Depth

3. **Sand Blinding (150mm thick):**

- 230mm walls: 4.89 m³ = Length x Width x Thickness

- 115mm walls: 0.59 m³ = Length x Width x Thickness

## Superstructure Wall Calculations

1. **Net Wall Area:**

- 230mm walls: 111.93 m² = (Length x Height) - Openings

- 115mm walls: 23.43 m² = (Length x Height) - Openings

2. **Plastering:**

- Internal/External Areas: 135.36 m² = Net wall area x 2 sides (less openings)

3. **Painting:**

- Internal/External Areas: 135.36 m² (three coats applied to plastered surfaces).

## Flooring Calculations

1. **Concrete Slab Volume:**

- 14.37 m³ = Area x Thickness (150mm)

2. **Cement Screed Volume:**


- 2.40 m³ = Area x Thickness (25mm)

3. **Tiling Area:**

- 95.8 m² = Sum of room areas.

## Roofing Calculations

1. **Roof Area:**

- 92 m² = Base Area / cos(Pitch Angle)

2. **Timber Truss Volume:**

- 0.45 m³ based on standard spacing (900mm c/c).

3. **Gutters and Downpipes Length:**

- 25 m based on roof perimeter.

## Doors and Windows Calculations

1. **Doors:**

- D01: 1 unit

- D02: 4 units

- D08: 1 unit

2. **Windows:**

- GW05: 1 unit

- GW08: 1 unit

- GW11: 4 units

- GW13: 1 unit

## Site Works Calculations

1. **Sewer Line Length:**

- 20 m based on site plan.

2. **Pergola Area:**
- 4.5 m² based on site plan.

---

## Material Breakdown (Detailed Calculations)

1. **Bricks:**

- Total Bricks = (Wall Surface Area / Brick Size) + Wastage

- Approximate Total: 8,000 pcs

2. **Cement:**

- Cement Bags = (Concrete Volume + Plaster Volume + Screed Volume) / Mix Ratio

- Approximate Total: 200 bags

3. **Sand and Aggregate:**

- Sand: 17.05 m³ (mortar, plaster, concrete)

- Aggregate: 16.43 m³ (foundation and slab concrete)

4. **Roofing Materials:**

- Chromadek Sheets: 92 pcs

- Timber Truss: 0.45 m³

---

## Notes:

- The calculations consider a standard wastage percentage (5-10%) for materials.

- Adjustments may be required on-site based on practical conditions.