DESIGN OF PRECAST PEIR CAP
0M SPAN
SPAN ARRANGEMENT

PIER CAP LENGTH mm


DESIGN PARAMETERS
Grade of concrete 50 MPa
Pre-stressing strands K15
Grade of prestressing strands 1861 Mpa
No of Cables 190
Total No of Strands 190
Elasticity of Strands 1.95E+05 Mpa
Type of strands Low Relaxation
Area of Each Strands 140 mm2
Slip length 6 mm
Cable Duct 19K15
k Wobble coefficent 0.002
υ Friction coefficent 0.17
No of strands Cab-1 19
Cab-2 19
Cab-3 19
Cab-4 19
Cab-5 19
Cab-6 19
Cab-7 19
Cab-8 19
Cab-9 19
Cab-10 19
Load corrosponding to 0.1% proof stress
0.765
(85% of breaking load)
Jacking Force Cab-1 3787 kN
Cab-2 3787 kN
Cab-3 3787 kN
Cab-4 3787 kN
Stage-1 Stressing Cab 3 & Cab 4
Modulus of Elasticity before application of SIDL
Precast PIER CAP Ecm(t) 35000
Cast in Situ Slab Ecm(t) 29082
madular ratio for composite PIER CAP 1.203
CREEP COEFFICIENT SIDL LOADING AT 14 DAYS
The Time PRECAST PIER CAST IN SITU
Infinity (100yrs) Girder Erection
Stressing CAP SLAB
t days 3.36E+04 14 21 35 14
t0 days 7 7 7 7 14
RH 50 50 50 50 40
Ac m2 0.71 0.71 0.71 0.71 0.71
P m 11.882 6.072 6.072 11.882 11.882
h0 m 119.5 119.5 119.5 119.5 119.5
fck 50 50 50 50 40
fcm Mpa 60 60 60 60 60
fcm0 Mpa 16.07143 16.07143 16.07143 16.07143 16.07143
Concrete type Normal Normal Normal Normal Normal
a 0 0 0 0 0
a1 0.80 0.8016 0.8016 0.8016 0.8016
a2 0.94 0.9388 0.9388 0.9388 0.9388
a3 0.85 0.8539 0.8539 0.8539 0.8539
a4 4 4 4 4 4
a5 0.12 0.12 0.12 0.12 0.12
t0_corr 6.99 7.0 7.0 7.0 7.0
bh 393 392.8 392.8 392.8 392.7
bc(t,t0) 0.997 0.297 0.364 0.444 0.297
f RH 1.70 1.70 1.70 1.70 1.86
b(fcm) 2.42 2.42 2.42 2.42 2.42
b(t0) 0.635 0.635 0.635 0.635 0.635
f0 2.62 2.62 2.62 2.62 2.86
f (t,t0) 2.61 0.78 0.95 1.16 0.85

SHRINKAGE
End of curring days 14 14.000 14.000 14.000 14.000
days at consideration days 33600 14 21 35 14
b RH 1.356 1.356 1.356 1.356 1.451
e cd0 04.861E-04 05E-04 05E-04 05E-04 05E-04
kh 0.971 0.971 0.971 0.971 0.971
b ds 0.998446452 0 0.118126215 0.286655569 0
e cd(t) 04.712E-04 00.0E+00 55.7E-06 01.4E-04 00.0E+00
fck 50 50 50 50 40
e ca 0.000075 0.000075 0.000075 0.000075 0.000055
b as(t) 0.527 0.527 0.527 0.527 0.527
e ca 3.95133E-05 3.95133E-05 3.95133E-05 3.95133E-05 2.89765E-05

e cs 05.1E-04 39.5E-06 95.3E-06 01.7E-04 29.0E-06


79.5E-06
RELAXATION LOSSES

Days at Consideration days 33600 14 21 35 14

Relaxation type Low Low Low Low Low


Cab UTS 4950.26 4950.26 4950.26 4950.26 4950.26
Cab Jack 3712.695 3712.695 3712.695 3712.695 3712.695
Initial Stress 0.75 0.75 0.75 0.75 0.75
Losses at 1000 hrs 2.5 2.5 2.5 2.5 2.5
Losses above 1000hrs 7.5 7.5 7.5 7.5 7.5
losses at hrs 806400 336 504 840 336
7.50 2.10 2.25 2.42 2.10
Relaxation losses at hrs 806400 336 504 840 336
% of jacking force 7.50 2.10 2.25 2.42 2.10

