The document provides drawings and details for the construction of Abutment A1 for a major bridge along the 4-laning of NH-6 from Km 166.000 to Km 360.000 in Maharashtra, India. Specifically, it includes dimension and reinforcement details for Abutment A1 located at chainage 273.075 of the highway expansion project, which is being executed as a BOT toll project under India's National Highways Development Project Phase III. The drawings are dated March 2020.
The document provides drawings and details for the construction of Abutment A1 for a major bridge along the 4-laning of NH-6 from Km 166.000 to Km 360.000 in Maharashtra, India. Specifically, it includes dimension and reinforcement details for Abutment A1 located at chainage 273.075 of the highway expansion project, which is being executed as a BOT toll project under India's National Highways Development Project Phase III. The drawings are dated March 2020.
The document provides drawings and details for the construction of Abutment A1 for a major bridge along the 4-laning of NH-6 from Km 166.000 to Km 360.000 in Maharashtra, India. Specifically, it includes dimension and reinforcement details for Abutment A1 located at chainage 273.075 of the highway expansion project, which is being executed as a BOT toll project under India's National Highways Development Project Phase III. The drawings are dated March 2020.
4-laning of Amravati to Chickle Section of DRG. NO. CIPL/D1033/MJBR/STR/DWG/201 (SH. 1 OF 3)
NH-6 from Km 166.000 to Km 360.000 DIMENSION AND REINFORCEMENT DETAIL (Package-I) in the state of Maharashtra OF ABUTMENT-A1 FOR MAJOR BRIDGE @ DATE : MARCH 2020 REV: R0 to be executed as BOT (Toll) project CH.: 273.075 (CA DESIGN CH.: 273.069) CHECKED APPROVED R0 MARCH 20 DESIGNED DRAWN on DBFOT pattern under NHDP Phase III REV DATE DESCRIPTION A B C D NS LS GS SK SCALE : AS SHOWN PAPER SIZE : A3 CLIENT: INDEPENDENT ENGINEER : CONCESSIONARE: EPC CONTRACTOR : DESIGN CONSULTANT : PROJECT : DRAWING TITLE : 4-laning of Amravati to Chickle Section of DRG. NO. CIPL/D1033/MJBR/STR/DWG/201 (SH. 3 OF 3) NH-6 from Km 166.000 to Km 360.000 DIMENSION AND REINFORCEMENT DETAIL (Package-I) in the state of Maharashtra OF ABUTMENT-A1 FOR MAJOR BRIDGE @ DATE : MARCH 2020 REV: R0 to be executed as BOT (Toll) project CH.: 273.075 (CA DESIGN CH.: 273.069) CHECKED APPROVED R0 MARCH 20 DESIGNED DRAWN on DBFOT pattern under NHDP Phase III REV DATE DESCRIPTION A B C D NS LS GS SK SCALE : AS SHOWN PAPER SIZE : A3 A2
Project Name Switchgear Name Panel Type Document Title Ekc Dwg. No. Total Sheet:::::: 11039-0-LPL-06 5 Bahregan Storage Tanks Development IRP/23, SS1/IRP/23, SS2/IRP/23
Project Name Switchgear Name Panel Type Document Title Ekc Dwg. No. Total Sheet:::::: 11039-0-LWD-08 54 Bahregan Storage Tanks Development IRP/23, SS1/IRP/23, SS2/IRP/23
(Bible in History - La Bible Dans L'histoire 8) John T. Willis - Yahweh and Moses in Conflict - The Role of Exodus 4-24-26 in The Book of Exodus-Peter Lang International Academic Publishers (2010)