RAIN AFTERMATH INSPECTION

Immediately make action to arrange the barricades and signages at site.

Saudi Aramco: Company General Use


RAIN AFTERMATH INSPECTION
Roads to be repaired, backfilled and compacted before use.

Saudi Aramco: Company General Use


RAIN AFTERMATH INSPECTION
Temporary power supplies, connections and other electrical units has been
inspected/maintained prior to re-energized by competent person.

Saudi Aramco: Company General Use


RAIN AFTERMATH INSPECTION
All rest shelters are secured against possible heavy winds. Shelters and
welfare facilities to be checked and maintained before using.

Saudi Aramco: Company General Use


RAIN AFTERMATH INSPECTION
Civil/Structural engineer inspect and approve the excavation before sending the workers
inside. Install and correct all barricade on site and excavations’-Pre-excavation and Daily
excavation checklist properly completed and made available onsite.

Saudi Aramco: Company General Use


RAIN AFTERMATH INSPECTION
Civil/Structural engineer inspect and approve the excavation before sending the workers
inside. Install and correct all barricade on site and excavations’-Pre-excavation and Daily
excavation checklist properly completed and made available onsite.

Saudi Aramco: Company General Use


RAIN AFTERMATH INSPECTION
1. Excavation Safety
✓ Materials, motor vehicles, cranes and heavy equipment shall be kept away from the edge of the deep
excavation.
✓ Hard barricades (e.g., concrete or water-filled plastic “jersey” barriers, metal fencing) shall be used to keep
motor vehicles, cranes and heavy equipment at the proper distance away from the excavation.
✓ Blinker lights and signs shall be in place.
✓ A documented inspection shall be performed by an excavation competent person before workers are allowed
to initially enter an excavation or after a change in site conditions.
✓ Follow SM Guide-06-002-2008 & CSM-II-1 for Excavation & Shoring Safety.

2. Electrical Safety
✓ Hand/power tools and personal ground cables shall be visually inspected by the user prior to each use.
✓ Make sure all electrical outlet, extension and panel board in secure area.
✓ All welding cables, extension cord, plug are in good condition. No damage and defect.
✓ Follow CSM III-3 Electrical Equipment

3. Traffic and Road Access.


✓ Right way of way shall be repair and safe to use.
✓ Precautions shall be implemented to prevent blocking of roadways or endangering other traffic.
✓ Access road and traffic flow shall be repair and Emergency response vehicle access shall be provided at all
times to all locations.
✓ Follow CSM I-8 Traffic and Vehicle Safety

Saudi Aramco: Company General Use


RAIN AFTERMATH INSPECTION
Contractor supervisors and safety officer make sure all items were rectified
and safe to be used, then workers can be allowed to use that location.