CONCRETE STRENGTH

Days under consideration


days 3.36E+04 14 21 35 14
Grade of Concrete Mpa 50 50 50 50 40
fcm Mpa 60 60 60 60 50
βcc (t) 1.27 0.90 0.96 1.03 0.90

fcm(t) Mpa 76 54 58 62 45
fck (t) Mpa 50 44 48 50 35
Ecm Mpa 35000 35000 35000 35000 30000
Ecm (t) Mpa 35000 33929 34596 35000 29082

fctm Mpa 3.48 3.48 3.48 3.48 3.00


fctm(t) Mpa 3.48 3.14 3.35 3.48 2.70
fctk Mpa 2.4 2.2 2.3 2.4 1.9
Sec1-1 Sec2-2 Sec3-3 Sec4-4 Sec5-5 Sec6-6 Sec7-7
Section Distance 0.000 1.000 2.000 3.000 4.000 5.000 6.000
Section Property for PIER CAP
Area m2 2.13 2.56 2.96 3.34 3.74 4.10 4.40
Ixx m4 0.07 0.13 0.20 0.30 0.43 0.60 0.76
ycg_TOP m 0.32 0.39 0.45 0.51 0.58 0.64 0.69
ycg_BOT m 0.32 0.39 0.47 0.54 0.62 0.71 0.79
Depth m 0.65 0.78 0.92 1.05 1.20 1.35 1.48
Section Property of Composite Section
Area m2 2.13 2.56 2.96 3.34 3.74 4.10 4.40
Ixx m4 0.07 0.13 0.20 0.30 0.43 0.60 0.76
ycg_deck top m 0.32 0.39 0.45 0.51 0.58 0.64 0.69
ycg_TOP gir m 0.32 0.39 0.45 0.51 0.58 0.64 0.69
ycg_BOT m 0.32 0.39 0.47 0.54 0.62 0.71 0.79
DEPTH m 0.65 0.78 0.92 1.05 1.20 1.35 1.48

Prestressing forces after fric and slip Losses:-


Total H (kN) 14088 14118 14165 14220 14274 14327 14379
V (kN) -585 -586 -514 -397 -279 -159 -39
ycg (M) 0.300 0.258 0.218 0.185 0.160 0.144 0.136

Stresses due to Prestressing Mpa


Stresses top 8.0 11.0 12.1 12.2 11.7 11.1 10.5
section cg 6.6 5.5 4.8 4.3 3.8 3.5 3.3
Cable cg 7 7 9 9 10 9 9
bottom 5.2 -0.1 -2.8 -4.1 -4.7 -5.0 -5.0

BM due to PIER CAP Selfweight kN-m 10 77 212 426 725 1114 1604
Stresses top -0.04 -0.23 -0.47 -0.73 -0.97 -1.19 -1.45
Cable cg 0.00 0.08 0.26 0.51 0.78 1.06 1.37
bottom 0.04 0.24 0.49 0.77 1.05 1.33 1.66
Combined Stresses immediately After Stressing (Suprior check considering 10% higher pre-stressing stress)
Stresses top 8.8 11.9 12.8 12.7 11.9 11.0 10.1
Sec1-1 Sec2-2 Sec3-3 Sec4-4 Sec5-5 Sec6-6 Sec7-7
Section Distance 0.000 1.000 2.000 3.000 4.000 5.000 6.000
cable cg 7.3 6.2 5.5 5.2 5.0 4.9 5.0
bottom 5.7 0.2 -2.6 -3.8 -4.2 -4.1 -3.8

