You are on page 1of 2

HSE MANAGEMENT SYSTEM Rev no.

:0
RISK IDENTIFICATION AND CONTROL
Date of Rev:
SIL-HSE-F-06
06.10.07

BACK FILLING
SL. ACTIVITY TYPE OF RISK RISK RISK CONTROL MEASURES CONTROL
NO HAZARD INVOLVED LEVEL MEASURES
BY
01. Backfilling Back filling of A. Striking M A. Area layout including existing services. ACE/PEE/
excavated pit existing services PME
through heavy - Work permit
equipments - Planning of marching of equipment.
- Continuous supervision.
- Within 3 mtrs. Radius of life pipe
line/electrical line back filling through
mechanical equipment should not be used.

B. Persons struck H B. Induction training for workmen and operators ACE/PME/


by machine boom - Continuous supervision SO
- Display of warning sign
- No persons allowed standing working
with in operating radius.
- Vehicles should have reverse horn
C. Equipment H C. Planning for safe working procedure. ACE
falling into the pit - Continuous supervision
- Restriction of vehicles movements &
warning sign.
D. Noise and L D. Checking & approval by movement authority. ACE/PME
smoke emission - Planned maintenance program
from equipment.
HSE MANAGEMENT SYSTEM Rev no.:1
RISK IDENTIFICATION AND CONTROL
Date of Rev:
SIL-HSE-F-06
07.10.07

SL. ACTIVITY TYPE OF RISK RISK RISK CONTROL MEASURES CONTROL


NO HAZARD INVOLVED LEVEL MEASURES
BY
02. Backfilling Compaction back A. Head, foot & M A. Selection of capable fit & experience ACE/SO
filled loss earth by eye injury workmen.
help of plate - Proper Training
compactor or - Providing off pits.
vibratory roller or - Display of caution boards
grader or water - Continuous monitoring
sprinkling tanker - Monitoring based on weather condition for
safe working atmospheres
B. Injury from H B. Using of proper PPEs. ACE
unguarded - All moving parts of mechanical equipment
moving parts of should be properly guarded.
machine - Trained & experienced workmen should be
engaged for the work
C. Noise & L C. Checking & approval by competent authority. ACE/PME
smoking emission - Planned maintenance program
from equipment - Water sprinkling shall be done for dust
and dust hazard control

ABRIVATIONS USED IN CONTROL MEASURES ARE AS FOLLOWS


ACE: ACTIVITY CONTROL ENGINEER/SUPERVISOR
SO: SAFETY OFFICER/ENGG/SUPERVISOR
PME: PLANT MAINTENANCE ENGINEER
PEE: PLANT ELECTRICAL ENGINEER
H - HIGH
L – LOW
M - MEDIUM

You might also like