FOUR LANING WITH PAVED SHOULDER OF GAD OF LVUP SECTION FROM KM 53+600 (GOLA ON NH-320) AT CH. :- 54+375 (1x12M SPAN) DATE : JULY 2022 REV: R0 R0 JULY 2022 FOR APPROVAL TO KM 81+446 (ORMANJHI ON NH-320B) IN THE (SH:- 1 OF 2) DESIGNED DRAWN CHECKED APPROVED NATIONAL HIGHWAYS STATE OF JHARKHAND ON HYBRID ANNUITY MODE SS VS SM AM REV DATE DESCRIPTION A B C D AUTHORITY OF INDIA BARBRIK PROJECT LIMITED. CIVIL MANTRA INFRACON PVT. LTD. SCALE : AS SHOWN PAPER SIZE : A3 CLIENT: EPC CONTRACTOR : CONCESSIONAIRE : DESIGN CONSULTANT : PROJECT : DRAWING TITLE : INDEPENDENT ENGINEER : DRG. NO.CIPL/D-/STR/LVUP1/DWG/GAD/101 FOUR LANING WITH PAVED SHOULDER OF GAD OF LVUP SECTION FROM KM 53+600 (GOLA ON NH-320) AT CH. :- 54+375 (1x12M SPAN) DATE : JULY 2022 REV: R0 R0 JULY 2022 FOR APPROVAL TO KM 81+446 (ORMANJHI ON NH-320B) IN THE (SH:- 2 OF 2) DESIGNED DRAWN CHECKED APPROVED NATIONAL HIGHWAYS STATE OF JHARKHAND ON HYBRID ANNUITY MODE SS VS SM AM REV DATE DESCRIPTION A B C D AUTHORITY OF INDIA BARBRIK PROJECT LIMITED. CIVIL MANTRA INFRACON PVT. LTD. SCALE : AS SHOWN PAPER SIZE : A3