Elastic Shortaining Losses


stress at cg of cables 7.27 6.16 5.52 5.19 4.98 4.90 4.97
strain 0.000214 0.000181 0.000163 0.000153 0.000147 0.000144 0.000146
stress loss in cables 2.09E+01 2E+01 2E+01 1E+01 1E+01 1E+01 1E+01
Total Force Loss 555.40 470.50 422.20 396.72 380.75 374.49 379.71
% Loss 3.94 3.33 2.98 2.79 2.67 2.61 2.64
Sec1-1 Sec2-2 Sec3-3 Sec4-4 Sec5-5 Sec6-6 Sec7-7
Section Distance 0.000 1.000 2.000 3.000 4.000 5.000 6.000
Cable Force after Elastic Shortaining Losses
H (kN) 13533 13648 13743 13823 13893 13953 13999
V (kN) -562.0536 -566.836 -498.8226 -385.71709 -271.101 -155.2259 -38.3429
ycg (kN) 0.300 0.258491 0.218053 0.1849394 0.16021 0.143865 0.136
Stress due to Pre-stress after Elastic Shortaning
Stresses top 8.03 11.03 12.09 12.20 11.72 11.09 10.49
section cg 6.60 5.52 4.79 4.26 3.82 3.49 3.27
Cable cg 6.71 7.36 8.56 9.32 9.53 9.38 9.07
bottom 5.17 -0.06 -2.76 -4.11 -4.74 -4.96 -4.98
Combined Stress after Elastic Shortaining
Stresses top 7.99 10.79 11.62 11.47 10.76 9.89 9.04
Cable cg 6.71 7.44 8.81 9.83 10.30 10.44 10.45
bottom 5.22 0.18 -2.28 -3.34 -3.69 -3.63 -3.32
Check for 10% higher pre-stressing force Safe Safe Safe Safe Safe Safe Safe
Sec1-1 Sec2-2 Sec3-3 Sec4-4 Sec5-5 Sec6-6 Sec7-7
Section Distance 0.000 1.000 2.000 3.000 4.000 5.000 6.000

Time Dependent Losses


Days from casting of concrete t 14 14 14 14 14 14 14
cg of cable σcp 6.71 7.44 8.81 9.83 10.30 10.44 10.45
strain at cg of cables εcg 0.00019 0.0002 0.0003 0.0003 0.0003 0.0003 0.0003
strain loss due to creep Δεcp 0.00019 0.00021 0.00025 0.00028 0.00029 0.00029 0.00029
Astrands * Cables *Es*Δεcp ΔP 959.61 1084.86 1285.56 1433.52 1502.84 1522.09 1523.53
Creep loss in, ΔP/P*100 % 6.81 7.68 9.08 10.08 10.53 10.62 10.60
Losses due to shrinkage εsh 9.53E-05 9.53E-05 9.53E-05 9.526E-05 9.53E-05 9.53E-05 9.53E-05

Shrinkage loss in force, Astrands *


kN
Cables *Es*Δεsh
494.09 494.09 494.09 494.09 494.09 494.09 494.09
Sec1-1 Sec2-2 Sec3-3 Sec4-4 Sec5-5 Sec6-6 Sec7-7
Section Distance 0.000 1.000 2.000 3.000 4.000 5.000 6.000
Shrinkage loss in % 3.51 3.50 3.49 3.47 3.46 3.45 3.44
Losses due to Relaxation % 2.25 2.25 2.25 2.25 2.25 2.25 2.25
Losses in Force, kN 317 318 319 320 321 323 324
Total Loss in % 12.57 13.44 14.82 15.81 16.24 16.32 16.28

COMBINED CAB FORCES AFTER TIME DEPENDENT LOSSES (AND 10% REDUCTION IN CABLE FORCE)
H kN 11085 10999 10859 10775 10760 10790 10834
V kN -460 -457 -394 -301 -210 -120 -30
Stresses due to pre-stressing
top 6 9 10 10 10 9 9
cable cg 5 3 0 -1 -2 -3 -4
bottom 4 0 -2 -4 -4 -5 -5

