Professional Documents
Culture Documents
General Inspection
Finding 2
1. Grinder had not been inspected for the month of October..
2. There were no secure anchor points available inside the man lift#KAB001
3. IPAF trained man lift operator Hema Gurran 1793225 could not understand/ read when prompted the daily checks list or its contents.
4. Argon gas bottle observed unattended and not in use with no safety cap in place.
5. Steel bars where observed at the site without any safety caps in place.
6. General housekeeping in various areas of the site are of a poor standard.
Recommendation 1
Status: With Processor Assigned To: Abdulrahman Alsaleh (ALSAAA3D)
1. As Per CSM 11-11.3.10 Only properly insulated or nonconductive tools shall be used when work is performed on or near electrical
equipment. Insulation integrity shall be regularly inspected by an authorized/certified electrician.
2. As Per CSM 2 Mechanical And Heavy Equipment E. Personnel inside a manlift, whether operator or passenger, shall wear full body
harnesses and lanyards attached to the anchor point within the basket of the manlift.
3. As Per CSM 2 Mechanical and heavy equipment. 2.3.3 Pre-use inspections shall be conducted on all mechanical and heavy equipment.
at a minimum, prior to operating the equipment.
4. As Per CSM 9 Compressed Gas Cylinders 9.4.11 When regulators are removed from the cylinders, they shall be considered “not in use”
or “stored” and cylinder valve caps shall be put back in place.
5. As Per CSM 6 Concrete Construction. 6.5.1 All protruding reinforcing steel onto which employees could fall shall be guarded to
eliminate the hazard of impalement.
6. As Per CSM 4 Temporary Walking And Working Surfaces 4.3.3 Good housekeeping shall be maintained to help prevent slips, trips and
falls.