You are on page 1of 1

CLIENT: INDEPENDENT ENGINEER : CONCESSIONARE: EPC CONTRACTOR : DESIGN CONSULTANT : PROJECT : DRAWING TITLE :

Balancer Four Laning Work of Package -3 DRG. NO. D1041/CIPL/STR/DWG/MNB/ GAD/001


from Km 270.000 (near Shelad) GAD OF MINOR BRIDGE CH- 299+315
to Km 315.000 (Near Nandura) Section of DATE : APRIL 2020 REV: D0
APR 20 DRAFT
Amravati - Chikhli NH-6 in the state of DESIGNED DRAWN CHECKED APPROVED
D0
NATIONAL HIGHWAYS Maharashtra to be executed as Hybrid
REV DATE DESCRIPTION A B C D
MONTECARLO LIMITED MONTECARLO LIMITED CIVILMANTRA INFRACON PVT LTD. Annuity Project Under NHDP Phase IV. NS LS GS SK
AUTHORITY OF INDIA SCALE : AS SHOWN PAPER SIZE : A3

You might also like