Precast Girder Erection kn-m 0 221 1692 3164 4636 7507 10451
Addisional loads kn-m 0 0 0 0 0 0 0
Stresses due to Girder top 0.00 -0.67 -3.76 -5.42 -6.17 -8.04 -9.46
cable cg 0.00 0.44 1.82 1.96 1.72 1.81 1.86
bottom 0.00 0.68 3.88 5.71 6.69 8.94 10.80
Combined Stresses During girder erection
top 6.30 7.87 5.41 3.61 2.39 -0.05 -2.05
cable cg 5.11 3.28 2.47 1.17 0.02 -0.32 -0.36
bottom 4.09 0.69 1.87 2.82 3.42 5.61 7.61
Stress Check during deck casting Safe Safe Safe Safe Safe Safe Safe
Sec1-1 Sec2-2 Sec3-3 Sec4-4 Sec5-5 Sec6-6 Sec7-7
Section Distance 0.000 1.000 2.000 3.000 4.000 5.000 6.000

Time Dependent Losses Between 14 to 35 days


Creep ceff. 1.16 - 0.95 = 0.21
shrinkage strain loss 9.53E-05 - 0.000175 = -7.95E-05
Relaxation losses % 2.25 - 2.42 = 1.68E-01
creep strain loss εcreep 3.05E-05 1.83E-05 1.62E-05 1.763E-05 1.95E-05 2.98E-05 4.01E-05
shrinkage strain loss εshrink -7.95E-05 -7.95E-05 -7.95E-05 -7.953E-05 -8E-05 -7.95E-05 -8E-05
Total Strain Loss εcg -4.91E-05 -6.13E-05 -6.34E-05 -6.189E-05 -6E-05 -4.97E-05 -3.9E-05
Force Loss εcg*Es*As -254.4644 -317.8447 -328.6531 -321.03683 -311.216 -257.7975 -204.765
Relaxation losses H (kN) 23.62062 23.67132 23.7492 23.841985 23.93284 24.02175 24.10869
Total Force Loss -231 -294 -305 -297 -287 -234 -181
Stage-1 % Loss -1.639 -2.084 -2.153 -2.090 -2.013 -1.632 -1.256
Change in stress due to losses
Stresses top-gir 1.00 0.89 0.68 0.51 0.38 0.25 0.16
top-gir 1.00 0.89 0.68 0.51 0.38 0.25 0.16
cg -0.93 -0.59 -0.33 -0.18 -0.11 -0.06 -0.03
bottom -1.01 -0.90 -0.70 -0.54 -0.41 -0.28 -0.19

Prestressing forces after fric and slip Losses( Stage-2):-

Total H (kN) 21132.0 21177.4 21247.0 21330.1 21411.3 21490.9 21568.7


V (kN) -877.7 -879.6 -771.2 -595.2 -417.8 -239.1 -59.1
ycg (M) 0.300 0.258 0.218 0.185 0.160 0.144 0.136

Stresses due to Prestressing stg-2 (Mpa)


Stresses top 12.0 16.5 18.1 18.3 17.6 16.6 15.7
PIER CAP top 12.0 16.5 18.1 18.3 17.6 16.6 15.7
section cg 9.9 8.3 7.2 6.4 5.7 5.2 4.9
Cable cg 10 11 13 14 14 14 14
Sec1-1 Sec2-2 Sec3-3 Sec4-4 Sec5-5 Sec6-6 Sec7-7
Section Distance 0.000 1.000 2.000 3.000 4.000 5.000 6.000
bottom 8 0 -4 -6 -7 -7 -7

Elastic Shortaining Losses for Stage-1 Cables due to Stage-2 Cables

stress at cg of cables stg-1 10 11 14 15 16 17 17


strain 0.000297 0.000332 0.000401 0.0004523 0.000483 0.000496 0.0005
stress loss in cables 2.89E+01 3E+01 4E+01 4E+01 5E+01 5E+01 5E+01
Total Force Loss 769.24 861.41 1038.92 1172.99 1252.02 1285.70 1296.06
Elastic Shortaining Losses for Stage-2 Cables due to Stage-2 Cables
avg strain 0.000148 0.000163 0.000189 0.0002061 0.000211 0.000207 0.000201
stress loss in cables 1.45E+01 2E+01 2E+01 2E+01 2E+01 2E+01 2E+01
Total Force Loss 384.42 421.79 490.48 534.49 546.14 537.58 520.15

