Safety Measures for Major Hazardous work

Department Mechanical - Condenser Work Description Installation Strainer


Location Unit # 10 – Condenser Pre-Assembly Work Duration Day
Responsible Manager Danny/Siva S/Asra Engineer / Supervisor Rohmi / Afrizal / Afriansya

Job Step
Eqpt. / Tools Hazzard/Risk
Control Measures Remarks
Phots Description /ETC. Identification

Critical Lifting Chain block • Lack of Com- • All personal must known the lifting
(Strainer) 10 Ton Qty. 2 munication. Risk assessment.
• Setting up Pcs, Chain • Only one lifting supervisor/signal
sling wire in block 5 Ton man to give directions.
positioning 1 Pcs, lifting • Working at • All personnel must be wearing full
• Prepare Chain gears and height. body harness.
block & lifting equipment. • Barricade installed.
gears • Manual han- • Hazard associated of manual han-
• locking should dling. dling communicated to all workers
be done during TBM.
• Uninstall lifting • Max 25 kg load weight for individ-
gears after on ual personnel for manual lifting.
base. • Rigging work be performed by
• Failure of lifting trained / qualified personnel.
equipment. • Ensure correct rigging equipment is
available.
• Make sure all lifting gear that used
are inspected and color code up-
dated.
• Make sure all chain hoist hooks
must be provide with safety latch.