S No TASK INVOLVED POTENTIAL HAZARDS RECOMMENDATION

01 Pipe shifting • Fall of material • Material shall not be thrown or pulled during
unloading.
• Stacking of Material on over height should be avoid.

• Protruding ends of sharp • Mandatory PPE’s with job specific Hand gloves shall
edges. be used.
• Crush injury • Ensure Pipes shall lowering carefully.

• Slip & Trip • Unwanted material removed from the work area to
avoid slip and trip.

• Manual lifting shall be done as per safe ergonomic


• Strain injury principles.

S No TASK INVOLVED POTENTIAL HAZARDS RECOMMENDATION

1|Page
JOB SAFETY ANALYSIS
PROJECT:

02 Pipe installation • Flying particle • Ensure safety goggle during installation of Pipes.
• Sharp edges/ Pinch points • Mandatory PPE’s with job specific PPE’s shall be used.

• Collapse of Soil • Do not allow any person near to the excavation


edge.
.
• Unsafe use of tools • Ensure proper tools for every activity.
• Defective tool removed from the site.
• Trained & experienced worker to be perform the
job.
• Slip and Trip • Ensure a Safe access and egress to the
excavation area.
• Ensure access should free from any obstruction.

• Falling into the excavation • .Avoid the stocking of unwanted materials &
(Person/Materials)
pipes near excavation edge or the access area.

S No TASK INVOLVED POTENTIAL HAZARDS RECOMMENDATION

2|Page
JOB SAFETY ANALYSIS
PROJECT:

03 Pump operation • Excess Noise generation • Job specific PPE’s will be used( Ear muff/ear plug,
• Dust generation Nose mask)
• Ensure nose mask for the pump operator while
operate the pump.
• Improper guarding • Inspect the pump by the competent person
before start the equipment.
• Ensure moving parts of power tool has proper
guard.
• Pump area must be barricade.
• Improper competency
• Pump operated by competent persons.

• Poor illumination • Don’t allow other persons near the pump.

• Ensure sufficient illumination during work at night.

S No TASK INVOLVED POTENTIAL HAZARDS RECOMMENDATION

3|Page
JOB SAFETY ANALYSIS
PROJECT:

04 Vehicle movement • Break failure • Inspect the vehicle before entering into the site and
every day before start the work.
• Provide wheel stopper to prevent certain movement
of vehicle during loading or unloading.
• Ensure leveled or compacted access for vehicle.

• Improper competency • Training given to all drivers or operators about safe


operation of vehicle & speed limit of vehicle inside
the plant premises.

• Ensure all drivers have valid driving licence.


• Person hit by vehicle
• Trained & experience supervisor to be monitoring the
activity.

• Appoint a flagman for safe operation of vehicle.

• Do not allow person near to the vehicle.

S No TASK INVOLVED POTENTIAL HAZARDS RECOMMENDATION

4|Page
JOB SAFETY ANALYSIS
PROJECT:

05 Concrete Pouring • Flying slurry particle • Job specific PPE’s shall be used.(Safety goggle, Nose
mask, hand gloves, Gumboots ).
• Maintain certain distance while pouring in progress.
• Slip & Trip
• Good housekeeping should be maintained on working
area.
• Unwanted tools/materials removed from the work
location or access area immediately.
• Do not allow throw any material.
• Electrical shock
• Electrical connection will given by Authorized
Electrician.
• Power tool should be inspected by the PMC safety
person and the power tools have validated inspection
tags.
• Always use insulated electrical equipment.
• Electrical cables should be completely insulated and
free from joints.
• Skin injury
• Avoid cement or cement slurry direct contact of
persons skin by using full sleeve clothing.

5|Page
JOB SAFETY ANALYSIS
PROJECT:

PREPARED BY: REVIEWED AND APPROVED BY:

1) …………………………. 1) …………………………..

2) …………………………. 2) …………………………..

SIGNATURE OF INITIATOR & ACCEPTOR SIGNATURE OF PERMIT ISSUER

…………………. ……………………….. …………………………………..

DATE & TIME ………………… DATE & TIME …………………

JSA REFERENCE NUMBER: Use additional sheets if required

6|Page

You might also like