Total Elastic Shortaining Losses due to Stage 2 Stressing


Total Loss in Cables Force kN -1154 -1283 -1529 -1707 -1798 -1823 -1816
cg of combined stg-1 & stg-2 Cables 0.30 0.26 0.22 0.18 0.16 0.14 0.14
Stress Due to Elastic Shortaning Losses
Stresses top -deck
top-gir -0.5 -0.5 -0.5 -0.5 -0.5 -0.4 -0.4
cg -1 -1 -1 -1 -1 -1 -1
bottom -0.66 -1.03 -1.39 -1.60 -1.68 -1.68 -1.64
Stress Check Immidietly after stg-2 stressing ( Suprior cable forces 10% higher)
Stresses
PIER CAP top 19.004 25.559 24.844 23.224 21.252 17.800 14.857
cg 15 12 9 7 5 4 4
bottom 11.97 -0.44 -4.07 -5.57 -6.09 -4.25 -2.25
PROVIDE PROVIDE PROVIDE PROVIDE
Check for Min stress Safe Safe REINF REINF REINF REINF Safe
chk Conc chk Conc
Check for Maximum stress Safe Grade Grade Safe Safe Safe Safe
Sec1-1 Sec2-2 Sec3-3 Sec4-4 Sec5-5 Sec6-6 Sec7-7
Section Distance 0.000 1.000 2.000 3.000 4.000 5.000 6.000
Stress Check Immidietly after stg-2 stressing (Infrior cable forces 10% lower forces)
Stresses top -deck
PIER CAP top 16.595 22.251 21.216 19.565 17.734 14.474 11.709
cg 13 10 8 6 4 3 3
bottom 10.42 -0.42 -3.25 -4.33 -4.67 -2.76 -0.76
Check for Min stress Safe Safe Safe PROVIDE PROVIDE Safe Safe
Check for Maximum stress Safe Safe Safe Safe Safe Safe Safe

RCC deck kN-m 0 173 1325 2476 3628 5198 7406


Stresses
top-gir 0.00 -0.52 -2.94 -4.24 -4.83 -5.57 -6.70
Cable cg 0.00 0.35 1.42 1.53 1.34 1.25 1.32
bottom 0.00 0.53 3.04 4.47 5.23 6.19 7.66

BM due to Surfacing kN-m 0 30 230 430 630 1020 1420


BM due to Surfacing x 1.2 kN-m 0 36 276 516 756 1224 1704
Stresses due to Surfacing
gir-top 0.00 -0.11 -0.61 -0.88 -1.01 -1.31 -1.54
cg 0.00 0.07 0.30 0.32 0.28 0.30 0.30
bottom 0.00 0.11 0.63 0.93 1.09 1.46 1.76
Combined Stresses: After Application of surfacing and Crash Barrier

top -gird 16.60 21.62 17.66 14.44 11.90 7.60 3.46


cg 13.48 10.47 9.67 7.54 5.43 4.52 4.25
bottom 10.42 0.22 0.43 1.07 1.66 4.89 8.66
Sec1-1 Sec2-2 Sec3-3 Sec4-4 Sec5-5 Sec6-6 Sec7-7
Section Distance 0.000 1.000 2.000 3.000 4.000 5.000 6.000
Stage-1 Cables
Time Dependent Losses Between 43200 to 35 days
Creep ceff. 2.61 - 1.16 = 1.45
shrinkage strain loss 0.000511 - 0.000175 = 3.36E-04
Relaxation losses % 7.50 - 2.42 = 5.08 %
creep strain loss εcreep 8.03E-05 6.24E-05 5.76E-05 4.493E-05 3.24E-05 2.69E-05 2.53E-05
shrinkage strain loss εshrink 3.36E-04 3.36E-04 3.36E-04 3.4E-04 3.4E-04 3.36E-04 3.4E-04
Total Strain Loss εcg 4.16E-04 0.000398 0.000394 0.0003808 0.000368 0.000363 0.000361
Force Loss εcg*Es*As 409 391 387 374 362 357 355
Relaxation losses H (kN) 716 717 720 722 725 728 731
Total Force Loss 1125 1109 1106 1097 1087 1084 1085
% Loss Stage -1 7.98 7.85 7.81 7.71 7.62 7.57 7.55
Stage-2 Cables
Time Dependent Losses Between 43200 to 0 days
Creep ceff. 2.61 - 1.16 = 1.45
shrinkage strain loss 0.000511 - 0.000175 = 3.36E-04
Relaxation losses % 7.50 - 0.00 = 7.50 %
creep strain loss εcreep 8.03E-05 6.24E-05 5.76E-05 4.493E-05 3.24E-05 2.69E-05 2.53E-05
shrinkage strain loss εshrink 3.36E-04 3.36E-04 3.36E-04 3.4E-04 3.4E-04 3.36E-04 3.4E-04
Total Strain Loss εcg 4.16E-04 0.000398 0.000394 0.0003808 0.000368 0.000363 0.000361
Force Loss εcg*Es*As 409 391 387 374 362 357 355
Relaxation losses H (kN) 1057 1059 1062 1067 1071 1075 1078
Total Force Loss 1466 1450 1449 1441 1432 1431 1433

