Risk Assessment: Installation and Testing of GRP Water Storage Tank
1. Project Details
- Project Title: Installation and Testing of GRP Water Storage Tank
- Location: [Insert Project Location]
- Date: [Insert Date]
- Prepared By: [Insert Name]
2. Scope of Work
- Delivery and unloading of GRP tank components.
- Assembly and installation of the GRP tank.
- Connection to plumbing system.
- Hydrostatic testing of the tank.
3. Hazard Identification and Risk Assessment
Activity Hazard Risk Level (L/M/H) Control Measures
Delivery of tank components Manual handling injuries M Use mechanical lifting aids; ensure proper lif
Vehicle movement H Use banksman; restrict access during unload
Assembly of tank Working at height H Use scaffolding/ladders with fall protection; P
Use of power tools M Tools inspection; PPE (gloves, goggles); trai
Installation and plumbing work Slips, trips, and falls M Housekeeping; non-slip footwear.
Confined space hazards (if any)H Conduct gas testing; ventilation; confined sp
Hydrostatic testing Water spillage and slips M Ensure proper drainage; use caution signs.
Structural failure during testing H Gradual filling and pressure monitoring; insp
4. Personal Protective Equipment (PPE)
- Safety helmet
- Safety gloves
- Safety boots
- High-visibility vest
- Eye protection
- Fall arrest harness (if working at height)
Risk Assessment: Installation and Testing of GRP Water Storage Tank
5. Emergency Procedures
- First aid kits on site.
- Fire extinguisher available.
- Nearest hospital/contact details displayed.
- Emergency assembly point designated.
6. Monitoring and Review
- Supervisor to conduct daily toolbox talks.
- Safety officer to perform regular site inspections.
- Risk assessment to be reviewed and updated if work scope changes.
7. Approval
- Prepared by: [Name, Signature, Date]
- Reviewed by: [Name, Signature, Date]