You are on page 1of 3

Crew: SINOPEC 321 Cote d'Ivoire 2D ONSHORE/LAKE SEISMIC ACQUISITION

Task: Maintain the out-board engine SN: 006

Version: 00 Date: 12th Dec.2019

Person responsible for JSA: Wei Jiasheng Approved by: Tullow EHS QC

Reference Procedure: Environmental Management Plan, Emergency Response Plan

Fre
Seve Ris Residual
No Basic Steps Hazards/Causes que Recommended Measures
rity k Risk
ncy
2 preparation tools are not in good Use certificate tools to do the maintain work
3 B L L
condition Inspect daily for defects.
Lack of or unqualified Confirm the quality and integrity of the PPE prior to operation
PPE 3 C M L

Inexperienced workers Maintain operations carried out with extreme caution and a high
3 C M level of safety awareness. HSE and technical Training, safety L
meeting, and unsafe act audit
3 Move the Poor position to move it - All personal will wear PPE consisting of boots, gloves & gators
outboard The out-board engine run (shin guards), eye protection (safety glasses).
engine over the foot.
3 C H - Fixed the engine before moving L
- All the workers should accept the manual handling training

- Strengthen supervision

4 Lift the Overload 4 B M - Establish a specific lifting plan L


outboard - Chain block capacity should be checked, the weight of the out
engine
board engine should be known.

- No lifts to exceed 90% of the Chain block capacity at any given


radius.

- PPE
Crew: SINOPEC 321 Cote d'Ivoire 2D ONSHORE/LAKE SEISMIC ACQUISITION

Load falling - Only certified equipment with a pre-use inspection to be carried


out.

- Operator ensure all lifting equipment to be used is certified '


3 C M L
- Ensure Load is stable and safe before releasing the slings

- Carry out a test lift and check load is balanced.

- No lifting over foot, or other equipment

Poor control - Trained operator.

3 C M - A supervisor monitor the lift process. L

- PPE

5 maintain Pinched fingers - Wear gloves and keep fingers clear

- Use the heel of the hand to steady a load if required


2 E M L
- JSA for the task

- SINOPEC Stop of work policy"

Oil spill "- JSA and Safe Work Procedure


- Proper tools
- Container for used oil
- Toolbox meeting prior to starting job
3 C M - EIA requirements L
- Compliance with crew WMP
- PPE (gloves, overalls, anti-slip boots)
- Pro-Action reporting
- Make sure a spill tray is in place
Crew: SINOPEC 321 Cote d'Ivoire 2D ONSHORE/LAKE SEISMIC ACQUISITION

6 refueling spills, fire, overflows - Competent & authorized refuelers only


- No smoking policy
- Training of fueling personnel
- Make use of funnel for refueling
- Fit for purpose fueling equipment (hoses, nozzles, etc.)
- JSA and SWP for fueling
3 D M - Refueling equipment maintained L
- Inspection schedule
- Fire extinguisher use training
- Planning of refueling ops
- Prohibition of ignition sources or any open flame
- Grounding and bonding
- PPE (gloves, eye protection, overalls)