Change in stress due to Losses at 100 yrs


Stresses
top-gir -1.25 -1.14 -1.05 -0.97 -0.89 -0.82 -0.78
cg -1.18 -0.91 -0.77 -0.68 -0.62 -0.57 -0.53
bottom -1.18 -0.86 -0.67 -0.54 -0.44 -0.38 -0.34
Sec1-1 Sec2-2 Sec3-3 Sec4-4 Sec5-5 Sec6-6 Sec7-7
Section Distance 0.000 1.000 2.000 3.000 4.000 5.000 6.000

COMBINED STRESSES AFTER


LONG TERM LOSSES top -gird 15.35 20.48 16.61 13.48 11.01 6.77 2.68
WITHOUT LIVE LOAD cg 12.30 9.56 8.90 6.86 4.82 3.95 3.72
bottom 9.24 -0.64 -0.24 0.53 1.21 4.51 8.32
Stress Check for long term withoul LL Safe Safe Safe Safe Safe Safe Safe

Stresses due to shrinkage


stresses Top -deck Comp 0.00 0.00 0.00 0.00 0.00 0.00 0.00
bottom-Tens 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Stresses due to thermal stress ENV
stresses Top -deck Comp 0.00 0.00 0.00 0.00 0.00 0.00 0.00
bottom-Tens 0.00 0.00 0.00 0.00 0.00 0.00 0.00

STRESSES UNDER SERVICE STAGE AT LONG TERM


BM due to LL kN-m 0 72 553 1034 1513 2543 3603
Stresses due to LL
top -gird 0.00 -0.22 -1.23 -1.77 -2.01 -2.72 -3.26
cg 0.00 0.14 0.59 0.64 0.56 0.61 0.64
bottom 0.00 0.22 1.27 1.87 2.18 3.03 3.72
Rare Combination (stress with LL in Long term +1.0 LL+ 0.6 temp+shrinkage)
Sec1-1 Sec2-2 Sec3-3 Sec4-4 Sec5-5 Sec6-6 Sec7-7
Section Distance 0.000 1.000 2.000 3.000 4.000 5.000 6.000

top -gir 15.35 20.27 15.38 11.71 8.99 4.05 -0.58


bottom 9.24 -0.42 1.03 2.39 3.40 7.54 12.05
Check for Min stress Safe Safe Safe Safe Safe Safe Safe
Check for Maximum stress Safe Safe Safe Safe Safe Safe Safe
Frequent Combination (stress with LL in Long term +0.75 LL+ 0.5temp+1.0 shrinkage)

top -gir 15.35 20.32 15.69 12.15 9.50 4.73 0.24


bottom 9.24 -0.48 0.71 1.93 2.85 6.78 11.12
Stress Check Safe Safe Safe Safe Safe Safe Safe
Quasi Parmanent Combination (stress without LL in Long term +0.0 LL+ 0.5temp+1.0 shrinkage)

top -gir 15.35 20.48 16.61 13.48 11.01 6.77 2.68


bottom 9.24 -0.64 -0.24 0.53 1.21 4.51 8.32
Stress Check Safe Safe Safe Safe Safe Safe Safe
Summary of Loads for Critical Load at diff Position as per Staad Results
Section Sec1-1 Sec2-2 Sec3-3 Sec4-4 Sec5-5 Sec6-6 Sec7-7
Distance, meter 0.000 1.000 2.000 3.000 4.000 5.000 6.000
Cap Selfweight BM 10 77 212 426 725 1114 1604
SF 35 99 174 255 343 438 541

