You are on page 1of 6

SIFY INFINIT SPACES LIMITED SIRUSERI

JSA FOR LIFTING(CRANE)

Basic Job
Potential Hazard Control Measure Responsible Person
Sequence
• Obtain correct Permit to Work
• Injury / damage as a result of • Only authorized person allowed
1. Obtain PTW incorrect information • All Workers must be inducted SITE ENGINEER / SAFETY
• Unauthorized personal OFFICER
• All personnel to be project and zone inducted
• Ensure all approved controls and prevention measures are
discussed and JSA discussed with all persons involved in the
work.
2. Tool box talk Unauthorized access/egress, • All personnel to attend daily toolbox talk prior to the SITE ENGINEER / SAFETY
working platform, Unsafe commencement of work. OFFICER
conditions • All personnel should be Wear proper PPE

• Safety induction to new employees, specialized training to


• Risk of injury due to low craftsmen
awareness of work activities • job pre start Meeting / Tool box meeting SITE ENGINEER / SAFETY
3. Identify work
and area condition • Mandatory use Of PPE’s OFFICER
Area
• Unsafe Access • Work area pre inspection Provide proper access.

• Risk of Electrical injury due to • Safety induction to all area employees


electrical shock. • Job pre start meeting / Tool box meeting
• Electrocution (death due to • Required to maintain proper work distances
3. Overhead powerlines electrical shock) • Provide proper access SITE ENGINEER / SAFETY
• Burns due to electrical shock • Area should not be wet because Electric hazards can be made OFFICER
• Falls due to electrical shock worse if the worker, location or equipment is wet

1
SIFY INFINIT SPACES LIMITED SIRUSERI

JSA FOR LIFTING(CRANE)

Basic Job
Sequence Potential Hazard Control Measure Responsible Person
• Area should be clear from any debris
• Improper access • Material must be segregate
• Personal injury • Housekeeping must be done prior to start the job and finished
• Uneven ground pavement the job
4 .Lifting area • Bad housekeeping • Adequate access.
preparation • Scattered materials • Ensure area is properly prepared for job
• Slip, trip • Ground pavement must be levelled properly SITE ENGINEER / SAFETY
• Un authorized entry • Provide proper barricades OFFICER
• Excavations and trenches • Provide signage
• Provided spill tray for flammable oils
• Provide adequate fire extinguisher
• Follow the monthly colour code
• Maintain safe distance from Excavation and trenches.

SIFY INFINIT SPACES LIMITED SIRUSERI

JSA FOR LIFTING(CRANE)

Basic Job
Sequence Potential Hazard Control Measure Responsible Person

2
• Pre inspection of crane equipment prior to start the job.
• Personal injury • Ensure crane is third party certified
• Improper access • Follow safe operating procedures
• Sharp edges • Proper supervision from immediate supervisor
• Hand injury • Prepare proper signage and barricade prior to lifting job
• Pinch point • Use PPE’s as per requirements
• Hit by/hit by objects • Ensure that overhead object has properly place and tied off
• Rolling over of stack pipes • Material should be properly stacked
• Slip, trip hazard • Good house keeping
• Improper stacking of pipes • If working at height must be undergo training of working at
• Property damage heights
• Falling objects • Use fall protection gear
• Scattered pipe materials • Proper segregation of pipes as per sizes
• Fire • Ensure proper fire extinguisher is available in the area SITE ENGINEER / SAFETY
5. Material preparation
• Fall of height • Don’t put the hands in between two objects OFFICER
• Mechanical failure • Ensure sling is third party certified
• Lifting tackle failure • Inspect the sling thoroughly prior to use
• Caught in between • Ensure lifting gear has third party certified and valid
• Vision blocked • Ensure lifting gear has no signed of damage, if damage found
don’t use it or replace immediately
• Ensure out rigging pad available and no defects
• Follow monthly colour code
• Operation vision must be clear
• Proper communication between operator and Rigger.

