PROJECT:
01 Pipe shifting • Fall of material • Material shall not be thrown or pulled during
unloading.
• Stacking of Material on over height should be avoid.
• Protruding ends of sharp • Mandatory PPE’s with job specific Hand gloves shall
edges. be used.
• Crush injury • Ensure Pipes shall lowering carefully.
• Slip & Trip • Unwanted material removed from the work area to
avoid slip and trip.
1|Page
JOB SAFETY ANALYSIS
PROJECT:
02 Pipe installation • Flying particle • Ensure safety goggle during installation of Pipes.
• Sharp edges/ Pinch points • Mandatory PPE’s with job specific PPE’s shall be used.
• Falling into the excavation • .Avoid the stocking of unwanted materials &
(Person/Materials)
pipes near excavation edge or the access area.
2|Page
JOB SAFETY ANALYSIS
PROJECT:
03 Pump operation • Excess Noise generation • Job specific PPE’s will be used( Ear muff/ear plug,
• Dust generation Nose mask)
• Ensure nose mask for the pump operator while
operate the pump.
• Improper guarding • Inspect the pump by the competent person
before start the equipment.
• Ensure moving parts of power tool has proper
guard.
• Pump area must be barricade.
• Improper competency
• Pump operated by competent persons.
3|Page
JOB SAFETY ANALYSIS
PROJECT:
04 Vehicle movement • Break failure • Inspect the vehicle before entering into the site and
every day before start the work.
• Provide wheel stopper to prevent certain movement
of vehicle during loading or unloading.
• Ensure leveled or compacted access for vehicle.
4|Page
JOB SAFETY ANALYSIS
PROJECT:
05 Concrete Pouring • Flying slurry particle • Job specific PPE’s shall be used.(Safety goggle, Nose
mask, hand gloves, Gumboots ).
• Maintain certain distance while pouring in progress.
• Slip & Trip
• Good housekeeping should be maintained on working
area.
• Unwanted tools/materials removed from the work
location or access area immediately.
• Do not allow throw any material.
• Electrical shock
• Electrical connection will given by Authorized
Electrician.
• Power tool should be inspected by the PMC safety
person and the power tools have validated inspection
tags.
• Always use insulated electrical equipment.
• Electrical cables should be completely insulated and
free from joints.
• Skin injury
• Avoid cement or cement slurry direct contact of
persons skin by using full sleeve clothing.
5|Page
JOB SAFETY ANALYSIS
PROJECT:
1) …………………………. 1) …………………………..
2) …………………………. 2) …………………………..
6|Page