Girder Selfweight BM 0 221 1692 3164 4636 7507 10451


SF 0 1472 1472 1472 1472 2944 2944

RC Deck Slab BM 0 114 870 1625 2381 3555 5367


SF 0 756 756 756 756 1512 1512

Crash Barrier BM 0 59 455 851 1247 1643 2039


SF 0 396 396 396 396 396 396

Finishing BM 0 30 230 430 630 1020 1420


SF 0 200 200 200 200 400 400
LL ( with Impact and Centrifugal Forces)
LL Max BM ENV BM 0 72 553 1034 1513 2543 3603
LL Max SF ENV SF 0 480 480 480 480 1060 1060
Load Combinations ULS-Basic SLS_Rare SLS-Freq. SLS-quasi
DL 1.35 1 1 1
SIDL_Per 1.35 1 1 1
SIDL_Surf 1.75 1.2 1.2 1.2
Live Load 1.5 1 0.75 0
Temp 0.9 0.6 0.5 0.5
Shrikage 0 1 1 1

ULS-BASIC LOAD COMBINATION

Section L0 Tps Tpe L/8 2L/8 3L/8 4L/8


Dist, mm 0 1000 2000 3000 4000 5000 6000
BM 13.5 812.3 5716.3 10725.2 15848.5 24657.9 34623.0
SF -1290.8 3518.6 3790.9 4169.8 4556.7 9130.8 9540.2
Flexural Capacity
Limit state of concrete 0.0035 0.0035 0.0035 0.0035 0.0035 0.0035 0.0035
Limit state of steel εuk 0.035 0.035 0.035 0.035 0.035 0.035 0.035
Design Limit state of steel εud 0.0315 0.0315 0.0315 0.0315 0.0315 0.0315 0.0315
Pre-strain 0.00715 0.00715 0.00715 0.00715 0.00715 0.00715 0.00715
Modulus of Elasticity 3.50E+04 3.39E+04 3.46E+04 3.50E+04 2.91E+04 0.00E+00 0.00E+00
Permissible stress in con 22 22 22 22 22 22 22
Permissible stress in strands 1617 1617 1617 1617 1617 1617 1617
Area of single strands mm2 140 140 140 140 140 140 140
For steel strain in limit state
Depth of NA mm 725 725 725 725 725 725 725
No of Strands 190 190 190 190 190 190 190
fy Mpa 1861 1861 1861 1861 1861 1861 1861
.87fy Mpa 1619.07 1619.07 1619.07 1619.07 1619.07 1619.07 1619.07
Total Ultimate Tension ForcekN 43067 43067 43067 43067 43067 43067 43067
deff mm 1295 1337 1377 1410 1435 1451 1459
fck 50 50 50 50 50 50 50
εc2 0.002 0.002 0.002 0.002 0.002 0.002 0.002
Concrete Compression ForcekN 43067 43067 43067 43067 43067 43067 43067
Net Section Force kN 0 0 0 0 0 0 0
Maximum strain concrete kN 0.0036 0.0036 0.0036 0.0036 0.0036 0.0036 0.0036
strain in steel 0.003 0.003 0.003 0.003 0.004 0.004 0.004
Tenstion fialure mode
MU
Cable kN-m 42657 44445 46187 47613 48678 49382 49725
Ultimate moment Capacity kN-m 42657 44445 46187 47613 48678 49382 49725
M/Mu <1 0.0003 0.0183 0.1238 0.2253 0.3256 0.4993 0.6963
Check Capacity Safe Safe Safe Safe Safe Safe Safe