SIFY INFINIT SPACES LIMITED SIRUSERI

JSA FOR LIFTING(CRANE)

Basic Job
Sequence Potential Hazard Control Measure Responsible Person

3
• Uneven ground pavement • Ensure crane must third party certified
• Falling objects/pipes • Only competent rigger allowed to performed the job
• Struck by/hit by • Only qualified crane operator can Performed the job
• Crane overload • Ensure the ground pavement level properly
6 Lifting work (by means
• Inadequate access • Provide proper barricade
of crane)
• Crane overturning / Property • Provide proper signage
damage • Ensure clear visibility between rigger and crane operator
• Ensure outrigger pad is free of damage
• Mechanical failure
• Ensure proper sling position
• Uncontrolled movements of • Inspect lifting gear prior to use
lifted pipes/objects • Lifting gear must third party certified
• Improper communication bet. • Regular inspection of lifting equipment's prior to use
Crane operator and rigger • Lifting tackles must have a third party certified and valid
• Oil spill • Use PPE’s as per requirements
• Slip, trip • Don’t put hands in between two objects
• Pinch point • Ensure proper access
• Personal injury • Use two tag lines SITE ENGINEER / SAFETY
• Failure of lifting equipment • No people should stand beneath the lifted object OFFICER
• Collision of objects/pipes • Maintain safe distance from lifted objects
• Vision blocked • Be sure no overhead objects within boom range
• Caught in between • Crane load chart must strictly Followed
• Ensure lifted objects must be in proper
• Use wooden wedge block
• No person should stay within boom range
• Never sit stand, walk, work under suspended load
• Ensure no hydraulic leakage of crane
• Maintain safe distance from DSL cables box bar

SIFY INFINIT SPACES LIMITED SIRUSERI

JSA FOR LIFTING(CRANE)

4
Basic Job
Sequence Potential Hazard Control Measure Responsible Person
• Irregular inspection on all • Wire rope shall be provided properly identified for SWL
lifting tackles and manufacturer.
• Shackle improperly • Inspections shall be done by authorized personnel and by
7. chain block and maintained and inspected the safety department Shall keep the records.
rigging gear • Wear and tear of wire ropes • Safe working load stamp shall provide by the
• Mechanical failure manufacturer
• Chain block failure • Only trained persons may use electric or pneumatic tools.
• Over loading of chain block • Defective tools or equipment shall not Allowed to use
• Improper coordination • Ensure proper rigid mounting
• Falling of lifted pipes • Ensure to use PPE
• Collapse of loads • Stay away from lifted loads
• Collapse of rigid mounting • Lift the pipes slowly
• Personal injury • Provide sufficient access as possible
• Inadequate access • Be sure not to over load the capacity of chain block
SITE ENGINEER / SAFETY
• Property damages • Be sure not to over load the maximum strength of wire OFFICER
• Fall from height ropes
• Inspect chain blocks before use
• All chain blocks should be 3rd party certified
• Use two tag lines to control load movements
• Use fall protection if working at height
• Only qualified personnel allowed to do the job
• Barricade the area
• Provide proper signage
• all lifting tackles must be 3rd party certified

SIFY INFINIT SPACES LIMITED SIRUSERI

5
JSA FOR LIFTING(CRANE)

Basic Job
Sequence Potential Hazard Control Measure Responsible Person
• Arrange/ stage all the material in neat orderly manner.
Tripping Hazards • Remove damage, banding, crate material, nails etc. and
dispose of properly

• Provide trash for work areas means for maintaining.


• Waste disposal • All containers should be labelled
8. Housekeeping SITE ENGINEER / SAFETY
• Fire • Clean the spill area immediately, and reporting of incident and
OFFICER
• Slip, trip, Fall spillage.
• Crushed by EOT crane • Stay away from EOT crane.
• Maintain safe distance from live box bar

Prepared by: Reviewed by: Approved by: Date

Safety Officer Project Engineer Sify SafetyTeam 06/ 01 / 2024