Ultimate Shear Capacity


1) Uncracked Shear Capacity of Section
S [mm3] 0.17 0.25 0.33 0.43 0.55 0.67 0.79
I_gross [mm4] 0.074 0.129 0.203 0.299 0.433 0.597 0.763
bwc (duct dia deducted) [mm] 433.3 433.3 433.3 433.3 433.3 433.3 433.3
fck [Mpa] 50 50 50 50 50 50 50
fctd [Mpa] 2.44 2.44 2.44 2.44 2.44 2.44 2.44
fcd [Mpa] 22.33 22.33 22.33 22.33 22.33 22.33 22.33
scp <=0.2*D72 [Mpa] 12.30 9.56 8.90 6.86 4.82 3.95 3.72
tc [Mpa] 5.99 5.41 5.26 4.76 4.20 3.95 3.87
VRD [kN] 1119 1215 1381 1429 1440 1514 1626
Check Safe Shear Link to be Shear
provided
Link to be provided
Shear Links Shear Link Shear LinkShear Link to be provided
2) Cracked Capacity of Section
bwc [mm] 433.3 433.3 433.3 433.3 433.3 433.3 433.3
d [mm] 1295 1337 1377 1410 1435 1451 1459
Ast (anchored beyond length[mm2]
lbd+d) 26600 26600 26600 26600 26600 26600 26600
Ac [mm2] 561166.6667 579154.088 596677 611026 621742 628825 632275
fck [Mpa] 50 50 50 50 50 50 50
K 1.39 1.39 1.38 1.38 1.37 1.37 1.37
scp [Mpa] 12.30 9.56 8.90 6.86 4.82 3.95 3.72
ρ 0.0200 0.0200 0.0200 0.0200 0.0200 0.0200 0.0200
tc [Mpa] 1.047 1.034 1.021 1.011 1.004 0.999 0.997
0.15scp [Mpa] 1.84 1.43 1.33 1.03 0.72 0.59 0.56
V.Rd.c [kN] 1623 1429 1406 1246 1073 1001 983

Net Shear Capacity [ kN] 1119 1215 1381 1246 1073 1001 983

Net Design Shear Force -1290.84 3518.61 3790.87 4169.77 4556.65 9130.81 9540.23

Shear Force to be resisted


by sttirups kN -2410 2304 2410 2924 3483 8130 8557
Hence Shear Reinforcement to be provided

z mm 1166 1203 1239 1269 1291 1306 1313


s mm 200 100 100 100 100 100 100
bar dia 12 12 12 12 16 16 16
no of legs 12 12 12 12 12 12 12
fywd Mpa 435 435 435 435 435 435 435
Asw mm2 1356 1356 1356 1356 2412 2412 2412
VRd.s kN 3437 7094 7309 7485 13539 13693 13769
> -2410 2304 2410 2924 3483 8130 8557
Safe Safe Safe Safe Safe Safe Safe
DESIGN OF ANCHORAGE ZONE
Type of Anchor 19K15
B (base plate) 300 mm
D (base plate) 300 mm
NO OF STRANDS 19
Strands Area 140 mm2
Strands UTS 1861 Mpa
duct diameter 94 mm
% Jacking force of UTS 76.5 %
Jacking Force 3787 kN
Grade of Concrete M 50
Stressing Time from Concreting 21 days
Cement Type Coeff "S" Normal=.25,
Rapid setting=.20, Slow setting=.38 0.25
Nominal Strength of Concrete at Time of Stressing 57.72 N/mm2
base plate Area 90000
Duct Area 6936.26 mm2
Net Area 83063.74 mm2
Jacking Force 3762 kN
Design Jacking Force 4166 (10% higher)

Area at Bearing Plate, Aco 90000 mm2


Width of Girder at diaphragm 500.0 MM
Min Distance b/w Cables 350.0 mm
Edge Distance in verti 175.0 mm
Area at Dispersion, Acl 175000.0 mm2
Permissible Bearing Stress CL. 16.1.3 IRC112 -2019fcd.(Acl/Aco)^.50 < 3f cd
fcd .67/yc 25.8
yc 1.5
Permissible Bearing Stress 36.0 N/mm2
Jacking Force (10% higher) 4165643.8 N
Bearing Stress 33.6 N/mm2
Check for Bearing stress Safe
Pk 4950.3 kN
YPO 150 mm
Y0 250 mm
YPO/ Y0 0.60
Fbst/Pk 0.230
Fbst 1139 kN

Ast Req =Fbst/0.87/fy


Ast Req mm2 2617
Pitch mm 45
Dia mm 20
Length mm 450
NO OF TURNS 11
Ast provided mm2 3140
> 2617 Safe